ProjectName:1 Watercress Low Pressure Sewer Extension City Sec No.: 1 53181
Project No.(s): 56016-07ON30-CO1783 DOE No. IV/A CityProj.No.:l 101002
Project Description: Extend low pressure in Watercress Drive and connecting Streets,Install grinder pumps at each home.
Contractor: William J.Schulz,Inc.dba Circle C Construction Change Order# L.� Date: 7/13/2020
City Project Mgr,l Walter Norwood City Inspector: I Ronald Rackley
Phone Number: 817-392-5026 1Phone Number: (817)392-7148
Dept. Sewer Paving Totals Contract Tlme
(Calender days)
Original Contract Amount ,905,476.50 $510,107.50 $ ,4 5,584. 730
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $4,905,476.50 $510,107,50 $5,415,584.00 730
Amount of Proposed Change Order 0.00 $0.00 $0.00
Revised Contract Amount $4,905,476.50 $510,107.50 $5.415,584,00 730
Original Funds Available for Change Orders $147,164.00 $25,505.00 $172,669.00
Remaining Funds Available for this CO $147,164.00 1 $25,505.00 $172,669.OD
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0,00%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) ,769,480.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This change order allows for the 3 inch diameter low pressure force main in the farthest reach of the system to be changed to DR 7 from DR
11 HDPE pipe. The thickerwall of DR 7 pipe reduces the diameter of the pipe sufficiently to provide the cleanout velocity required by the
TCEQ.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractors Company Name Contractor Name Contractor Signature Date
Wllllam J.Schutr,Inc.dba Ude C Constructon Teri Skelly —,—e--a J;e'GI
Ins ec I tof.-2 Date Project Manager Date
7
Director Water Dept) Date Construction Supervisor IWater Dept) Dale
n,.g,n.,. Wi11,2MOM.Co _S• Jul 17,2020
Assistant City Attorney Date I Assistant City Manager Date
Jam' Jul 23,2020 Ju123,2020
Council Action If Required OFFICIAL RECORD
M&C Number NIA M&C Date Approved NIA
CITY SECRETARY
FT.WORTH,TX
Fcpa'r WOPt.-m City of Fort Worth
Change Order Additions
Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No.(s): 56016-070043O-CO1783 DOE No.E= City Proj.No.: 01 02
Project Extend low pressure in Watercress Drive and connecting Streets.Install grinder pumps at each home.
Description
Contractor William J.Schulz,Inc.dba Circle C Construction Change Order. Date; 7/13/2020
City Project Mgr. Walter Norwood I City Inspector Ronald Rackley
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Coat Toil
3'HOPE(DR ) Sewer 1,640 LF $30.25 49,610A0
Fewer 9,610.00
[Additions
aving
Page 1 oi'i Sub Total 1$49,610.00
FORT Wblprr 1 City of Fort Worth
Change Order Deletions
Project Name Watercress Low Pressure Sewer Extension City Sec No.. 53181
Project No.(s): 56016-0700430-CO1783 DOE No. N/A City Proj.No.: 101002
Project Description Extend low pressure in Watercress Drive and connecting Streets.Install grinder pumps at each home.
Contractor William J.Schulz,Inc.dba Circle C Construction Change Order: 711 Date 7/1312020
City Project Mgr. Walter Norwood City Inspector: Ronald Rackley
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
7 3"HDPE(DR11) Sewer 1,640.00 LF $29.00$47,560.00
65 Construction Allowance Sewer 0.04 EA $50,000.00 $2,050.00
Sewer $49,610.00
Paving
Page 1 of 1 Deletions Sub Total 1$49,610.00
IVIMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 1 of 1
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
GG) 2��cez'--D
Signature
Name of Employee
Title a��FonT��IIa
P��'oo 00000�dP
o P
C1'o
ATTEST: pP 000* *�
ry����� PdQn�nooc000
exp54ab
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX