HomeMy WebLinkAboutContract 43778 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. q
ma4?
WHEREAS, the undersigned Developer ("Developer") desires to make certain
improvements ("Improvements") related to a project as described below ("Project"), an
addition to the City of Fort Worth, Texas ("City"); and
WHEREAS, the Developer and the City desire to enter into this "Agreement" in
connection with the Improvements.
Developer Information:
Developer Company Narne: D.R. Horton — Texas, Ltd.
Address, State, Zip Code: 6751 North Freeway, Fort Worth Texas 76131
Phone, E-Mail: (817) 230-0800/mpallen@drhorton.com
Authorized Signatory/Title: Don E. Allen , Assistant Secretary
Project Name: Emerald Park Phase 4C
Project Location: Intersection of Hawks Landing & Erinmoor Trail
Plat Case No.: FP-012-022 Plat Narne: Emerald Park Phase 4C
Mapsco: 20N
CFA: 2012-055 DOE: 6879
To be completed by staff
Received by: c j j(\.,
Council District: 7 City Project No: 01959
1
Date:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and the
Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth and
subsequently amended from time to time via a Mayor and Council
Communication adopted by the City Council of the City of Fort Worth, is
hereby incorporated into this Community Facilities Agreement ("CFA") as if
copied herein verbatim. Developer agrees to comply with all provisions of said
Policy in the performance of its duties and obligations hereunder and to cause
all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the infrastructure. Developer further acknowledges that said
process requires the contractor to submit an Affidavit of Bills paid signed by
its contractor and Consent of Surety signed by its surety to ensure the
contractor has paid the sub -contractor and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in
full for all the services provided under this contract.
C. Developer agrees to cause the construction of the improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) _X_,
Sewer (A-1) X: Paving (B) X Storm Drain (B-1) X_, Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of community
facilities in accordance with Section II, paragraph 7 of the Policy and the
contracts for the construction of the public infrastructure shall be administered
in conformance with paragraph 8, Section II, of the Policy.
F. For all infrastructure included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being insured, licensed and
bonded to do work in public streets and/or prequalified to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the infrastructure, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the infrastructure for a period of two (2) years insuring the maintenance
and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced
and to meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the ACORD Certificate of
Insurance supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours notice to the City's Construction
Services Division of intent to commence construction so that City
inspection personnel will be available; and to require the contractor to allow
the construction to be subject to inspection at any and all times by City
inspection forces, and not to install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City to schedule a Pre -Construction Meeting The submittal
should occur no less than 10 working days prior to the desired date of the
meeting. No construction will commence without a City -issued Notice to
Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department
G. Developer agrees to provide, at its expense, all engineering drawings and
documents necessary to construct the improvements required by this
Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the improvements required herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City
harmless for any inadequacies in the preliminary plans, specifications and cost
estimates supplied by the Developer for this Agreement
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement
L. The Developer further covenants and agrees to, and by these presents does
hereby, fully indemnify, hold harmless and defend the City, its officers, agents
and employees from all suits, actions or claims of any character, whether real
or asserted, brought for or on account of any injuries or damages sustained by
any persons (including death) or to any property, resulting from or in
connection with the construction, design, performance or completion of any
work to be performed by said Developer, his contractors, subcontractors,
officers, agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such inhales, death or
damages are caused, to whole or in part. by the alleged negligence of
the City of Fort Worth, its officers, servants. or entplovees.
M. Developer will further require its contractors to indemnify, defend and hold
harmless the City, its officers, agents and employees from and against any and
all claims, suits or causes of action of any nature whatsoever, whether real or
asserted, brought for or on account of any injuries or damages to persons or
property, including death, resulting from, or in any way connected with, the
construction of the infrastructure contemplated herein, whether or not such
iniuries, death or damages are caused, in whole or in part, by the
alleged negligence of the City of Fort Worth, its officers. servants, or
entplovees. Further, Developer will require its contractors to indemnify, and
hold harmless the City for any losses, damages, costs or expenses suffered by
the City or caused as a result of said contractor's failure to complete the work
and construct the improvements in a good and workmanlike manner, free from
defects, in conformance with the Policy, and in accordance with all plans and
specifications and shall cause to be executed and delivered to the City an
indemnity agreement from such contractors on a form to be promulgated by the
City
N. Upon completion of all work associated with the construction of the
infrastructure and improvements, Developer will assign to the City a non-
exclusive right to enforce the contracts entered into by the Developer with its
contractor along with an assignment of all warranties given by the contractor,
whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce
such contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. The City's obligation to participate (exclusive of front foot charges) in the
cost of the community facilities shall terminate if the facilities are not
completed within two (2) years; provided, however, if construction of the
community facilities has started within the two year period, the developer
may request that the CFA be extended for one year. If the community
facilities are not completed within such extension period, there will be no
further obligation of the City to participate. City participation in a CFA
shall be subject to the availability of City funds and approval by the Fort
Worth City Council.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the community
facilities if at the end of two (2) years from the date of this Agreement the
community facilities have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the community facilities or to cause the
payment of costs for construction of same before the expiration of two (2)
years if the Developer breaches this Agreement, becomes insolvent or fails
to pay costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Emerald Park Phase 4C
CFA No.: 2012-055 DOE No.: 6879
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light lnspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
$
$
110,914.00
129,818.00
$ 240,732.00
$
264,622.75
99,023.00
26,418.00
$ 390,063.75
$ 630,795.75
$
$
$
$
$
4,814.64
4,814.64
9,629.28
14,545.83
7,272.92
1,056.72
735.00
23,610.47
33, 239.75
Amount
630,795.75
630,795.75
300, 915.00
487,579.69
788,494.69
Choice
(ck one),
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Developer has executed this
instrument in quadruplicate, at Fort Worth, Texas this ,n1,2n_ day of/7ai-__J=
20d)/
CITY OF FORT WORTH - Recommended by:
Water Department
7
Wendy Cl -Babulal, '; A7P:E.
Development Engineering Manager
Approve to Form & Legality:
D�iglas lam/. Black
Assistant City Attorney
M&C No. /OA-
Date:
ATTEST:
any J. Kae'��
City Secret
ATTEST:
Signature
(Print) Name: Mark Allen
c°0
ab��,
�7'1000 0
Cr ��� Y,
Flabo0
0
o
Fl a g
Transportation & Public Works Department
Dougla��W. Wiersig, P.E.
Directo
Approved by City Manager 's Office
Fernando Costa
Assistant City Manager
14)$
**0 0
a
O
0o
D.R. Horton — Texas, Ltd.
9
By:
D.R. Horton, Inc.
Its Authorized Agent
Signature
Print Name: Don Allen
Title: Assistant Secretary
OFF1CIAL RECORD,
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
iz
z
z
►1
►1
m
m
►s
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
PROJECT
OCA' 'ION
0
RI 11F ranting)
PHASE
4B
* VICINITY MAP *
NOT TO SCALE
MAPSCO NO. 20N
COUNCIL DISTRICT 7
OWNER/DEVELOPER:
D.R. HORTON TEXAS, LTD.
DFW West Division
6751 North Freeway
Ft Worth, TX 76131
(817) 230-0800
FAX 230-0896
DATE:
PROJECT #:
DRAWN BY.
CHECKED BY:
SHEET NO:
09/13/2012
1978-04-03
M. YORK
A. CASCO
1 OF 6
t-
IaJ
1
a
L
FINAL PLAT
LOTS 57-80, BLOCK 19,
LOTS 8-30, BLOCK 20,
LOTS 2-19, BLOCK 21
EMERALD PARK
AN ADDITION TO THE CITY OF FORT WORTH,
TARRANT COUNTY, TEXAS
BEING 12.039 ACRES OF LAND LOCATED IN THE
HENRY ROBERTSON SURVEY, ABSTRACT NO. 1259,
IN THE CITY OF FORT WORTH, TARRANT COUNTY,
TEXAS
63 RESIDENTIAL LOTS
THE PRECEDING TO BE KNOWN AS:
LOTS 57-80, BLOCK 19, LOTS 8-30, BLOCK 20,
LOTS 2-19, BLOCK 21
PRELIMINARY PLAT CASE NUMBER: PP-002-036
CASE NUMBER: FP— 012— 022
CASE NAME: EMERALD PARK
PHASE: 4C
f-,'1t/I f-h,'1 L'AL /) 1 'A1 KKK
PIIA S H,' FO U -? C
PLAT INFORMATION
& VICINITY MAP
m m a
mycoskie-: mcinnis- associates
civil engineenng surveying landscape architecture planning
t pe registration number: I — 2759
200 east abram
arlington, texas 76010
817-469-1671
fax: 817-274-8757
w w w. m m a t e x a s. c o m
EXISTING 8" -
WATER LINE
•
y\b0�P�'
EMERALD PARK
,=PHASE 413
NIN
r
Ai\ CV
kq
• EMERALD' PARK
PHASE3/
LEGEND
N
DATE:
PROJECT #:
DRAWN BY:
CHECKED BY:
SHEET NO:
o..
78
Qi
79
77
14
13
a:A, \ DELGAl
76
tto
76
74
73
72
71
60
RAIL
30
59
EXISTING
WATER
SERVICE
8" WATER LINE
FIRE HYDRANT
GATE VALVE
SERVICES
09/13/2012
1978-04-03
M. YORK
A. CASCO
2 OF 6
4
5
67
66
70
65
27
26
62
63
64
15
74
EMERALD PARK
FUTURE PHASE 5
73
****P4w
70
EXISTING 8"
WATER LINE
EXISTING `•
WATER
SERVICE
200
0
100
200
1','Mt,'1 SAL 1) PA1 ?K
PHA SH,' FOUL' C
WATER
EXHIBIT "A"
1 inch = 200 ft.
m= m.a
400
mycoskie $ mcinnis- associates
civil engineering surveying landscape architecture planning
tbpe registration number: f — 2759
200 east obram
arlington, texas 76010
817-469-1671
fax: 817-274-8757
www.mmatexas.com
•
•
EXISTING 8"
SANITARY
SEWER LINE
EMERALD"PARK;
E PHASE B
/
EMERALD PARK
PHASE 3 ,
LEGEND
•
_DATE:
PROJECT #:
DRAWN BY:
CHECKED BY:
SHEET NO:
•
AQ
f
--.h'p9jl 1dl
EXISTING 15"
SANITARY
SEWER LINE
79
78
77
14
74
73
72
70
71
t
Veta la
QINSTP‘a
******keti*
avast
F31
3
SANI TARY SEWER MANHOLE
WI TH CONCRETE COLLAR
8" SANITARY SEWER
SANI TARY SEWER SERVICE
09/13/2012
1978-04-03
M. YORK
A. CASCO
3 OF 6
67
66
69
65
L
EXISTING 8"
SANITARY
SEWER LINE
63
200
TRAIN
30
59
57
0
14
EMERALD PARK
FUTURE PHASE 5
13
100
200
400
KMH,'1-?AL 1) PAJ K
_PIIASH,' P'OUl-R C
SANITARY SEWER
EXHIBIT "A-1"
1 inch = 200 ft.
m£ma
mycoskie mcinnis associates
civil engineer ng surveying landscape architecture planning
t pe registration number: f — 2759
200 east obrom
arlington, texas 76010
817-469-1671
fox: 817-274-8757
w w w. m m a t e x a s. c o m
•
II iiiiya.ndo bid h iv
//
/
•
•
EMERALD PARK
..4PHASE 473
•
•
LEGEND
•
•
79
78
77
76
75
'441..
74
73
•
4•
• • :�•
e
•
•
a
•
•
•
•
72
70
•
•
•
69
TYPE C RAMP•
EMERALD PARK
30 FUTURE PHASE 5
27
1s
• t
4
26
3 OO ® 13
® 11
20 Q 10
71
•
•
61
P
•s
60
•
59
n C
•
•
•
•
•
TYPE C RAMP
EMERALD PARK.
PHASE 3
29' B—B PAVEMENT, 7" CONC., 50' ROW
DATE:
PROJECT #•
DRAWN BY:
CHECKED BY:
SHEET NO:
09/13/2012
1978-04-03
M. YORK
A. CASCO
4 OF 6
200
0
•
100 200
14,'M1-/,'1 C'ALD
J'IIAs»,' F'O Ul i C
PAVEMENT
EXHIBIT "B"
1 inch = 200 ft.
mma
•
400
mycoskie . mcinnis associates
civil engineering surveying landscape architecture planning
t pe registration number: f — 2759
200 east abram
arlingion, texas 76010
817-469-1671
fax: 8 1 7 — 2 7 4 — 8 7 5 7
w w w. m m a t e x a s. c o m
•
\
EXISTING 10'
CURB INLET
EXISTING
42" RCP
•EMERALD PARK.
-*HAS? 3
LEGEND
DATE:
PROJECT #:
DRAWN BY:
CHECKED BY:
SHEET NO:
15' CURB INLETS
•
! EXISTING
-
48" RCP
EXISTING
48" RCP
STORM SEWER LINE
STORM MANHOLE
CURB INLET
09/13/2012
1978-04-03
M. YORK
A. CASCO
5 OF 6
15' CURB INLET
42" RCP
42" RCP
15' CURB INLET
200
0
EMERALD PARK
FUTURE PHASE 5
100
200
400
J
MH,'HAL 1) PAJ eK
PHASH,' FO Ulb C
STORM DRAIN
EXHIBIT "B-1"
1 inch = 200 ft.
m¢m£a
mycoskie s mcinnis associates
civil engineering surveying landscape architecture pl nning
t pe registration number: f — 2759
200 east a bram
arling ton, texas 76010
8 1 7 — 4 6 9 — 1 6 7 1
fax: 817-274-8757
w w w, m m a t e x u s, c o m
•
,/'
EXISTING STREET
LIGHT (TYP.)
•
•
EMERALD PT1 RK
PHLASE 413
•
EMERALD PARK
• PHASE'3
79
78
Q'1
77
76
75
74
72
71
70
�•J
60
66
65
' DEs*
GAN T
r
® G
•
•
LEGEND
1 STREET NAME SIGNS
0 STREET LIGHTS
DATE:
PROJECT #:
DRAWN BY:
CHECKED BY:
SHEET NO:
09/13/2012
1978-04-03
M. YORK
A. CASCO
6 OF 6
ikk
0
EXISTING STREET
LIGHT
26
27
200
Y
RAIL
30
•
59
57
14
\
•
EMERALD PARK
FUTURE PHASE 5
13
et
4*
0
100
200
H,714-14,'1 A'AL I) PARK
PHA S H,' FO UH C
STREET LIGHTS & SIGN
EXHIBIT "C" & "Cl"
1 inch = 200 ft.
mina
400
mycoskie- mcinnis+associates
civil engineering surveying landscape architecture planning
t pe registration number: f — 2759
200 east obrom
orlington, texas 76010
817-469-1671
f ax: 817-274-8757
www.mmotexas.com
•
PART B — PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: D.R. Horton — Texas LTD. DFW West Division
PROPOSAL FOR:
PROJECT NAME* UNIT I — WATER & SEWER IMPOROVEMENTS
UNIT II — DRAINAGE, PAVING, & STREET LIGHT
IMPROVEMENTS
TO SERVE
EMERALD PARK PHASE FOUR C
(2012)
WATER PROJECT NO. P265-607150195983
SEWER PROJECT NO. P275-707130195983
FILE NO. FW-22351
X NO.21916,
CITY PROJECT NO. 01959
Includes the furnishing of all materials, except materials specified to be furnished by the City,
equipment and labor for the installation of Water, Sewer, Paving, and Drainage Improvements
and all necessary appurtenances and incidental work to provide a complete and serviceable
project designated as:
UNIT I — WATER & SEWER IMPOROVEMENTS
UNIT II — DRAINAGE, PAVING, & STREET LIGHT IMPROVEMENTS
TO SERVE
EMERALD PARK PHASE FOUR C
(2012)
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the General
Contract Documents and General Specifications for Water Department Projects, the General
Contract Documents and General specifications for Transportation and Public works Projects, the
site of the project and understanding the amount of work to be done and the prevailing
conditions, hereby proposes to do all the work, furnish all labor, equipment and material except
as specified to be furnished by the City, which is necessary to fully complete the work as
provided in the Plans and Contract Documents and subject to the inspection and approval of the
Director of the Department of Transportation & Public Works of the City of Fort Worth Texas;
and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved
Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be
required by the Contract Documents for the performing and completing of the said work.
Contractor proposes to do the work within the time stated and for the following sums:
Updated: 8/30/2010
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE
UNIT I: WATER
Unit Price
1. 2064 LF 8" PVC WA I ER PIPE
THIRTY DOLLARS & $ 30.00
ZERO CENTS per LINEAR FOOT
2. 5 EA
3. 3EA
Unit Price
8' GATE VALVE
NINE -HUNDRED FIFTY DOLLARS $ 950.00
& ZERO CENTS - EACH.
Unit Price
FIRE HYDRANT
THREE-THOUDSAND TWO -
HUNDRED DOLLARS $ 3,200.00
& ZERO CENTS -EACH.
Unit Price
4. 60 EA 1" WATER SERVICE
THREE -HUNDRED FIFTY DOLLARS $ 350.00
& ZERO CENTS - EACH.
Unit Price
5. 60 EA CLASS "A' METER BOX
FIFTY DOLLARS $50.00
& ZERO CENTS - EACH.
6. 1 TON DUCTILE IRON WATER FITTINGS
FOUR -THOUSAND FIVE -HUNDRED
DOLLARS
& ZERO CENTS per TON.
7. 3EA
Unit Price
$ 4,500.00
Unit Price
CONNECTION TO EXISTING 8"
WATER MAIN
FIVE -HUNDRED DOLLARS $500.00
& ZERO CENTS - EACH.
Unit Price
8. 2064 LF TESTING
TWO DOLLARS & $ 2.00
ZERO CENTS per LINEAR FOOT
Unit Price
9. 2064 LF TRENCH SAFETY
ZERO DOLLARS & $ 0.25
TWENY-FIVE CENTS per LINEAR
FOOT
TOTAL UNIT I - WATER
TOTAL
AMOUNT
Total Amount
$ 61,920.00
Total Amount
$ 4,750.00
Total Amount
$ 9,600.00
Total Amount
$ 21,000.00
Total Amount
$ 3,000.00
Total Amount
$ 4,500.00
Total Amount
$ 1,500.00
Total Amount
$ 4,128.00
Total Amount
$ 516.00
$ 110,914.00
Updated: 8/30/2010
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE
UNIT II: SANITARY SEWER
Unit Price
8" SEWER PIPE (SDR-35)
1. 630 LF THIRTY DOLLARS & $ 30.00
ZERO CENTS per LINEAR FOOT.
Unit Price
8" SEWER PIPE (SDR-26)
2. 1068 LF THIRTY-TWO DOLLARS & $ 32.00
ZERO CENTS per LINEAR FOOT.
4' MANHOLE (ALL DEPTHS
3. 11 EA INCLUDING CONCRE I E COLLAR)
THREE -THOUSAND TWO -HUNDRED
DOLLARS & ZERO CENTS — EACH.
Unit Price
$ 3,200.00
Unit Price
CEMENT STABILIZED BACKFILL
4. 200 LF TWENTY DOLLARS & $ 20.00
ZERO CENTS per LINEAR FOOT.
Unit Price
4" SEWER SERVICE (SDR-35)
5. 35 EA THREE -HUNDRED FIFTY DOLLARS $ 350.00
& ZERO CENTS — EACH.
Unit Price
4" SEWER SERVICE (SDR-26)
6. 28 EA FOUR -HUNDRED DOLLARS & $ 400.00
ZERO CENTS — EACH.
Unit Price
SEWER SERVICE 2-WAY CLEANOUT
7. 63 EA FIFTY DOLLARS & $ 50.00
ZERO CENTS — EACH.
Unit Price
CLAY DAMS
8. 2 EA TWO -HUNDRED FIFTY DOLLARS & $ 250.00
ZERO CENTS — EACH.
CONNECT TO EXISTING SANITARY
9. 2 EA SEWER LINE
ONE -THOUSAND DOLLARS &
ZERO CENTS — EACH.
MANHOLE VACUUM TESTING
10. 11 EA ONE -HUNDRED FIFTY DOLLARS &
ZERO CENTS — EACH.
Unit Price
$ 1,000.00
Unit Price
$ 150.00
TOTAL
AMOUNT
Total Amount
$18,900.00
Total Amount
$ 34,176.00
Total Amount
$ 35,200.00
Total Amount
$ 4,000.00
Total Amount
$ 12,250.00
Total Amount
$ 11,200.00
Total Amount
$ 3,150.00
Total Amount
$ 500.00
Total Amount
$ 2,000.00
Total Amount
$ 1,650.00
Updated: 8/30/2010
Unit Price Total Amount
TRENCH SAFETY
11. 1698 LF TWO DOLLARS & $ 2.00
ZERO CENTS per LINEAR FOOT.
$ 3,396.00
Unit Price Total Amount
POST —CCTV INSPECTION
12. 1698 LF TWO DOLLARS & $ 2.00
ZERO CENTS per LINEAR FOOT.
$ 3,396.00
TOTAL UNIT II: SANITARY SEWER $ 129,818.00
Updated: 8/30/2010
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
UNIT III: PAVING
1.
2.
Unit Price
7" CONC PVMT (3500 PSI
7292 SY REINFORCED, PER
RECOMMENDATION FROM
GEOTECH ENGINEER)
(SFE SHEET 20)
TWENTY-NINE DOLLARS & $ 29.50
FIFTY CENTS per
SQUARE YARD
7725 SY
3. 139 TON
4.
3 EA
Unit Price
6" LIME TREATMENT (SUBGRADE,
PER RECOMMENDATION FROM
GEOTECH ENGINEER)
(SEE SHEET 20)
TWO DOLLARS & $ 2.75
SEVENTY-FIVE CENTS per
SQUARE YARD
LIME (36 LBS/SY PER
RECOMMENDATION FROM
GEOTECH ENGINEER)
ONE -HUNDRED FIFTY-FIVE
DOLLARS & ZERO CENTS per TON.
REMOVE EXISTING BARRICADE &
CONNECT TO EXISTING PAVEMENT
FIVE -HUNDRED DOLLARS &
ZERO CENTS — EACH.
Unit Price
$ 155.00
Unit Price
$ 500.00
Unit Price
4' BARRIER FREE RAMPS, TYPE C
4 EA NINE -HUNDRED FIFTY DOLLARS & $ 950.00
ZERO CENTS - EACH.
Unit Price
CONSTRUCT STREET HEADER
6. 29 LF TWENTY DOLLARS & $ 20.00
ZERO CENTS per LINEAR FOOT.
Unit Price
INSTALL END OF ROAD
7. 28 LF BARRICADE
THIRTY DOLLARS & $ 30.00
ZERO CENTS — LINEAR FOOT.
TOTAL UNIT III: PAVING
Total Amount
$ 215,114.00
Total Amount
$ 21,243.75
Total Amount
$ 21,545.00
Total Amount
$ 1,500.00
Total Amount
$ 3,800.00
Total Amount
$ 580.00
Total Amount
$ 840.00
$ 264,622.75
Updated: 8/30/2010
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
UNIT IV: STREET LIGHTING
1.
Unit Price Total Amount
ROADWAY ILLUMINATION
7 EA ASSEMBLY, TYPE D25-6
(SEE SHEET 24)
DOLLARS & $ 1,000.00 $ 7,000.00
CENTS — EACH.
Unit Price Total Amount
ROADWAY ILLUMINATION
2. 7 EA FOUNDATION, TYPE 4
DOLLARS & $ 1,200.00 $ 8,400.00
CENTS — EACH.
Unit Price Total Amount
2" — SCH 40 PVC CONDUIT
3. 406 LF DOLLARS & $ 15.00 $ 6,090.00
CENTS — LINEAR FOOT.
Unit Price Total Amount
3 - # 10 XHHW CONDUCTOR
4. 406 LF DOLLARS & $ 3.00 $ 1,218.00
CENTS — LINEAR FOOT.
Unit Price Total Amount
HPS LIGHTING FIXTURE
5. 7 EA DOLLARS & $ 530.00 $ 3,710.00
CENTS — EACH.
TOTAL UNIT IV: STREET LIGHTING
$ 26,418.00
Updated: 8/30/2010
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
UNIT V: STORM DRAIN
1.
Unit Price Total Amount
24" RCP, CLASS III
66 LF FORTY-EIGHT DOLLARS & $ 48.00 $3,168.00
ZERO CENTS per LINEAR FOOT.
Unit Price Total Amount
36" RCP, CLASS III
2. 524 LF SEVENTY-FIVE DOLLARS & $ 75.00 $ 39,300.00
ZERO CENTS per LINEAR FOOT.
Unit Price Total Amount
42" RCP, CLASS IV
3. 85 LF NINETY DOLLARS & $ 90.00 $ 7,650.00
ZERO CENTS per LINEAR FOOT.
Unit Price Total Amount
48' RCP, CLASS IV
4. 21 LF ONE -HUNDRED FIVE DOLLARS & $ 105.00 $ 2,205.00
ZERO CENTS per LINEAR FOOT.
Unit Price Total Amount
15' CURB INLET
5. 5 EA (per SD-020 of the city std.)
THREE -THOUSAND DOLLARS & $ 3,000.00 $ 15,000.00
ZERO CENTS per EACH.
7
4' STORM JUNCTION BOX
2 EA (per SD-006 of the city standards,
See sheet 19a)
THREE -THOUSAND TWO -
HUNDRED DOLLARS &
ZERO CENTS per EACH.
Unit Price Total Amount
$ 3,200.00 $ 6,400.00
Unit Price Total Amount
REMOVE 10' CURB INLET (see sheet
3 EA 19a)
ONE -THOUSAND DOLLARS & $ 1,000.00 $ 3,000.00
ZERO CENTS EACH.
Unit Price Total Amount
CONNECT TO EXISTING 48" RCP
8. 1 EA W/ CONCRETE COLLAR
FIVE -HUNDRED DOLLARS & $ 500.00 $ 500.00
ZERO CENTS - EACH.
Updated: 8/30/2010
Unit Price Total Amount
REMOVE & DISPOSE OF
9. 1 EA CONCRETE APRON, VERTICAL
HEADWALL AND ROCK RIP RAP
THREE -THOUSAND FIVE- $ 3,500.00 $3,500.00
HUNDRED DOLLARS &
ZERO CENTS - EACH.
GROUT, PLUG AND ABANDON IN
10. 1 LS PLACE EXISTING 21" RCP
ONE -THOUSAND TWO -HUNDRED
DOLLARS & ZERO CENTS per
LUMP SUM.
GROUT PLUG AND ABANDON IN
11. 1 LS PLACE EXISTING 30" RCP
ONE -THOUSAND EIGHT -HUNDRED
DOLLARS & ZERO CENTS per
LUMP SUM.
Unit Price Total Amount
$ 1,200.00 $ 1,200.00
Unit Price Total Amount
$ 1,800.00 $ 1,800.00
Unit Price Total Amount
SAWCUT REMOVE, AND REPLACE
12. 255 SY CONCRE I E PLAVEMENT
SIXTY DOLLAR & $ 60.00 $ 15,300.00
ZERO CENTS per SQUARE YARD
TOTAL UNIT V: STORM DRAIN $ 99,023.00
Updated: 8/30/2010
UNIT I TOTAL AMOUNT BID WATER
UNIT II TOTAL AMOUNT BID SEWER
UNIT III TOTAL AMOUNT BID PAVING
UNIT IV TOTAL AMOUNT BID STREET LIGHTING $
UNIT V TOTAL AMOUNT BID STORM DRAIN
GRAND TOTAL AMOUNT BID
$ 110,914.00
$ 129,818.00
$ 264,622.75
26,418.00
$ 99,023.00
$ 630,795.75
Updated: 8/30/2010