Change Order Request
Project Name Rolling Hills WTP High Service Pump Station(HSPS)Swilchgear Rehab City Sec# 1 48132 _
Client Project#(s)[ City Project#CO2315;Texsun Job No 1837;
Project Description Rolling Hills WTP HSPS Swilchgear Replacement and Electrical Distribution System Improvements(M&C C-27848;
approved on 8/2/2016)
Contractor[ Texsun Electrical Contractor Change Order# I�J Date 4/1012020
City Pro)ecl Mgr. Farida Goderya,PE City Inspector Mike-Hill
Dept, Water Select Day
Tvpe
Original Contract Amount $6,600,600.00 1 $6,600,600.00 545
Extras to Date Changes in red are made
Credits to Dale by Farida Goderya,
Pending Change Orders(in M&C Process) 8/19/2020
Contract Cost to Date E$5,500,600.00 $6,600,600.00 545
(Amount of Proposed change Order $40,916.00 $40,916.00 460
Revised Contract Amount $6,641,616.00 $6,641,616.00 1005
Original Funds Available for Change Orders 1 1,486-40y1LBa80
Remaining Funds Available for Ihls CO $0,00
Additional Funding(i1 necessary) $40.916.00 1 $40,916.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.74%
MAX ALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACTCOST+25%) $6,950,000,00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
See attached sheets for various details on various Proposed ContractModirications(PCMs).A short summary is given below: I4
I
PCM#01-Ethernet Module and Processor Changes
PCM#03-Replacement of C7's in Vista Switches&HSPS Swilchgear
PCM#05-A new Duct bank between Manholes A&B and pavement of road for the new duclbank
PCM#06-Asphalt Ramp and Storm Drain
PCM#07-Remote Manual Control of Existing Valves at Existing PLC Cabtnel
Construction Closeout Letter,dated March 11,2020, Giving a time extension of 460 days to accommodate Oncor Delays and seasonal Plant
Shutdowns.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
z's Ga or'§"Gu`mpa)iy,Nam_e :;Contractor(Name) Date
Texsun Electrical Contractor Steve Miller/Doug Moulder
nsp�[Snnspect on.SuperYisor Gate ; _Project ManageriPragram Mana er Dade,
Mike HIII ITim Campbell(LKC)� �� 4-14-20 Farida Goderya � 4/15/2020
Assistant Director,(Dept)' 'Date Director,Contracting Ddpartmen((C 1)-'`.' Oggle-
r��+o�w/lgider_ I Jul15,2020
Assistant city Aftome Date Assistant City Manager Date 1
Jul 16,2020J.116,2020
Council Action(if required)
M&CNumber NIA M&C Dale Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
Change Orde,_eHWTPSwitchgear TeNsun COI R2.p& 1 4/14/2020 1:27.38PM
ca T Wo rrs City of Fort Worth
Change Order Additions
ProjeciNamo F_R_oTmq MsWTP High SoraicePum Station HSPS Switch aarRehab CySac# 48132
UentProjed# C P ed#C42315;TexsunJobNa1g37;
Projad Dosaipuon Rolifng HHia MP HSPS S1 t itgearReplacementand ElecWcal MsbibugoR System ImMyements(M&C G27m;approved on
P01m)
Contrador TaxsunEiectdcaiConfac#or Changaorder# = ®ate Af10P2020
C ty Prajed Mgr. I Fadda Gode a,PE oty inspecw miko m
DESCRIPTION AUtJt t IONS
n o
ame u an rocessor anges a .
e.acemen o s is es gear lWater 1 1.001 LS 1 15,191,
new Duct bankbetween ManhdesAa r
a Rg o roa e a new u anlWatur
pat emp arw Sturm Main lWatar
amo PuElContmicMung Valvesat tmg PLC Cabinet jft r
n seou r, alWater
I
i
i
i
t
i
d
i
F
t
a
3
Water 9i8.00
u oha taans
a
Change Order Additions Page 2 of 2
s
Change order_RSWIPSWItc4ear TPXIUn COI R2.pdf 2 4/14/2020 1:2709PM
a
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performanc and reporting requirements.
r--
n SD � �
Signalize
Tony Sholola
Name of Employee
Assistant Water Director
Title
a440�4
O%. Daa�
A�`o o0A.10
ATTEST: o*000 00o*
Qa r
°B TBXPSo41
Mary. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
FORT WORTH
WATER
March.11,202.0_ (Distribnred by Ln{riil cg,d Reguhu•Certified mail)
Texsun Electrical Contractors
4646 Mansfield Highway
Fort Worth,Texas 76119
Attention:. Doug Moulder,Vice President/Principal in Charge
RE: Construction Contract with the City of Fort Worth
Rolling Hills WTP High Service Pump Station(HSPS)Switchgear Replacement
City Project No.: CO2315
City Secretary Contract(CSC)No.:48132(M&C C-27848, 8-02-16)
Dear Mr.Moulder:
Please be advised that closeout of the above-referenced project is seriously past due. This letter
selves as a final warning, establishes certain timelines for completion and outlines the
consequences for failure to comply.
Please note the following:
1, The effective date of Notice to Proceed (NTP) for this contract was September 12,
2016, with original duration (Final Acceptance) of 545 days from the NTP. Original
contractual completion date was March 11,2018,
i
2. There was a milestone to reach substantial completion for electrical distribution site
work of 270 days from the NTP. This does not affect the overall contract's timeline
and we are not considering this contractual date.
3. Substantial Completion for the Project was realized to be February 13, 2019. The
mutually agreed two-year Warranty start date for items installed was February 01,
2019.
I
i
4. The Preliminary Punch list was issued in January 2019. There were multiple updates
and follow up as work slowly progressed (e.g. July 2019, August 2019, October 2019, j
1YATER DEPARTMENT
ENGINEERING&CAPITAL DELIVERYDMSION
The City of Fort North♦200 Texas Strut•Fort Worth,Texas 76102 j
817-392-8240♦Fax 817-392-8195
H:\CFMRHWTP HSPS SwitchGear Replacement(02315)1ConstruedonEegal Closeoulllet2;Construction Closout Notice to Texsnn March 2020,
Final.doc
I
j %
January 2020, and Feb 2020). As per most recent update in March 2020, however,
there are still around 10 items remaining on punch list.
5. Keeping everything in perspective,the City will extend the contract time to substantial
completion to accommodate the Oncor delays and seasonal plant shutdowns,and by an
additional 120 days-to June 15,2019, for the punch list work completion: However,
that leaves your firm exposed to liquidated damages,at$650/day,from June 15,2019
to the present.
6. The punch list must be completed ASAP and the project must reach Final
Acceptance no later than April 10, 2020. Failure to do so will subject Texsun to
further financial losses as the City will close the contract, perform or have
performed any remaining punch list items and withholding not only the accrued
liquidated damages to that date but also the cost to complete the punch list items.
7. The City will consider any justifiable time relief should it be presented on or before
Final Acceptance or April 10,2020,whichever occurs first.
If there are any questions, please do not hesitate to contact me at 817-392-8214 or
Farida.Go deryaAfo rtworthtexas.g.ov.
Sincerely,
Farida Goderya,PhD,PE
Senior Project Manager
Distribution:
Tom Crew and Steve Miller,Texsun Electrical Contractors
Chris Harder,PE;Laura Wilson,PE;Tony Sholola,PE;David Townsend,PE;FWWD
Tim Campbell,PE;LKC;Puncet Gupta,Gupta&Associates
Michael Graves,PE;Paul Roach,PE;CP&Y
Doug Black,Legal
Surety Info:Bond#9829099
John W Schuler(Attorney-in-fact)
Great American Insurance Company of New York
Address:2435 N Central Expressway, Suite 600,Richardson TX 75081
Tel No.: 800-365-6065
1
Sholola, Tony
From: Goderya, Farida
Sent: Tuesday,July 14,2020 11:55 AM
To: Sholola,Tony
Subject: RE: Reminder:Waiting for you to sign 48132 C01 Rolling Hills WTP Pump Station
Switchgear Rehab,Tony*July 2020
Importance: High
Tony,
The time extension of 460 days is correct and this is how it is estimated:
• Notice to Proceed (NTP): September 12, 2016
• Original Completion Date March 11, 2018 (with 545 calendar days)
• Actual Substantial Completion given February 13, 2019.
• The contract extended to June 15, 2019, by giving additional 120 days for long punchlist (-140 items).
• Hence the total time extension given 460 days;time calculated between Original completion date
(311112018) and Extended completion date (611512019). Not sure, how 420 days came about!!
• FYI, here is some 300 days between Extended completion date (611512019)and the Legal letter Time
(4110120);for which there is no time extension given, and is subject to LID and final payment
negotiations.
Call or email with questions. Regards. Farida
----------------------------------------------------
Farida Goderya, PhD,PE ISenior Project Manager (Fort Worth Water Department (FWWD)
Office: 817-392-8214 1 Cell:817-851-4910 (Farida.Goderva@fortworthtexas.gov
City of Fort Worth—Working together to build a strong community
FWWD Mission—Enable our Community to thrive with Clean Water done right every time
From:Goderya,Farida
Sent: Monday, May 11,2020 11:54 AM
To:Sholola,Tony<Anthony.Sholola@fortworthtexas.gov>
Subject: RE: Reminder:Waiting for you to sign 48132 C01 Rolling Hills WTP Pump Station Switchgear Rehab,Tony
Importance: High
Hello Tony,
Here is my write up....
Justification (Summary of reasons)for additional 429 days(460 days)
1. Overall Contract Details:
a. Notice to Proceed (NTP): September 12,2016
b. Overall Duration (Final Acceptance)545 days. Original Completion Date March 11, 2018
c. Actual Substantial Completion given February 13,2019. We have the functional use of facility, since July
2018.
2. Oncor coordination and work delays:
1
o. Per original construction schedule, Oncor work to begin 1/6/2017 and energize 3/27/2017
b. Dialogue with Oncorstarted September 2O16 and Oncoragneementfina|k/executed 3/3/ZD17 �
($268,640). OnceUncoragremmentIovoicepaid, G/1f/2D17, on|ythaoDncormobiUzedtothe |
site. Oncor work completed ~1Z/3l/2O17. |
�
c. There were multiple RHWTP shutdowns to incorporate and tie in Oncor substation new gear with plant
new electrical gear, overall, there were eight shutdowns, started in October 2017 and the last one was
inJune2U1O. |
3. Other Miscellaneous challenges causing delays: !
a. Operational and seasonal shutdowns, The shutdown ofH3PS only allowed
'during winter months
/Novemberthnou&hFebruary). �
` �
h. Heavy rain during 2017 and 2018 and Contractor(Texsun) being the electrical contractor, not fully
equipped to deal with aftereffects of ponding and mud puddles;and not usedto beingthe prime
contractor.
c. The preliminary/initial punch list issued in January Z019 (~14Oitcms). Because ofa long list ofitems,
additional gO days were given to complete the punch list.
d. Contractor says/maintained that because of initial delays,they assigned additional workers to another
' job. Moreover,they claimed that they had challenges in retaining and hiring field personnel.
e. Site superintendent being a good electrician,may not be an efficient or right field supervisor!
` ` |
|
`
|
|
|
�
�
'
�
/
|
�
Soto, Vania Elizabeth
From: Black, Doug
Sent: Thursday,August 20, 2020 5:07 PM
To: Soto,Vania Elizabeth
Cc: Sholola, Tony; Goderya, Farida
Subject: Replacement CO
Attachments: 48132 C01 Rolling Hills WTP High Service Pump Station (HSPS) Corrected.pdf,48132 C01 Rolling
Hills WTP High Service Pump Station (HSPS)#2.pdf
Vania—
Water has presented for my review the attached replacement CO document, see "Corrected".
It replaces the one currently on file in your office (attached with "#2").
Please swap the documents so there will be an accurate record.
Thanks,
Doug
Douglas W Black
Senior Assistant City Attorney
200 Texas Street
Fort Worth, Texas 76102
817-392-7615 Direct
Doug.Blackkfortworthtexas.gov
Due to the ongoing coronavirus pandemic,the Fort Worth City Attorney's Office has implemented a
department-wide telework and all staff, except the City Attorney, are working remotely. You may
communicate with me by using my customary email address and telephone extension number.
City of Fort Worth— Working together to build a strong community.
FnTWORTH.
RECIPIENTS- PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS
ATTORNEY-CLIENT COMMUNICATIONS.
This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity
to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you
are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient,be advised that
you have received this e-mail in error and that any use,dissemination, forwarding,printing, or copying of this e-mail is
strictly prohibited. If you have received this e-mail in error,please immediately notify Doug Black at the City of Fort
Worth City Attorney's Office (817) 392-7615.
i