HomeMy WebLinkAboutContract 46414ARY
CITY
f NO. LtL4
Developer and Project Information Cover Sheet:
Developer Company Name: BNM Lake Vista Development LP
Address, State, Zip Code: 9001 Airport Freeway, North Richland Hills, Texas 76180
Phone, E-Mail: 817-849-5220; terrv.tice(a,historvmaker.com
Authorized Signatory/Title: Bruce French, Vice President; brucelrenchnhistorvinaker.com
Project Name and Brief Description: Lake Vista Ranch Phase 1 (water/sewer, paving, storm drain,
street lights and street signs)
Project Location: Boaz Road between Boat Club Road and Bowman Roberts Road
Plat Case No.: FP-14-044 Plat Name: Lake Vista Ranch
Mapsco: 32Q
Council District: 7 City Project No: 02393
CFA: 2015-004 DOE: 7322
To be compleXIbiAstaff
.
Received by: c %AAu' tL&
J
Date: ga) CM
1
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
Wag
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Lake Vista Ranch -Phase 1
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Project.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
OFFICIAL RECORD tion II, of the Policy and recognizes that there shall be no reduction in the
CITY SECRETARY
FT�WORTH, Thcoalateral until the Project has been completed and the City has officially
- - accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
RECEIVED FEB 12 1_3015
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X ,
Sewer (A-1) X , Paving (B) X , Storm Drain (B-1) X, Street Lights &
Signs (C) X .
E The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Lake Vista Ranch- Phase 1
CFA No.:2015 004 DOE No.: 7322
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $242,602
2. Sewer Construction $280,540.72
Water and Sewer Construction Total $ 523,142.62
B. TPW Construction
1. Street $ 627,036.00
2. Storm Drain $ 511,367.37
3. Street Lights Installed by Developer $ 89,761.50
TPW Construction Cost Total $ 1,228,164.87
Total Construction Cost (excluding the fees): $ 1,751,307.49
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 10,462.85
D. Water/Sewer Material Testing Fee (2%) $ 10,462.85
Sub -Total for Water Construction Fees $ 20,925.70
E TPW Inspection Fee (4%) $ 45,536.13
F. TPW Material Testing (2%) $ 22,768.07
G. Street Light Inspsection Cost $ 3,590.46
H. Street Signs Installation Cost $ 2,205.00
Sub -Total for TPW Construction Fees $ 74,099.66
Total Construction Fees: $ 95,025.37
Choice
Financial Guarantee Options, choose one Amount (ck one)
Bond = 100% $ 1,751,307.49
Completion Agreement = 100% / Holds Plat $ 1,751,307.49
Cash Escrow Water/Sanitary Sewer= 125% $ 653,928.28
Cash Escrow Paving/Storm Drain = 125% $ 1,535,206.09
Letter of Credit = 125% w/2yr expiration period $ 2,189,134.36 t®
Secretary, with the corporate seal of the City affixed, and said ev oper has execu -d hi
instrument in q�uplicate, at Fort Worth, Texas this /aWday�of
,20 .
CITY OF FORT WORTH - Recommended by:
Water Department
Wendy Chi-$ibulal, EMBA, P.E.
Development Engineering Manager
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. ate
Date:
ATTEST:
ar/J. ser
City Secretary
ATTEST:
Signatures
(Print) Name:
7J2Zy TEE
Transportation & Public Works Department
1 1
Douglas VO. Wiersig, P.E.
Director
Approved by City Manager's Office
An-soben4
Fernando Costa
Assistant City Manager
DEVELOPER:
BNM Lake Vista Development, LP
By: HMH Development, Inc.
its sole General Partner
cessas:et.),-
Signature
Print Name: Bruce French
Title: Vice President
9
OFFICIAL RECORD
CITY SECRETARY'
Fr. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
El
a
a
El
El
El
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
•
J
•
m
U
0
m
rd
BanroneStark•SlArift
C Engineers
6221 Southwest Boulevard, Suite 100
Fort Worth, Texas 76132
(0) 817.231.8100 (F) 817.231.8144
Texas Registered Engineering Firm F-10998
Texas Registered Survey Firm F-10158800
www.barronstark.com
C7
es
c.
•
i
•
�z
•
SITE
•
LOCATION MAP
N.T.S.
W BAILEY BOSWELL RD.
we Brmweil High school
a`Eagle Mountain -Saginaw
4U
•r.
0
l'InP.ef:; .t5`;iiilitirii
gib
W. J. B OA Z RD.
LOCATION MAP
LAKE VISTA RANCH PHASE 1
PROJECT No. 241-8096
DATE: 01/07/2015
SHEET
a
'oN 1331"08d
k kIr;Ii 'IRM.
rn
173
r
0
•cn•
• •
�!I
4401.
�A •. •D•
:%N •r:
•n •
xxxx
oar ._•
• S
T
• •
D:Z W•
•v• •
� . •
• •
•o
.'Y••
-CAPTAIN L AAANE r»
7 ...._.. »�
• <1 V
:o/
•
• ▪ y/
/
• •*
Ami
CT
CO
O
0
Z
m
v
m
m
r
O
m
26HO '0N I031Md A110
ZZ2L '0N 300
+ I 4
r
11
c '410
KE VISTA WAY
M
..A.
INd80AH a113 03SOdOeld
3A1VA 31VO 03S0dO Jd
2131VM „8 03S0dOdd
m
rn
z
0
0 -
....- --1.---- ---
l 1. N
__..„----.____ _...,
\ c=.
_............_.............:77.............2.21.
:: ----\--. 1 \
1
t 1
i ..... \
\ :l1A._..
:LI 1 t_ ..... __________
I l
0
CD
0
r
r
.N'
iy
Tom``�'1 — •••
BOWMAN ROBERTS ROAD
13OAZ RD, LP
D2r0422620
I
SPR1TSAW'E
31VOS OIHdV2iD
rn
UNIT PRICE BID
Bidlist
Item No.
1 3311.0261
2 3312.3003
3 3312.3002
4 3312.0001
5 3312.4112
6 3312.2003
7 3305.0109
8 3201.0121
9 3471.0001
10 3311.0001
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
8" PVC Water Pipe
8" Gate Valve
6" Gate Valve
Fire Hydrant
16" x 8" Tapping Sleeve & Valve
1" Water Service
Trench Safety
4' Wide Asphalt Pvmt Repair, Arterial
Traffic Control
Ductile Iron Water Fittings w/ Restraint
1
Specification Section No.
UNIT I: WATER IMPROVEMENTS
33 11 12 _
33 12 20
33 12 20 _
33 12 40
33 12 25
33 12 10
33 05 10
32 01 17
34 71 13
3311 11
00 42 43
DAP- BID PROPOSAL
Page 1 of6
Bidder's Application
Unit of I Bid
Measure Quantity
LF
EA
EA
EA
EA _
EA
LF
LF
MO___
TON
Bidder's Proposal
Unit Price
4711 _ $19.80
15 $1,230.00
8 $850.00
8 $2 740.00
1 $4 000.00
124 $720.00
4711 $0.10
24 $83.00
1 $1,500.00
1.4 $3,650.00
TOTAL UNIT I: WATER IMPROVEMENTS
Bid Value
$93,277.80
$181450.00
$6,800.00
$21,920.00
$4,000.00
$89,280.00
$471.10
$1,992.00
$1,500.00
$5,110.00
$242,800.90
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fonn Version April 2, 2014
00 42 43_13id Proposal lake Vista Ranch.xls
Lake Vista Ranch
02393
6221 Southwest Boulevard, Suite 100
Fort Worth, Texas 76132
(0) 817 231 8100 (F) 817.231.8144
Texas Registered Engneeritg Firm F-10998
Texas Registered Survey Firm F-10158800
www.barronslark.com
GRAPHIC SCALE
E
1"=200'
100
CHS
0
100
SR
ref _
c 11
1--
200
LiULUX R(i'13tfttr
W J BOAZ ROAD
D ,4038792
(REM/\II DEE:)
03
0)
EsLINTLINE-ROAD
v
tt
J
I1
LEGEND
PROPOSED 8" SEWER PIPE
PROPOSED 4' MANHOLE
co
BOWMAN ROBERTS ROAD
DOE N0. 7322
CITY PROJECT NO. 02393
SS 'r
aI
af
7,1
OWNER/DEVELOPER
BNM LAKE VISTA DEVELOPMENT, LP
9001 AIRPORT FREEWAY, SUITE 400
NORTH RICHLAND HILLS, TX 76180
TEL: 817-849-522
i P� OF'•r\11i, i
r� •.qs•
CHARLES F. STARK
4
ra -19, =.• 57357 j cam
CENS .
USE OF THIS ELECTRONIC SEAL/SIGNATURE
AUTHORIZED BY CHARLES F. STARK, P.E.
TEXAS REGISTRATION N0. 57357
comobionglinn'� EXHIBIT 'Al' WASTE WATER IMPROVEMENTS
Tresia
LAKE VISTA RANCH PHASE 1
SS
a
PROJECT No.
DATE:
7o
241-8096
01/07/2015
SHEET
Al
UNIT PRICE BID
Bidlist
Item No.
1 3331.4115
2 3331.4116
3 3331.3101
4 3339.1001
5 3471.0001
6 0330,0001
7 3201.0111
8 3301.0002
9 3305.0109
10 3301.0101
11 3339,1003
12 3339.0001
13 9999.0001
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
8" Sewer Pipe
8" Sewer Pipe, CSS Backfill
4" Sewer Service
4' Manhole
Traffic Control _
Concrete Encase Sewer Pipe
4' Wide Asphalt Pvmt Repair, Residential
Post -CCTV Inspection
Trench Safety
Manhole Vacuum Testing
4' Extra Depth Manhole_
Epoxy Manhole Liner
Connect to Ex. Manhole
Project Item Information
Specification Section No.
UNIT II: SANITARY EWER IMPROVEMENTS
33 11 10, 33 31 12, 33 31 20
33 11 10, 33 31 12, 33 31 20
33 31 50
33 39 101 33 39 20
34 71 13
03 30 00
32 01 17
33 01 31
33 05 10
33 01 30
33 39 10, 33 39 20
33 39 60
03 80 00
Unit of
Measure
LF
LF
EA
EA
MO
CY
LF_
LF _
LF
EA
VF
VF
00 42 43
DAP - BID PROPOSAL
Page 2 of 6
Bidder's Application
Bid
Quantity
4098
702
124
23
1
248
24
4800
48.00
23
53
5
Bidder's Proposal
Unit Price
$25.86
$44.50
$520.00
$2,350.00
$1,500.00
$60.00
$86.00
$1.40
$1.00
$100.00
$100.00
$180.00
EA 1 $1,500.00
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS
Bid Value
_$1051974.28
$31,239.00
$64,480.00
$54,050.00
$1,500.00
$14,880.00
$2,064.00
$6,720.00
$4,800.00
$2,300.00
$5,300.00
$900.00
$1,500.00
$295,707.28
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal Lake Vista Ranch.xls
Lake Vista Ranch
02393
X Oo
a N.,
52
471-
Q�
0 m
w<5 H
;e < `� �r X
03
tn
3 �T N cn
• �"c
• o �-
CO CO 1 1
80 BAN o
�S(n
0
iv 0 c
o co
m
'oN 133f 021d
TRAIL.
4.
1
GVOd ZVOB f M
n r�
APALACHEE
TRAIL
m
/r
✓• ,/ /.. /
7
r.•
r
>—
LAKE VISTA WA
-..•CAPTAIN LANE
•
• ole
• \
''> •D•
•�
•O5
•�/
ram • •
D .z GJ •
r ;� (r • '1.
• ..
• •
• • ;.,;* c2441%.6130
of
•
(0
CO
m
D
0
z
m
70
m
m
r
70
m
£6Z0 '0N 10]1-'Odd A110
ZHL '0N J00
I11I�GN00 «V
1
0
07
i
\.1
1 I\ \
1 L.L..
t t�' tip~ o
—....\.. .... — : ;. \
W.... ....... ....._.. ..... ........1-- -.1 \ . \ ;. vi.k..............„----
\\\
- 1
rn
0
C
�J J
m
z
/
/
/ /
/
/ f
/ _ /• _
BOWMAN ROBERTS ROAD
BOAZ RD, LP
D20422620
-i
CZ)
0
T
rri
tCZ
r�NJ
UNIT PRICE BID
Bidlist
Item No.
1 3211.0400
2 3211.0501
3 3213.0101
4 3213.0301
5 3213.0501
6 3305.0111
7 3471.0001
8 3305.0107
9 9999.0012
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
Hydrated Lime
6" Lime Treatment
6" Conc Pvmt
4" Cone Sidewalk
Barrier Free Ramp, Type e R-1
Valve Box Adjustment
Traffic Control
Manhole Adjustment, Minor
Dead End Barricade
Project Item Information
Specification Section No.
UNIT IV: PAVING IMPROVEMENTS
32 11 29
32 11 29
32 13 13
32 13 20
32 13 20
33 05 14
34 71 13
33 05 14
00 00 00
00 42 43
DAP - BID PROPOSAL
Page orb
Bidder's Application
Unit of Bid
Measure Quantity
TN
SY
SY
SF
_EA
EA
MO_
EA
EA
263
17513
16447
1735
15
15
1_
22__
3
TOTAL UNIT IV: PAVING IMPROVMENTS
Bidder's Proposal
Unit Price
$150.00
$2.30
$30.55
$4.15
$1,750.00
$100.00
$1,000.00
$200.00
$1,500.00
Bid Value
39450
40279.9
502455.85
7200.25
26250
1500
1000
4400
4500
$627,036.00 1
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposai_Lake Vista Ranch.xls
Lake Vista Ranch
02393
'oN 1031108d
co
O
Of
1
>rn
I:0
MY)
-1
= 0
m°m
N m =
(75
P1
>Jo
Onz
zL o
0.D
r
v01
m�
P1
OVO8 ZVOO f M
r'_'1 r....1
APALACHEE
TRAIL
I 11
.,�
LT, :m:
D :
rrl
• z CAI .•
• .
•�, • •
.Q •
•(i)•
•
L
` J4
r, 1 .
Lfir►��`C`1'�� ; •
l r
IA
4,)
cn
\_- ."^.... . ,..-
w..._.
•• ..
0
_
m 5
03
0o _
(&)
` LTI
N
N
Cr)
03
0
LAKE VISTA WAY
0
z
m
m
m
r
O
m
c6cZO '0N 103 0eid A110
ZZCL '0N 300
cn
n
131NI 8dl0 '01S 03SOdO id
51213A 1l0 X08 '01\100 03S0dOdd
NIVal IV:101S 03S0dO Id
m
Gi
m
z
0
24LRCP:.:-• -w ~'T�" ---
24" RCP
3I
BOWMAN ROBERTS ROAD _.."......_
BOAZ RD, LP
D20 ;•22r620
O
0
O
0
O
0
31VOS 0IHdV2:19
N
0
0
080 £XL—C
UNIT PRICE BID
Bidtist
Item No.
1 3341.0103
2 3341.0201
3 3341.0205
4 3341.0302
5 3341.0309
6 3341.0402
7 3341.0409
8 3341.1401
9 3349.0001
10 3349.0002
11 3349.5001
12 3349.5002
13 3305.0109
_ 14 3471.0001
15 0241.0800
16 0241.0900
17 9999.0002
18 9999.0003
19 9999.0004
20 9999.0005
_ 21 9999.0006
22 9999.0007
23 9999.0008
24 9999.0009
25 _ 9999.0010
_ 26 _ 3136.0102
27 3136.0104
28 9999.0011
29 0241.3001
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
18" RCP, Class III
21" RCP, Class III
24" RCP, Class III
30" RCP, Class III
36" RCP, Class III
42" RCP, Class III
48" RCP, Class III
_
7x3 Box Culvert
4' Storm Junction Box
5' Storm Junction Box
10' Curb Inlet
15' Curb Inlet
Trench Safety
Traffic Control
Remove Rip Rap
Remove Misc Conc Structure
24' Wide Asphalt Pavement Repair (Residential)
18" TxDOT SET P-PD Headwall
24" TxDOT SET P-PD Headwall
42" TxDOT Type CH-FW-30 Headwall
36" TxDOT Type CH-FW-30 Headwall
TxDOT Skewed Box Culvert Headwall Type FW-S
TxDOT Skewed Box Culvert Headwall Type PW-1
Pyramat with Sod Overlay
5" Concrete Channel Lining
Twisted Gabions
Twisted Gabion Mattresses
10' Wide 8" Conc. Slab
Storm Line Grouting
Project Item Information
Specification Section No.
UNIT 11I: DRAINAGE IMPROVEMENTS
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 49 10
33 49 10
33 49 20
33 49 20
33 05 10
34 71 13
02 41 13
02 41 13
32 01 17
00 00 00
00 00 00
00 00 00
00 00 00
00 00 00
00 00 00
00 00 00
00 00 00
31 36 00
31 36 00
00 00 00_
02 41 14
Unit of
Measure
00 42 43
DAP - BID PROPOSAL
Page 3 of 6
Bidder's Application
Bid
Quantity
Bidder's Proposal
Unit Price
LF 90 $37.00
LF 192 $42.00
LF 1100 _ $46.00
LF 394 $59.00
LF 83 $80.00
LF 227 $104.00
LF 343 $140.00
_ LF 261 $316.67
_ EA 2 _ $31300.00
EA 3 $3,600.00
EA 4 _ $3,200.00
EA 10 $4,000.00
LF 2429 $0.50 -,
MO _ 1 $2,500.00
_SF 402 $2.00
_ LS 112 $28.00
LF 28 $420.00
EA 2 $1,200.00
EA _3 __- $1,800A0
EA 1 _ _ $4,500.00
EA 1 _ $4,200.00 -_
EA 1 $13,100.00
EA 1 $29,100.00
SY - 2414 $23.50
SY _ 205 $60.00
CY _ 24 $500.00
CY 54 $500.00
LF 47 $95.00
CY 22 $200.00
TOTAL UNIT III: DRAINAG E IMPROVMENTS
Bid Value
$3,330.00
$8,064.00
$50,600.00
$23,246.00
$6,640.00
$23,608.00
$4.8,020.00
$82,650.87
$6,600.00
$10,800.00
$121800.00
$40,000.00
$1,214.50
$2,500.00
$804.00
$3,136.00
$11,760.00
$2,400.00
$5,400.00
$4,500.00
$4,200.00
$13,100.00
$29,100.00
$56,729.00
$12,300.00
$121000.00
$27,000.00
$4,465.00
$4,400.00
$511,367.37
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal_Lake Vista Ranch.xls
Lake Vista Ranch
02393
GRAPHIC SCALE
100
0
100
7.2
CC
F-
v
Barron•Stark•Swl t
Consulting high's;
8221 Southwest Boulevard, Suite 100
Fort Worth, Texas 76132
(0) 817.231.8100 (F) 817 231 8144
Texas Registered Engineering Firm F-10998
Texas Registered Survey Finn F-10158800
www.barronstark.com
1 "=200'
200
il;
ri
BOLLARD -DR VC
T= SU
W J$OAZ ROAD
E
•
T C'
( -2� i` ,I`I -)L, i
SKYSAI-L-RQA
{ITN-N-E-ROAD
26
CNJ
NI
/7/ •
LEGEND
PROPOSED STREET LIGHT (POLE & LUMINAIRE, 20 EA)
DOE NO. 7322
CITY PROJECT NO. 02393
OWNER/DEVELOPER
BNM LAKE VISTA DEVELOPMENT, LP
9001 AIRPORT FREEWAY, SUITE 400
NORTH RICHLAND HILLS, TX 76180
TEL: 817-849-522
i P. E F T•®\9
l,
�• •
it" •�i •.JP
>*. • /\ • *,%
CHARLES F. STAt
S7357• �
�l S
�S1ONAL
ovo
USE OF THIS ELECTRONIC SEAL/SIGNATURE
AUTHORIZED BY CHARLES F. STARK, P.E.
TEXAS REGISTRATION NO. 57357
EXHIBIT'C' STREET LIGHT IMPROVEMENTS
LAKE VISTA RANCH PHASE 1
PROJECT No. 241-8096
DATE:
01/07/2015
SHEET
C
'oN 1D3r0Hd
.4
1RAIL
rri
I 0
C rn
— I 0
rn ° -11
X 73
> r\J
Drrl
xi 7)
M co rn
0 r-
n
- (--)
> >
— O
z F5
Z LI)
0 rn
cn
0..! 7) -6
z
-0 —1
• c
• 7c)
rn
avoi ZVO f M
APALACHEE
TRAIL
1
(
-ri
igerior 6
016 .. •
/)> •• •
. > .
•••
C/)
•
rs, • : M :
• , A •
z
z
rm.!, cri
• •
•• c.c.\
• •
1.4
4+) ;:)7 1/,/
s /4
(9(c).71 t/ 4
./c.)
t.;# -} 1/0
< .•
....As)
—t-
..
-
i
!
I
1
•1•••
___
4-1-=
-
, .;
................
—
ATO
>
—1 : •• A- 400
• • -2Awe
;tj.** airy
•41.‘,11,11111r
— — —
0
rnz
c01
co =
4N. Fr_
I CA
C)
CO
CD
C.0
cD
CD
- rn
<
- c.n
>.
rn
En -ID
m
1
0
z
m
0
m
m
-a
rn
LAKE VISTA WAY
6CZO 'ON 1.03rOdd 1110
CD
rn
N.)
•••
•
r-
rn
z
m
—r
!--
_.T----z--._....2.-
77.2z.__\,
7..2: - --
\
/
/
/
....... ..... .....„ ,
/ -----
7---- ''-(.:\ •
1 ••,_ . ••--- - --
,
''
-il
. \ \
, i
,..\,, \ c(..
....
.....,.\--.. , \ \ \ .. .., ..-„,
\ \ \ \ ' •-. ' ,
\ \ ",‘,
-......_
... --,...
. *--........
.
/ ' ....:7:.>•••••••
". ..... ......_
.
;7,„
"-
.. ...
, --, .,
•
.........
BOWMAN ROBERTSROAD
BOAZ 1-ZD, LP
ID20422620
E
7
C:)
0
-13
5
(i)
0
1
m
I 10
C,
Lt")
•••••••••••••••••
UNIT PRICE BID
Bidtist
Item No.
1 _ __ 2605.3015
2 3441.3110
3 3441.3201
4 3441,3301
5 3441.3302
6 3441.1410
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
UNIT V: STREET
2" CONDTPVC SCH 80 (T)
Install LightingFixture
LED Lighting Fixture
Rdwy Illum Foundation TY 1,2, and 4
Rdwy Illum Foundation TY 315,6, and 8
NO 10 Insulated Elec Condr
Specification Section No.
LIGHTING IMPROVEMENTS
260533___
34 41 20
34 41 20
34 41 20
34 41 20
34 41 10
00 42 43
DAP - BID PROPOSAL
Page 5 of 6
Bidder's Application
Unit of I Bid
Measure Quantity
LF
EA
EA
EA
EA
LF
2765.
20
20
20__
20
Bidder's Proposal
Unit Price
$7.00
$100.00
$450.00
$1,080.00
$1,600.00
8295 $0.70
TOTAL UNIT V: STREET LIGHT IMPROVMENTS
Bid Value
$19,355.00
_ $2,000.00
$9,000.00
$21,600.00
$32,000.00
$5,806.50
$89,761.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROSE
Form Version April 2, 2014
00 42 43 Bid Proposal_Lake Vista Ranch.xls
Lake Vista Ranch
02393
UNIT PRICE BID
Bidlist
Item No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Specification Section No.
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
00 42 43
DAP - BID PROPOSAL
Page 6 of 6
Bidder's Application
Unit of ( Bid
Measure Quantity
Total Construction BidI
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
Bidder's Proposal
Unit Price ( Bid Value
$242,800.90
$295,707.28
$511,367.37
$627,036.00
$89,761.50
$1,766,673.05
180 calendar days after the date when the
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_13id Proposal_Lake Vista Ranch.rls
Lake Vista Ranch
02393