HomeMy WebLinkAboutContract 43806-A2 (2)AMNDMENT No 0 2 TO CITY SXCRETY CONTRACT WHEREAS, the City of Fort (worth (CITY) and EYES, Incorporated, (ENGINEER) made and entered into City �ty Secretary Contract No. 43806, the CONTRACT) which was authorized by M&C C- 25848 on the i8th day of September, 2012 in the amount of $193,110.00; and V IE 8'AIM the contrac L was subsequently revise by: Amendment Number 1 in the amount of $119 , 3 8 i . 0 0 which was authorized by M&C C-26877 on the day of July 22, 2014; and WHEREA@9 the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 91; and "WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. X OW y H l R tH tfM , CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 2 5 th , 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Xngineer totals $48,942.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for al 1 work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $361,439.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Page o 1 FT. WORTH TIC EXECUDIOD and XVVECTIVE as of the date last written by a signatory, below. APPROVED: City of Mort Worth Jesus . Chapa- Assistant City Manager DATE: APPROV � : C Mid r Andrew T. Cronberg, E. i';NCINET 9R ,JCS, incorporated. Ti,dwin B. Jones, /P. E. President DAME : I O/q/2o / 5 Assistant Director, Water Department APPROVED AS TO FORM AND LEGALITY: Douglas W. Black Senior Assistant City Attorney ATTbiST: M- r J. City Sec etary r • M&c : N/A Date: N/A OFFICIAL RECORD CITY SECRETARY �r WaPnH, TX Page o2 INCORPORATED Service With Excellence September 25, 2015 CORPORATE OFFICE 12655 N. Central Expy. Suite 500 Dallas, Texas 75243 Phone. 214 343-1210 Fax. 214 343-3885 Rakesh Chaubey, P. E City of Fort Worth Water Department Engineering & Fiscal Services Division 1000 Throckmorton Street Fort Worth, TX 76102-6311 817-392-6051 RE: Amendment No 2 Sanitary Sewer Rehabilitation, Contract 91 City Project No. 01957 Additional Design, Research and Survey Work Dear Mr. Chaubey: o Architectural o Engineering 13 Planning ri Construction Management ▪ Environmental Services IT Services Per your request we are pleased to submit this Amendment No. 2 for additional design services required to complete the above referenced project. The requested modifications will be outside of our scope of services as set forth in City Secretary Contract No. 43806, therefore this Amendment No. 2 is being developed to further identify these services and summarize the associated costs. The additional services required to prepare final construction documents will include the following: 0 Design Additional 1,182 LF of 8" Waterline in Anita Avenue, 1,018 LF of 8" Waterline in Winfield Avenue, 1,567 LF of 8" Waterline in Cherokee Trail, and 1,055 LF of 8" Waterline in Seminary Drive and Survey of the location and size of the existing water meters along those streets: 0 1. Anita Avenue (Manderly Pl. to South Dr) 2. Winfield Avenue (Anita Ave. to Carolyn Rd.) 3. Cherokee Trail (West Seminary Dr. to Suffolk Dr.) 4. Seminary Drive (Trail Lake Dr. to South Dr) Research and Verify locations of water lines and any conflicts with Storm Drains and Sanitary Sewer Lines Revise Summary of Quantities and Cost Estimate Obtain surveyed location of existing water meters and sizes of meters(4, 822 LF) • We are requesting your assistance in the execution of this Amendment No 2 in order for us to expeditiously perform these services. The attached Level of Effort LOE) of spreadsheet , outlines the additional tasks, personnel and man-hours we anticipate to be required to make the requested revisions to the construction documents. The total fee for these additional services will be an amount not to exceed $48,942 In order to avoid any further delay in the project schedule, EJES, Inc. will proceed to make the requested revisions outlined above at this time. Fort Worth 7524 Mosier View Court, Suite 104 Fort Worth, TX 76118 (817) 284-2640 Houston 525 N. Sam Houston Pkwy. Suite 440 Houston, TX 77060 (281) 272-1612 Shreveport 6007 Financial Plaza, Suite 511 Shreveport, LA 71129 (318) 670-7275 Page 2 These Amendment No. 2 services will be performed with the good faith understanding that an executed agreement for additional compensation is forthcoming and will be received prior to submittal of the final documents. The total contract amount to date, including amendments, is as follows: Original Contract Amount Amendment No. 1 Amendment No. 2 New Contract Amount 5193,110.00 $119, 387.00 $ 48,942 00 _ $361,439.00 The City MWBE goal for this contract is 22%. The total amount to be paid to Arredondo, Zepeda, & Brunz, LLC (MWBE) for topographic survey from the total Amendment No. 2 of 348,942 is $5,995 which is 12 25%. The total amount to be paid to MIWBE on total contract amount of $361,439 is $119,762, which is 32.13%; therefore meeting the City MWBE goal of 22%. Sincerely, edt/A442 • Edwin B. Jones, P.E , President EJES, Inc. 12655 N. Central Expressway, Suite 500 Dallas, TX 75243 Tel. 214-343-1210 ejones@ejesinc.com Attachment