Change Order Request
Project Name; FY 16 CD9 Street Repair and Reconstruction City Sec No.; 1 51701
Project No.(s): CO2387&C Q448 DOE No. N/A City Proj.No.: 02387/02445
Project Description: FY 16 CD9 Street Repair and Reconstruction Program and Near Soulhside Medical District Water and Sanitary Sewer
Main Improvements
Contractor. Jackson Construction Ltd. Change Order II 0 Dale: 7/15/2020
City Project Mgr.1 John I<asavich City Inspector: I Martina Salinas
Phone Number. 817-392-8480 Phone Number. 817-392-2381
Dept, Water Unit I Sewer Unit 2 TPW Unit 3 Totals Contract Time
(Calender days)
Original Contract Amount $3,130,449.75 $422,758.00 $2,618,148.25 $6,171,356.00 430
Extras to Dale $3,811.90 $3,811.90 070
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $3,134,261.65 $422,768.00 $2,618,148.25 $6,175,167.90 500
Amount of Proposed Change Order $0.00 $0.00 $0.00 $0.00 050
Revised Contract Amount $3,134,261.65 $422,758.00 $2,618,148.25 $6,175,167.90 550
Original Funds Available for Change Orders 156 512-00 J 2f 139.00 TI30 07.00 $308 5-67.00
Remaining Funds Available for this CO
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.06%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $7,714,195.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change Order No.2 will provide for the following:
• The replacement of 321 feet of 6-inch sewer main on Vickery Boulevard by open cut instead of cured-in-place
pipe as originally proposed due to the severely deteriorated condition of the main.
• Permanent pavement repair for the open cut segment.
Staff concurs with the contractor's request for 50 additional calendar day on the project.
It is understood and agreed that Ilia acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,Ilia above Change Order.
Conlraoloes Company Name Contractor Name ColilraotorSigbat& ate
Jackson Construction Ltd. Carmen Eslep
In for Date Pro ect Manager Dale
'7-7-2-Z Construction Supervisor(TPW —2-6ateD r for Water Dept) Date
T 5. Jul 23 2020
Assistant City Attorney Date Assistant City Manager Date
u[2s 2020 0 o a,e r Jul 23 2020
Council Action If Required)
M&C Number NIA M&C Dale Approved NIA OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX --
F(iz—r VV O n'r t t City of Fort Worth
Change Order Additions
Project Name I FY 16 CD9 Street Repair and Reconstruction City Sec No.: 51701
Project No.(s): I CO2387&CO2448 DOE No. N/A City Proj.No.: 02387/02445
Project FY 16 CD9 Street Repair and Reconstruction Program and Near Southside Medical District Water and Sanitary Sewer
Description Main Improvements
Contractor Jackson Construction Ltd, Change Order:= Date: 7/15/2020
Cily Project Mgr. John Kasavich City Inspector Marlina Salinas
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
II-41 6"Sewer SDR-26,Acceptable Backl'ill Sewer Unit 2 321.00 LF $58.00 $18,618.00
II-42 9999.0002 HES Cone Pvml Repairw/Asphalt Overlay,Arterial/Industrial Sewer Unit 2 221.13 SY $90.00 $19,902.00
• I
i
Water Unit I
Sewer Unit 2 $38,520.00
TPW Unit 3
Page 2 of 4 Additions Sub Total 1$38,520.00
FoP-1, W-C-3R -g,I_d City of fort Worth
Change Order Deletions
Project Name FY 16 CD9 Street Repair and Reconstruction City Sec No.: 51701
Project No.(s): CO2387&CO2448 I DOE No. = City Proj.No.: 02387/02445
Project Description FY 16 CD9 Street Repair and Reconstruction Program and Near Soulhside Medical District Water and Sanitary
Sayer Main Improvements
Contractor Jackson Conshuclion Ltd. Change Order: M Dale 7/15/2020
City Project Mgr. I John I(asavich City Inspector: Martina Salinas
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
11.4 3331.2101 6"CIPP Sewer Unit 2 321.00 LF $120.00$38,520.00
i'
Water Unit I
Sewer Unit 2 $38,520,00
TPW Unit 3
Page 3 of 4 Deletions Sub Total 1$38,520.00
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
I
f
Total $0.00
Previous Change Orders
co r{ DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Name of Employee
v
Title ppFORr� °
r o'p00�d
oOoAv0' =o
ATTEST: pfo dl
��dddd
d
aaa��EXpSo4.�
.0.000000.0.
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX