HomeMy WebLinkAboutContract 53179-AR3 CSC No.53179-AR3
FORT WORTH City of Fort Worth
Y _ Construction Allowance Request
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179
Client Project#(s) CO2101
Project Description Silver Creek Roadway Improvements Phase 2 between Brewer High School and Live Oak
Contractor Texas Bit/Texas Materials Group,Inc. CA# 3 Date 6/19/2020
City Project Mgr.Alejandra Ayala City Inspector Jahn Crowley
Dept. UNIT I UNIT II Contract Time
Totals (CD)
Original Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64
Extras to Date
Credits to Date
Current Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64
Go to ADD&DEL Tabs to Enter CA Backup $75,664.60 $34,284.20 $109,948.80
Original Allowance Available to Allocation $200,000.00 $100,000.00 $300,000.00
Allowance Funds Previously Allocated $2,075.00 $29,750.00 $31,825.00
Remaining Funds Available for this Allocation $122,260.40 $35,965.80 1 IL $158,226.20
JUSTIFICATION(REASONS)FOR CHANGE ORDE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all materials for the 11"Pulverization of Silver Creek Road,Item
Numbers: Unit 1#9-11"Pulverization and Unit II#6-11"Pulverization. Approximately 9,284 SY(Unit 1)and 4,181 SY(Unit 11)were not included in the bid quantity. This
Construction Allowance is to add additional quantity to the Item Numbers mentioned above.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will
be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager
signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance
and reporting requirements.
ontractors Company NaW a ntract Signat re
p Pedro Alonso �� ` "�
Texas Bit I Texas Materials Group Inc. Pedro AlonSO 06/22/2020
Inspector/Inspection Supervisor Date Project Manager Date
Jut22,2020 &%ghd!-a�yala Ju122,2020
kla"amn
Program Manager Date Date
Aug 13,2020
Assistant Director(Dept) Date I Director,Contracting Department(Dept) Date
.Prwr(Mg 17,20 W:30 CDT, Aug 17,2020 ��7�-Y-� Aug 17,2020
Assistant City Attorney Date oer Date
/5-a'— Aug 18,2020 Dana eurandoFF Aug ,2020
."rsmar wss.uuoaaacnn li
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Construction Allowance Additions
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179
Client Project# CO2101
Contractor Texas Bit/Texas Materials Group,Inc. PM Alejandro Ayala Inspector John Crowley
Construction Allowance Submittal# O3 Date fi11912020
ADDITIONS
ITEM DESCRIPTION DEPT ty Unit Unit Cost Total
9 11"Pulverization UNIT 1 9,284.00000000 SY 8.15 75,66 .60
6 11"Pulverization UNIT II 4,181.00000000 SY 8.20 3 ,28 .20
UNIT 1 75,664.60
UNIT 11 $34,284.20
Sub Total Additions 109,948.80
Change Order Additions Page 2 of 4
Fo R I WORTH City of Fort Worth
T Construction Allowance Deletions
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179
Client Project# CO2101
contractor Texas Bit I Texas Materials Group,Inc. PM Alejandro Ayala Inspector John Crowley
Construction Allowance Submittal# O3 Date 8/19/2020
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
UNIT I 50.00
UNIT 11 50.00
Sub Total Deletions 50.00
Change Order Deletions Page 3 of 4
MISBE for this Construction Allowance
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Construction Allowances
co# DATE AMOUNT
Total $0.00
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
i
liC
Name tnployee/Signature
Sr. Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
4.p444UQ��
vd�10 fuRT O9�0
I
ATTEST: o .1
oo *�
�n�p5o4
Mary J.Kayser,City Secretary
i
I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Request for Information — Initiation Form
Form should be completed by Contractors Project Manager or Designated Representative
Project Name: SILVERCREEK ROAD RFI#:
Project No. (CPN): CO2101 Date Submitted: 06/10/2020
Contractor: TexasBit Response Needed by(NLT):
City Project Manager: ALEX AYALA Design Engineer: MV ENGINEERING, INC.
RFI Title (Short Description): 11" Pavement Pulverization Overrun
Attachments Image ❑ Document C7
RFI Reference Data (If Applicable):
Specification Section No. Spec Page No Paragraph No.
Drawing Sheet No. Drawing Detail Title: Other:
RFI Question or Clarification Needed: (Describe the issue and clearly state the question. Provide field data related to the
issue, including street location,distance measurements and pictures if applicable.)
We have calculated the 11" pulverization quantity in the project and have come up with the
conclusion that the estimated plan quantity total is incorrect. Plan quantity matches area of
existing width of roadway however does not account for added widening of the road.
See chart below for our new estimated totals on the project.
IWIM gd umt Eft&eam Differsee Rite Add tCut
MUMAM
9 UM I 11'Uvetwon 26,784 SY 35IMSY 91 SY .15 7 'lm
S UQ U 11*Uvotwon 709 SY a,=SY $B.20 . 4.20
Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his
knowledge of the project and existing conditions to assist with accelerating the response)
Additional cost will be paid out of the construction allowance for the base bid and
alternate bid.
Does the Contractors Recommended Solution require a Change Order? : Yes ❑ No ❑
Potential Impact to the City of Fort Worth ( Schedule, Scope, Cost):
added cost.
Is This RFI Stopping ALL work on the project? Yes ❑ No
If yes, why was this issue not foreseen and sufficient response time provided?
Alonso, Pedro (TexasBit)
From: Ayala, Alejandra <Alejandra.Ayala@fortworthtexas.gov>
Sent: Thursday, May 28, 2020 4:29 PM
To: Fabian A. Herrera; Perez, Aaron R (TexasBit)
Cc: Crowley, John; Brown, TJ (TexasBit); Alonso, Pedro (TexasBit)
Subject: RE: [EXT] CO2101 Silver Creek - RFI #4 11" Pulverization Overrun
Fabian,
To clarify:
Item Bid Amount Engineers Difference Price Additional Cost
Estimate
9 Unit I 11" Pulverization 26,784 SY 36,068 SY 9,284 SY $8.15 $75,664.60
6 Unit II 11" Pulverization 4,789 SY 8,970 SY 4,181 SY $8.20 $34 284.20
K6n&-1e,W dk,
Aleja4l rya,(Alex) Aye PE
Sr. Project Manager I TPW
0: 817-392-8883 1 C: 682-201-9106
Aleiandra.Aya/a@fortworth texas.goy
From: Fabian A. Herrera [mailto:fherrera@mv-engineering.com]
Sent:Thursday, May 28, 2020 3:59 PM
To: Perez,Aaron R (TexasBit) <aaron.perez@TexasBit.com>
Cc: Crowley,John <Johnny.Crowley@fortworthtexas.gov>; Ayala,Alejandra <Alejandra.Ayala@fortworthtexas.gov>;
Brown,TJ (TexasBit) <tj brown @texasbit.com>; Alonso, Pedro (TexasBit) <pedro.alonso@texasbit.com>
Subject: RE: [EXT] CO2101 Silver Creek- RFI#4 11" Pulverization Overrun
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Unit I Unit II
Pulverization I 36o68 8970
From: Perez, Aaron R (TexasBit) <aaron.perez@TexasBit.com>
Sent: Wednesday, May 27, 2020 3:47 PM
To: Fabian A. Herrera <fherrera@mv-engineering.com>
Cc: Crowley,John <Johnny.Crowley@fortworthtexas.eov>; Alejandra.Ayala@fortworthtexas.gov; Brown,TJ (TexasBit)
<tj brown @texasbit.com>;Alonso, Pedro (TexasBit) <pedro.alonso@texasbit.com>
Subject: RE: [EXT] CO2101 Silver Creek- RFI#4 11" Pulverization Overrun
1
Fabian,
Can you give us your numbers for Units I and II so we can update the RFI?
Thanks,
Aaron
From:Ayala, Alejandra <Aleiandra.Ayala@fortworthtexas.gov>
Sent: Monday, May 18, 2020 1:57 PM
To:Alonso, Pedro (TexasBit) <pedro.alonso@texasbit.com>; Brown,TJ (TexasBit) <ta brown @texasbit.com>; Perez,Aaron
R (TexasBit) <aaron.perez@TexasBit.com>
Cc: Fabian A. Herrera (fherrera@mv-engineering.com) <fherrera@mv-engineering.com>; Crowley,John
<Johnny.Crowlev@fortworthtexas.gov>
Subject: [EXT] CO2101 Silver Creek- RFI#4 11" Pulverization Overrun
All,
Please update the attached RFI with the correct amounts. This will be paid out of the construction allowance
for the base bid and the alternate bid.
Sincerely,
Alejandra (Alex) Ayala, PE
Sr. Project Manager
City of Fort Worth
Transportation & Public Works Department
200 Texas Street, 2nd Floor
Fort Worth,Texas 76102
0: 817-392-8883 1 C: 682-201-9106
Aleiandra.Aya/a@fortworth texas.goy
City of Fort Worth—Working together to build a strong community.
FORT WORTH
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you are
expecting this email and know the contents are safe.ATTENTION: Ce courriel vient de 1'exterieur de 1'entreprise. Ne
cliquez pas sur Ies liens, et n'ouvrez pas Ies pieces jointer, a moins que vous ne connaissiez 1'expediteur du courriel et
savez que le contenu est securitaire.
CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you are
expecting this email and know the contents are safe.ATTENTION: Ce courriel vient de 1'exterieur de 1'entreprise. Ne
cliquez pas sur Ies liens, et n'ouvrez pas Ies pieces jointer, a moins que vous ne connaissiez 1'expediteur du courriel et
savez que le contenu est securitaire.
2