HomeMy WebLinkAboutContract 43846 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No. LI LC -
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Name: Sun Valley Industrial Park, L.P.
Address, State, Zip Code: 5301 Sun Valley Drive, Fort Worth, TX 76119
Phone, E-Mail: (817) 572-2250/Sandra@empireroofmg.com
Authorized Signatory/Title: Sandra McGlothlin
Project Name: Sun Valley Industrial Park
Project Location: Marie Jones Road @ Sun Valley Drive
Plat Case No.: FP-011-021 Plat Name: Sun Valley Industrial Park
Mapsco: 93 J & K
Council District: 5 City Project No: 01798
CFA: 2012-051 DOE: 6733
To be completed by taff
Received by: Q.} itypyje
OFFICIAL RECORD
CITY SECRETARY
rrn WORTH, T1(
1
Date: 10131 la.
11-05-12 PO4:20 IN
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) _X_,
Sewer (A-1) )1_, Paving (B) _X_, Storm Drain (B-1) , Street Lights &
Signs (C) LC .
E. The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perfonlin
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
m the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting. The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement
L The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers. servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or m any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
injuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers, servants, or
employees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and stoi i drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's fmancial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Sun Valley Industrial Park
CFA No.: 2012-051 DOE No.: 6733
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TRW Construction
1 Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$
226,157.00
113,450.00
$ 339,607.00
$
$
472,330.00
$ 35,135.00
$ 507,465.00
$ 847,072.00
$
$
$
6,792.14
6,792.14
13,584.28
18,893.20
9,446.60
1,405.40
29,745.20
43,329.48
Amount
847,072.00
847, 072.00
424,508.75
634,331.25
1,058,840.00
Choice
(ck one)
Development Engineering Manager
A 'proved ' . to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. Al/Q.--
Date:
ATTEST:
r
Mary J. Kayser
City Secretary
ATTEST:
Signature
(Print) Name: Ettlisiv) ilt
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has execute this
instrument in quadruplicate, at Fort Worth, Texas this day of
CITY OF FORT WORTH - Recommended by:
Water Department
ita\ !)ILL
Transportation & Public Works Department
Wendy Chi- abulal, EMBA, P.E. Dougs W. Wiersig, P.E.
Director
Approved by City Manager's Office
J
Fernando Costa
Assistant City Manager
.pp�p'al1'btl
40:4 9,144:04%
O�4 p OCIP ek
0 0 ni rt
0 t? lea
lod ��cte
�a00000�� 0 4irct
13-ti:anti-Tfr
Sun Valley Industrial Park, L.P.
By its General Partner
McGlothlin Equities, L.L.C.
9
vii-Acom
Print Name:
•
Signature
Sandrta Me4iethillo
Title: Masta3tr
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH,'
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
►1
//
0
1
gi
In
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
cj
oci
1
24
BLOCK 1
2
EXHIBIT A - WATER
LOTS 1-28, BLOCK 1
SUN VALLEY
INDUSTRIAL PARK
'NA
/' vv/i.
1
DAVID STRICK[AND DRIVE
BLOCK 1
2
7 6
5
12" WL/L
8 9
15
16
3
VESrA FARLEY ROAD
BLOCK 1
10
11
14 13 12
12" WL/L
SUN VALLEY DRIVE
17
BLOCK 1
18
19
23 22 21 20
11111111111110
12" WL/L
KALTENBRUN ROAD
25
BLOCK 2R
BRIARVI000 ADON.
VOL 388-176, PO. 92
P.R.T.C.T.
26 27
28
"1y/L
£
•
J
4
1
40
39
VESTA FALUEY RD.
1 2
c
nto
-!— _ 3" Wit
' SUN VALLEY DR.
1
2
t.J
40 39
8 Y /L
KAWXENBRUN RD.
2
40 39
SD Engineering, Inc.
Site Development Engineering
PO Box 1357 Aledo, TX 76008-1357
(817) 441-6400 Fax (817) 441-6085
TEXAS REGISTERED ENGINEERING FIRM F-7643
TEXAS REGISTERED SURVEYING FIRM 10095800
II 11111 11111 11111 1111 II 11 1 II
SD Engineering, Inc.
Site Development Engineering
Opinion of
Probable Cost
P roject: Sun Valley Industrial Park
Owner: Sun Valley Industrial Park
S ubject: Water Facilities
Item Description
1 2" PVC Water Line (CL 200)
2 12" Water Line (DR 14)
3 Abandon Exist. 2" W/L-David Strickland Rd
4 2' X12" Tapping Tee and Valve with
Cast Iron Box & Lid
5 12" Gate Valve with Cast Iron Box & Lid
6 6" Gate Valve with Cast Iron Box & Lid
7 Fire Hydrant (incl 6" W/L as needed)
8 1" Water Service,'ncl Class A Meter Box
9 12" W/L Fittings, Inc' Poly Wrap & Blocking
10 HMAC Pavement Repair
11 Cone Pavement Repair
12 Trench Safety System (depth>5')
13 Traffic Control
14 Erosion Control
Quantity
60.00
3,020.00
1.00
2.00
Unit
LF
LF
EA
EA
6.00 EA
3.00 EA
3.00 EA
28.00 EA
3.50 TN
1,800.00 LF
55.00 LF
3,020.00 LF
1.00 EA
1.00 EA
P roject No.: 040902
P repared By: EAC
Date:
Revised
Revised
Unit Price
10
34.00
200.00
800.00
2,200.00
890.00
2,600.00
750.00
4,700.00
31.00
41.00
0.10
500.00
1,100.00
07/2012
07/26/12
09/07/12
Amount
600
102,680
200
1,600
Sub -Total $
Contingencies
Engineering
Other*
Total $
13,200
2,670
7,800
21,000
16,450
55,800
2,255
302
500
1,100
226,157
226,157
Page 1 of 5
P.O. Box 1357
Aledo, TX 76008-1357 Texas Firm F-7643
Phone: 817.441.6400
Fax: 817.441.6085
11S11111111111111111011111111111S111111111 Lill! III i
w
Imo
2
SI$1'. 3
14ATE)
24
BLOCK 1
EXHIBIT Al- WASTEWATER
LOTS 1-28, BLOCK 1
SUN VALLEY
INDUSTRIAL PARK
1
111
DAVID B7fIICQAID DIIR
*MUM MIPMEI off®
8" SANITARY SEWER
BLOCK 1
2 3
7 6 5 4
ki SANITARY SEWER
8
15
18
t
40
30
VESTA PARLEY ROAD ICA FARM f1D.
BLOCK 1
9 10
14
13
SIN VALLEY DRIVE
11
12
" SANITARY SEWER
BLOCK 1
17 18
23 22
21
EALTINBRIN ROAD
1
44
40 30
BUN VA]ZY Dt,-
1 2
40 39
fm.
.a15f.
rTh
8" SANITARY SEWER
25 26 27
ui
vi
19
20
1
1
28
BLOCK 2R
BRIARMOOD ADON.
VOL 3E8-170, Pas D2
PRTC.T.
a0
i
40 39
MD1IDas >m.
EXIST. 6"
SD Engineering, Inc.
PO Box 1357 Aledo, TX 76008 13570
(817) 441-6400 Fax (817) 441-6085 oN
TEXAS REGISTERED ENGINEERING FIRM F-7643
TEXAS REGISTERED SURVEYING FIRM 10095800
Site Development Engineering
0
Copyright CO 2012 SD Engineering, Inc.
P roject: Sun Valley Industrial Park
Owner: Sun Valley Industrial Park
S ubject: Sanitary Sewer Facilities
Item
1
SD Engineering, Inc.
Site Development Engineering
Opinion of
Probable Cost
Description
8" Sanitary Sewer Line (Various Depths)
(includes Post Construction TV)
2 4' Dia. Manhole, incl conc collar & inserts
(includes MH Vacuum Testing)
3 Extra Depth Manhole (>6')
4 Abandon & Remove Exist Private SS Line
5 • 4' SS Service, incl tap & Cleanout
6 Trench Safety System (depths > 5')
7 HYMAC Pavement Repair
8 Traffic Control
9 Erosion Control
Quantity
2,200.00
Unit
LF
10.00 EA
14.00
1.00
28.00
2,200.00
700.00
1.00
1.00
VF
EA
EA
LF
LF
EA
EA
P roject No.:
040902
P repared By: EAC
Date:
Revised
Revised
Unit Price
23.00
2,200.00
200.00
1,350.00
400.00
1.00
31.00
500.00
1,100.00
07/2012
09/07/12
10/09/12
Amount
50,600
Sub -Total $
Contingencies
Engineering
Other*
Total $
22,000
2,800
1,350
11,200
2,200
21,700
500
1,100
113,450
113,450
Page 2 of 5
P.O. Box 1357
Aledo, TX 76008-1357 Texas Firm F-7643
Phone 817.441.6400
Fax: 817.441.6085
1
24
BLOCK 1
2
EXHIBIT B - PAVING
LOTS 1-28, BLOCK 1
SUN VALLEY
INDUSTRIAL PARK
1
8 GONG. F VMT
1
7
8
15
i
DAVID STRICKLAND DRIVE
BLOCK 1
2
6 5
8" HMAC PVMT
VEST, L FARLEY MAD
3
MY /OS
4
8" kONC. bVMT
9
BLOCK 1
10
1
14 13 12
8" HMAC PVMT
SUN VALLEY DRin
16
BLOCK 1
17 18
19
23 22 21 20
8" -IMAC PVMT
8" CONC. I'VMT
25
26
28
27
40 39
,fSECTi_WBtBY RD.
2
40 39
c
io
JAKOKIRRUN RD.
BLOCK 2R J v
BRIARWOOD ADDN.
VOL 388-176, PG. 92
P.R.T.C.T. _ SAUNDERS LtD.
SD Engineering, Inc.
Site Development Engineering
PO Box 1357 Alecto, TX 76008-1357
(817) 441-6400 Fax (817) 441-6085
TEXAS REGISTERED ENGINEERING FIRM F-7643
TEXAS REGISTERED SURVEYING FIRM 10095800
1
P roject:
Owner:
S ubject:
SD Engineering, Inc.
Site Development Engineering
S un Valley Industrial Park
S un Valley Industrial Park
Excavation & Grading
Item Description
1 Clearing & Grubbing
2 Unclassified Street Excavation
3 Erosion Control
Opinion of
Probable Cost
Quantity Unit
3.00 AC
7,000.00 CY
1.00 EA
Project No.:
Prepared By:
Date:
Revised
Unit Price
16 000.00
4.00
1,100.00
040902
EAC
07/2012
09/07/12
Sub -Total $
Contingencies
Engineering
Other*
Total $
Amount
48,000
28,000
1,100
77,100
77,100
P.O. Box 1357
Aledo, TX 76008-1357
Page 3 of 5
Texas Firm F-7643
Phone: 817.441.6400
Fax: 817.441.6085
SD Engineering, Inc.
Site Development Engineering
P roject: Sun Valley Industrial Park
Owner: Sun Valley Industrial Park
S ubject: Paving Facilities
Item Description
1 Subgrade Manipulation (81")
2 Lime (40#/SY)
3 8" Concrete Pavement (4000 psi)
4 Pavement Joint Sealant
5 8" HMAC Pavement Transition
6 7" Concrete Curb
7 Concrete Pavement Header
8 Concrete Flume "A"
9 Concrete Flume "B' & "C"
10 Traffic Control
11 Impact Flex Bollard
12 Erosion Control
Opinion of
Probable Cost
Quantity
7,600.00
155.00
7,100.00
11,000.00
530.00
2,750.00
125.00
10.00
20.00
1.00
9.00
1.00
Unit
SY
TN
SY
LF
SY
LF
LF
LF
LF
EA
EA
EA
P roject No.:
P repared By:
Date:
Revised
Revised
Unit Price
3.50
165.00
39.00
1.00
66.00
1.50
10.00
300.00
150.00
500.00
800.00
1,100.00
040902
EAC
07/2012
09/07/12
09/24/12
Amount
26,600
25,575
276,900
11,000
34,980
4,125
1,250
3,000
3,000
500
7,200
1,100
Sub -Total $ 395,230
Contingencies
Engineering
Other*
Total $
395,230
P.O. Box 1357
Aledo, TX 76008-1357
Page 4 of 5
Texas Firm F-7643
Phone: 817.441.6400
Fax: 817.441.6085
1111dddad Luau]
•
1
24
BLOCK 1
EXHIBIT C - STREET LIGHTS
& STREET SIGNS
LOTS 1-28, BLOCK 1
SUN VALLEY
INDUSTRIAL PARK
1
7
DAVID STRICKLAND DRIVE
BLOCK 1
2
3
6 5 4 (
•-STREET LIGH1 (TYP) I
1
VESTA ROAI
TREE
P
S BCBCK"1
SIGN
8 9 10 11
15
16
14 13 12
,STREE f LIGH1 (TYP)
SUN DRIVF 11 I
STREE STOP SIGN 1
BLOCK 1
17
18
19
23 22 21 20
;STREET LIGH- (TYP)-
KALTENBRUN ROAD
STREET STOP SIGN
25 26 27 1 1
1
40 39
VESTA FARLEY RD.
SUN VALLEY DR.
1 2
M
Q
d
40 39
RALTENBRUN RD.
28
BLOCK 2R
BRIARN'000 ADM.
VOL 388-176, PG. 92
P.R.T.C.T.
SAUNDERS RD.
SD Engineering, Inc.
Site Development Engineering
PO Box 1357 Aledo, TX 76008-1357
(817) 441-6400 Fax (817) 441-6085
TEXAS REGISTERED ENGINEERING FIRM F-7643
TEXAS REGISTERED SURVEYING FIRM 10095800
SD Engineering, Inc.
Site Development Engineering
Opinion of
Probable Cost
P roject: Sun Valley Industrial Park
Owner: Sun Valley Industrial Park
S ubject: Street Light/Street Sign Facilities
Item Description
1 2" PVC (Sch 80) Conduit - Bore
2 2" PVC (Sch 80) Conduit
3 3-#6 Aluminum Conductor Wire
4 1-#10 Aluminum Conductor Wire
5 Street Light Foundation Type 2
6 Street Light Pole Type 8
7 Street Light Arm Type 33A.150W Luminaire
8 Ground Box
9 Pole Riser
10 Stop Sign w/ pole & foundation
11 Traffic Control
12 Erosion Control
Quantity Unit
90.00 LF
1,105.00 LF
1,195.00 LF
1,195.00 LF
6.00 EA
6.00 EA
6.00 EA
8.00 EA
3.00 EA
3.00 EA
1.00 EA
1.00 EA
P roject No.:
P repared By:
Date:
Revised
Unit Price
14.00
7.00
1.50
0.50
850.00
1,400.00
250.00
650.00
300.00
350.00
500.00
1,100.00
040902
EAC
07/2012
07/26/12
Sub -Total $
Contingencies
Engineering
Other*
Total $
Amount
1,260
7,735
1,793
598
5,100
8,400
1,500
5 200
900
1,050
500
1,100
35,135
35,135
P O. Box 1357
Aledo, TX 76008-1357
Page 5 of 5
Texas Firm F-7643
Phone: 817.441.6400
Fax: 817.441.6085