Loading...
HomeMy WebLinkAboutContract 43862-A2 (2)cry RFCRETARY (C OMTRACT - ae a AMENDMENT No 0 2 TO CITY SMCRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, P LC o , (} NGIN; ER.) made and entered into City Secretary Contract No o 43 862 ,. (the CONTRACT) which was authorized by M&C C=25817 on the 1`I to day of September, 2012 in the amount of $131, 291. 00; and WHEREAS, the CONTRACT was subsequently revised by Amendment Number 1 in the amount o. $ 2 8, 3 6 9 0 0 0 which was authorized administratively on August 23, 2013; and WHIRMEAC, the CONTRACT involves engineering services for the following project Sanitary Sewer Rehabilitation, Contract 86. W HIEREAS, it has become necessary to execute Amendment No 0 2 to the CONTRACT to include an increased scope of work and revised fee Now Fr EREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 10 Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 5, 2013, a copy of which is attached hereto and incorporated herein° The cost to City for the additional design services to be performed by Engineer totals $13,068.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $17 2, 7 2 8. 0 0. RECEIVED OCT 2013 Page -1 OFFICIAL RECORD CITY SECRETARY FT. WORTfl1 tui7A 3 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ernando Costa ,i Assistant City Manager DATE: r `2, (9,-) APPROVL RECO 2 e 4.4 0 S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: : nit\ 14\-A Douglas W - Black 19 1117\ Kr., Assistant City Attorney ENGINEER Shield Engineering Group, PL L C Craig H Barnes, P.E. President ATTEST: J. Kayser City Secretary DATE: M&C: Date: 09.l0. 13 N/A N/A • )ML & REQT[JKR'aD i OFFICIAL RECORD CITY UCRETARY; Pt WORTH, TX September 5, 2013 Soon Wong Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Re: Sanitary Sewer Rehab Contract 86 CPN 01964 Dear Soon, Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original contract shown above: • Prepare Water Plans to replace existing 8" lines in 4th and 5th Street (approximately 3500 LF). Water line plans were added to this project as recommended by COFW Water Dept (Kasavich) due to recent water main breaks on both streets. Plans include water details, overall water map exhibit, and existing water meter numbers and sizes. (5 plans sheets, 1 overall water map, 3 detail sheets) Total change/addendum to the contract Original contract Amendment 1 Amendment 2 Original contract $131,291 $28,369 $13, 068 $172,728 $11,880 10% sub markup $1,188 $13,068 The new contract amount will be $172,728. The revised M/WBE participation will meet or exceed the 18% M/WBE goal established by the City on the original contract. See Attachment A for detailed scope of Amendment 2 Water Improvements. Please feel free to contact me with any questions or comments. Sincerely, Jean-Marie Alexander, P.E. CEO Shield Engineering Group, PLLC Enc: Attachment A for Amendment 2 Water Improvements OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Shield Engineering Group, PLLC 1200 W. Freeway, Suite 300, Fort Worth, TX 76102 0 office (817) 810-0696 0 fax (817) 810-0372 Email: info@segpllc.c©m 0 www.shieldengineeringgroup.com