HomeMy WebLinkAboutContract 53179-AR2 CSC No. 53179-AR2 FOR_ _T WORTH City of Fort Worth Construction Allowance Request Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project#(s)ICO2101 Project Description Silver Creek Roadway Improvements Phase 2 between Brewer High School and Live Oak Contractor Texas Bit/Texas Materials Group,Inc. CA# 2 Date 6/10/2020 City Project Mgr. Alejandra Ayala City Inspector John Crowley Dept. UNIT I UNIT II Contract Time Totals (CD) Original Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64 Extras to Date Credits to Date Current Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64 Go to ADD&DEL Tabs to Enter CA Backup $0.00 $29,750.00 $29,750.00 Original Allowance Available to Allocation $200,000.00 $100,000.00 $300,000.00 Allowance Funds Previously Allocated $2,075.00 S0.00 $2,075.00 Remaining Funds Available for this Allocation $197,925.00 $70,250.00 $268,175.00 ir JUSTIFICATION(REASONS)FOR CHANGE ORDER IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all labor and materials for the temporary roadway which was necessary in order to create a northbound lane for the purpose of shifting traffic away from the work zone needed to construct the upstream headwall of Culvert C,STA 79+63. The temporary roadway is 12 feet wide with 540 feet including the transitions. The driving surface of the roaway was constructed with flexbase ranging in thickness from 8-20 inches. This material will be removed,stock piled and reused to stabilize the roadway. The lump sum amount is to compensate the contractor for the cost of the permit,traffic control and labor. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ontractor's Company Name Contractor(Name) Contract Signatur Texas Bit/Texas Materials Group Inc. Pedro AIOIISO Pedro Alonso ; - �1 1/202 Inspector nspec ion upei r Date roject Manager/Program Manager Date (Qf vu EW1 Ju124,2020 Ja127,= A u:m mn qi.wi x mm axis can Assistant Director(Dept) Date Director, pContracting Department(Dept) Date L""gt'Pr4ffr Aug 5,2020 W Aug 5,2020 rea Prieur(Aug 5,202011:19 CDT) i Cilyjtorney Date Assistant City Manager Date aa.twKs,�or«r:an Aug 6,2020 8 Aug 6,2020 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth Construction Allowance Additions Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project# CO2101 Contractor Texas Bit I Texas Materials Group,Inc. PM Alejandra Ayala Inspector 7Jahn Crowley Construction Allowance Submittal# O2 Date 6I10I2020 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 45 Temporary Roadway Construction UNIT II 1.00000000 LS $29,750.00 29,750.00 UNIT 1 $0.00 UNIT 11 $29,750.00 Sub Total Additions $29,750.00 Change Order Additions Page 2 of 4 Fogg WOR I H City of Fort Worth Construction Allowance Deletions Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179 Client Project# CO2101 Contractor Texas Bit 1 Texas Materials Group,Inc. PM Alejandra Ayala InspectorF Jahn Crowley Construction Allowance Submittal# O2 Date 6I10I2D20 DELETIONS ITEM DESCRIPTION DEPT Cty Unit Unit Cost Total UNIT 1 $0.00 UNIT 11 $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 3 of 4 MISBE for this Construction Allowance M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Construction Allowances co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. / 6/11/2020 Name of Employee/Signature Sr. Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature a�FORT�a p.s o�odAo ATTEST: `i�� U// `�� paaa nEXA54pG Mary J.Kayser,City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX