Loading...
HomeMy WebLinkAboutContract 54317 Received Date: 08/20/20 Received Time: 1:26 PM Developer and Project Information Cover Sheet: Developer Company Name: Bloomfield Homes,L.P. Address, State,Zip Code: 1050 E.Hwy 114., Suite 210 Southlake,Texas 76092 Phone&Email: (817)416-1572 1 donAbloomfieldhomes.net Authorized Signatory,Title: Donald J.Dykstra I President Project Name: Hulen Trails Phase 1 Brief Description: Water, Sewer,Paving, Storm Drain, Streetlights Project Location: S Hulen St&Old Cleburne Crowley Rd Plat Case Number: None Provided Plat Name: I Hulen Trails Mapsco: None Provided Council District: 6 CFA Number: CFA20-0075 City Project Number: 102565 1 1PRC20-0001 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 1 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] City Secretary Number: 54317 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT("Agreement") is made and entered into by and between The City of Fort Worth("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Bloomfield Homes, L.P. ("Developer"),acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth,Texas or its extraterritorial jurisdiction,for a project known as Hulen Trails Phase 1 ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement,and Developer may be required to make dedications of land,pay fees or construction costs,or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. City of Fort Worth,Texas OFFICIAL RECORD Page 2 of 16 Standard Community Facilities Agreement CITY SECRETARY Rev.10/5/19[NPC] FT. WORTH, TX 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments; Oversized Water Line The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: X Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving X Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. As a condition of the Project, Developer is required to construct an 8 inch water line within the Hulen Street right-of-way as depicted in Exhibit A.During the review of the Engineering Plans,the City requested and the Developer agreed to oversize the 8 inch water line in Hulen Street to a 16 inch water line. Due to Developer's desire to proceed to construction quickly, Developer chooses to construct the 16 inch water line without requesting that the City reimburse Developer for the difference between the cost of constructing the 16 inch water line the City requested and the cost of constructing the 8 inch water line the Developer was required to construct. Developer understands that because the construction costs were privately bid and the Developer has not provided a development bond for the entire cost of the Improvements in this CFA as required by chapter 212, subchapter C of the Texas Local Government Code for the City to participate in the cost, the City is prohibited from paying Developer for the cost of oversizing the water line from 8 inches to 16 inches. BY EXECUTING THIS AGREEMENT, DEVELOPER AGREES THAT DEVELOPER SHALL NOT RECEIVE ANY REIMBURSEMENT FROM THE CITY FOR THE COST TO OVERSIZE THE WATER LINE FROM AN 8 INCH WATER LINE TO A 16 INCH WATER LINE AND DEVELOPER WAIVES ALL CLAIMS AGAINST THE CITY FOR THE COST OF OVERSIZING THE WATER LINE. City and Developer agree that should the City Council place a water main capacity charge on the 16 inch water line within the Hulen Street right-of-way, Developer may be eligible to receive reimbursement for the costs incurred by Developer for oversizing the 8 inch water line to a 16 inch water line in accordance with Chapter 35, Article 111, Division 4 of the City Code of the City of Fort Worth if the City collects water main capacity charges from other developments within the boundary established for the water main capacity charge. The City makes no guarantee that the City Council will establish a water main capacity charge for the 16 inch water line Developer constructs in the Hulen Street right-of-way. Developer understands and agrees that the 16 inch water line Developer constructs City of Fort Worth,Texas Page 3 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] in the Hulen Street right-of-way is not currently eligible pursuant to the City Code to have a water main capacity charged imposed on it by the City Council. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and City of Fort Worth,Texas Page 4 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors,or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. City of Fort Worth,Texas Page 5 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] (e) Developer will require the Developer's contractors to give forty-eight(48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed,and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT OF ANY INJURIES OR DAMAGES SUSTAINED B Y ANY PERSONS,INCL UDINGDEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION,DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE City of Fort Worth,Texas Page 6 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer.If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must City of Fort Worth,Texas Page 7 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office Bloomfield Homes, L.P. City of Fort Worth 1050 E. Hwy 114., Suite 210 200 Texas Street Southlake, Texas 76092 Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. City of Fort Worth,Texas Page 8 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three(3)years after final payment under the contract,have access to and the right to examine any directly pertinent books, documents,papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. City of Fort Worth,Texas Page 9 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys,have had the opportunity to review and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting parry shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"has the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility City of Fort Worth,Texas Page 10 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. City of Fort Worth,Texas Page 11 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original,but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder,and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 12 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] 34. Cost Summary Sheet Project Name: Hulen Trails Phase 1 CFA No.: CFA20-0075 IPRC No.: IPRC20-0001 City Project No.: 102565 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 1,049,194.16 2.Sewer Construction $ 652,548.01 Water and Sewer Construction Total $ 1,701,742.17 B. TPW Construction 1.Street $ 1,804,394.40 2.Storm Drain $ 1,566,881.79 3.Street Lights Installed by Developer $ 170,545.47 4. Signals $ - TPW Construction Cost Total $ 3,541,821.66 Total Construction Cost(excluding the fees): $ 5,243,563.83 Estimated Construction Fees: C. Construction Inspection Service Fee $44,590.00 D. Administrative Material Testing Service Fee $29,988.00 E. Water Testing Lab Fee $2,490.00 Total Estimated Construction Fees: $ 77,068.00 Choice Financial Guarantee Options,choose one Amount Mark one Bond= 100% Completion Agreement=100%/Holds Plat $ 5,100,325.97 x Cash Escrow Water/Sanitary Sewer= 125% $ 179,047.33 x Cash Escrow Paving/Storm Drain=125% Letter of Credit=125% City of Fort Worth,Texas Page 13 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC) IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER Bloomfield Homes,L.P. Dana J"%�/— Dana Burghdoff ¢18,202008:58 CDT) Don Dykstra(Aug 17,202014:46 PDT) Dana Burghdoff Donald J.Dykstra Assistant City Manager President Date: Aug 18,2020 Date: Aug 17,2020 Recommended by: Evelyn Rob (Aug 17,202016:47 CDT) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form &Legality: RicAwrd A. mey-t-�ceti Richard A.McCracken(Aug 17,202021:21 CDT) Contract Compliance Manager: Richard A.McCracken Sr.Assistant City Attorney By signing, I acknowledge that I am the person M&C No. N/A responsible for the monitoring and Date: administration of this contract,including ensuring all performance and reporting Form 1295: N/A 4p44oa4�� requirements. F gpFORt�aa /,,',,n /,,,/ ATTEST: d V o g=� Laurie Lewis(Aug 17,2020 20:19 CDT) o o 0000 00*�d ntzp5gpa Laurie Lewis Interim Development Manager Mary J.Kayser/Ronald Gonzales City Secretary/Assistant City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth,Texas Page 14 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ❑ Attachment 2—Phased CFA Provisions ❑ Attachment 3 —Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 15 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACIEMENT"1" Changes to Standard Community Facilities Agreement City Project No. 102565 Negotiated changes are contained in the body of this Agreement. City of Fort Worth,Texas Page 16 of 16 Standard Community Facilities Agreement Rev.10/5/19[NPC] SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Hulen Trails,Phase 1,City Project#102565 UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity Water Facilities 1 0241.1118 4"-12"Pressure Plug 0241 14 EA 11 $162.92 $1,792.12 2 3305.0109 Trench Safe 330510 LF 14,536 $0.20 $2,907.20 3 3305.1002 Concrete Encasement 330522 LF 23 $56.60 $1,301.80 4 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 4.0 $20,752.01 $83,008.04 5 3311.0241 8"PVC Water Pipe 33 11 10' LF 9,232 $257,757.44 331,12 $27.92 6 3311.0241 8"PVC Water Pipe,CSS Backfill 3311 10' LF 105 $5,767.65 3311 12 $54.93 7 3311.0441 12"PVC Water Pipe 3311 10' LF 3,626 $189,385.98 3311 12 $52.23 8 3311.0442 12"Water Pipe,CSS Backfill 3311 10' LF 227 $14,979.73 3311 12 $65.99 9 3312.0001 Std.Fire Hydrant Assembly w/6"Gate Valve&Valve Box 33 12 40 EA 14 $4 141.84 $57,985.76 10 3312.0117 Connect to Existing8"W.L.Stub-out 33 12 25 EA 1 $907.09 $907.09 11 3312.1002 2"Combination Air Valve Assemblyfor Water 33 12 30 EA 1 $9,168.21 $9,168.21 12 3312.2003 1"Domestic Water Services 33 12 10 EA 224 $918.90 $205,833.60 13 3312.2103 11/2"Domestic Water Services 33 12 10 EA 1 $1,731.58 $1,731.58 14 3312.3003 8"Gate Valve&Valve Box 33 12 20 EA 22 $1,304.69 $28,703.18 15 3312.3005 12"Gate Valve&Valve Box 33 12 20 EA 9 $2,563.91 $23,075.19 16 3312.4313 36"x 12"Ta in Sleeve&Valve 33 12 25 EA 1 $7,713.58 $7,713.58 17 9999.0001 Sawcut,Remove,&Re air 00 00 00 SY 31 $221.77 $6,874.87 18 9999.0002 Remove&Re air Gravel Drive 00 00 00 SY 36 $61.50 $2,214.00 19 9999.0003 Water Line Lowerin Under Box Culvert in Creek 000000 EA 1 $18,787.88 $18,787.88 20 0241.1106 16"Pressure Plug 024114 EA 2 $594.89 $1,189.78 21 3311.0541 16"Water Pipe 3311 10, LF 1,260 $84,092.40 33 11 12 $66.74 22 3311.0542 16"Water Pipe,CSS Backfill 3311 10, LF 63 $7,765.38 3311 12 $123.26 23 3312.3006 16"Gate Valve w/Vault 3312 20 EA 3 $12,083.90 $36 251.70 Overall Water Facilities Subtotal $1,049,194.16 Sanitary Sewer Facilities 24 10241.1118 4"-12"Pressure Plug 0241 14 EA 4 $55.19 $220.76 25 3301.0002 Post-CCTV Inspection 330131 LF 9,432 $1 A7 $13,865.04 26 3301.0101 Vacuum Test Manholes 330130 EA 45 $110.00 $4,950.00 27 3305,0109 Trench Safety 330510 LF 9,432 $0.56 $5,281.92 28 3305.0113 Trench Water Stops 330515 EA 13 $310.95 $4,042.35 29 3331,3101 SDR-264"Sewer Services 333150 EA 220 $651.65 $143,363.00 3311 10, 30 3331.4115 8"SDR-26 PVC Sewer Pipe 33 31 12, LF 9,023 $30.61 $276,194.03 3331 20 31 3331.4116 8"PVC Sanitary Sewer Pipe w/CSS Backfill 3311 10, LF 409 $56.77 $23,218.93 33 11 12 32 3339.1001 4'Std.Dia.Manhole 33 39 10, EA 45 $3,259.74 $146,688.30 33 39 20 33 3339.1003 4'Extra Depth Manhole 3339 10, VF 150 $168.80 $25,320.00 3339 20 34 9999.0004 Install Warren Protection Per Manhole 000000 EA 2 $3,232.26 $6,464.52 35 9999.0005 Connect to Existing 8"Sewer 0000 00 EA 3 $979.72 $2,939.16 Sanitary Sewer Subtotal $652,548.01 Storm Drain Facilities 36 3137.0102 Large Stone Ri ra,dry 31 37 00 SY 876 $102.80 $90,052.80 37 3137.0104 Medium Pill,d 31 3700 SY 86 $93.50 $8,041.00 38 3305.0109 Trench Safety 330510 LF 4,743 $0.37 $1,754.91 39 3305.0112 Concrete Collar 330517 EA 3 $446.17 $1,338.51 40 3341.0201 21"RCP,Class 111 334110 LF 269 $59.93 $16,121.17 41 3341.0205 24"RCP,Class 111 3341 10 LF 496 $68.11 $33,782.56 42 3341.0208 27"RCP,Class 111 3541 10 LF 417 $77.92 $32,492.64 43 3341.0302 30"RCP,Class III 3541 10 LF 229 $88.03 $20,158.87 44 3341.0305 33"RCP,Class 111 3541 10 LF 27 $105.49 $2,848.23 45 3341.0309 36"RCP,Class 111 3541 10 LF 589 $122.31 $72,040.59 46 3341.0312 39"RCP,Class 111 3541 10 LF 78 $149.72 $11,678.16 47 3341.0402 42"RCP,Class III 3541 10 LF 443 $167.67 $74,277.81 48 3341.0409 48"RCP,Class 111 3541 10 LF 1,029 $204.32 $210,245.28 49 3341.11of 4x2 Box Culvert 3641 10 LF 91 $220.45 $20,060.55 50 3341.1202 5x4 Box Culvert 3641 10 LF 427 $306.31 $130,794.37 51 3341.2003 10x6 Box Culvert 3641 10 LF 444 $598.82 $265,876.08 52 3341.2004 10x7 Box Culvert 374110 LF 204 $653.29 $133,271.16 53 3349.0001 4'Storm Junction Box 33 49 10 EA 6 $4,422.46 $26,534.76 54 3349.0002 5'Storm Junction Box 33 49 10 EA 5 $5,639.38 $28,196.90 55 3349.0004 7'Storm Junction Box 33 49 10 EA 2 $8,243.72 $16,487.44 56 3349.0103 4'Manhole Riser 33 49 10 EA 1 $2,668.83 $2,668.83 57 3349,1000 Headwall,Box Culvert 344940 CY 152 $771.71 $117,299.92 58 3349.4106 27"SET,1 ipe 334910 EA 1 $2,077.67 $2,077.67 59 3349.4109 36"SET,1 pipe 334910 EA 1 $2,730.65 $2,730.65 60 3349.4111 42"SET,1 pipe 334940 EA 1 $3,086.82 $3,086.82 61 3349.4113 48"SET,1 pipe 334940 EA 2 $3,383.63 $6,767.26 62 3349.5001 10'Curb Inlet 33 49 20 EA 11 $5,223.85 $57,462.35 63 3349.5002 15'Curb Inlet 334920 EA 14 $6,589.17 $92,248.38 64 9999.0006 Pedestrian Rail 00 00 00 LF 407 $178.09 $72,482.63 65 9999.0007 4x2 SET 1 e 000000 EA 2 $3,561.72 $7,123.44 66 9999.0008 Sx4 SET,1 e 00 00 00 EA 1 $6 879.65 $6,879.65 Storm Drain Subtotal 1 $1,566,881.79 Water/Sanitary Sewer/Storm Drain Facilities Subtotal $3,268,623.96 This bid is submitted by the entity listed below: Company: By Street Address: City,State,Zip Code: Q S19 �i Phone: I. r �� m I G yV Dus -1Izp(2--> Cont.atoragreestocomplete WOREfor FINALACCEPTANCE within worhingdaysafter(hedntewhenthe CONTRACT ei,-.es ro run ns provided in the General Conditions. END OF SECTION SECTION 00 42 43 Developer Awarded Pmjem-PROPOSAL FORM 1luleaTmits,Phmc 1,City Project Mt02565 UNIT PRICE BID Pno bo Item Idormadon Biddefs Proposal Bidlisl Specificatio° Uoftof Bid Win No. 0° SecdonNo Masora Quantiq' Ud[Pdoe Bid Value Nft Facilities 1 D241.1100 RoroM AWWK Pvm1 02 41 15 SY 2,246 $10.00 522.460.00 2 3211.040D HOWed Lime Q 301b-Y. -01 32 11 29 TO" t99,0 5t65.00 $32.835.00 3 2211.0400 Hvitram Lime a 30 D51B.Y.(ReMo("Q 32 t129 TOR 358,0 St65A0 369070A0 4 3211,0400 HyftW LII110 Q 35 Us1G.Y.WadmiD 321129 TOM 102.0 MUM $1663D.00 5 3211.0501 WLime Tleded Subgraft�_kT_WM 321313 BY 6,638 52A0 $13533.60 8 9211.05018WroTfe61ot1514 fade Co8ocl 32 1129 5Y 13,M $2.40 33019.20 7 3211A601 6'Lhm TcoWod Su u-1-ResWlet 321120 SY 23828 $2,40 357.107.20 8 22110101 6'Cene ete P4wrnejt!1t!esWm,tiaQ 32 13 13 SY 22.372 $33,80 S758.173.60 9 3213,01027'Concmto Pavemoni 060ct 321313 SY 125W 535.60 $447.300.00 10 3213.0104 CConnate Pammme t(A,,t;iWQ 321313 BY 5332 1 S41.70 3222344,40 11 3213.0301 5'Cone Sidewalk 31 1320 SF 1.622 S4,96 $8,026.00 12 321SA301 0'Cone Sidewalk 3113213 SF 1 005 L1.95 38 43B.76 13 3213.050t R-1 Ramp 321320 CA 12 S175D.00 $21.000.00 14 3213.OSN6 P-1 Ra 2 13 20 CA 16 $1,50D,00 $24.000. 15 3441A003 Fumksh/lnsl AA1m Orow+d Mound City Sid 34 41 30 PA 16 SOAO $4 0D0.00 16 3441.4106 Renww Sign Panel OW Post 34 41 15 FA 1 S105.00 ST 5.0D 17 3741.0001 taflk Control 34 71 13 LS 1 $5 2$0.00 $5 250.00 16 9999.0009 1"a4 End of 14044 Bsrtlreda 000000 CA 4 S975A0 $3%0.00 19 OM0010 Rowvc End of Road Sankade 060000 EA 1 $750,00 §60.DD 20 9989.0011 Cww*tn Meador 00 OD 00 LF 121 slo.00 Sl 10.00 21 9999A012 Cwwed In Pavamanl _009000 FA 3 MOM $2.250,00 22 09MOO13 Saweul 2.TDM&DK of Concmle Curb&Gu11x.W 00 00 00 LF 77 Siam 51 424.50 23 9990.0014 R1-1 Map Won 08 OD 00 CA 14 $8230 51,155.00 2A 0093619 St Marker S1ado 00 OD 00 EA 64 27.00 $1 726.00 26 9 .0016 24'The SloeSlt 00 00 00 FA 3 a5.00 33.OD 26 0M.0017 Remov4 and R lr EWslkQ Gravel Ddw 000000 BY 21 00 31.050.0D 27 9999A01610'COtic Sidow&% 0000 OD SF 12,679 %4,751 o mn Paving Sul 61 3043 AO This bid Is oubmAtM by the entity lislad below. Company: Street Address: CHy,State,Zip Cod°: Phone: 9 alula 7 17- WZU ('m(rw•trs•gee+ni�v�pk4e\\'ORI(forEINAL A('fBPf,INf.B wil6m 95 Rur4®f 4,n anar Ne dale nhm aK ('UIYT M(T coe�cncva k rvn n prm�lcd in tlxe(:nrrd('uW rhrn t:�o UF'BECTION C1TY�F�MIe�0.1H ��Lwb Phml .r[UN em mg09N.aaYHL�WaRAWwenaD PROAaT9 ryngetr Nlm565 F�nxJ remrA�� W 4l l Od nopn, SECTION Ito 42 43 Developer Awarded Projects-PROPOSAL FORM Bolen Trails,Phase 1,City Project N102565 UNIT PRICE BID Project Item Information Bidders Proposal Bidlist Description Specification Unit of Bid Unit Pnce Bid Value Ile m N. Section No. Measure Quantity Street Lighting Facilities 1 2605.3011 2"CONDT PVC SCH 40 T) 26 05 33 LF 4,571 $9.39 $42,921.69 2 3441.1408 NO 6 Insulated Elec Condr 34 41 10 LF 13,713 $1.06 $14,535.78 3 3441,1633 Type 338 Ann 344120 EA 38 170.00 $6,460.00 4 3441.3201 LED Liohtinq Fixture R-2 344120 FA 34 $258.00 $8,772.00 5 3441.3201 LED Li htin Fixture R-0 344120 EA 4 $258.00 $1.032.00 6 3441.3301 R Ilium Foundation TY 1,2,and 4 3541 20 EA 38 $1,067.00 $40,546.00 7 3441.3341 Rdwy Blum TY 11 Pole 3441 20 EA 38 $1,481.00 $56,278.00 Street Lighting Subtotal $170,545.47 This bid is submitted by the entity,listed below: C. Deny: By: Wolfe Street Address: City,State,Zip Code: Phone: aR Title: President 0"':07/20/2020 Cnntructnraarrnto<omplete WORK far FINAL ACCEPTANCE wind. 30 workine dv�.ancr the darewhen the CONTRACT romnence�to run n.prodded in lhr G--1 Conditions. END OF SECTION CRY OF FORT lom STAnN hu j ND.Wt CONSTRUCTON alp PROPOS.U.-DE-LUPER AWAROEO PROIECl2 d Fum ReInMl » .— W! eid Fmpou BENBROOK LAKE 0 w r m SUM ER C EEK DR z W RISINGE 0 0 S HUL O o (U McPHERSO Q O r w CV 0 G w N STEWART FELTZ RD z r z O O �� w N o ����� SITE o 80 0� W CLEBURNE RD N �ti5 0 5 w � z W CLEBURNE CROWLEY RD (L N w 0 a W E LONGHORN TRAIL Q LL v S cn 87 a� SCALE: IL" � 590009 L CPN 102565 MAPSCO# 117 E&F cn 0 �IULEN TES n c PHASE R 0 n LOCATED H1 0 1t.1111 11 OF FORT WOR 111L7.19 TEXAS i ~ JULY9 2020 _ PRF2 FOR: P]EPARM]BY: BLOOMFIELD HOMES (300DW1 e 1050 E.HWY 114,SUITE 210 M.LRSHAL' 8 O Southlake,TX 76092 CIVIL ENGINEERS-PLANNERS-SURVEYORS Phone(817)416-1572 2405 Mustang Di (,Gr 3 vne,Texas 76051 Metro w N HULEN TRAMS A MS W E PHASIE I VVA l�i'ev7ll�7�l�1yC'e¶Lilll7�111g Ell av p oa S SCALE. E ¶ O N O N O N CD E(3rCONC. �R 1AA WATER MAIN —0. �4 0 1� 7 2 1 .17 j. . 1. . 12 .x31 ss Ar.r Z.,0 16'WATER LINE 3 -fl� ff.„ ver® Z, Q ars. Li— 12'WATER LINE o W 128 WATER UNE 12'WATER UNE _� n 12'WATER LINE 0 168WATERLINE n i cn 0 a NOTE : = ALL WATER LINES SHOWN ARE 8' IN DIAMETER UNLESS OTHERWISE NOTED PREPARM BY. PREPARED FOR: rn (3®0IDS-' BLOOMFMLD HOMES LEGEND JVARSkL L, g 1050 E.HWY 114,SUITE 210 0 CIVIL ENGINEERS—PLANNERS—SURVEYORS Southlake,TX 76092 W PROPOSED WATER LINE 2405 Mustang Drive,Grapevine,Texas 76051 Phone(817)416-1572 Metro(817)329-4373 W EXISTING WATER LINE 2 OF 2 N HULEN TRAMS A MS W E PHASIR I 'WC,1MR�v77��y=fig ET av p oa S SCALE. E ¶ O N O N 0(8'WATER LINE MAW V7]E T$gURNE ROAD CR 1035 -------------------------------- N v . . . . . . . . . . . ---- -- Imo' ' Q -- ---- Li N cn . . . . . . . . . . . . . . . 14'"NAFER UNE . 12'WATER LINE cn 0 L c a� a� cn 0 n c 0 n cn 0 a NOTE : = ALL WATER LINES SHOWN ARE 8' IN DIAMETER UNLESS OTHERWISE NOTED PREPARM BY. PREPARED FOR: rn G'®OID V)I N1 BLOOMFIELD HOMES LEGEND �A�BS IL, g 1050 E.HWY 114,SUITE 210 0 CIVIL ENGINEERS—PLANNERS—SURVEYORS Southlake,TX 76092 / W PROPOSED WATER LINE 2405 Mustang Drive,Grapevine,Texas 76051 Phone(817)416-1572 Metro(817)329-4373 W EXISTING WATER LINE 1 OF 2 (� INH�J EN TRAMSW E �v�p i� PHAS1E I SIE VV lC.d'R E=IT"A—V S CPN 102565 SCALE. V 4 00' N �7 1 rl 7 O " ° M N --n "a a ' t� " EX.368 S S.LINE AMP s, � i Q 71 LL z. c� DS(36'S S.LINE 72 " "® ® afi a s �e ®>4 ~ EX.36 S S.LINE s= (D / a� U) 0 n c 0 n cn 0 c LEGEND S PROPOSED SEWER LINE M S EXISTING SEWER LINE PREP BY: PREPARED]B®Ili' rn GOODWW-1 BLOOMFIELD HOMES o NOTE : 1050 E.HWY 114,SUITE 210 / ALL PROPOSED SANITARY SEWER CIVIL ENGINEERS—PLANNERS—SURVEYORS Southlake,TX 76092 LINES SHOWN ARE 8" IN DIAMETER 2405 Mustang D'I (,Grapevine,3 3 as 76M1 Phone(817)416-1572 w UNLESS OTHERWISE NOTED TOT N HULEN TRAMS PHASE b W E PA'xvW(G 1G=11ll av1Bvv S SCALE:'Eo V _400 9 o moa: o O ' LO s a x� � o 14 w0 e, a �e K .......... Q x z X amp x U13 13 x x�a, 00 N ern ' cn c „ s U O L ^ ara a C N S LEGEND a� o d w PROPOSED 34 ' B-B ARTERIAL PROPOSED 29 ' B-B ROADWAY ROADWAY W/ 80' R.0. W. co W/ 50' R.O. W. 9" PCC PAVEMENT W/ 6' 6" PCC PAVEMENT W/ 6" LIME-STABILIZED SUBGRADE LIME-STABILIZED SUBGRADE cn PREPARED BY: 2" ASPHALT PAVEMENT TYPE D C'QGDVENll PER SECTION 32 /2 /6 OVER 4 H MARSHAIL,IL c PROPOSED 37' B-B ROADWAY ASPHALT PAVEMENT T YPE B PER CIVIL ENGINEERS—PLANNERS—SURVEYORS W/ 60' R.O. W. SECTION 32 /2 /6 OVER 6" LIME � 2405 Mustang Drive,Grapevine,Texas 76051 = 7 H PCC PAVEMENT W/ 6 H STABILIZED SUBGRADE 9 36 Metro(817)329-4373 LIME-STABILIZED SUBGRADE LBS/SY PER SECTION 32 // 39 PREPARED FOR: 0) - SIDEWALK PER THIS CONTRACT BLOOM ULD HOMES O 1050 E.HWY 114,SUITE 210 SIDEWALK BY HOMEBU/LDER Southlake,TX 76092 w 0 ADA RAMPS PER THIS CONTRACT Phone(817)416-1572 TOT IN ZhULEN TRAMS PHASE I W E STORM DRAW F-=rr"B-1 S CPN ll®2565 O N O N 0) ° , 44 17 ;n41 17 7 7— 1 21727 —1 2 N �a B8 6x 37 34 1 1 31 30 1 1 17 w m a2 21 ° O °.. 17 1. d LL- 2 �„ s= / a� u) 0 n c 0 n cn 0 a� LEGEND _ PROPOSED STORM DRAIN LINE EXISTING STORM DRAIN LINE � PREPARED 18Y. PREPARED FOR: GyOODVnN-. BLOOMFIELD HOMES PROPOSED STORM DRAIN INLET O - SHALL, g 1050 E.HWY 114,SUITE 210 MA / CIVIL ENGINEERS—PLANNERS—SURVEYORS Southlake,TX 76092 -- ° PROPOSED STORM DRAIN AND HEADWALL 2405 Mustang Drive,Grapevine,Texas 76051 Phone(817)416-1572 •e. LiJ Metro(817)329-4373 HIMEN TRAMS N PHASE W E S 1L P=T LIGHT yL 1L 1CeL]1117L1L1®1L 1l "C—¶1L 1, S C1r 102565 SCALE. 7( �o ¶ t.��X'1\II' 1100 4009 z, zz zo ,s .s ,. ,9 .z .. .o a , a 9 ,2 NA-- O - Ln &�:, , a ' IU k3'r - N a. m -. -- 7 - ZO L Z LL 81 O -- 5: .. ETA Q 2. 12 a o �a L / U) 0 n /U) 0 n / cn 0 LEGEND I ♦& LIGHT POLE PRIEPARIEDBY. PREPARED FOR: 0' GGGD I BLOOMFEFLD HOMES 00 EXISTING LIGHT POLE M(ARSHAL]L 1050 E.HWY 114,SUITE 210 / CIVIL ENGINEERS—PLANNERS--SURVEYORS Southlake,TX 76092 2405 Mustang Drive,Grapevine,Texas 76051 Phone(817)416-1572 W PROPOSED STREET NAME SIGN Metro(817)329-4373 COMPLETION AGREEMENT— SELF FUNDED This Completion Agreement ("Agreement"), is made and entered into by and between the City of Fort Worth, ("City")and Bloomfield Homes,L.P.,a Texas Domestic Limited Partnership, authorized to do business in Texas, ("Developer"), effective as of the last date executed by a Party hereto. The City and the Developer may collectively be called the "Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 75.968 acres of land located in the City, the legal description of which tract of real property is marked Exhibit "A"—Legal Description, attached hereto and incorporated herein for all purposes, ("Property"); and WHEREAS, the Developer intends to develop the Property as an addition to the City through plat FP-19-073; and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development, Hulen Trails Phase 1 for Water, Sewer, Paving, Storm torm Drain and Streetlights ("Improvements"); and WHEREAS, the City has required certain assurances that the Developer will cause to be constructed to City standards the Improvements pursuant to the Community Facilities Agreement; and WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. NOW, THEREFORE, for and in consideration of the mutual covenants and agreements hereinafter set forth, it is hereby agreed by and between City and Developer as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs(as shown on Exhibit`B")required to complete the Community Facilities in the aggregate should not exceed the sum of Five Million One Hundred Thousand Three Hundred Twenty Five and 97/100 Dollars ($5,100,325.97), hereinafter called the "Completion Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 1 of 12 the Community Facilities may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. City hereby waives the requirement for developer to deposit a financial guarantee of 100% of the Hard Costs under the CFA Policy. 3. Completion by the Developer. The Developer agrees to complete the Community Facilities and pay all Hard Costs in accordance with City standards,the CFA, the Plat, and the Plans as approved by the City. For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Community Facilities pursuant to Section 6, hereof. 4. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to Developer's Financial Guarantee, as described in the CFA Policy, or other requirements for security in connection with the development of the Property and the completion of the Community Facilities that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained herein in lieu thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions of this Agreement shall control. 5. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a) acceptance by the City of the Community Facilities; or(b)mutual written agreement of the Parties. 6. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Community Facilities are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits,the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 2 of 12 7. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Community Facilities the following: A. A statement that the City is not holding any security to guarantee any payment for work performed on the Community Facilities; B. A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; C. A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property; and D. A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in (a), (b) and(c) above. 8. Miscellaneous. A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. B. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: (i) Notice to the City shall be addressed and delivered as follows: City of Fort Worth Development Services 200 Texas Street Fort Worth, Texas 76102 Attention: Contract Management Office Janie Morales, Development Manager Email: Janie.Morales@fortworthtexas.gov Confirmation Number: 817-392-7810 and/or CFA Division Email: CFA(ibfortworthtexas.gov Confirmation Number: 817-392-2025 With a copy thereof addressed and delivered as follows: City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 3 of 12 City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Attention: Richard A. McCracken Assistant City Attorney Confirmation Number: 817-392-7611 (ii) Notice to the Developer shall be addressed and delivered as follows: Bloomfield Homes, L.P. 1050 E. Hwy 114 Suite 210 Southlake, Texas 76092 A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. E. Legal Construction. In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof. G. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to this Agreement. City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 4 of 12 H. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 5 of 12 Executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH: DEVELOPER: Bloomfield Homes, L.P. Dana Burghdoff Dana Burghdoff ug 18,2020 08:58 CDT) Dana Burghdoff Don Dykstra(Aug 17,202014:46 PDT' Assistant City Manager Name: Donald J. Dykstra Title: President Date: Aug 18,2020 Date: Aug 17,2020 Approved as to Form &Legality: Rzdtw--e2 A. McCracken, Richard A.McCracken(Aug 17,2020 21:21 CDT) Contract Compliance Manager: Richard A. McCracken Assistant City Attorney By signing,I acknowledge that I am the person responsible for the monitoring and administration ATTEST: of this contract,including ensuring all performance and reporting requirements. 6/I�1�'vnl///y1 %lam"p�� Lmy/2 ZIPA* V!i � Laurie Lewis(Aug 17,2020 20:19 CDT) Mary J. Kayser Laurie Lewis City Secretary Interim Development Manager M&C: Date: City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 6 of 12 LIST OF EXHIBITS ATTACHMENT "I"-CHANGES TO STANDARD AGREEMENT EXHIBIT A - LEGAL DESCRIPTION EXHIBIT B - APPROVED BUDGET City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 7 of 12 ATTACHMENT "1" Changes to Standard Agreement Self-Funded Completion Agreement None. City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 8 of 12 EXHIBIT A LEGAL DESCRIPTION All that certain lot, tract, or parcel of land, situated in a portion of the Antonio Castello Survey, Abstract No. 271, the W. H. Colthorp Survey, Abstract No. 286, Antonio Fernandes Survey, Abstract No. 506, John Korticky Survey, Abstract No. 914, and the International and Great Northern Railroad Company Survey, Abstract No. 826, City of Fort Worth, Tarrant County, Texas,being part of that certain called 280.597 acre tract described in a deed to Bloomfield Homes, L.P. recorded in Instrument Nos. D218204117, D218204118, D218204119, and D218204120 of the Deed Records of Tarrant County, Texas (DRTCT), and being more completely described as follows, to-wit: BEGINNING at a 1" iron pipe found for an ell corner of said 280.597 acre tract and the Southeast corner of a called 40.004 acre tract described in a deed to Sharon Lynn Sankary recorded in Instrument No. D204323827 (DRTCT); THENCE North 0 deg. 46 min. 54 sec. West along the most northerly West line of said 280.597 acre tract, the East line of said 40.004 acre tract, the East line of a called 1.000 acre tract described in a deed to DTH REO Inc. recorded in Instrument No. D215152949 (DRTCT), the East line of a called 2.000 acre tract described in a deed to O. F. Bush, Sr., et al recorded in Volume 4777, Page 308 (DRTCT), and the approximate centerline of West Cleburne Road (County Road No. 1035), a distance of 753.71 feet to a P.K. nail set with washer stamped "GOODWIN&MARSHALL", herein after referred to as P.K. nail set with washer, for the most northerly Northwest corner of said 280.597 acre tract; THENCE North 89 deg. 37 min. 3 sec. East departing said centerline and continue along the North line of said 280.597 acre tract, the South line of a called 40.006 acre tract described in a deed to Jerry Savelle Ministries, Inc. recorded in Volume 13436, Page 290 (DRTCT), and the South line of Lot 1 Block 1 of Heritage of Faith Christian Center recorded in Cabinet A, Slide 11818 of the Plat Records of Tarrant County, Texas (PRTCT), at 24.44 feet pass a 1/2" iron rod found for the Southwest corner of said 40.006 acre tract, continue a total distance of 2,776.07 feet to a P.K. nail set with washer for the Northeast corner of said 280.597 acre tract and being in the approximate centerline of West Old Cleburne Crowley Junction (County Road No. 1079); THENCE South 0 deg. 34 min. 39 sec. East along the East line of said 280.597 acre tract and said approximate centerline, a distance of 1,023.30 feet to a P.K. nail set with washer; THENCE West departing said East line and centerline, a distance of 1,086.09 feet to a 1/2" capped iron rod set stamped"GOODWIN&MARSHALL", hereinafter referred to as 1/2" capped iron rod set; THENCE North 56 deg. 18 min. 36 sec. West, a distance of 100.07 feet to a 1/2" capped iron rod set; City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 JLE CFA Official Release Date: 07.01.2015 Page 9 of 12 THENCE West, a distance of 189.91 feet to a 1/2" capped iron rod set; THENCE South 34 deg. 58 min. 29 sec. West, a distance of 809.22 feet to a 1/2" capped iron rod set; THENCE North 55 deg. 01 min. 31 sec. West, a distance of 346.42 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 120.00 feet to a 1/2" capped iron rod set; THENCE North 0 deg. 46 min. 54 sec. West, a distance of 110.00 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 50.00 feet to a 1/2" capped iron rod set; THENCE North 45 deg. 46 min. 54 sec. West, a distance of 14.14 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 220.00 feet to a 1/2" capped iron rod set; THENCE South 44 deg. 13 min. 6 sec. West, a distance of 14.14 feet to a 1/2" capped iron rod set; THENCE South 0 deg. 46 min. 54 sec. East, a distance of 10.00 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 50.00 feet to a 1/2" capped iron rod set; THENCE North 45 deg. 46 min. 54 sec. West, a distance of 14.14 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 140.00 feet to a 1/2" capped iron rod set; THENCE South 44 deg. 13 min. 6 sec. West, a distance of 14.14 feet to a 1/2" capped iron rod set; THENCE South 89 deg. 13 min. 6 sec. West, a distance of 80.00 feet to a 1/2" capped iron rod set; City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 10 of 12 THENCE North 0 deg. 46 min. 54 sec. West, a distance of 529.05 feet to a 1/2" capped iron rod set; THENCE North 45 deg. 50 min. 56 sec. West, a distance of 14.13 feet to a 1/2" capped iron rod set; THENCE North 0 deg. 46 min. 54 sec. West, a distance of 30.00 feet to a P.K. nail set with washer in the most westerly North line of said 280.597 acre tract; THENCE North 89 deg. 5 min. 3 sec. East along said North line, a distance of 50.00 feet to the POINT OF BEGINNING, containing 3,309,177 square feet or 75.968 acres of land, more or less. City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 11 of 12 EXHIBIT B APPROVED BUDGET Section I Water $1,049,194.16 Sewer $ 652,548.01 Sub-total $1,701,742.17 Section II Interior Streets $1,804,394.40 Storm Drains $1,566,881.79 Sub-total $3,371,276.19 Section III Street Lights $170,545.47 Sub-total $170,545.47 TOTAL $5,243,563.83 City of Fort Worth, Texas Standard Completion Agreement— Self-Funded Revised 09.07.2017 ME CFA Official Release Date: 07.01.2015 Page 12 of 12