_�'� Change Order Request i
Project Name; Water and Sewer Main Replacements Contract 2015A City Sec No.; 4779�
Project No.(s):1 50601.060043•CO2730-001703 DOE No. N/A CI[yProj.No.:J 02738
Project Descdplion: Miscellaneous Water and Sewer Main Replacements Contract 2015A, I
Conlraclor. Willam J Schultz,Inc dba Circle C Construction Change Order# Dale; 8/17/2020
City Project Mgr.1 Adolfo Lopez City Inspector Donald Watson
Phone Number: a17 392 7t329 Phone Number; 817-205.1911
Dept. Water Sewer Totals Contract Thne
(Calender days)
Original Contract Amount $1600,000.00 $1,500,000.00 $3,000,000.00 365
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,600 000.00 $1 500 000.00 $3,000 000,00 365
Amount of Proposed Change Order $0.00 $67 094.44 $67 094A4 650
Revised Contract Amount $1,500,000.00 $1,567,094.44 $3,067,094.44 1 015
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(If necessary) 1 $0.00 $67,094.44 $67 094.44
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2,24%
MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $3,750,000,00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Tile change order will provide additional funding for replacing and/or relocating water and sewer mains,service
I lines and other pertinent construction required to provide water service to individual customers and developers.
The contract was approved by Council on May 3,2016,
Staff recommends the approval of 650 calendar days to the project for the time additional period it took to issue
sufficient work orders to exhaust the project funding.There are sufficient funds available to pay the cost of the
change order.
Ills understood and agreed ghat the acceptance of lhls Change Order by the contractor conslilules an accord and satisfaction and represents payment
In full(both time and money)for all costs arising out of,or incidental to,the above Change Order,
Contraclor's Company Name Gonlraetor Name Contraotor Signature Date
WIVam J Schuh Inc dba Ci cle C ConswcVon Teri Skelly
In5ppotor Dale Pr ect Manager Date
14
DlrecW Water Dept) Date opsir etton u ervlsor/c/- Dole
kw.ww.wmm,n s, Aug19,2020 /���(�-Zi L
Assistant City Attorney Data Assistant Oily Md a e Date_
ug21,2020 aitm 8
CouncILACIlon(If Required
M&C Number NIA M&C Date Approved NIA
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX
FORT Woaxm City of Fort Worth
Change Order Additions
I
Project Name Water and Sewer Main Replacements Contract 2016A City Sec No,: 47791 j
Project No.(s): 59601.060043-002738-CO1783 DOE No.E= City Pro],No,: 02738
Project Miscellaneous Water and Sewer Main Replacements Contract 2015A. f
Description
Contractor Willem J Schultz,Inc dba Circle C Construction Change Order:0 Date: 8/17/2020
City Project Mgr. Adolfo Lopez City Inspector F Donald Watson
ADDITIONS
DEPT City, un t 'unit cost Total
1 Work Order Mobilization Sewer 8.00 EA $2,000.00 16,000.00
3 8"PVC Sewer Pipe,0'=6'Depth Sewer 121.00 LF $40.00 $4,840.00
4 8"PVC Sewer Pipe,6'-8'Depth Sewer 251.50 LF $42.00 $10,663,00
5 8"PVC Sewer Pipe,8'-1 O'Depth Sewer 34.90 LF $45.00 $1,670.50
6 8"PVC Sewer Pipe,10'-12'Depth Sewer 379.31 LF 1$48,00 $18,206.88
60 8"PVC Sewer Pipe,6'-8'Depth,CLSM Backtill Sewer 47.20 LF $80.00 $3,776.00
143 Post Construction CCTV Inspection Sewer 833.91 LF $3.00 $2,601.73
144 Trench Safety System Sewer 885.1 LF $3.00 $2,655,33
149 4'Dia Manhole,Extra Depth Sewer 8.64 VF $150.00 $1,281,00
151 4'Dia Drop Manhole,Extra Depth Sewer 4.80 VF $250.00 $1,200.00
75 Concrete Collar Sewer 9.00 EA $360.00 $3,160,00
81 Remove 4'Dia Manhole Sewer 1.00 EA $1,000.00 $1,000.00
198 4"2-way Cast Iron Cleanout Sewer 1.00 EA $350.00 $360.00
i
I
i
i
i
I
I
4!
I
I
E
i
G
1
f
i
C Water
Sewer $67,094.44
Page 2 of 4 Additions Sub Total 1$67,094.44
i
i
FoizT' WoP,- 'H City of Fort Worth
Change Order Deletions
Project Name Water and sewer Malt)Replacements Contract 2015A City Sec No.: 47791
Project No.(s): f�59601.a60043-CO2738-CO1783 I DOE No. N/A City Proj.No,: 0273t3
Project Description l Miscellaneous Water and Sewer Main Replacements Conlracl 2015A.
Contractor 1111 Wlllam J Schultz,Inc dba Circle C Construction I Change Order: ETI Date 8/17/2020
City Project Mgr. Adolfo Lopez City Inspector: r Donald Watson
DELETIONS _
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
i
I
j
I
Water
Sewer
Page 3 of 4 Deletions Sub Total
MMBE Breakdown for this Change Order
MWBE'Sub Type of Service Amount for(his CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title
ba4vvanb
fo
ORt09dp
01'o •1?
w8 o2p
ATTEST: a$ 000 *�
C�nEXASaA`
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX