GI �,���GR��y t� Developer and Project Information Cover Sheet:
?rzjI?yve1oper Company Name: Cross Companies, Inc.
Address, State, Zip Code: 6012 Reef Point Ln. Suite A
Phone & Email: 817-401-7855, richard@crosscompanies.com
Authorized Signatory, Title: Richard Cross, Manager
Project Name and Brief Lake Crest Estates
Description:
CITY SECRETARY �f7d98
Project Location:
Plat Case Number: FP-14-063 Plat Name: Lake Crest Estates
Mapsco: 32U, 32V Council District: 2 City Project Number: 02416
CFA Number: 2015-081
To be completed by staff:
Received by:
DOE Number: 7364
*to Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
7.
0
CITYSECREn.OFF
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
City Secretary
Contract No.
WHEREAS, Cross Companies, Inc, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Lake Crest Estates> ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City -approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) , Sewer (A-1) Paving (B) ►Z1 Storm Drain (B-1) ®, Street Lights &
IZ1
Signs (C) 0
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a. period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
maintenance bond All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, stoiin drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants. or employees Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Project Name: Lake Crest Estates
CFA No.: 2015-081
Cost Summary Sheet
DOE No.: 7364
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2 Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2 Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement - 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
Developer's Cost
65,250.00
52,320.00
117,570.00
142,946.75
77,970.50
51,342 00
272,259.25
$ 389,829.25
$ 2,351.40
$ 2,351.40
$ 4,702 80
$ 8,836.69
$ 4,418.35
$ 2,053.68
$ 15,308.72
$ 20,011.52
Choice
Amount (Mark one)
$ 389,829.25
$ 389,829.25
$ 146,962 50
$ 340,324.06 I
$ 487,286.56 I
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
1
Jesus J. Chapa
Assistant City Manager
Date: ) gej 7 S
Recommended by:
t,sImom,m,•1
Wendy Chi-l3abulal, EMBA, P.E.
Development Engineering Manager
Water Department
>�
Douglas W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. Afit&ef
•
Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
DEVELOPER
Cross Companies, Inc
` III _Li ruillo�
Name: Richard Cross
Title: Manager
Date:
ATTEST: (Only if required by Developer)
Signature
Name:
ATTEST:
Mary J. Kayser
j\v\
City Secretary City Secretary
OFFde:ipL RECORD
CIYy SECRETARY
>, "e�'1RTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
FI
a
►/
Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02416
None
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 11 of 11
1
Ji
ounce€n _pun try Club
PROJECT NAME:
Lake Crest Estates,
Fort Worth, Texas
Park Dr
0
w
Oat-5 Dr
4107
PROJECT SITE
B-caz R I
Crornwell I'sai ;in e Creek Rd
LOCATION MAP
CIVIL POI1° T
3102 Maple Ave., Ste 400
972-554-1100 (Office)
1-866-682-8129 (Fax)
Contact@Civilpt.com
re
z
rB E
0
c
0
d
DRAWN BY: JHB
DATE SEPTEMBER 2015
SCALE NTS
a
ENGINEERS
SHEET 1 of 1
Luil•1111.111111 1.1 I 1111.1111w!
LEGEND
W L -
WATER ESIJT
7.5' OFT TIC
Exa
.«.w„3
_ I13.1aa+�i3�i
OHL
•
•
OHf1--- OHL:
BLOC KA
•
SIAGGI1S STRrET
•
BLOCK B
f L
• •
`I3.•y
,m
• •
".EAMGE STR1ET
•
•
' BLOC KC
((unix
.+,.m.r., .>
1 4
GATE VAI/E
INDIVIDUAL WATER SERVICE
PROP. W
ER LINE W/ FIRE HYDRANT
•
EXISTING WATER LINE
WATER PLAN
.03
33,
t
15. DRAINAGE
f9R
MEE
ily111.1.3711i111113i 311 1 i 11 1,11i1.1111171i 1E1131 1 lighl 1 lin111113111111731111i31 31.31.117111111113111133/111131311161111113311731413177131111341U313III 1.131111113711 did ill1111111.113131111ii171311n 117111N 1u1ibli.71111:, 11, 1.1111Ellinh.„lill fin 3716111n11:11uuWm, 411.11111111.41•11w3711a ,1ru. 1,.111 OF
411113313 1 111.,11 1 3.611331.17 min 11 HUI/A.713W 71311731131731.11111331.31.111imil t,, .17,.
3102 Maple Ave., Ste. 400
972-554-1100 (Office)
PROJECT NAME:
Lake Crest Hstates,
Fort Worth, Texas
CIVIL PO
ENGINEERS
1-866-682-8129 (Fax)
Contact@Civilpt.com
DRAWN BY.: JHB
DATE: SEPTEMBER 2015
SCALE: 1' = 150'
SHEET
2 OF 6
3
•
��e ������ 11�, �����m w,w ��������ew �����eR�udi1��d,.,o3.n��1u. ��3�a�e��1dd...11..1we��newinu�����,aiiie�,���u w�,„,�i��i„m�.��m,w o�i u���uu,w,��.�����„�����������,i��!, w„��ui�����wenima��.��������.�n���e,��ou��a,u��i����������d.a.��,.mo Ni�����.i����e�:��,�,�xi�,wn��e�u�o��,.w�dd.d11mmfl1.1111���11 11111 m311.eaa:u,o.�13111,11::�1ill�ill iiwwwno111Nw .�a�m �, ie�����,wo-e�a��,a, i�,�����i�m,.c�.a�,�..er�uw� ��� m�mw � i u u ��� i � � i����
11.
klilk, ,1111111/1,1.e4umu; I'
rn
o A
-1 rri
II
cn
0
sWe" 8380100
K
tk
NAM
ni 111'1I i,JJ nui
-o m
77 X 0
O
-0 <
z 0
m O c
'= m
z X m
m
� z
m
z
0
r
m
r
0
Z
0
m
n
m
A
•
441, YlitluKCIC WYWLLLYI'.W11,
EX12" SS
..S- ..--r. .. r• .-aN...�,.
BOlthlL§N RORERTSRD
•
EX it)' SS
IlR7
i1i.1LIII i:i..,i,n JY uiui.�l°iuYIIWYYiI i, i��i,lluiil°1n�ui,u lWWi,iiu „uwlu,IlY�,lu lli u,,iiili
•
•
!
Pg
w
r
O
W
FPXi2 SS
wmv'.t:n.cee.enn,
\ I r u
GAS 04 i . ::n. 7 IAA GA, tl 1\`,w ..,. (,
kK.
V
SETHBARW/,SEST
Alt
iYr °1
t
fia
sF
iF
1.1
▪ �'•
I ,.......
w
z r
eu,. 0
w n
•
A D
-1
\EX 10" SS ,T
•
11111I,IIIWiIi IYIIIILallili IWY"IIwIC4OWwniPAKKAKY1 i YUWwluuuumYY,lYW4YuLIAKKKWW°JYYt,tlWu,WY.
A
D
BLOCK A
14
3LOCK I-1
[JOCK 0
6" CURB
PROP STREET W/ 6" CROWN
PROP 4 ' SIDEVVALK
PROJECT NAME:
Lake Crest Estates,
Fort Worth, Texas
PAVING PLAN
MI
CIVPOI
EN6ILINTEENS
45
3102 Maple Ave., Ste. 400
972-554-1100 (Office)
1-866-682-8129 (Fax)
Contact@Civilpt.com
DRAWN BY: JHB
DATE SthhtMBER 2015
SCALE: 1' = 150'
SHEET 4 of 6
4
PROJECT NAME:
Lake Crest Estates,
Fort Worth, Texas
1
•
tot
BLOCK A
Ft
BLOCK B
BLOCK C
STORM DRAIN PLAN
CIVIL POD T
ENGINEERS
3102 Maple Ave., Ste. 400
972-554-1100 (Office)
1-866-682-8129 (Fax)
Contact@Civilpt.com
DRAWN BY: JHB
DATE: SEPTEMBER 2015
SCALE: 1' = 150'
r
r
SHEET 5 of 6
4„
BLOCK A
3LOCK B
BLOCK
GROUND BOX
LUNIINAIRE
POLE MOUNTED TRANSFORMER
WOOD POLE
STREET LIGHTING PLAN
40
PROJECT NAME:
Lake Crest Estates,
Fort Worth, Texas
CIVIL POIrT
ENGINEERS
3102 Maple Ave., Ste. 400
972-554-1100 (Office)
1-866-682-8129 (Fax)
Contact@Civilpt.com
DROWN BY: JHB
DATE SEPTEMBER 2015
SCALE: 1' = 150'
SHEET 6 of 6
r
1
UNIT PRICE BID
Bidlist Item No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
Project Item Information
3305.0003 8" Waterline Lowering
3305.0109 Trench Safety
_ 3311.0241 8" Water Pipe
3312.0001 Fire Hydrant
3312.0117 Connection to Existing 4"-
12" Water Main
3312.2001 1" Water Service
3312.3003 8" Gate Valve
3311.0001 Ductile Iron Water Fittings
w/ restraint
Specification Section No.
Unit of Measure
UNIT I: WATER IMPROVEMENTS
33 05 12
33 05 10
331110,331112
33 12 40
33 12 25
33 12 10
33 12 20
33 11 11
EA
LF
LF
EA
EA
EA
EA
TON
00 42 43
DAP - BID PROPOSAL
Page 1 of 11
Bidder's Application
Bid Quantity
Bidder's Proposal
Unit Price
4 $200.00
914 $1.00
914 $24 00
2
4
$3,400.00
$2,000.00
28 $600.00
8 $1,250 00
0.5
1
$500.00
Bid Value
$800.00
$914.00
$21,936.00
$6,800.00
$8,000.00
$16,800.00
$10,000.00
$250.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April2, 2014
LAKE CREST ESTATES-00 42 43 Bid Proposal_DAPI
UNIT PRICE BID
Bidlist Item No.
I: WATER
00 42 43
DAP - BID PROPOSAL
Page 2 of 11
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
3331.3101 4" Sewer Service
3331.4115 8" Sewer Pipe
Bidder's Application
Project Item Information
Specification Section No. Unit of Measure Bid Quantity
UNIT II: SANITARY SEWER IMPROVEMENTS
3331.4116 8" Sewer Pipe, CSS Bacicill
3339.1001 4' Manhole
3339.1002 4' Drop Manhole
9999.0002 Trench Safety for Sanitary
Sewer Line
13301.0002 Post CCTU Tnsp
3339.0001 Manhole Epoxy Liner
33 31 50
33 11 10, 33 31 12, 33
31 20
33 11 10, 33 31 12, 33
31 20
33 39 10, 33 39 20
33 39 10, 33 39 20
33 05 10.01
33 01 31
33 39 60
EA
LF
LF
EA
EA
LF
LF
EA
28
725
65
2
1
790
790
3
Biddet's Proposal
Unit Price
$535.00
$28.00
$50.00
$3,550.00
$5,150.001
$1.00
$0.50
$250.00
Bid Value
$65, 500.00
$14, 980.00
$20, 300.00
$3,250.00
$7,100.00
$5,150.00
$790.00
$395.00
$750.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43_Bid Proposal DAPI
00 42 43
DAP - BID PROPOSAL
Page 3 of 11
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Bidlist Item No.
Project Item Information
Bidder's Proposal
Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value
TOTAL UNIT
II:
SANITARY
SEWER
IMPROVEM
ENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAM. CREST ESTATES-00 42 43_Bid Proposal_DAP1
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidlist Item No.
Description
I4INAGE IMPROVEMENTS
Project Item Information
3341.0201 21" RCP, Class III
3341.0205 24" RCP, Class III
3341.0302 30" RCP, Class III
3341.0309 36" RCP, Class III
3349.5001 10' Curb Inlet
3349.9002 3' Grate Inlet
9999.0001 36" Sloped -End Headwall
9999.0003 Trench Safety for Storm
Sewer
3137.0104 Medium Stone Riprap, dry
Specification Section No.
33 41 10
33 41 10
33 41 10
33 41 10
33 49 20
33 49 20
33 49 40.01
33 05 10.02
31 37 00
Unit of Measure
LF
LF
LF
LF
EA
EA
EA
LF
SY
00 42 43
DAP - BID PROPOSAL
Page 4 of 11
Bidder's Application
Bid Quantity
90.5
283
23 3
254.1
4
2
1
650.9
15
Bidder's Proposal
Unit Price
$57.00
$64.00
$92.00
$105.00
$4, 000.00
$3,200 00
$2,000.001
$1.00
$55.00
Bid Value
$52, 715.00
$5,158.50
$18,112.00
$2,143.60
$26,680.50
$16, 000.001
$6,400.00
$21000.00 1
$650.90
$825.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43_Bid Proposal_DAPI
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
00 42 43
DAP - BID PROPOSAL
Pape 5 of 11
UNIT PRICE BID Bidder's Application
Bidlist Item No.
TOTAL UNIT
III:
DRAINAGE
IMPROVEM
ENTS
Description
Project Item Information Bidder's Proposal
Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECII'HCATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43 _Bid Proposal_DAPI
UNIT PRICE BID
Bidlist Item No.
»VING IMPROVEMENTS
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
Project Item Information
Residential
3211.0400 Hydrated Lime
3211.0501 6" Lime Treatment
3213.0101 6" Conc Pvmt
3216.0101 6" Conc Curb and Gutter
Specification Section No.
32 01 29
32 11 29
32 11 29
32 13 13
32 16 13
Unit of Measure
SY
TN
SY
SY
LF
00 42 43
DAP- BID PROPOSAL
Page 6 oil]
Bidder's Application
Bid Quantity
12
43
3089
2887
1900
Bidders Proposal
Unit Price
$100.00
$180.00
$5.75
$35.00
$8.00
Bid Value
$77,970.50
$1,200.00
$7, 740.00
$17,761.75
$101,045.00
$15,200 00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAI{E CREST ESTATES-00 42 43_13id Proposal_DAPI
00 42 43
DAP -RID PROPOSAL
Pagel of11
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Bidlist Item No. Description
TOTAL UNIT
IV PAVING
IMPROVEM
ENTS
Project Item Information Bidder's Proposal
Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43_Bid Proposal_DAPI
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Bidlist Item No.
Description
r LIGHTING IMPROVEMENTS
80 (T)
2605.3002 1 1/4" CONDT PVC SCH
80 (B)
3441.1403 NO 6 Tnplex OH insulated
Elec Condr
3441.1501 Ground Box Type B
3441.3002 Rdwy Ilium Assmbly TY
8,11,D-25, andD-30
3441.3301 Rdwy Ilium Foundation TY
1,2, and 4
3441.3323 Furnish/Install 8' Wood
Light Pole Arm
3441.3401 6-6-6 Triplex Alum Elec
Conductor
9999.0004 Fumish/Install LED
Luminaire A 1130-30BLED-TYP2-70W-
NW or equal
9999.0005 Furnish/Install LED
Lununaire STREETVIEW-TYP2-
90W-NW or equal
Specification Section No.
26 05 33
26 05 33
34 41 10
34 41 10
34 41 20
34 41 20
34 41 20
34 41 20
34 41 20.01
34 41 20.02
V: STREET
Unit of Measure
LF
LF
LF
EA
EA
EA
EA
LF
EA
00 42 43
DAP - BID PROPOSAL
Page 8 of i 1
Bidder's Application
Bid Quantity
870
35
464
4
7
7
4
870
7
EA
4
Bidder's Proposal
Unit Price
Bid Value
$142,946.75
$10.00 $8,700.00
$33.00 $1,155.00
$3.00
$750.001
$1,625.00
$1,600.00
$740.00
$3.00
$1, 392.00
$3,000.00
$11,375.00
$11,200 00
$2,960.00
$2, 610.00
$650.00 $4,550.00
$1,100.00
$4,400.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43_Bid Proposal DAPI
00 42 43
DAP - BID PROPOSAL
Pape of11
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Bidlist Item No.
Description
IC SIGNAL IMPROVEMENTS
Project Item Information Bidder's Proposal
Specification Section No.
3471.0001 Traffic Control 34 71 13
3471.0003 Traffic Control Details 34 71 13
Unit of Measure
MO
EA
Bid Quantity Unit Price
1 $1,000.00
1 $1,000.00
Bid Value
$51,342 00
$1,000.00
$1,000.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
•
LAKE CREST ESTATES-00 42 43_Bid Proposal_DAPI
00 42 43
DAP - BID PROPOSAL
Page 10 of 11
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information
Bidlist Item No. I Description Specification Section No. Unit of Measure Bid Quantity
VI: TRAFFIC!
Bidder's Proposal
Unit Price Bid Value
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
LAKE CREST ESTATES-00 42 43 Bid Proposal_DAPI
UNIT PRICE BID
Bidlist Item No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
Bid Summary
Project Item Information
Specification Section No.
Unit of Measure
UNIT I. WATER IMPROVEMENTS
U NIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
U NIT V: STREET LIGHTING IMPROVEMENTS
U NIT VI: TRAFFIC SIGNAL IMPROVEMENTS
00 42 43
DAP - BID PROPOSAL
Page 11 of 11
Bidder's Application
Bidder's Proposal
Bid Quantity Unit Price
Total Construction Bid
Contractor agrees to complete WORK for FINAL ACCEPTANCE # days
CON TRACT commences to run as provided in the General Conditions.
calendar
Bid Value
$2, 000.00
$65,500.00
$52, 715.00
$77,970.50
$142,946.75
$51,342.00