HomeMy WebLinkAboutContract 43017COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. L1 D k1 WHEREAS, the undersigned "Developer" desires to make certain improvements (refer to the name of the project at the bottom of the page) an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a home -rule municipal corporation situated in Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called "City ", to do certain work in connection with said improvements. Developer Information: Developer Company Name: D.R. Horton — Texas, Ltd. Authorized Signatory: Don E. Allen Title: Assistant Secretary Project Name: North Beach Street Addition Project Location: South of Keller -Hicks Rd., West of Alta Vista Rd., North of Golden Triangle Additional Streets: N/A Plat Case No.: FP- 012 -001 Plat Name: North Beach Street Addition Mapsco: 22K Council District: 2 City Project No: 01849 CFA: 2012 -002 DOE: 6783 To be completed bi, staff- Received by. `� I —��- L t,`— Date: 3� n i I OFFICIAL RECORD 1, CITY SECRETARY i FT. WORTH, TX NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ( "Policy ") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended from time to time via a Mayor and Council Communication adopted by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Agreement ( "CFA ") as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the infrastructure. Developer further acknowledges that said process requires the contractor to submit an Affidavit of Bills paid signed by its contractor and Consent of Surety signed by its surety to ensure the contractor has paid the sub - contractor and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full for all the services provided under this contract. C. Developer agrees to cause the construction of the improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer (A -1) XX, Paving (B) X , Storm Drain (B -1) X , Street Lights & Signs (C) X . E. The Developer shall award all contracts for the construction of community facilities in accordance "ith Section 11. paragraph 7 of the Pohcv and the contracts for the construction of the public infrastructure shall be Combined CFA final Sept 12, 2008 administered in conformance with paragraph 8, Section II, of the Policy. F. For all infrastructure included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being insured, licensed and bonded to do work in public streets and /or prequalified to perform water /waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100 %) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100 %) of the contract price of the infrastructure for a period of two (2) years insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer- awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the ACORD Certificate of Insurance supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours notice to the City's Construction Services Division of intent to commence construction so that City inspection personnel will be available; and to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, and not to install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed. and to make such laboratory tests of materials being used as may he required by the City. N'. To require its contractor to have fully executed contract documents 3 submitted to the City to schedule a Pre - Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City- issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer agrees to provide, at its expense, all engineering drawings and documents necessary to construct the improvements required by this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the improvements required herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER_ his contractors, sub- contractors, officers, agents or employees, whether or not such injuries, death or damages are Combined (TA final Sept 13, 2008 4 caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications and shall cause to be executed and delivered to the City an indemnity agreement from such contractors on a form to be promulgated by the City. N. Upon completion of all work associated with the construction of the infrastructure and improvements, Developer will assign to the City a non- exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2 %) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (41)<)) and material testing fees equal to two percent (2 %) for a total of 6% of the de,.,eloper's share of the total construction cost as 5 stated in the construction contract. ill. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4 %) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS I. The City's obligation to participate (exclusive of front foot charges) in the cost of the community facilities shall terminate if the facilities are not completed within two (2) years; provided, however, if construction of the community facilities has started within the two year period, the developer may request that the CFA be extended for one year. If the community facilities are not completed within such extension period, there will be no further obligation of the City to participate. City participation in a CFA shall be subject to the availability of City funds and approval by the Fort Worth City Council. It. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. Ili. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the community facilities if at the end of two (2) years from the date of this Agreement the community facilities have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the community facilities or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and /or suppliers are not paid for the costs of supplies and/or construction, the contractors and or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Combined CFA final Sept 12. 21108 6 Cost Summary Sheet Project Name: North Beach Street Addition CFA No.: 2012 -002 DOE No.: 6783 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre- construction meeting. An itemized estimate corresponding to each project- specific exhibit is required to support the following information. Items $ 749,103.78 Developer's Cost A. Water and Sewer Construction $ 749,103.78 1. Water Construction $ 155,405.80 2. Sewer Construction (On -Site & Off -Site) $ 181,264.42 Water and Sewer Construction Total $ 336,670.22 B. TPW Construction 1. Street $ 320,757.85 2. Storm Drain $ 53,775.55 3. Street Lights Installed by Developer $ 37,900.16 TPW Construction Cost Sub -Total $ 412,433.56 Total Construction Cost (excluding the fees): $ 749,103.78 Construction Fees: C. Water /Sewer Inspection Fee (2 %) $ 6,733.40 D. Water /Sewer Material Testing Fee (2 %) $ 6,733.40 Sub -Total for Water Construction Fees $ 13,466.81 E. TPW Inspection Fee (4 %) $ 14,981.34 F. TPW Material Testing (2 %) $ 7,490.67 G. Street Light Inspsection Cost $ 1,516.01 H. Street Signs Installation Cost $ 1,225.00 Sub -Total for TPW Construction Fees $ 25,213.01 Total Construction Fees: $ 38,679.82 Choice A­­# /rk ...I Bond = 100% $ 749,103.78 x Completion Agreement = 100% 1 Holds Plat $ 749,103.78 Cash Escrow Water/Sanitary Sewer= 125% $ 420,837.78 Cash Escrow Paving/Storm Drain = 125% $ 515.541.95 Letter of Credit = 125% w %2 r expiration period $ 936 379 73 7 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, at Fort Worth, Texas this 'D -1 day of rv(\ ac , 20 1 a- CITY OF FORT WORTH - Recommended by: Water Department Transportation & Public Works Department S Wendy Chi- abulal, EMBA, P.E. Dougla Vic rsig, P.E. Dcvelopme t Engineering Manager Director Approved as to Form & Legality: Dou . Black Assistant City Attorney M &C No. Date: ATTEST: Ma(y J.`,,a City Secret ATTEST: Signat'usre Niinici Approved by City Manager's Office Fernando Costa Assistant City Manager px0 line' L�r� �Qv, fif. /%*t, ( umhirnecl ( I A Final Sept I_ 1. _1001 S D.R. Horton — Texas, Ltd. By its Authorized Agent D.R. Horton, Inc. 1 Signature Nanrc: Don E. Allcn Tillc: Assistant Sccrclarn OFFICIAL RECORDI CITY SECRETARY FT, WORTH. TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A -1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B -1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) / I SOT KES ��HOO�P / i i i �- N 6508 a r NO LOT ` loo 0� \GK � D \Z \ON KE G - Fh \OpLE - -- Z -- I -- GL S M U+IJ�T OPEHp AGE ♦ GD`DEN BEPGH, 11D `♦ TY OAp\1 P1- FVL EXHIBIT A - WATER NORTH BEACH STREET 0 200 ADDITION GRAPHIC SCALE DATE. FEBRUARY 2012 I I I I I ENE St S1F EMP ER BOBBY GENE U)i a >J s I. CNI: WI: LEGEND PROPOSED WATER LINES EXIST WATER LINES NOTE: ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED DEVELOPER: fill! PELOTON DR HORTON - TEXAS, LTD Iljq ,•.e ......... 6751 NORTH FREEWAY 5751 KROGER DRIVE FORT WORTH TEXAS 76131 SUITE 185 PHONE 817- 230 -0800 KELLER. TX 76244 FAX: 817- 230 -0899 PHONE. 817 -562 -3350 R H ccKOO�IJON / i i KE CHOOI M�OO�E B / OJN �c PD jA0 0. z * * GL kSS MC LIN All FT—TG �0 I OPE HpAI CE AC 11 Al GO�OEN BEH ` 0 yer CAP R Fl LEGEND �— PROPOSED SEWER LINES — - EXIST SEWER LINES * SDR 26 SERVICES NOTE: ALL PROPOSED SANITARY SEWER LINES ARE 8" UNLESS OTHERWISE NOTED 10" SS C I co co O I I II O: Q: I O• In .01f: O F- LL _U): z* > Q li F- M II> Qu IX �t Iw:11 BOBBY GENE 1ERUEMPI�H EXHIBIT Al - WASTEWATER -- -- GOLDEN TRIANGLE BLVD Ex 21" ss p� DEVELOPER: N 0 ~ 7 200• NORTH BEACH STREET DR HORTON — TEXAS, LTD 111 LA.. plq �•.o ADDITION FORT NORTH FREEWAY WORTH TEXAS 76131 5751 KROGER DRIVE SUITE 185 PHONE. 817 - 230 -0800 KELLER. TX 76244 3RAPHIC SCALE DATE. FEBRUARY 2012 FAX 817- 230 -0899 PHONE 817- 562 -3350 I I ow ""op') GE I \ I \ `\ E 51R�UEMP�ER \ gO88y GENE 9 �1 P� Go�-oEN RE�TM cPP \\ I LEGEND 29' B —B / 50' ROW (TYP) SIDEWALK BY DEVELOPER SIDEWALK BY HOME BUILDER EXHIBIT B - PAVING In ADA RAMPS BY DEVELOPER DEVELOPER: 0 200 NORTH BEACH STREET PELOTON DR NORTON - TEXAS, LTD pjq .•.o ......... ADDITION FORT NORTH FREEWAY 5751 KROGER DRIVE WORTH TEXAS 76131 SUITE 185 PHONE 817- 230 -0800 KELLER. TX 76244 GRAPHIC SCALE DATE. FEBRUARY 2012 FAX 817- 230 -0899 PHONE. 817- 562 -3350 KE\ GNpO� P g o O SzE�E - N OOcK K S � 0\TO E00\.A 0 y � I 2-4 • M \DOS i � i � C• � FLUME a GpEHGPPGE GO- EN FE�� GPpC(P�G \ ` I EXHIBIT B1 - STORM DRAINAGE 0 200 NORTH BEACH STREET ADDITION 3RAPHIC SCALE DATE. FEBRUARY 2012 .✓ J e Q: �0: i� Q: H• Q iQ xlBo GENE 5 I'lo EFz LEGEND PROPOSED STORM DRAIN EXIST STORM DRAIN DEVELOPER: i'llij PELOTON DR HORTON - TEXAS, LTD 1114 ..•. ......... 6751 NORTH FREEWAY 5751 KROGER DRIVE FORT WORTH TEXAS 76131 SUITE 185 PHONE 817- 230 -0800 KELLER. TX 76244 FAX 817- 230 -0899 PHONE. 817 -562 -3350 i I I OPE HOPI OE \I ♦ I = O \1 Pl GOIN DE PP BEPON.. �� \ R may EXHIBIT C - STREET LIGHTS 0 N, " 200 NORTH BEACH STREET ADDITION GRAPHIC SCALE DATE. FEBRUARY 2012 8008_ GBNES FVEMP`ER LEGEND • PROPOSED STREET LIGHTS 0 EXIST STREET LIGHTS DEVELOPER: yii PELOTON DR HORTON — TEXAS, LTD p111 L..e fOLYt 0Mf 6751 NORTH FREEWAY 5751 KROGER DRIVE FORT WORTH TEXAS 76131 SUITE 185 PHONE: 817- 230 -0800 KELLER. TX 76244 FAX 817- 230 -0899 PHONE: 817 -562 -3350 / I • SOT ��RH� Kpp1T�ON i � � i SON B`OCKT KEE�E oo` PQp \T \ON SGH i I � PNpRENts I OHESZ NEp P-�0 OPE Nog \ I GOpEN ggPOH PTO `\ \ OPP�T N. ` Rte" EXHIBIT Cl -STREET SIGNS llT 0 200 NORTH BEACH STREET ADDITION DATE. FEBRUARY 2012 M �Tl T I Z OPR�Y GENE U- EUPEMP�ER gOgg LEGEND Q: u) Q iQ A PROPOSED STREET SIGNS Q EXIST STREET SIGNS DEVELOPER: ii''' PELOTON DR NORTON - TEXAS, LTD fl-ill •�� .� ��. 6751 NORTH FREEWAY 5751 KROGER DRIVE FORT WORTH TEXAS 76131 SUITE 185 PHONE 817- 230 -0800 KELLER. TX 76244 FAX 817- 230 -0899 PHONE 817- 562 -3350 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIBIT A - WATER IMPROVEMENTS ITEM # CITY BID # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 00618 8" PVC Water Line LF 2,787 21.15 58,945.05 2 00749 8" Gate Valve & Box EA 6 1,229.25 7,375.50 3 00546 Fire Hydrant w /6" Gate Valve EA 4 3,061.06 12,244.24 4 00568 Cast Iron Fittings TON 1.9 3,997.79 7,595.80 5 00837 Concrete Blocking - Type B CY 5.4 779.80 4,210.92 6 00762 Water Service, 1" Tap to Main EA 81 325.31 26,350.11 7 00758 Water Service, 1" Line LF 2,198 11.64 25,584.72 8 00553 Meter Box, Class B (Polyethylene) - Res EA 79 146.40 11,565.60 9 00553 Meter Box, Class B (Polyethylene) - Irr EA 2 70.18 140.36 10 00372 ITrench Safety LF 2,787 0.50 1,393.50 TOTAL WATER IMPROVEMENTS $155,405.80 u `,J0BVDRH1100S —North BeachVCIv,CFAVCFA NBSA Page 1 of 6 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIBIT Al - SANITARY SEWER IMPROVEMENTS ITEM # CITY BID # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 00351 8" Sanitary Sewer Main (SDR-35 PVC LF 2,415 14.05 33,930.75 2 00350 8" Sanitary Sewer Main (SDR -26 PVC) with Cement Stabilized Sand LF 658 15.28 10,054.24 3 00227 10" Sanitary Sewer Main (SDR-35 PVC) LF 667 16.04 10,698.68 4 00228 10" Sanitary Sewer Main (SDR -26 PVC) with Cement Stabilized Sand LF 20 1 18.09 361.80 5 10" Ductile Iron Pipe w/ Protecto 401 protective lining LF 113 72.50 8,192.50 6 00213 Manhole - Std 4' Dia. EA 17 2,023.28 34,395.76 7 00213 Manhole - Std 4' Dia. Over Existing EA 1 2,593.18 2,593.18 8 00207 Manhole - Drop Std 4' Dia. EA 2 2,850.00 5,700.00 9 00217 Manhole - Vacuum Test EA 20 205.21 4,104.20 10 00211 Manhole - Interior Protective Coating VF 1 31 244.07 7,566.17 11 00355 Sewer Service - 4" Tap EA 79 279.58 22,086.82 12 00354 4" Sewer Service with cleanouts (SDR-35 PVC LF 869 7.42 6,447.98 13 00358 4" Sewer Service with cleanouts (SDR-26 PVC LF 1,246 20.49 25,530.54 14 Concrete Encasement LF 80 32.88 1 2,630.40 15 00372 Trench Safety LF 31873 0.50 1,936.50 16 00201 Post Construction CCTV LF 1 3,873 1.30 5,034.90 TOTAL SANITARY SEWER IMPROVEMENTS $181,264.42 C, U0B \DRH11005 —North Beach \&v UA \CFA N85A Page 2 of 6 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIBIT B- PAVING IMPROVEMENTS ITEM # CITY BID # DESCRIPTION UNIT CITY UNIT PRICE TOTAL 1 00450 6" Concrete Pavement w/ 7" Curbs SY 9,493 28.85 273,873.05 2 00484 6" Lime Stabilized Sub grade SY 10,092 1.90 19,174.80 3 00496 Hydrated Lime 30 # /SY) TON 151.0 133.00 20,083.00 4 00527 4' Wide, 4" Thick Concrete Sidewalk SF 76 5.00 380.00 5 1 00505 IStreet Barricade LF 29 1 35.00 1,015.00 6 00462 Pavement Header LF 29 8.00 232.00 7 00532 ADA Wheelchair Ramp EA 6 1,000.00 6,000.00 8 Payment, Performance, and Maintence Bonds LS 1 5,200.00 5,200.00 TOTAL PAVING IMPROVEMENTS $325,957.85 O ,J0B \DRH11005 -North Beach \0v`,,CFA \CFA NBSA Page 3 of 6 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 18S, KELLER, TX 76244 (817) S62 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIBIT B1- STORM DRAIN IMPROVEMENTS ITEM # CITY BID # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 00087 48" RCP LF 174 92.72 16,133.28 2 00083 30" RCP LF 339 44.56 15,105.84 3 01092 27" RCP LF 37 38.37 1,419.69 4 00082 24" RCP LF 109 33.69 3,672.21 5 1 01291 Concrete Flume CY 23 26.47 608.81 6 00107 15' Std Curb Inlet EA 1 4 105.87 423.48 7 00106 10' Std Curb Inlet EA 1 105.87 105.87 8 02187 4' Storm Junction Box EA 1 4,034.34 4,034.34 9 01287 6' Storm Junction Box EA 1 4,679.29 4,679.29 10 00077 48" Sloping Headwall - Install EA 1 3,975.55 3,975.55 11 1 00062 lEngineered Channel LF 107 8.67 927.69 12 1 00094 18" Thick Rock Rip Rap Sy 50 47.20 2,360.00 13 1 00372 ITrench Safety LF 659 0.50 329.50 TOTAL STORM DRAIN IMPROVEMENTS $53,775.55 6 ,JOB \DRHIIOOS —North Beach \Civ',CFA \CfA NBSA Page 4 of 6 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIRIT C - STREET LIGHTING IMPROVEMENTS ITEM # CITY BID # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 00382 Conduit - 2 Inch - Open Cut - Sched. 40 - Install LF 560 13.75 7,700.00 2 00969A Light - Concrete Foundation - Type 1 - Install EA 12 1,059.00 12,708.00 3 00972A Install EA 12 1,365.00 16,380.00 4 01304 #10 Copper - Install LF 1,680 0.66 1,112.16 TOTAL STREET LIGHTING IMPROVEMENTS $37,900.16 G ,J0B \DBH1100S —North Beach \CvtCf A \CFA NBSA Page S of 6 PELOTON LAND SOLUTIONS, LLC 5751 KROGER DR, SUITE 185, KELLER, TX 76244 (817) 562 -3350 CFA ESTIMATE FOR: NORTH BEACH STREET ADDITION 3/7/2012 EXHIBIT Cl -STREET SIGNS ITEM #I CITY BID # DESCRIPTION UNIT QTY UNIT PRICE TOTAL 1 1 00506 IStreet Name Blades EA 5 245.00 1,225.00 TOTAL STREET SIGNS $1,225.00 G.':JOB \DRH11OO5 —North Beach \Cry \CFA \CFA -NBSA Page 6 01 6