Loading...
HomeMy WebLinkAboutContract 46984 (2)'i CONTRACT Developer and Project Information Cover Sheet: Developer Company Name: Kroger Texas, LP Address, State, Zip Code: 1331 E Airport Freeway Irving TX 75062 Phone & Email: 972-785-6025 Authorized Signatory, Title: Chad Treadwell, Regional Director of Construction -Southwest Project Name and Brief Kroger SW 532 Park Vista Description: Project Location: NEC N. Tarrant Pkwy at Ray White Rd Plat Case Number: FS-13-208 Plat Name: Kroger Park Vista Mapsco: 36G Council District: 4 City Project Number: 02280 CFA Number: 2015-049 To be completed by staff: Received by: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 1 of 11 DOE Number: 7226 Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT § § City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Kroger SW 532 Park Vista ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facihties ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an affidavit of bills paid signed by its contractor and consent of surety signed by City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 01 2015 Page 2 of 11 its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) , Sewer (A-1) , Paving (B) , Storm Drain (B-1) X , Street Lights & Signs (C) x . X X Signals (C2) x X X X X E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 3 of 11 required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 01 2015 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub- contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stouun drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 6 of 11 iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 01 2015 Page 7 of 11 Cost Summary Sheet Project Name: Kroger SW 532 Park Vista CFA No.: 2015-049 DOE No.: 7226 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information, Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2 Sewer Construction Water and Sewer Construction Total $ 25,896.35 $ 7,761.00 $ 18,135.35 B TPA/ Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total $ 261, 368.27 $ 166,234.27 $ 35,499.00 $ 45,985.00 $ 13,650.00 Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees $ 287,264.62 517.93 517.93 1,035.85 E TPW Inspection Fee (4%) $ 8,069.33 F. TPW Material Testing (2%) $ 4,034.67 G. Street Light Inspsection Cost $ 1,839.40 H. Signals Inspection Cost $ 546.00 H. Street Signs Installation Cost Sub -Total for TPW Construction Fees $ 14,489.40 Total Construction Fees: $ 15,525.25 Choice Financial Guarantee Options, choose one Amount (Mark one) 'Bond = 100% $ 287,264.62 (Completion Agreement = 100% / Holds Plat $ 287,264.62 (Cash Escrow Water/Sanitary Sewer= 125% $ 32,370.44 City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 8 of 11 x ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH fraear Scrxt5 Orcpci Assistant City Manager Name`. ad Treadvell Title: Regional Director of Construction -SW DEVELOPER Kroger Texas LP Date: Recommended by: Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Signature Water Department Name: Date: if. •boiC ATTEST: (Only if required by Developer) Douglas \*) Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. di' Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.01.2015 Page 9 of 11 alb ATTEST: Mhry J. Kayser City Secretary OF(; MAL RECORD Co � if SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included `1 0 0 1/ Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvements Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 05.01.2015 Page 10 of 11 ATTACIIMIENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. <City Project #> <Insert "None." if there are no negotiated changes. If changes have been negotiated, please insert them below citing to the paragraph for reference. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 01 2015 Page 11 of 11 WE, o lkeIneazr Agmeeficetaz, Jae, CONSULTING CIVIL ENGINEERS • SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale : NTS Date 06-26-2014 Dwg. File : 31568 CFA WTR&SWR.dwg Protect No. : 31568.00 TARRANT PKWY. VflCUIITY M MINTY MAP (ROGER SW m ...._. _. r rrrr, r r,,aury r r, TX J. EDMONDS SURVEY ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY, TEXAS KROGER TEXAS LP 1331 E. AIRPORT FREEWAY Irfy1Nf . TX 757 SHEET 1 OF 7 PROP. WATER - Li t car- r • F.F.E. - 672.40 I I I' ri it END PUBLIC WATER', CONNECT TO EXISTING 16 " WATER CONNECT TO EXISTING 12" WATER x w tin W711 �e ffit_i Mt & �1��®c�n�itc�oo iliac. CONSULTING CIVIL ENGINEERS • SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale 9 =60' Date . 06-26-2014 Dwg. Fle : 31568 CFA WTR&SWR.dwg Project No.: 31568 00 ADMOS_ INSTALL STD FHA PROP. 6" WATER' EX. 127CA_-- TES WATER _FXHB/T_ EXHIBIT A_ _ KROGER SW 532 FT WORTH, TARRANT COUNTY TX J. EDMONDS SURVEY, ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY, TEXAS KROGER TEXAS LP 1331 E AIRPORT FREEWAY IRVING. TX 75062 SHEET 2 OF 7 • a 0 82,000 S,F. PRELIMINARY FOOTPRINT F.F E = 68/.00 9 ..S / / /\. i i 2 , r Lei I ill R i fI INSTALL STD FHI LEND PUBLIC WATER EW K \\ytl\ x\ \ \ \ \, H _O.F{CRETE PAVEMENT ;PROP. 6" WA TERJ diMIPPIMMI EX. 12" WATER CONNECT TO EXISTING 12" WATER I Hi I AL PAVFMFNT v® Winkelmann & --Associates, -Inc. CONSULTING CIVIL ENGINEERS • SURVEYORS (972) 490-7090 FAX (972) 490-7099 scale :1 "=60' Date : 06-29-2014 Dwg. File : 31568 CFA WTR&SWR.dwg Prolect No. : 31568.00 PROP. WATER ESM T FOR METERS PROP. 2" WATER CONNECT TO EXISTING 12" WATER CONNECT TO EXISTING[ j 12" WATER r- j kIPRI VA TE • SAUK!-LUW PROP. 2" WATER AS HALT HAE_MENT WATER sSST 'Extant A. KROGER SW 532 riva4, At rwayry; Tx J. EDMONDS SURVEY ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY,, TEXAS KROGER TEXAS LP 1331 E. AIRPORT FREEWAY TX 7506Z 0116 OM IN NY PROP. 8" FIRE LINE INN SHEET 3 OF 7 I! II nil!. W11111101 E R 0 0 CONNECT TO EXISTING 21" SEWER f CONST. 4' DIA SAN. SWR. M.H. 1 ri PROP. 8" SAN. SWR. CONST. 4' DIA Fes' Ir- SAN. SWR. M.H.I / / CONST. 4' DIA SAN. SWR. M.H. ® 24" STM \" 4FWFP \\\ IjPROP. 8" SAN. SWR. 6" SEA � � _� I• alb i F.F.E. = 672.40 1 (-BEGIN PUBLIC SAN. { SWR. INSTALL 4' DIA SAN. SWR. M.H. 1. f- 7 irCONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 II I VrF17 Winkelmann & Associates, -Inc.--- scale :1 "=60' Date : 06-26-2014 Dwg. File : 31568 CFA W1R&SWR.dwg Protect No. 1„ 00 gta 110I-CillE 18" SIM FENCE Li ACE FENCE LINE 00 JCONST 4' DIA DROP SAN. SWR. M.H. \\\ \\ END PUBLIC \ SAN. SWR. CONST. 4' DIA SAN. SWR. M.H. \ \ ' \,\\\ \\ \\, \ SANITARY SEMER mar- DIfN&T A-1-1 KROGER SW 532 emir n -TI 6+T 'RTY !a J. EDMONDS SURVEY ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY. TEXAS KROGER TEXAS LP 1331 E. AIRPORT FREEWAY illy?\ANC. TX 750g2 ., SHEET 4 OF 7 I-LNCE \ 11 " 4000 PSI CONC. PA VEMEN T TYPE P-2 BFR 4" AND 6" PA VEMEN T IAARKING TAPE _H1 lPTYPE —2 BFR 1 L -4 11 " 4000 PSI CONC. PA VEMEN T gh ®T �Llfil�e�o. 6305b1 cis Agennita>�aga, Eine° CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale 1"=100' Date . 06-26-2014 Dwg. File : Project No.: 31568.00 • -' TO TYPE TYPE P-2 BFR 11" 4000 PSI CONC. PAVEMENTv fl me-fir'—� ERIZON i Os 7" 3500 PSl CONC. PA VEMEN T VERIZON 4" AND 6" NORTH TARRANT AY of —way) PA VEMENT MARKING TAPE PAVIMC- R/T— rXII/R../T R . EXH! KROGER SW 532 FT WORTH, TARRANT COUNTY TX J. EDMONDS SURVEY, ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY, TEXAS KROGER TEXAS LP 1331 E. AIRPORT FREEWAY IRVI„NG TX 75062 0 82,000 S.F. PRELIMINARY FOO T PF F.F.E. = 681.00 TYPE P-2 BFR SHEET 5 OF 7 • SS MN &5g 14 GRATE INLE g • 3 5'X5' JUNCTION BOX a0 0 0 _lf LJ I H- t ICVia) _°' ICVO ,_ '-� < 0 0 II rtNLtt \ 48" CLASS V RCP1- 20' CURB INLET 20' CURB INLET —142" CLASS III RCPI y— I 24" CLASS 'II 30" CLASS III RCP! 30" CLASS III RCP 110' CURB INLET 4' DROP STM MANHOLE —I 18" CLASS III RCP' 24" PARALLEL HEADWALL 'Fa 111 RCP 24" PARALLEL HEADWALL Wfimas Ensi ®® a Aeinc�hateofl lima. CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale :1 "=100' Dwg. File : Protect No.: 31568.00 Date . 06-26-2014 I' j 24" PARALLEL HEADWALL 124" CLASS Ill RCP 'ERIZON VERIZON 71d05 n''_ '24" PARALLEL HEADWALL NORTH TARRANT PARKWAY (200' rtght—of—way) STORE! SEWER-Enl/01_T__- EXHIST 34= KROGER SW 532 FT WORTH, TARRANT COUNTY TX J. EDMONDS SURVEY, ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY, TEXAS KROGER TEXAS LP 1331 E. AIRPORT FREEWAY IRVING TX 75062 SHEET 6 OF 7 SS 0.1E4 Ai J TRAFFI C SIGNAL REL OCA TIO RELOCATION 0-0 Ua 0 • SS NH bolted CABLE FENCE,' TBM (2 "X" CUT IN CONCRETE FOUND ELEV. = 656.47 CABLE FENCE CONDUIT AND WIRINGI = LIGHT POLES (040-9 r) 2 LUMINARIES GROUND BOX ,f ' -�� LIGHT POLES I t I (D40-9T) : 1 LUMINARIES PAD MOUNTED r-" CONDUC TOK POWER POLE W/ TRANSFORMER ./ELEV.�66/�titc_YS„, I/ Il a CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale :1'1=150' Dwg. File : Protect No. :• 31568.00 Date . 06-25-2014 Of / jai a NORTH TARRANT PARKWAY (200' right —or —itch fLooDeer_ CC / 21311901 82.000 S.F- PRELIMINARY FOOTPRINT E = 661 00 20. BR.@UGE EASFILENT I UGC ED213119L / �— H 1,,L Y•ARI r I • 7 NM 00/ CONDUIT AND W/RINGF KROGER SW 532 FT WORTH, TARRANT COUNTY TX J. EDMONDS SURVEY, ABSTRACT NO. 457 CITY OF FORT WORTH TARRANT COUNTY, TEXAS KROGER, TEXAS LP 1331 E. AIRPORT FREEWAY IRVING. TX 75062 glwv SHEET 7 OF KROGER SW 532 PROJECT QUANTITY MATRIX ITEM NO. BID ITEM WATER 1 1 6" PVC WATER PIPE 1 1 2 8" PVC WATER PIPE 3 FIRE HYDRANT 4 2" WATER SERVICE 1 1 5 1" WATER SERVICE 6 CONNECTION TO EXISTING 4"-12" WATER MAIN 7 CONNECTION TO EXISTING 16" WATER MAIN SANITARY SEWER 1 POST -CCTV INSPECTION I � 2 MANHOLE VACCUM TESTING 3 6" SEWER PIPE 4 8" SEWER PIPE 1 1 5 4' MANHOLE 6 4' DROP MANHOLE 7 4' EXTRA DEPTH MANHOLE SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST UNIT 1 2 3 4 5 6 7 LF. XX 51 $12.00 $612.00 L.F.. X X 12 $14.00 $168.00 EA XX 2 $1,192.00 $2,384.00 EA. X X 2 $981.00 $1,962.00 EA. X.X 1 $239.00 $239.00 EA XX 1 $675.00 $675.00 EA X X 1 $1,721.00 $1,721.00 SUBTOTAL $7,761.00 LF X 523 $0.70 $366.10 EA X 6 $75.00 $450.00 LF X 12 $13.00 $156.00 LF X 523 $15.00 $7,845.00 EA X 5 $981.00 $4,905.00 EA X 1 $1,872.00 $1,872.00 VF X 18.7 $85.00 $1,589.50 8 9 10 DRAINAGE 2 3 4 5 6 7 9 10 11 12 13 14 15 6" SEWER SERVICE 8" SEWER SERVICE TRENCH SAFETY 4' DROP MANHOLE 18" RCP, CLASS 1II 24" RCP, CLASS III 30" RCP, CLASS III 1 42" RCP, CLASS III 48" RCP, CLASS V 5' STORM JUNCTION BOX 24" SET, 1 PIPE 10' RECESSED INLET 20' RECESSED INLET 4' GRATE INLET REMOVE 33" STORM LINE 33" STORM ABANDONMENT PLUG STORM LINE GROUTING REMOVE 20' RECESSED INLET EA X 1 $397.00 $397.00 EA X 1 $424.00 $424.00 LF X 523 $0.25 $130.75 SUBTOTAL $18,135.35 EA X 1 $1,710.00 $1,710.00 LF X 103 $19.00 $1,957.00 LF X 240 $23.00 $5,520.00 LF X 72 $29.00 $2,088.00 LF X 49 $43.00 $2,107.00 LF X 84 $59.00 $4,956.00 EA X 1 $2,190.00 $2,190.00 EA X 3 $621.00 $1,863.00 EA X 1 $1,750.00 $1,750.00 EA X 2 $2,150.00 $4,300.00 EA X 1 $2,765.00 $2,765.00 LF X 18 $6.00 $108.00 EA X 1 $157.00 $157.00 CY X 27 $68.00 $1,836.00 EA X 1 $225.00 $225.00 16 17 18 PAVING 2 3 4 5 6 7 8 9 10 11 12 13 14 SWPPP Z 1ACRE TRENCH SAFETY 4' DROP INLET REMOVE CONC PVMT REMOVE CONC CURB & GUTTER 11" CONC PVMT 7" CONCRETE DRIVEWAY " CONC CURB AND GUTTER 6" LIME TREATMENT 8" LIME TREATMENT HYDRATED LIME 4" CONC SIDEWALK JOINT SEALANT BARRIER FREE RAMP, TYPE P-1 REFL RAISED MARKER TY I-C LANE LEGEND ARROW 8" SLD PVMT MARKING TAPE (W) Ls X 1 $120.00 $120.00 LF X 548 $0.25 $137.00 EA X 1 $1,710.00 $1,710.00 SUBTOTAL $35,499.00 SY X 266 $10.00 $2,660.00 LF X 1054 $10.00 $10,540.00 sY X 872 $51.00 $44,472.00 SF X 3543 $4.89 $17,325.27 LF X 883 $2.50 $2,207.50 sY X 462 $12.00 $5,544.00 sY X 1021 $12.00 $12,252.00 TN X 0 $0.00 $0.00 SF X 3358 $3.00 $10,074.00 LF X 945 $1.50 $1,417.50 EA X 7 $150.00 $1,050.00 EA X 7 $15.00 $105.00 EA X 2 $150.00 $300.00 LF X 386 $5.00 $1,930.00 15 16 17 PAVING (REIMBURSABLE 1 TRAFFIC CONTROL 6' CHAIN LINK, STEEL REMOVE FENCE REMOVE SIDEWALK 2 REMOVE ADA RAMP 3 REMOVE 12" PVMT MARKING 4 2" ASPHALT PVMT TYPE D 5 7" ASPHALT BASE TYPE B 6 BARRIER FREE RAMP, TYPE M-1 7 6" LIME TREATMENT 8 HYDRATED LIME 9 4" SLD PVMT MARKING TAPE (W) 10 LANE LEGEND ARROW 11 REFL RAISED MARKER TY I-C 12 12" SLD PVMT MARKING TAPE (W) 13 24" SLD PVMT MARKING HAE (W) 14 TRAFFIC CONTROL STREET LIGHT MO X 1 $1,000.00 $1,000.00 LF X 124 $8.00 $992.00 LF X 124 $2.00 $248.00 SF X 216 $10.00 $2,160.00 EA X 1 $50.00 $50.00 LF X 947 $7.00 $6,629.00 SY X 206 $33.00 $6,798.00 SY X 206 $115.00 $23,690.00 EA X 1 $150.00 $150.00 SY X 245 $12.00 $2, 940.00 TN X 11.76 $0.00 LF X 100 $4.00 $400.00 EA X 1 $150.00 $150.00 EA X 7 $15.00 $105.00 LF X 35 $7.00 $245.00 LF X 775 $12.00 $9,300.00 MO X 1 $1,500.00 $1,500.00 SUBTOTAL $166,234.27 1 CONTACT ENCLOSURE, POLE MOUNT 2 RDWY ILLUM ASSMBLY TY 18,18A,19, AND D-40 3 INSTALL LIGHTING FIXTURE 4 2-2-2-4 QUADPLEX ALUM ELEC CONDUCTOR 5 RELOCATE STREET LIGHT POLE 6 GROUND BOX TYPE B 7 GROUND BOX TYPE B, W/APRON 8 2" CONDT PVC SCH 80(T) SIGNAL IMPROVEMENTS 1 TY 5 SIGNAL FOUNDATION 2 INSTALL TYPE 45 SIGNAL POLE (Relocate) 3 INSTALL MAST ARM 52' - 60' (Relocate) 4 INSTALL MODEL 712 PREEMPTION DETECTOR 5 SALVAGE TRAFFIC SIGNAL 6 HAWK SIGNAL CONTROLLER AND CABINET 7 PORTABLE MESSAGE SIGN 8 TRAFFIC CONTROL DETAILS 9 TRAFFIC CONTROL EA EA EA LF EA EA EA LF EA EA EA EA EA EA WK EA MO X 1 $1,090.00 $1,090.00 X 4 $4,325.00 $17,300.00 X 4 $970.00 $3,880.00 X 1310 $3.00 $3,930.00 X 2 $3,175.00 $6,350.00 X 1 $985.00 $985.00 X 2 $985.00 $1,970.00 X 1310 $8.00 $10,480.00 SUBTOTAL $45,985.00 1 $4,155.00 $4,155.00 1 $2,375.00 $2,375.00 1 $2,750.00 $2,750.00 1 $0.00 1 $275.00 $275.00 1 $200.00 $200.00 1 $595.00 $595.00 1 $0.00 2 $1,500.00 $3,000.00 10 NO 8 BARE ELEC CONDR LF 200 SUBTOTAL $1.50 $300.00 $13,650.00 GRAND TOTAL $287,264.62