HomeMy WebLinkAboutContract 47022 (2)tv
it if
Company Name: FFW Properties, LLC
CtitY R
cONTRACT
Developer and Project Information Cover Sheet:
Address, State, Zip Code: 1806 S. 16th St. La Porte TX 77571
Phone 2 81-3 07-2070 E-Mail: gcook@ftlg.net
Authorized Signatory/Title: George Cook/ CEO
Project Name and Brief Description: Frontier Logistics
Project Location: 601 Northeast Loop 820
Plat Case No.: FP-006-097
Mapsco:
CFA: 2015-040 DOE: 7388
To be complete staff
Received by:
Plat Name:
Council District: 2 City Project No: 02511
Wedli* Date: `='71
OFFICIAL RECORD
CIry SECRETARY
Ft WORTH, TX
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
( `Improvements") related to a project generally described as Frontier Logistics
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHEREAS, any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Proj ect.
NOW, THEREFORE, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
perfouuiance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated
by this Agreement and that said construction shall be completed in a good and
workmanlike manner and in accordance with all City standards and the City -
approved construction plans, specifications and cost estimates provided for the
Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof:
Water (A) x
Sewer (A-1) x , Paving (B) x_, Storm Drain (B-1) x
MOP
Street Lights & Signs (C)
E. The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond in the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
in the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
3
Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved form) supplied by the contractor's
insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement.
L. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such iniuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants. or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such iniuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth. its
officers, servants. or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
5
damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction, the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Cost Summary Sheet
Project Name: Frontier Logistics
CFA No.: 2015-040 DOE No.: 7388
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPV`,l Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.01.2015
Page 8 of 11
Developer's Cost
$ 46,490.52
$ 39,371.50
85,862.02
$
$
154,019.00
199,308.27
$ 353,327.27
$ 439,189.29
1,717.24
1,717.24
3,434.48
$ 14,133.09
$ 7,066.55
$
$
$
21,199.64
24,634.12
Amount
439,189.29
439,189.29
107, 327.53
Choice
(Mark one)
x
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said De ego er has executed this instrument in quadruplicate, at Fort Worth, Texas this 1 �`��1� day of �ianber
. 20 /6.
CITY OF FORT WORTH - Recommended by:
Water Department
6 LC
Wendy Chi-Bbulal, EMBA, P.E.
Developmen Engineering Manager
Approved as to Form & Legality.
Douglas W. Black
Assistant City Attorney
M&C No.
Date:
AT�T'EST:
A I /1 le-v-licttC I -
Miry J. Kayser
City Secretary
ATTEST:
Pawtfr/g4,4_,
Signature
(Print) Name: Paul Heard
josas,saceS:igetiYm-
o vi
00 0' 0
Transportation & Public Works Department
Douglas
Director
Li
Wiersig, P.E.
Approved by City Manager's Office
scc) .) • CM.apsc.
Assistant City Manager
DEVELOPER: FFW Properties LLC
./C1
Signature:
Print Name: George T. Cook
Title: Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
n
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
J� i� mi�Vimu
0 20 40
80 120
GRAPHIC SCALE IN FEET
17.5' SANITARY
SEWER EASEMENT
(DOC. NO.
D206040402)
11
i APPROXIMATE END OF
NXISTISERPOLY STEEL ENCASEMENT
PIG
( BEGIN PROPOSED 21" STEEL
(LENCASEMENT & 12" WATER
1 .� ENDS OF PROPOSED
21" STEEL ENCASEMENT
i INSTALL:
i 1-45' VERTICAL BEND
(1
EtR
( INSTALL:
�1-45' VERTICAL BEND
( INSERT CLEAN WYE & REMOVE
( POLY PIG
( CONNECT TO EXISTING 12" WATER ),
( END PROPOSED 12" WATEF
f
4
9
1
Pacheco Koch
DALLAS • FORT WORTH • HOUSTON
DRAWN BY CHECKED BY
AMS JDJ
SCALE
1 "-40'
O
0
8350 N. CENTRAL EXPWY. SUITE 1000
DALLAS, TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
TX REG. SURVEYING FIRM LS-100080-00
DATE I JOB NUMBER
05/11/2015 1977-14.326
0
D
N
6)
0
1
1
=1�
1
75' ACCESS EASEMENT
(DOC. NO. D205143846)
1
FRONTIER LOGISTICS
WATER
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY TEXAS
PAGE 1 OF 7
L
FROM v n[ER LADS T IICS WATER O IMP
Engineer's Ipinion of
6-May45
Parts Description
CI VI L
Division 2 - Sitework
ina Water
Remove 12" Water Line
12" Waterline Lowering
21" Casing By Open Cut
12" Water Pipe
2" Water Service
10" Gate Valve
12"x10" Tapping Sleeve & Valve
Thrust Blocking
2" Domestic Water Meter
2" Irrigation Water Meter
VEMEN -T S
babft•e Construction C.st
Spec #
02 41 14
33 05 12
33 05 22
33 11 10, 33 11 12
33 12 10
33 12 20
33 12 25
00 00 00
00 00 00
00 00 00
Qty
100
1
35
100
2
1
1
8
1
2
Unit
LF
EA
LF
LF
EA
EA
EA
CY
EA
EA
Unit Cost
$16.50
$7,015.00
$107.00
$58.50
$2,184.84
$2,044.44
$4,903.20
$255.20
$4,957.20
$4,957.20
Total Cost
$1, 650.00
$7,015.00
$3,745.00
$5,850.00
$4,369.68
$2,044.44
$4,903.20
$2,041.60
$4,957.20
$9,914.40
•
Subtotal
10% Contingency
Total
i
i
$46,490.52
$4,649.05
$51,139.57
miliiihhhhhhhiiiihaimmi,uiniimmiiiiihhhhimminimilii Himumumnnnunnimimmiiumunwiiewiinumimueiumdininiiiinuiiimuni uwienimiiiuuiiiiuuiihnhiiihnuumamoiinimihniiuhhhhiimiuumwieieeiuuiiuuuuiiiuuuuiuiiminiuiiiiiimiiufiniimiwiuuwmuuuiiiiiwiiuinumuumuuuuuiwuiiimweewiuhihaadilieimuiiuuwewweiwieieiimwuiiiffinho uuhiminiiiimithohiiiiohliuwdbuuuu
0 20 40 80 120 < I
GRAPHIC SCALE IN FEET
17.5' SANITARY
SEWER EASEMENT
(DOC. NO.
D206040402)
EXISTING
r MANHOLE
1
1
Pacheco Koch
DALLAS • FORT WORTH • HOUSTON
DRAWN BY CHECKED BY
MIS JDJ
SCALE
1 "-40'
0frpr2
(7)Z
It (Z0
0 ri"
APPROXIMATE END OF
EXISTING 24" STEEL ENCASEMENT
BEGIN PROPOSED 24"
STEEL ENCASEMENT
REMOVE AND REPLACE
EXISTING 10" SANITARY SEWER 1 r--
75' ACCESS EASEMENT
(DOC. NO. D205143846)
END OF PROPOSED 24
STEEL ENCASEMENT
y.
w
0
cn
8350 N. CENTRAL EXPWY. SUITE 1000
DALLAS, TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
TX REG. SURVEYING FIRM LS-100080-00
DATE I JOB NUMBER
05/11/2015 1977-14.326
�= L
FRONTIER LOGISTICS
SANITARY SEWER
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 2 OF 7
•
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
•
- _m
- -
35' SANITARY SEWER EASEMENT (DOC. NO. D206040414) -
30' PERMANENT WATER
MAIN EASEMENT -,
(DOC. NO. D20433663)
_ - -
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
0 100 200 400 600
F 1
GRAPHIC SCALE IN FEET
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
Pacheco Koch 8350 N. CENTRAL EXPWY. SUITE 1000
DALLAS, TX 75206 972.235.3031
,.„, TX REG. ENGINEERING FIRM F-469
. HOUSTON TX REG. SURVEYING FIRM LS-100080-00
DALLAS • FORT WORTH
DRAWN BY
AMS
CHECKED BY I SCALE DATE JOB NUMBER
JDJ 1 "=100' I 05/11/2015 I 1977-14.326
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
CONTRACTOR SHALL
FIELD ADJUST RIM &
COVER TO FINISH GRADE
SECTION A -A
DRAINAGE & DETENTION
IMPROVEMENTS POND 013
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 2 OF 7
FR NM R LOG OS T OCS SANHTS HWE R OM
Engineer's Opina.r of Pr
6nMay-45
Parts Description
CIVIL
Division 2 - Sitework
Sanitary Sewer
Remove Misc Conc Structure
Remove 10" Sewer Line
Remove 4' Manhole Riser
Pre -CCTV Inspection
Post -CCTV Inspection
Manhole Vacuum Testing
Manhole Adjustment, Minor
24" Casing By Open Cut
10" Sewer Pipe
0
Ibabile Construed
Spec #
02 41 13
02 41 14
02 41 14
33 01 31
33 01 31
33 01 30
33 05 14
33 05 22
33 11 10,
33 31 12,
33 31 20
Qty
1
55
7
415
415
7
7
55
55
ROVEMENTS
n Cost
Unit
LS
LF
EA
LF
LF
EA
EA
LF
LF
Unit Cost
$1,584.00
$16.50
$1,803.00
$2.20
$2.201
$550.00
$1,803.00
$60.00
$48.40
Total Cost
$1,584.00
$907.50
$12,621.00
$913.00
$913.00
$3,850.00
$12,621.00
$3,300.00
$2,662.00
•
Subtotal
10% Contingency
Total
i
i
i
$39,371.50
$3,937.15
$43,308.65
1111111111101111111110111111111111111111111111111111111111111111
nil 111111111111111111
0 20 40
80
120
1
GRAPHIC SCALE IN FEET
17.5' SANITARY
SEWER EASEMENT
(DOC. NO.
D206040402)
INSTALL
10' CURB INLET
INSTALL:
24" STORM DRAIN
d
■
, INSTALL
48" STORM DRAIN
CONNECT TO EXISTING
54" STORM DRAIN
IINSTALL. Li
48" STORM DRAIN
O
o tofr
I
rnI
Pacheco Koch
__ - .
DALLAS . FORT WORTH . HOUSTON
DRAWN BY CHECKED BY
AMS JDJ
SCALE
1 "-40.
INSTALL.
45' BEND
r
cc-
sai
/////////////i P (t)
i,
CONNECT TO EXISI1NGL
54" STORM DRAIN
INSTALL:
24" STORM DRAIN
75' ACCESS EASEMENT
(DOC. NO. D205143846)
INSTALL:
10' CURB INLET
G) H INSTALL:
48" STORM DRAIN I
8350 N. CENTRAL EXPWY. SUITE 1000
DALLAS TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
TX REG. SURVEYING FIRM LS-100080-00
DATE JOB NUABER
05/11/2015 I 1977-14.326
FRONTIER LOGISTICS
STORM DRAIN
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 6 OF 7
DALLAS . FORT WORTH
DRAWN BY CHECKED BY
AMS JDJ
0 20 40
80 120
GRAPHIC SCALE IN FEET
CONNECT TO EXISTING
42" STORM DRAIN
INSTALL:
-42" STORM DRAIN
INSTALL:
42" FLARED
HEADWALL
I II
Hi I III III II II II
47.5' RAILWAY UTILITY &
DRAINAGE EASEMENT.
DOC. NO. 0205143846
75' ACCESS EASEMENT
(DOC. NO. D205143846)
CONNECT TO
EXISTING 36"
STROM DRAIN
WITH WYE
I INSTALL.
I 30' BEND
1INSTALL:
36" STORM DRAIN
50 ACCESS EASEMENT
BY SEPERATE INSTRUMENT
CONNECT TO EXISTING
36" STORM DRAIN
INSTALL:
36" STORM DRAIN
INSTALL:
4 X4' EMERGENCY
OUTFALL STRUCTURE
(SEE CFA PLANS
FOR DETAILS)
8350 N. CENTRAL EXPWY. SUITE 1000
Pacheco Koch DALLAS, TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
HOUSTON TX REG. SURVEYING FIRM LS-100080-00
SCALE
1 "-40.
DATE JOB NUMBER
05/11/2015 I 1977-14.326
/
INSTALL:
5 X5' PRIMARY
OUTFALL STRUCTURE
(SEE CFA PLANS FOR
DETAILS)
® �+ ICU
\
INSTALL:
36" STORM DRAIN
BY JACK AND BORE \
FRONTIER LOGISTICS
STORM DRAIN
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 7 OF 7
FIR OGk i�Ddv LOGOS Ii0CST
Engineer's Opinion ,, f
6-May45
Parts Description
RM MAHN 0M OVEMNTS
habDe Corostruictiion Cosit
CIVIL
Division 2 - Sitework
Storm Drain
Remove 10' Curb Inlet
Trench Safety
Concrete Collar
24" RCP, Class III
30" RCP, Class III
36" RCP, Class III
42" RCP, Class III
48" RCP, Class III
72" RCP, Class III
24" Flared Headwall, 1 pipe
42" Flared Headwall, 1 pipe
48" Flared Headwall, 1 pipe
72" Flared Headwall, 1 pipe
10' Curb Inlet
Primary Pond Outfall Structure
Pond Emeregency Overflow Structure
Concrete Cradle
Dewater Pond
i
Spec #
02 41 14
33 05 10
33 05 17
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 41 10
33 49 40
33 49 40
33 49 40
33 49 40
33 49 20
00 00 00
00 00 00
00 00 00
00 00 00
Qty
2
175
7
90
52
383
147
183
60
1
1
1
1
2
1
1
1
1
Unit
EA
LF
EA
LF
LF
LF
LF
LF
LF
EA
EA
EA
EA
EA
EA
EA
EA
LS
Unit Cost
$1, 690.00
$0.70
$1,690.00
$66.90
$81.70
$110.33
$150.92
$195.69
$392.70
$2,808.00
$3,846.67
$4,273.50
$6,655.00
$3,717.00
$4,762.00
$3,540.90
$6,571.40
$10,000.00
Total Cost
$3,380.00
$122.50
$11,830.00
$6,021.00
$4,248.40
$42,256.39
$22,185.24
$35,811 27
$23,562.00
$2,808.00
$3,846.67
$4,273.50
$6,655.00
$7,434.00
$4,762.00
$3,540.90
$6,571.40
$10,000.00
.
Subtotal
10% Contingency
Total
i
i
i
$199,308 27
$19,930.83
$219,239.10
Jiiee 0n1niim0101iiieii�iii,meu��iaul,iue�wueiiwiiuii111111 iiei�iiiuiw1iiiiiiiieeuuiewei1iiIimiiiiiu�111101iiiieiiiuiiiiiinihw,iii�iiliiiiweiliiiiiiii1iwiiiiiieiliiuimiiiiii�i0uuliiilili„w�wiwulini�iiiuiiuiii!iiiiiuem�i!!!w�umuIiIieeii�iliiiiliiiilll1 liliiliiiiililiiilil uuuuiuu�imu�iiii!i�uililililiiilliiiil�iim�uuiiii�!!ii!II!iaueiiiiui�mi iiiiliii lililiiililiililiiiililiiiilIII!IIII1iiiiiIIlili iiiiiiililliiliii� uliunwii�meuii11uuiii1ii.niu10111 d�,ille�i�iiiuiuieiii0i1,i1uililimuliu,iuw,�mu11,iailiu�u!IIiui�� i,ue,ei i,�a1,wuuieie,iIa uuieiiii,miiiiuiui���eii1ei,ui��ueiiiiiiii�,iw1ii0ei�iiiiiiiiuuuuuuuiwiiwei0euwiiiiiiiu
1 iiiiilliuu� ,I
0 20 40
80
120
GRAPHIC SCALE IN FEET
17.5' SANITARY
SEWER EASEMENT
(DOC. NO.
D206040402)
lei
1
PROPOSED RAIL
L
Pacheco
DALLAS . FORT WORTH
DRAWN BY CHECKED BY
AMS JDJ
■
1
1
1
Koch
HOUSTON
SCALE
1 "_40.
V V V
7 0 V 0
z
cn
W
7 7 7 0
7 7 7
m„,„-\\\\\\\ \\\ \\\\\\���������������� amq qP ge����ot
ltralI
v
0
7 0 0
7 0 0
7 07 '70 D
77v' co
s7vvvu L v V 0
D v V c 0
000>
si
75' ACCESS EASEMENT
(DOC. NO. D205143846)
PROPOS,ED_ R I-
PROPOSED
E.
L— t— cri. N 0
3" HMAC TRANSITION
FIELD & CAGE PANEL FOR RAIL
CROSSING
t
v v v v v 8" REINFORCED CONCRETE PAVEMENT
v v '7 v v d 3,600 PSI WITH #3 BARS ® 24' O.C.E.W.
n ^ n n I (CLASS "C", 3600 PSI)
8350 N. CENTRAL. EXPWY. SUITE 1000
DALLAS TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
TX REG. SURVEYING FIRM LS-100080-00
DATE I JOB NUABER
05/11/2015 1977-14.326
FRONTIER LOGISTICS
PAVEMENT
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 4 OF 7
0 50
J
100 200 300
GRAPHIC SCALE IN FEET
75' ACCESS EASEMENT
(DOC: -NO. D205143846)
em
:3
ROCK RIP RAP
WIMP
10' MAINTENANCE ACCESS ROAD)
POND #3
7:$ RAILWAY, UTILITY, &
D*NAGE EASEMENT.
Dt C NO D205143846
•
10' MAINTENANCE ACCESS RAMP
30 PERMANENT WATER 15' SANITARY SEWER EASEMENT
MAIN EASEMENT -- (DOC. NO. D206040414)
(DOC. NO. 020433663)
NORT- -EA
I_ I- 0 f- N
V V V V V 8" REINFORCED CONCRETE PAVEMENT
V 0 0 0 V 3,500 PSI WITH #3 BARS ® 18' O.C.E.W.
Pacheco Koch
DALLAS . FORT WORTH . HOUSTON
DRAWN BY CHECKED BY
AMS JDJ
SCALE
1 "=40'
i
8350 N. CENTRAL EXPWY. SUITE 1000
DALLAS, TX 75206 972.235.3031
TX REG. ENGINEERING FIRM F-469
TX REG. SURVEYING FIRM LS-100080-00
DATE JOB NUMBER
05/11/2015 1977-14.326
697_-
cj
i
•
+•.
•
•
s\-1.;"k
•
FRONTIER LOGISTICS
PAVEMENT
IMPROVEMENTS
RAILHEAD FORT WORTH
LOCATED IN THE CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
PAGE 5 OF 7
FRONTIER LOGISTICS PAVING & GRADONG llMVP VEf�1iEKuS
Engineer's pinion of Probable Crastruictuon Cst
6-May-15
Parts Description
CIVIL
Division 2 - Sitework
Paving & Grading
Railroad Coordination
Railroad Flagmen
Remove Conc Pvmt
Site Clearing
Unclassified Excavation by Plan
Medium Stone Riprap, dry
Hydrated Lime
HMAC Transition
8" Conc Pvmt
6" Conc Curb and Gutter
Topsoil
Seeding, Hydromulch
Imported Embedment; Rackfill, CLSM
Traffic Control
Relocate RR Sign
Subtotal
10% Contingency
Total
Spec #
Qty
0135 13
01 35 13
02 41 15
31 10 00
3123 16
31 37 00
32 11 29
32 12 16
32 13 13
32 16 13
32 91 19
32 91 19
33 05 10
34 71 13
00 00 00
1
12
717
1
7400
945
7
1
425
275
380
380
56
1
2
i
Unit
LS
WD
SY
LS
CY
SY
TN
TN
SY
LF
CY
CY
CY
MO
EA
i
i
Unit Cost
$1,000.00
$350.00
$8.00
$15,376.00
$1.60
$92.40
$170.00
$2,000.00
$33.00
$14.00
$5.00
$1.00
$9.00
$4,500.00
$100.00
Total Cost
$1,000.00
$4, 200.00
$5,736.00
$15,376.00
$11,840.00
$87,318.00
$1,190.00
$2,000.00
$14,025.00
$3,850.00
$1, 900.00
$380.00
$504.00
$4, 500.00
$200.00
$154,019.00
$15,401.90
$169,420.90