Loading...
HomeMy WebLinkAboutContract 46263-FP1 (2)via vewartent or � P t�W �onsE. Services DOE# Date 4--(See Projeci-Manager � L Risk Management J. Pa • e D.O.E. Brotherton � 3�( �� CFA Westerman/Scanned The Proceeding people have been Celacted concern ng the request for final payment & have released this project for such payment. Clearance Cdtiducted By Shameka Kennedy • CalY SECRETAW • 7Ci°CT Nor RT WORTH® CATION AND PUBLIC WORKS )F PROJECT COMPLETION 21P3---*F cea6 %iYli5 W4243 D.O.E. Ns: 7233 Regarding contract 117233 for SKYLINE RANCPI as required by the TRANSPORTATION & PUBLIC WORKS as approved by City Council on N/A through IvI&C N/A the director of the TRANSPORTATION & PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as complete. Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due Recommended for Acceptance Asst. Director, TPW - Infrastructure Design and Construction (r) Accepted OR Director, TRANlSPORTATION & PUBLICS WORKS Asst. City -Manager Comments: C205-541200-203320228983, C205-541200-203760228983 OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX $542,638.00 $542,638.00 $542,638.00 $o.00 $542,638.00 Date Date Nc.) Days @ $210.00/ Day • • FLIRT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name SKYLINE RANCH Contract Limits Project Type PAVING, DRAINAGE & ST LIGHT City Project Numbers 02289 DOE Number 7233 Estimate Number 1 Payment Number 1 City Secretary Contract Number 117233 Contract Date Project Manager Long Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 Inspectors LAYER / ODEN For Period Ending 7/17/2015 CD Contract Time 9ED Days Charged to Date 169 Contract is 100.00 Complete • Friday, July 17, 2015 Page 1 of 5 City Project Numbers 02289 Contract Name SKYLINE RANCH Contract Limits Project Type PAVING, DRAINAGE & ST LIGHT Project Funding STORM DRAIN Item No. Description of Items 1 MEDIUM STONE RIPRAP 2 24" RCP 3 30" RCP 4 36" RCP 5 4' STORM JUNCTION BOX 6 5' STORM JUNCTION BOX 7 36" SET 1, PIPE 8 10' CURB INLET 9 15' CURB INLET PAVING Item No. Estimated Quanity 192 SY 158 LF 53 LF 63 LF 1 EA 1 EA 3 EA 1 EA 3 EA Sub -Total of Previous Unit Description of Items 1 SWPPP>I ACRE 2 6" LIME TREATMENT 3 HYDRATED LIME 4 6" CONC PVMT 5 4" CONC SIDEWALK 6 BARRIER FREE RAMP STREET LIGHTS Item No. 1 LED LIGHTING FIXTURE Estimated Quanity Unit Unit Cost $85.00 $50.00 $67.00 $90.00 $7,500.00 $9,500.00 $4,000.00 $2,200.00 $3,500.00 Unit Unit Cost 1 LS 9960 SY 160 TN 9400 SY 4140 SF 4 EA Sub -Total of Previous Unit Description of Items 2 RDWY ILLUM ASSMBLY 3 RDWY ILLUM FOUNDATION 4 6-6-6 TRIPLEX ALUM ELEC CONDUCTOR 5 4" SCHEDULE 80 PVC SLEEVE 6 6" SCHEDULE 80 PVC SLEEVE Friday, July 17, 2015 Estimated Quanity 13 EA 13 EA 13 EA 1279 LF 152 LF 250 LF $1,800.00 $3.85 $175.00 $32.00 $3.00 $1,100.00 Unit Unit Cost $600.00 $3,600.00 $1,000.00 $5.00 $18.00 $20.00 DOE Number 7233 Estimate Number 1 Payment Number 1 For Period Ending 7/17/2015 Estimated Total $16,320.00 $7,900.00 $3,551.00 $5,670.00 $7,500.00 $9,500.00 $12,000.00 $2,200.00 $10,500.00 $75,141.00 Estimated Total $1,800.00 $38,346.00 $28,000.00 £300,800.00 $12,420.00 $4,400.00 $385,766.00 Estimated Total $7,800.00 $46,800.00 $13,000.00 $6,395.00 $2,736.00 $5,000.00 Completed Quanity Completed Total 192 $16,320.00 158 $7,900.00 53 $3,551.00 63 $5,670.00 1 $7,500.00 1 $9,500.00 3 $12,000.00 1 $2,200.00 3 $10,500.00 $75,141.00 Completed Completed Quanity Total 1 $1,800.00 9960 $38,346.00 160 $28,000.00 9400 $300,800.00 4140 $12,420.00 4 $4,400.00 Completed Quanity 13 13 13 1279 152 250 $385,766.00 Completed Total $7,800.00 $46,800.00 $13,000.00 $6,395.00 $2,736.00 $5,000.00 Page 2 of 5 City Project Numbers 02289 Contract Name Contract Limits Project Type Project Funding Friday, July 17, 2015 SKYLINE RANCH PAVING, DRAINAGE & ST LIGHT Sub -Total of Previous Unit DOE Number 7233 Estimate Number 1 Payment Number 1 For Period Ending 7/17/2015 $81,731.00 $81,731.00 Page 3 of 5 City Project Numbers 02289 Contract Name SKYLINE RANCH Contract Limits Project Type PAVING, DRAINAGE & ST LIGHT Project Funding Amin_c" ra? • n I Inspection Supprv, Project Contract Information Summary Original Contract Amount ChanEe Orders Date ?"2 1l Date 2/-3//%C llatn /W2ot / 2 Date U'SVC • Assrector/TPW - Infrastructure Design and Construction Director / 9ntracting Department DOE Number 7233 Estimate Number Payment Number For Period Ending $542,638.00 Total Contract Price $542,638.00 Date C)//3/ii\ Cify 7( Total Cost of Work Completed Less % Retained Net Earned Earned This Period $542,638.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment PIus Material on Hand Less 15% Balance Due This Payment 1 1 7/17/2015 $542,638.00 $0.00 $542,638.0u $0.00 $0.00 $0.00 $0.00 $0.00 $542,638.00 Friday, July 17, 2015 Page 4 of 5 City Project Numbers 02289 Contract Name Contract Limits Project Type Project Funding SKYLINE RANCH PAVING, DRAINAGE & ST LIGHT Project Manager Long Inspectors Contractor LAYER / ODEN CONATSER CONS 1 RUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 Line Fund Account Center Friday, July I7, 2015 DOE Number Estimate Number Payment Number For Period Ending City Secretary Contract Number Contract Date Contract Time Days Charged to Date Contract is .000000 CITY OF FORT WORTH SUMMARY OF CHARGES Amount Funded Gross Retainage Total Cost of Work Completed Less % Retained Net Earned Earned This Period Retainage This Period $542,638.00 $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment 117233 7233 1 1 7/17/2015 90 CD 169 CD Complete Net $542,638.00 $0.00 $542,638.00 $0.00 $0.00 $0.00 $0.00 $0.00 $542,638.00 Page 5 of 5 FORT WORTH TRANSPORTATION & PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO.:1 NAME OF PROJECT: Skyline Ranch Phase 5 PROJECT NO.: 02289 PERIOD FROM:O1/26/15 TO: 07/13/15 WORK ORDER EFFECTIVE: 1/26/2015 DAY OF MONTH 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. THIS PERIOD PREVIOUS PERIOD TOTALS TO DATE *REMARKS: DAYS CHARGED DURING SAT, SUN, & HOLIDAYS NTRACTOR i i i rev 03/05/07 CONTRACTOR: Conatser Construction DOE NO.: FINAL INSPECTION DATE: 22-Jul-15 CONTRACT TIME: 90 REASON FOR DAYS DAY OF CREDITED MONTH 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. RAIN, TOO WET, UTILITIES & TOO COLD RELOCATIONS i i i DATE ENGINEE The City of Fort Worth • 1000 Thro (817) 392 - 794 • DAYS CHARGED DURING OTHERS * 7233 O WD o CD REASON FOR DAYS CREDITED DAYS CHARGED 169 10 1169 (TOTAL DAYS 1169 10 1169 /art,t, .a-Ct M ECTOR � DA'f'E IgaPARTITEIsIT Nt • • .. , T17G012-G311 CITY SECRETARY FT. WORTH, TX I • • FORT WORTH TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR & PROJECT DATA Name of Contractor Conatser Construction DOE hrspeclor Weyman Oden DOE inspector Water Waste Water o Storm Drainage ■ ■ hlilial Contract Amount $542,63 8.00 Final Contract Amount $542,638.00 II) PERFORMANCE EVALUATION 0 - Inadequate ELEMENT Submission of Documents 2 Public Notifications 3 Plans on Site 4 Field Supervision 15 Work Performed 6 Finished Product 7 Job Site Safety 18 Traffic Control Maintenance 9 Daily Clean Up 10 Citizen's Complaint Resolution 11 Property Restoration 12 After Hours Response 113 Project Completion I 1 0 Project Name Skyline Ranch Phase 5 DOE Number 7233 Project Manager Pavement Aaron Long rojecl Difficul0) 1 - Deficient 2 - Standard 3 - Good 4 - Excellent WEIGHT (x ) i 2 5 5 15 15 15 15 15 5 5 5 5 5 REV: 02/20/07 O Simple o Routine 0 Complex Dale 7/17/2015 APPLICABLE (Y / N) Y N Y Y Y Y Y Y Y N Y N Y RATING (0 - 4) MAX SCORE 4 8 4 4 4 4 3 4 3 4 20 60 60 60 60 60 20 20 3 20 TOTAL ELEMENT SCORE (A) BONUS POINTS (25 Maximum) (B) TOTAL SCORE (TS) III) CONTRACTOR'S RATING Maximum Score (MS) = 448 or sum of applicable element score maximums which = 388 Rating ( [TS / MS] * 100%) 363 / 388 = 94% Performance Category Excellent <20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector Signature DOE Inspector's Supervisor CONTRACTOR'S COMMENTS Signature Contractor LA 0 A.7.---------- >_80% _ Excellent TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 SCORE 8 20 60 60 60 45 60 15 20 15 363 363 • BAYLEY YAND ELL D I1 V E 1. c) P N L' 1. '1' D. July 15, 2015 Mr. Brock 1-f uggins Conatser Construction TX, LP P O Box 15448 Port Worth, TX 761 1 9 RE: Skyline Runc-h City Case No. FP-014-018 City of Fort Worth. State of Texas Dear Mr. Huti�gins, SLR — BY 4, L.LC . hereby acknowIec1ges that Conatser Construction TX, LP as completed the Water and Paving portions of the above captioned project in a timely manner. A lthc ugh the contractual time was exceeded, SLR — BY 4, LLC will not assess any penalties or liquidated damaacs due to time extensions. lfyou have any questions, please feel free to contact our of -lice. Sincerely, Bryan Holland yl �t SLR — BY 4, LLC Vice President 1203 S. White Chapel Blvd., Suite 250, Southlake, TX 76092 * Office 214.626.8590 * Fax 817.545.1455 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared Brock Huggins, Vice -President of Conatser Management Group, Inc., general partner of Conatser Construction TX, LP. known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said: that all persons, firms, associations, corporations or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth, has been paid in full; and That there are no claims pending for personal injury and/or property damages; On Contract described as' SKYLINE RANCH WATER, SANITARY SEWER, STORM DRAIN, PAVING AND STREET LIGHT IMPROVEMENTS DOE# 7233 CITY OF FORT WORTH STATE OF TEXAS CONATS ¶ CONSTI R CTION TX, LP Brock Huggins Subscribed and sworn to before me this 27th day of Ju1ir2O FfrI Bertha Gianulis Notary Public for State of Texas My commission expires: 09/18/2015 Notary Pub zc m Tarrant County, Texas CONSENT OF SURETY COMPANY TO FINAL PAYMENT Confo ms with the American Institute of Architects, AtA Document G707 OWNER ARCHITECT CJ CONTRACTOR 11 SURETY C OTHER PROJECT: (name, address)water and Sanitary Sewer Replacement Contract 2014 Fort Worth TO (Owner) CITY OF FORT WORTH 1000 Throckmorion Street Fort Worth TX Bond No 0187842 ARCHITECT'S PROJECT NO: CONTRACT FOR: Skyline Ranch - Water, Sanitary Sewer, Drainage, Paving and Street Lighting Improvements DOE No, 7233, Project No. 02289 TX 76102 _f CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION TX, L.P. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (harp Insert name and address of Surety Company) BERKLEY INSURANCE COMPANY 475 Steamboat Road Greenwich CT 06830 on bond of (hare insert name and address of Contractor) CONATSER CONSTRUCTION TX, L.P. 5327 Wichita St. • Forest Hill TX 76119-6035 , SURETY' COMPANY , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to there Insert name and address of Owno I CITY OF FORT WORTH 1000 Throckmorton Street Fort Worth TX 76102 as set forth in the said Surety Company's bond. IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this Attest: 4 (Seal): \i)9.S\8ktiDV__ 6th day of July, 2015 BERKLEY INSURANCE COMPANY Surety Company Signature of Authorized Representative Rabbi Morales Title , OWNER, Attorney -in -Fact NOTE: This form Is to be usad as a companion document to A/A DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OP PAYMENT OF DEBTS AND CLAIMS, Current Edition ONE PAGE 11 V, ut-rkvUV pnvipa +at.u. tnittlttltlu t0 r C 4' J U .. .0 is• a WARNING: THIS POWER INVALID IF NOT PRINTED ON BLUE "BERKLEY' SECURITY PAPER. E STATE OF CONNECTICUT ) .. ) ss: -� COUNTY OP FAIRFIELD ) ra Sworn to before me, a Notary Public in the State of Connecticut, this ' / �rday of �dali.C4. , 2015, by Ira S. Lederman and r Jeffrey M. Halter who are sworn to me to be the Senior Vice President and Secretary, and Senior Vice President, respectively, of Notary Public, State of Connecticut POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E, Cornell; Lisa M. normal; Pena DeLene Marshall; S`ephinis Hunter; Rabbi Morales; or Kelly A, Westbrook of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.SSO 000,000,00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the Iaws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief Executive Officer President or any Vice President of the Company in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein to execute bonds, undertakings recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authonty to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-m-fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued IN WITNESS WHEREOF, the Corppany has cage these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed this y hay of f U ✓V . 2015 (Seal) Attest: By Ira S. 'Lederman Senior Vice President & Secretary in Berkley Insurance Company. MARIA C. RUNDBAKEN NOTARY PUBLIC f MY COMMISSION EXPIRES APRIL 30, 2019 CERTIFICATE 2 v I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a true, correct and complete copy of the original Power of Attorney, that said Power of Attorney has not been revoked or rescinded and that the authority of the Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this Power of Attorney is attached, is in full force and effect as of this date. Given under my hand and seal of the Company, this 6th day of July , 201.E Berkley Insurance Company By Halter Sea. `'st e President (Seal) Andr • I) PROJECT INFORMATION Name of Contractor Conatser Construction DOE Inspector FORT WORTH '—essirpr TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY Weyman Oden DOE Number Project Difficulty 0 Simple o Routine lnilial Contract Amount $542,638.00 Project Name Skyline Ranch Phase 5 Project Manager Aaron Long Type of Contract REV: 02/22/07 Date: 17/ 17/2015 0 Complex ■ Water • Waste Water El Storm Drainage o Pavement II) PERFORMANCE EVALUATION 0 - Inadequate 1 - Deficient 2 - Standard ELEMENT INSPECTION EVALUATION 1 Availability of Inspector 2 Knowledge of Inspector 13 Accuracy of Measured Quantities 4 Display Of Professionalism 5 Citizen Complaint Resolution 6 Performance - Setting up Valve Crews Labs 'ADMINISTRATION 1 Change Order Processing Time 2 Tilnliness of Contractor Payments 13 Bid Opening to Pre -Con Meeting Timefi•ame III) COMMENTS & SIGNATURES Final Contract Amount $542,63 8.00 3 - Good 4 - Excellent RATING ELEMENT (0 - 4) PLANS & SPECIFICATIONS li 1 Accuracy of Plans to Existing Conditions L COMMENTS liesicinrana 4 Clarity & Sufficiency of Details 3 Applicability of Specifications 4 Accuracy of Plan Quantities PROJECT MANAGER EVALUATION 1 Knowledge And/Or Problem Resolution 12 Availability of Project Manager 13 Coirununication 14 Resolution of Utility Conflicts 2 Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS • TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 RATING n (0 - 4) 14