Loading...
HomeMy WebLinkAboutContract 46411-A1 Date:07/24/20 CSC No. 46411-A1 Time:9:31 AM AMENDMENT No. 1 TO CITY SECRETARY CONTRACT WREREAIS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 46411 (the CONTRACT) which was authorized by M&C C-27174 on the 3rd day of February, 2015 in the amount of $697, 702 , 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Upper Clear Fork Drainage Basin Parallel Interceptor Improvements at Various Locations within the Upper Clear Fork Drainage Basin. WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOWTMREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated April 21 , 20201 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $22,266, 00 . (Sewer: 56002, WP 33) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $719, 968 . 00 . 3 . OFFICIAL RECORD Page -1- CITY SECRETARY FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Kimley-Horn and Associates, Inc. ba8�(1 a,d6-22 / Dana Burghdoff Glenn A. Gary, P.E. Assistant City Manager Senior Vice-President DATE: Jul 23,2020 6 _3 _ �DO� DATE: APPROVAL RECOMMENDED: Chrietoeher HaN (J1117,1 Z:000n Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all r�',orman and r porting requirements , a+,N LjAA Conlon Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A am- Date: N/A DB!!(Jul2i""M2 Con Douglas W. Black Senior Assistant City Attorney 44.d4U�n�� ATTEST: y�0FORr aad �o� p�° ° °Op.1G Pv8 o=d Pp�* 000 b Mary J. Kayser 0�4tt nBxAsgp City Secretary OFFICIAL RECORD Page -2- CITY SECRETARY FT. WORTH, TX Kimley >>> Horn April 21, 2020 Mr. Liam Conlon Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth,TX 76102 Re: Upper Clear Fork Drainage Basin Interceptor Improvements Amendment No. 1 —Additional Construction Phase Services KHA No. 061018142 City Project No. 02448 Dear Liam: This is an amendment to a contract between Kimley-Horn and Associates, Inc. and the City of Fort Worth ("the City")dated 02-13-2015 referred to herein as the"Contract'. This amendment will provide for Additional Construction Phase Services as indicated below: CONTRACT TASK 8 — CONSTRUCTION PHASE SERVICES (ONE BID PACKAGE): (Water$0, Sewer$22,266) ENGINEER will prepare Construction Phase Services scope of services in accordance with the Original Contract for the following: ® Review up to 10 Additional Shop Drawings ® Attend up to 6 Additional Progress Meetings or Site Observations, and Prepare Meeting Notes ® Provide clarification for up to 6 Contractor Requests for Information(RFI) We recommend that the City increase the budget by$22,266 for these additional services_The following tables summarize our recommended budget revisions, water and sanitary sewer design fees, and revised contract amount: Description Water Sewer Total Task 1-Design Management $0 $0 $0 Task 2—Upper Clear Fork Part 1 (WWMP Project 6) Conceptual Design(30%) $0 $0 $0 Task 3—Upper Clear Fork Part 2(WWMP Project 8) Conceptual Design(30%) $0 $0 $0 Task 4—ICAP Conceptual Design(30%) $0 $0 $0 Task 5—ICAP Preliminary Design(60%) $0 $0 $0 Task 6—ICAP Final Design(90%)and Final Construction $0 $0 $0 Documents(100%) Task 7—Bid Phase Services $0 $0 $0 Task 8—Construction Phase Services(One Bid Package) $0 $22,266 $22,266 Task 9—ROW/Easement Services $0 $0 $0 Task 10—Survey and Subsurface Utility Engineering Services $0 $0 $0 Task 11—Permitting Services $0 $0 $0 Total $0 $22,266 $22,266 8011300 Kimley >>> Horn Page 2 The following table summarizes the Fee per Work Phase breakdown.- Work Phase Water Sewer Total 31 $0 $0 $0 32 $0 $0 $0 33 $0 $22,266 $22,266 51 $0 $0 $0 The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee Survey Fee Total Original Contract $0 $656,102 $41,600 $697,702 Amendment No.1 $0 $22,266 $0 $22,266 Total $0 $678,368 $41,600 $719,968 The following table summarizes our recommended budget revisions and shows the revised contract amount: Original Contract Amend No.1 Revised Contract Task 1 $31,919 $0 $31,919 Task 2 $100,536 $0 $100,536 Task 3 $93,420 $0 $93,420 Task 4 $70,358 $0 $70,358 Task 5 $122,497 $0 $122,497 Task 6 $115.079 $0 $115,079 Task 7 $19,746 $0 $19,746 Task 8 $41,078 $22,266 $63,344 Task 9 $7,443 $0 $7,443 Task 10 $58,804 $0 $58,804 Task 11 $36,822 $0 $36,822 Total Project $697,702 $22,266 $719,968 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC Glenn A. Gary, P.E. Sr.Vice President GAG/jck K 1F74'G_Uohues461018142-Upper_Clear_Fork_SWPPPOST_NTPWmendmenl-Nd-1\Amendmerd-No I.doc • • 80111 Ft.Worth, 76102