HomeMy WebLinkAboutContract 54213 Jul 29, 2020
CSC No. 54213
8:27 am
DOE #
STORUWAT-ER—FACINam'
MAINTENANCE AGREEMENT
THIS AGREEMENT, made and entered into this day of July 26
2020 , by and between Home Depot U.S.A., INC., hereinafter referred to as
"Landowner", and the City of Fort Worth,hereinafter referred to as "City".
WITNESSETH
WHEREAS, the Landowner is the owner of certain real property described as an
approximately 6.47 acre tract located in the William Norris Survey, Abstract 1165, Hugh
F. Largent Survey, Abstract 960, Tarrant County, Texas according to the deed recorded in
Volume 388-209, Page 56, Deed Records, Tarrant County, Texas, hereinafter called the
"Property".
WHEREAS, the Landowner is proceeding to build on and develop the Property
according to the Site Plan/Subdivision Plan known as Civil Plans for the Home Depot
USA, INC. Fort Worth hereinafter called the "Plan", which is expressly made a part
hereof, as approved or to be approved by the City and the Landowner provides for
management of stormwater within the confines of the Property; and
WHEREAS, the City and the Landowner, and their successors and assigns, agree
that the health, safety and welfare of the residents of the City require that on-site
Stormwater Management Facilities be constructed and maintained on a portion of the
Property; and
WHEREAS the Cityi h requires qres that on-site Storm-water Management Facilities
("Facility") as shown on the Plan be constructed and adequately maintained by the
STORMWATER FACILITY MAINTENANCE AGREEMENT 1
Rev.11/17/2016
Landowner, its successors and assigns, the location and dimensions of which are shown
and more particularly described by metes and bounds in the attached Exhibit "A"
("Facility Property"); and
, THEFZ>✓FOR>;;in—consideration—of—the---foregoing,—the mutualcovenants
contained herein, and the following terms and conditions, the parties hereto agree as
follows:
1. The Landowner, its successors and assigns, shall adequately construct and
maintain the on-site Facility at no expense to the City in accordance with the
design specifications for the Facility, attached as Exhibit `B", and the current
standards then in force and effect in the City and with the Operations and
Maintenance Plan attached to this Agreement as Exhibit "C". The Facility
includes all pipes, channels or other conveyances built to convey stormwater to
the facility, as well as all structures, improvements, and vegetation provided to
control the quantity and quality of the stormwater. Adequate maintenance is
herein defined as good working condition so that these facilities are performing
their design functions. The Stormwater Structural Control Maintenance
Checklists, attached to this Agreement as Exhibit "D", are to be used to
establish what good working condition is acceptable to the City.
2. The Landowner, its successors and assigns, shall inspect the Facility and
submit an inspection report to the City annually. The purpose of the inspection
is to assure safe and proper functioning of the Facility. The inspection shall
cover the entire Facility, berms, outlet structure, pond areas, access roads, etc.
Components of the Facility, which need maintenance or replacement to
perform their design function, shall be noted in the inspection report along with
the corrective actions to be taken.
3. The Landowner, its successors and assigns, hereby grant permission to the
City, its authorized agents and employees, to enter upon the Property and to
inspect the Facility Property whenever the City deems necessary. City to
provide 24-hr advance notice of planned entry. The purpose of inspection is to
STORMWATER FACILITY MAINTENANCE AGREEMENT 2
Rev.11/17/2016
follow-up on reported deficiencies and/or to respond to citizen complaints.
The City shall provide the Landowner, its successors and assigns, copies of the
inspection findings and a directive to commence with the repairs if necessary.
4. In the event the Landowner, its successors and assigns, fails to maintain the
Facility-in-good-working-condition-as-specified-herein;the-C—ity,its-authorized
agents and employees, may enter upon the Facility Property and take whatever
steps necessary to correct deficiencies identified in the inspection report and to
charge the costs of such repairs to the Landowner, its successors and assigns.
It is expressly understood and agreed that the City is under no obligation
to routinely maintain or repair said Facility, and in no event shall this
Agreement be construed to impose any such obligation on the City, such
obligation is Landowner's.
5. The Landowner, its successors and assigns, will perform the work necessary to
keep the Facility in good working order as appropriate. In the event the City
pursuant to this Agreement,performs work of any nature, or expends any funds
in performance of said work for labor, use of equipment, supplies, materials,
and the like, the Landowner, its successors and assigns, shall reimburse the
City upon demand, within thirty (30) days of receipt thereof for all actual costs
incurred by the City hereunder. In the event that Landowner or its successors
or assigns fail to pay the City for the costs incurred under this section, the City
shall impress a lien for the costs of such work upon the Property. Such lien
shall be perfected by filing in the office of the County Clerk of Tarrant County,
Texas an affidavit identifying the property to be charged with such lien, stating
the amount thereof, and making reference to this Agreement.
6. This Agreement imposes no liability of any kind whatsoever on the City. THE
LANDOWNER AGREES TO HOLD THE CITY HARMLESS FROM
ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO
OPERATE PROPERLY. LANDOWNER COVENANTS AND AGREES
AND DOES HEREBY INDEMNIFY,HOLD HARMLESS AND DEFEND
THE CITY,ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND
AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS
STORMWATER FACILITY MAINTENANCE AGREEMENT 3
Rev.11/17/2016
OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH
MIGHT ARISE, FROM THE FAILURE OF LANDOWNER OF THE
ABOVE FACILITY PROPERTY TO MAINTAIN THE FACILITY,
INCLUDING, BUT NOT LIMITED TO, THE BED AND BANKS OF
THE DETENTION POND; ANY DAMAGES CAUSED TO PERSON OR
PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS
BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR (3)
FAILURE OF THE POND OR ITS BANKS TO OPERATE IN A
MANNER CONSISTENT WITH CITY CRITERIA.
7. Landowner covenants and agrees that no habitable building shall be erected
within the Facility Property, but this paragraph shall not preclude construction
of other improvements within the Facility Property, which do not impede
drainage. Landowner covenants and agrees that no habitable building shall be
erected on the Portion of the Property abutting such Facility Property which
shall have a finished floor at an elevation less than two feet above the
maximum depth of water in the detention pond which would occur during a
100 year frequency flood.
8. This Agreement shall be recorded among the land records of Tarrant County,
Texas, shall constitute a covenant running with the land, and shall be binding
on the Landowner, its administrators, executors, assigns, heirs and any other
successors in interests, including any property owners association.
STORMWATER FACILITY MAINTENANCE AGREEMENT 4
Rev.11/17/2016
Executed this 28th day of July 20 20
Landowner City of Fort Worth
?/1,q a Q W dAD z
Dana Burghdoff(J 28,2020 .01 CDT)
Name: John Chescavage bAtjK}
/ Assistant-City Manager
Title: Corporate Counsel
Approved as to Form and Legality
K'_.�
Chriata R.Lopm-Reynolds(Jul 28,2QM 09' T)
Assistant City Attorney
ATTEST
City Secretary
STORMWATER FACILITY MAINTENANCE AGREEMENT cJ
Rev.11/17/2016
STATE OF TEXAS §
COUNTY OF TARRANT §
This instrument was acknowledged before me on JUiy28,2020 by
�k4&mi5dW Assistant City Manager of the City of Fort Worth, on behalf of the City of
Fort Worth.
0
LAU RI E Digitally signed by LAURIE w Q o
PEQUENO LEWIS z x
PEQUENO LEWIS Date:2020.07.28 14:44:48-05'00' ��LLMo
daoo a
Notary Public, State of Texas W z Q E
U
Je�C♦Sb�
STATE OF GEORGIA § sO�°
COUNTY OF DEKALB §
jj,
Before me, the undersi Ted authority on this day of
l�/ , 20, personally appeared John Chescavage, known to
me to be the person whose name is subscribed to the foregoing instrument and
acknowledged to me that the same is the act of Home Depot U.S.A. Inc., and that he
executed the same as its Corporate Counsel and as the act of such Corporate Counsel and
for the purposes and consideration expressed in the foregoing instrument.
�Oota�ryPub&ic, ate of Georgia
Barbara Turner
NOTARY PUBLIC
Fulton County,GEORGIA
My Commission Expires 09/1012022
STORMWATER FACILITY MAINTENANCE AGREEMENT 6
Rev.11/17/2016
con txact Compliance Manager
By signing I acknowledge that Jam the person responsible
for the monitoring and admin.istra[ion of this contract,including
ensuring all perfoimaricc and rc pottinQrequirements,
Ls
Jamie S, Morales
DeveIuPnlent Services 'Manager
EXHIBIT ''All
METES AND BOUNDS DESCRIPTION
Detention Maintenance Area #1
BEING a tract of land situated in the H. Largent Survey, Abstract No. 960, City of
Fort Worth, Tarrant County, Texas, the subject tract being a portion of Lot 9, Block 3,
Riverbend West Business Park, an addition recorded in Volume 388-209, Page 56 of
the Plat Records, Tarrant County, Texas (PRTCT), with the subject tract being more
particularly described as follows:
BEGINNING at a point from which the southwest corner of Lot 9, Block 3, bears S
75°47'06" W, 70.21 feet;
THENCE N 00`08'08" W, 95.65 feet;
THENCE N 89°51 '52" E, 228.17 feet;
THENCE S 00°08'08" E, 65.23 feet;
THENCE S 82°16'14" W, 230.19 feet to the POINT OF BEGINNING with the subject tract
containing 18,354 square feet or 0.421 acres of land.
This document was prepared under 22 TAC §663.21 , does not reflect the results of an
on the ground survey, and is not to be used to convey or establish interests in real
property except those rights and interests implied or established by the creation or
reconfiguration of the boundary of the political subdivision for which it was prepared
Of
PAGE 1 OF 3 DARREN K. BROWN
J�SPIARSDETENTION MAINTENANCE AREA w 'P°ESS 1
ENGINEEPING a SURVEYING 0 S R`�F
RIVERBEND WEST BUSINESS PARK U
Drawn checked: Dote Job No. CITY OF FORT WORTH
ED DKB 1 4/24/20 1 20-061 TARRANT COUNTY, TEXAS DARREN K.BROWN, R.P.L.S.5252
-e ,Arz0 �_,\20 ,--_dc �.� �V ,A�.� -e ---- -, d.. ,, r: .30.2 ___ o , Io, t c.." a .z_ 12
EXHIBIT "A"
METES AND BOUNDS DESCRIPTION
Detention Maintenance Area #2
BEING a tract of land situated in the H. Largent Survey, Abstract No. 960, City of
Fort Worth, Tarrant County, Texas, the subject tract being a portion of Lots 7 & 8,
Block 3, Riverbend West Business Park, an addition recorded in Volume 388-209, Page
56 of the Plat Records, Tarrant County, Texas (PRTCT), with the subject tract being
more particularly described as follows:
BEGINNING at a point from which the northwest corner of Lot 7 bears N 08"15'22" W,
215.87 feet;
THENCE N 89°51 '52" E, 134.00 feet;
THENCE S 00°08'08" E, passing at 36.29 feet the south line of Lot 7 and the north
line of Lot 8, continuing a total distance of 100.00 feet;
THENCE S 89°51 '52" W, 134.00 feet;
THENCE N 00°08'08" W, passing at 63.71 feet said lot line, continuing a total distance
of 100.00 feet to the POINT OF BEGINNING with the subject tract containing 13,400
square feet or 0.308 acres of land.
This document was prepared under 22 TAC §663.21 , does not reflect the results of an
on the ground survey, and is not to be used to convey or establish interests in real
property except those rights and interests implied or established by the creation or
reconfiguration of the boundary of the political subdivision for which it was prepared
OF
G\SreRF��
PAGE 2 OF 3 DARREN K. BROWN
IVSPIARSDETENTION MAINTENANCE AREA
ENGINEERING&SURVEYING
- 9 RIVERBEND WEST BUSINESS PARK
Drawn:1L Checked: I Date Job No. CITY OF FORT WORTH1�G __
ED I DKB 4/24/20 20-061 r TARRANT COUNTY, TEXAS DARREN K.BROWN, R.P.L.S.5252
0 R T
' z
0
(�N LOT 7
50 0 50 100
J N
1" = 100'
P.O.B. Basis of bearing: West
I P' boundary line of Block 3,
Riverbend West Business
L5 Park, recorded in Vol.
388-209, Pg. 56 PRTCT
— — 73
J CCD
7�
Detention i `73 Line Table
Maintenance N m Line N Bearing Distance
I L7 Area#2 m 0 Lt N 00'08'08" W 95.65'
0.308 Ac. 3 Q L2 N 89'51'52" E 228.17'
(13,400 S.F.) -;0
LOT 8 0 � L3 S 00.08'08" E 65.23'
IT1 L4 S 82'16'14" W 230.19'
I Y L5 N 89'51'52"E 134,00'
RIVERBEND WEST 16 S 00'08'08" E 100.00'
I m BUSINESS FARK L7 S 89*5112° W 111,10'
Vol. 388-209, Pg. 56 PRTCT 1 18 N 00'08'08" W 100.00'
LOT 9 Detention
Maintenance
Area #I
0.421 Ac.
(18,354 S.F.)
L2 1 \
J
P.O.B. J
PAGE 3 OF 3
L4
41'p6" w - AVENUE -
OF T
S 15 p��SE �P �o s r eR Ff
' ENTER
---- - ---- - ------ - - Variable width ROW
DARREN K. BROWN
SPIARS
A 5252 v!�
DETENTION MAINTENANCE AREA �-�,�o.�ss,��� �
ENGINEERINGa 1,S1 aVEvmle S URA
- - _ RIVERBEND WEST BUSINESS PARK
CITY OF FORT WORTH
Drawn: Checked: Date Job No.
ED DKB 1 4/24/20 1 20-061 TARRANT COUNTY, TEXAS DARREN K.BROWN,R.P.L.S.5252
n—ag c.A2o20 does\20 cei RI—de V—t _ � ._ _. - 1.._7 E, _. _...a .-d oi.. d: Pa .-.,- �/30/2CK
ui
NHW Elm mma 0A
TI,
z 3::
S2
O
O
a0J
o 00 1
cn Yo'L
< cli
zc� N-0
Exhibit "C"
CITY OF FORT WORTH STORMWATER FACILITY
OPERATION AND MAINTENANCE PLAN
The only responsibility the City of Fort Worth has in the operation and
maintenance of this Facility is inspection.
General Maintenance Procedures
The structural and functional integrity of the Facility shall be maintained at all
times by removing and preventing drainage interference, obstructions, blockages,
or other adverse effects into, through, or out of the system.
Periodic silt removal shall occur when standing water conditions occur or the
pond's storage volume is reduced by more than 10%. Silt shall be removed and
the pond/basin returned to original lines and grades shown on the approved
engineering plans. In addition, corrective measures are required any time a basin
does not drain completely within 72 hours of cessation of inflow. NO STANDING
WATER IS ALLOWED in basins designed for dry detention purposes.
Accumulated litter, sediment, and debris shall be removed every 6 months or as
necessary to maintain proper operation of the basin. Disposal shall be in
accordance with federal, state and local regulations.
Detention facilities shall be mowed monthly between the months of April and
October or anytime vegetation exceeds 12-inches in height.
To prevent debris from entering and clogging the downstream storm sewer
system a wire mesh screen or similar screening device shall be installed over the
outlet until final acceptance.
4. PREVENTIVE MAINTENANCE/INSPECTION
• Visual inspections of all components will be conducted every 6 months.
• A log shall be kept of maintenance actions, and inspections. The log
should document the condition of the detention system's primary
components, mowing, and silt, litter and debris removal dates. Document
aeration of the basin bottoms and replanting to prevent the sealing of the
basin bottom.
• Written maintenance and repair records shall be maintained by the
party or parties signing the attached Agreement and shall be provided
to the City upon request.
STORMWATER FACILITY MAINTENANCE AGREEMENT
Rev. 11/17/2016 8
Exhibit "D"
Stormwater Structural Maintenance CHECKLIST
FREQUENT REPAIRS REPAIRS
INSPECTION DATE REQUIRED MADE NOTES
Mowing
Remove Trash and
debris
Inspect irrigation
system operation
Remove grass
clippings
Violations Noted
MINOR
INSPECTION
Condition of Pond
Amount of silt in
and
Amount of silt in
flume
Amount of ponded
water
Amount of wetland
vegetation
Location of Erosion
Percent of
vegetation
Condition of trash
guard
Location of Erosion
MAJOR
INSPECTIONS
Condition of
Stormwater Quality
Structure
Type of Stormwater
Quality Structure
Structure type and
Condition
Condition of Rip-
Rap
STORMWATER FACILITY MAINTENANCE AGREEMENT 9
Rev.11/17/2016
Condition of
filtrations stem
Berm or
Embankment
Settlement
Location of erosion
Evidence of
Animals
Evidence of Aquatic
life
Condition of
Aeration
Foundation
STORMWATER FACILITY MAINTENANCE AGREEMENT O
Rev.11/17/2016