HomeMy WebLinkAboutContract 46993 (2)-• . r/ r ti gie:j % awI comma <o l _ g3 '0-CV-NV , 4 10 G\Tl 0tWvtcml Fl CROSSING SURFACE INSTALLATION AGREEMENT TRINITY RAILWAY EXPRESS BEACH STREET GRADE CROSSING IN FORT WORTH DOT NO. 598341W MP 614.15 This Crossing Surface Installation Agreement (hereinafter called, this "Agreement") is entered into effective as of MO t/ . / . 2014, by and between City of Fort Worth, Texas (hereinafter called, "Agency") and The TRINITY RAILWAY EXPRESS (hereinafter called, the "TRE"). WHEREAS, TRE operates a commuter rail line between City of Fort Worth and City of Dallas; and WHEREAS, Agency and TRE desire to install new concrete crossing panels at 500 N Beach Street in Fort Worth, Texas; NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows: 1. TRE Work. The TRE will install new double track concrete surfaces for a width of 194 feet each from the edge of the pavement to the edge of the pavement. The TRE will use 210 feet of new concrete panels. The new crossing surface will adequately cover all vehicular driving lanes at 500 N Beach Street and accommodate a future five-foot sidewalk on the west side of Beach Street. The TRE will provide all necessary track upgrades to accommodate the new crossing surfaces including filling the gaps between the new concrete panels and the existing pavement. The cost estimate for the TRE work is shown on the Exhibit A attached hereto and made a part of this Agreement. The TRE contact person to coordinate schedule of work is Annka Robinson at TRE Office: (phone number) 214-749-5819. 2. Payment; Invoicing. Upon execution of the work, TRE will provide Agency an invoice for the materials. Agency agrees to pay TRE a lump sum total cost of eighty thousand and no/100 dollars ($80,000) for the new crossing surface. 3. Vehicular Traffic during Installation. TRE shall provide, at its own cost and expense, all necessary barricades, lights or traffic control devices for detouring vehicular traffic at the 500 N Beach Street crossing during installation of the new crossing surface. 4. Drainage. The TRE agrees to allow the Agency to drain water from the Beach Street crossing area into existing Agency storm sewers, if such storm sewers are available. Drain pipes and filter fabric necessary for such drainage will be furnished and installed by the TRE. 5. Term. This Agreement begins on the effective date set forth above and remains in effect until completion of all work contemplated in this Agreement and Agency's payment of the amount set forth in Section 2 above. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by its duly qualified and authorized officials as of the day and year first written above. Crossing Renewal for Beach Street (2014)LAW DEPARTMENT APPROVED OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AGENCY: City of Fort Worth, Texas BY: Fernandtreesta Jar Assistant City Manager Date: APPROVAL RECOMMENDED: By: Douglas Wiersig Director, ransportation Public Wb M&C No.: c-. 2Mfl M&C Date: (l ' lief( Dept TRINITY RAILWAY EXPRESS: i By. �/G � f � Et? P C7 w T4 4- /ea Gi i o to rt-- L o prnEr---A3 APPROVED AS TO FORM AND LEGALITY By: Douglas W. Black Assistant City Attorney ATTE A /�Iar$(J. Kayser erty Secretary ALA. J.� All invoices for the project will be sent to: City of Fort Worth Tai Nguyen Railroad Project Manager 5001 James Avenue Fort Worth, Texas 76115 Phone: 817-392-2359 Email: Tai.Nguyen@FortWorthTexas.gov OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 0. Crossing Renewal for Beach Street (2014)LAW DEPARTMENT APPROVED Beach Street Road Crossing Replacement Material Description Ballast 136# Rail (680 LF) 136# Anchors Concrete Xing Panels (56.88 TF) Pandrol Plates E Clips Screw Spikes 115-136# Transition Rails 10' Composite Ties 9/16" Drill Bits 3/4" Drill Bits 11/16" Drill Bits 136# Joint Bars 115# Joint Bars lx6' Track Bolts w/ Nuts 136# Boutet Weld Kits Oxygen Acetylene Rail Saw Blades Trak Star Drill Bits PVC Pipe for Signal Cables End Caps Solvent Cement Cleaner Perforated Pipe Filter Fabric LABOR & EQUIPMENT Description Handle Material & Stockpile Ballast Pre -plate Ties and Pre -Build Track Panels Thermite Weld Rails at end of crossing Remove Existing Track Panels Surface New Mainline Track Panel Install New Concrete Crossing Panels Destress Surrounding Tracks Cleanup Site Quantity 400 16.32 744 195 586 988 2000 4 186 2 2 2 8 4 48 12 12 12 4 2 500 8 1 1 200 500 UOM TN TN EA TF EA EA EA EA EA EA EA EA PAIR PAIR EA EA EA EA EA EA LF EA EA LS LF SQYD Quantity UOM 61 MH 429 MH 21 MH 392 MH 64 MH 208 MH 420 MH 104 MH Exhibit A Cost $ 30.80 $ $ 1,753.27 $ $ 2.94 $ $ 213.67 $ $ 19.95 $ $ 2.82 $ $ 1.90 $ $ 1,775.82 $ $ 161.40 $ $ 61.73 $ $ 22.98 $ $ 24.62 $ $ 109.15 $ $ 137.03 $ $ 3.51 $ $ 132.41 $ $ 11.10 $ $ 14.37 $ $ 11.46 $ $ 64.08 $ $ 3.06 $ $ 11.95 $ $ 9.90 $ $ 8.43 $ $ 2.22 $ $ 2.82 $ SUBTOTAL Cost 85.88 93.55 84.12 100.48 251.64 78.22 64.66 63.19 Total 12,320.00 28,613.33 2,185.13 41,665.25 11,693.04 2,782.21 3,806.00 7,103.27 30,020.10 123.46 45.96 49.24 873.22 548.11 168.43 1,588.88 133.22 172.39 45.85 128.15 1,529.00 95.57 9.90 8.43 444.40 1,408.00 $147,560.54 Total 5,238.97 40,132.30 1,766.47 39,389.29 16,104.64 16,269.69 27,156470 6,572.03 Flagman Work Train Rental Equipment/Subcontractors Description BlueBonnet Waste Control Traffic Control Subcontractor Sunday Plant Opening Sawcutting Pavement Paving Roadway Hauling (2) Loaders To/From Site Hauling Speed Swing To/From Site 30 Yd Tie Dumpsters 30 Yd Trash Dumpsters 12 MH 20 MH Quantity 1 1 1 1 1 4 2 2 1 UOM MO LS LS LS LS EA EA EA EA $ 66.86 $ 802.32 $ 277.14 $ 5,542.80 SUBTOTAL $ 158,975.21 Cost $ 96.92 $ 4,290.80 $ 3,898.80 $ 1,559.52 $ 20,541.48 $ 584.82 $ 519.84 $ 872.23 $ 519.84 SUBTOTAL CONTINGENCY TOTAL Total $ 96.92 $ 4,290.80 $ 3,898.80 $ 1,559.52 $ 20,541.48 $ 2,339.28 $ 1,039.68 $ 1,744.45 $ 519.84 $ 36,030.77 $ 13,702.66 $ 356,269.19 City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 16, 2015 LOG NAME: 20TRE BEACH STREET SUBJECT: REFERENCE NO,: **C-27342 Authorize Execution of an Agreement with the Trinity Railway Express to Install a New Concrete Railroad Crossing Surface at 500 North Beach Street in the Amounts of $80,000.00 for Materials and $10,000,00 for Staff Time for a Total City Participation Cost of $90,000.00 (2014 BOND PROGRAM) (COUNCIL DISTRICTS 4 and 8) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to enter into an Agreement with the Trinity Railway Express in the amount of $80,000.00 for the City's participation of materials to install new concrete railroad surface at the 500 Block of North Beach Street. DISCUSSION: The 2014 Bond Program approved funds for railroad safety improvements at various locations in the City. The Transportation and Public Works (TPW) Department has received numerous complaints concerning the roughness of this crossing on North Beach Street. The existing crossing uses concrete panels which have sunken in the last several years The total project cost is $366,269.19. The Trinity Railway Express (TRE) participation is $276,269.19. The City participation in the above Agreement is to pay for the purchase of materials in the amount of $80,000.00. In addition to funds required by this Agreement, additional funds in the approximate amount of $10 000.00 are required to provide staff participation/administration. Cost item Material LaborlEquipment Rental Equipment/Subcontractors TRE City Participation ($) Participation ($) 67,560.54 80,000.00 158, 975.21 10, 000.00 36, 030.77 Contingency 13,702.66 1 -- TOTAL 276,269.19 90,000.00 Total Project Cost ($) 147,560.54 168, 975.21 36,030.77 13, 702.66 366,269,19 This project will result in a shared cost with the TRE funding 75 percent and the City funding 25 percent. This project is included in the 2014 Bond Program. Available resources within the General Fund will be used to provide interim financing for these expenses until debt is issued. Once debt associated with this project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse what was adopted as part of the ordinance canvassing the bond Logname: 20TRE BEACH STREET Page 1 of 2