HomeMy WebLinkAboutContract 46983 (2)CITY irECRETARY
conZir� �Z
E3
Developer and Project Information Cover Sheet:
Developer Company Name: DR Horton Texas
Address, State, Zip Code: 6751 North Freeway Fort Worth TX 76131
Phone & Email: 817-230-0800, rhorton@drhorton.com
Authorized Signatory, Title: Randy Horton, Assistant Secretary
Project Name and Brief Tehama Bluffs Phase I
Description:
Project Location: North of Heritage Trace Parkway
Plat Case Number: FP-14-060 Plat Name: Tehama Bluffs
Mapsco: 21T Council District: 7 City Project Number: 02507
CFA Number: 2015-051 DOE Number: 7387
To be completed by aff.•
Received by:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
Date: ft'/9ui
OFFICIAL RECORD
CITE.' : EC STAR
r�T. WORTH, TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
City Secretary
Contract No.
WHEREAS, the undersigned Developer ("Developer") desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related to
a project generally described as Tehama Bluffs Phase 1 ("Project") within the City of Fort Worth,
Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memonalized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the
Policy and recognizes that there shall be no reduction in the collateral until the Project has
been completed and the City has officially accepted the Improvements. Developer
acknowledges that the said acceptance process requires the Developer's contractor(s) to
submit an affidavit of bills paid signed by its contractor and consent of surety signed by its
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 2 of 11
surety to ensure the contractor has paid any sub -contractors and suppliers in full.
Additionally, the contractor must also provide in writing that the contractor has been paid
in full by Developer for all the services provided under their contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City -approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) , Sewer (A-1) , Paving (B) , Storm Drain (B-1) ►4, Street Lights & Signs
(C)'
►Z1
►r
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8 Section II, of the Policy.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public streets and/or to perform water/waste water
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the Improvements, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the Improvements valid for
a period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253 Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 3 of 11
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state -approved fouls) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent to
commence construction to the City's Construction Services Division so that City
inspection personnel will be available; to require the contractor to allow the
construction to be subject to inspection at any and all times by City inspection
forces, to not install or relocate any sanitary sewer, stoinu drain, or water pipe unless
a responsible City inspector is present and gives his consent to proceed, and to make
such laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and service
lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide, at its expense, all engineering drawings and documents necessary
to construct the improvements under this Agreement
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in the relocation
of any utilities that are or may be in conflict with any of the community facilities to be installed
hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 4 of 11
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L The Developer further covenants and agrees to, and by these presents does hereby, fully
indemnify, hold harmless and defend the City, its officers, agents and employees from
all suits, actions or claims of any character, whether real or asserted, brought for or on
account of any injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design, performance or
completion of any work to be performed by said Developer, his contractors,
subcontractors, officers, agents or employees, or in consequence of any failure to
properly safeguard the work, or on account of any act, intentional or otherwise, neglect
or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents
or employees, whether or not such iniuries, death or damages are caused, in whole or
in part, by the alleged negligence of the City of Fort Worth. its officers. servants, or
employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless the
City, its officers, agents and employees from and against any and all claims, suits or causes
of action of any nature whatsoever, whether real or asserted, brought for or on account
of any injuries or damages to persons or property, including death, resulting from, or in
any way connected with, the construction of the infrastructure contemplated herein,
whether or not such iniuries. death or damages are caused, in whole or in part. by the
alleged negligence of the City of Fort Worth, its officers. servants. or employees. Further,
Developer will require its contractors to indemnify, and hold harmless the City for any
losses,' damages, costs or expenses suffered by the City or caused as a result of said
contractor's failure to complete the work and construct the improvements in a good and
workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements, Developer
will assign to the City a non-exclusive right to enforce the contracts entered into by the
Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii Developer shall pay in cash paving and stoim drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 6 of 11
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 7 of 11
Project Name:
Tehama Bluffs Phase 1
Cost Summary Sheet
CFA No.: 2015-051 DOE No.: 7387
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 466,539.80
$ 259,175.80
$ 207,364.00
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
640, 752.70
330,889.00
100,267.06
TPW Construction Cost Total $ 1,071,908.76
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
$ 1,538,448.56
$
$
9,330.80
9,330.80
18,661.59
38,865.67
19,432.83
4,010.68
NMI
1,225.00
63,534.18
82,1 95.78
Amount
$ 1,538,448.56
$ 1,538,448.56
$ 583,174.75
Choice
(Mark one)
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
Jesus J. Chapa
Assistant City Manager
Date: 3--
Recommended by:
k
Wendy Chi -Bab al, EMBA, P.E.
Development Engineering Manager
Water Department
Douglas W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. a
Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
DEVELOPER
D.R. Horton- Texas, Ltd.,
a Texas Limited Partnership
By: D.R. Horton, Inc.
a Delaware Corporation,
its Authorized Agent
Name: Randy Horton
Title: Assistant Secretary
Date: 2' 12 4-41S
ATTEST: (Only if required by Developer)
v
Signature
Name: �Txehl
ATTEST:
$4arjJ. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
►Z1
►Z1
►Z/
►Zt
Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storni Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. <City Project #>
<Insert "None." if there are no negotiated changes. If changes have been negotiated, please
insert them below citing to the paragraph for reference.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
1111111411111.1411billhildlill
dlntty Mop.dwp
• •
0
eo JOB NO. 61038-00
• DATE JULY 2015
t ▪ er rt> DESIGNER EAP
a e
m a CHECKED XXX DRAWNX c-Z_
u 1
SHEET of 1
fa
z
cc
a
HARMON I
I
1(
z
' off
Q
KELL
I
G.O�DEN TRI
SITE
HERITAGE frE
I zm
(HICKS
j <
\N TARRANT PKWY M
\
TEHAMA BLUFFS PHASE 1
FORT WORTH, TEXAS
VICINITY MAP
1
N.T.S
IPAPE-DAWSON
ENGINEERS
- 502 BEST 561£N01 spanYQY7r4 7E1015 76102 retie 817.8703668
SUM 350 FAX 877.8763669
7EYAs gam 0- pricneanum o6oa74 is RECSIRAIYII / 470
iw Id , Will iiuli id DEIIIWnU11111111TDflL wL/aJO.aiREYi6£NY WW,�mAupllORD101 SCPYxmdl�.Jdu..RIZ11,ui1Ji1au»lrs uRG ,m�.�YN III mullunww.mai. JJdmd.Ji��i�lilimu'�..IIueL.xi�w YUlmLulmna,iii.mxu
� .����i.�i�euei,n i��o�ae ��.,�i� i o d,�����uo��m�����u�ui,�,w ���o�im ��udw��.�w�iamo�,��oiui������oi�i����, i� iilk!! ei �
Hs roO�ENf HAS BDI PsrotNi➢ iRtlY YA/f7d/l TUT ■!LS SITRfD ND/tlt WIJt9If4D E1fC7MNG11Y AND MA NAME �1 pAefRiFNRY IllF16LL RELY 011Y d fNAL HAfd4]PY 116611115 Tf fIIA1TANiY (R(ilUi 9DlATPE NID gAL
th
4f
•
11
.iT
J4=
11 I j`_! ; f
ti ljlF.. /✓'
1 1
s,
16
I 1 I 1 J
j 14
LEGEND
PROPOSED WATER LINE
PROPOSED GATE VALVE
PROPOSED FIRE HYDRANT
PROPOSED 1" IRRIGATION METER
AND BACK FLOW
` SAI.D MOUNTAIN RO
111
1,-'I
11
11
11
11
SCALE: 1 "= 300'
m ui�m eliem!i.0 id1 nuuN IL!!! u1111g 1 ilia nnill,uim,4Jie014i i1iidaiueeJJJlienuuiuJehiii.u�iduuliu.uiedLa.XmLuuliii uuWW'ed ldue1WlbtlnoiluJpdtl1Jd ulmAll�p pl�l0u�di.mWdhFaWeLW WIUY,uYN��dJulil.uYw�emlWllouhtl.OJT.IiWddf,rv,I�ibpiudlunueniOWlipOhJ�luiiuuuwiWhlu�eieli.�, uelWpYailnnFi Oini i�wi Ji�J4uLWdeiIII! '
m�iw 11 oiu�n�o,iuo�,�wa.141.i11111411 n iioo��au^Jdp�yW,iadleoim�i��eo�iin��mimou ��� i W�'-'i
JOB NO. 61038-00
DATE JULY 2015
DESIGNER EAP
CHECKED XXX DRAWN XXX
o•
SHEET
�C111 , ��IED ELI iGI IL AND WAe,HM i. wm11,u„ I,AD1ERTDOL1 .t)'. FELYONLn(111 FP1o„1en AJ11:CPT MA1ThMmm111ARAC 1mieo COGLL NTS(,� NAL AlLIR1,m,����dmo��,��ixiu1,1��o.u,ruia a1io11um;1ui�1ou„,11onn,00��tau,.m.,enei�,��uu-�
o� ��������u a�����������i���iur������i���� ����oim����.����. a.„�i�a�u - eu ��,����o������w������a.,,����, � i� mW io������ ��
Its OOOb7f HAS ffDl PRODUCED FRLtI WhAl11NAT WAS SIOfED A1D,OR Tit/N.4(1Hl fiFMaTtGLLY AND WAY NA1E ffQl N/D,FAtOfiLY /LTdtfIl RELY ONLY tll i>aK HHrtYOPf NAIEAALS ff/17W. 1!E 6]141LWi'S OTUNAL SLNAtUAE AND gJ.L
PAPE-DAWSON
ENGINEERS
1of1
TEHAMA BLUFFS PHASE 1
FORT WORTH, TEXAS
EXHIBIT A - WATER
5130 NEST SEVENTH 57.1 FAIT N0R7)i TEXAS 78102 1 PHaIE 017•070.3668
&WTE 350 FAX' 8I7:870J689
TEYAS Ef iRD AL Dia F 1 REfS02A1tlt / 470
•
•
8
W
0 s
D W,
=o`
41,
LEGEND
PBV SE 2
' ---
> , ' 14 %�_%_
\\\k
iiti{1
1
15
•
•
lil
r11
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY MANHOLE
JOB NO.
DATE
DESIGNER
61038-00
JULY 2015
EAP
CHECKED XXX DRAWN M
SHEET
o �111 lino w' 1 _I '11 1 I II u 1 1'' . II III um����au ....,,,ae��������mm w�iiii,m��.������a����� ;m1II1111him.il' 11, 1m1i III 111111•1111 iII!ilmill„m 11 lLI!I�li11111i (uxm.mmm�am,oumNi ��n o��wm�����,Iii1I, n „jII!,I���1;nu,10n1e11,11.o WutN1W imuuuanuwu.w.•1111�i611n11,1d, o° 11 Dohs �BEDi P WASA��� » �
THS OOOWEli7 HAS ®i PR0011® F7t011 W70EAL THAT SRY6D ND/CH iRNe(7® 01TIRUWUiLY Alm WAY NA,E �i NAD54RIEHRY ALTOhIl RELY CRY d Fitt HA%IfdPY YA7E1WA15 ffAAC ME 03ALTNffS O50NAl 92.1A711RE AM 3_AI_
‘: X,‘%'T3',
/i
1»
•
_PALL MUUNL AINJiL1Al2
/
•
•
•
SCALE: 1"= 300'
um41 „o'11mild t uLai u 1u.,1au111 I Idiom W,�loiiaern„en.n'••n1 kii114o•i11mwdom,.1inw11!1o;p pmi�o mn.,111mn1., 1omno1mill nunm,iumi uudux,ueiii11 ,1.11 i„Milli•iin11u1ta,1dw;a1101imoudiwifilaluamwe,1uidliuiwiihhiduuumYl6JleMnaJlwuldi c.1
PAPE-DAWSON
ENGINEERS
1 of 1
TEHAMA BLUFFS PHASE 1
FORT WORTH, TEXAS
EXHIBIT Al - WASTEWATER
500 $CT SE1.fll7H SL I P07tT 7iCR711, TEXAS 76702 ' PHOME 877.8763668
SLLRE 350 7'AL` 817.8703669
7EYAS WARD Cr PRD7ESSONAL D7.7EEP5 Fail ROWS-0A7a l 470
•
Dote: Jul 29, 20I5, II: 2I am User ID: Pm:wanes
Few 5 \projecls\DIO\J8\00\Derlyr\CINI\ExhIbfls\EX150609 — CFA PasIng.dwg
ONIAVd - El 1181HXD
0 0 V
1 1,1 >
m (1)
0
m m2 m P
X 2
Ili 7 ' ME- Cn
,...
> Co 1 u
K 0 1
co 8
0 2
SVXD1 `1-1180M 1110d
I.,11111
3SVHd sddrno VIAJVH81
IN31613AVci 4350d021c1
8
0
0
r—
m
I 11111 ,1,1,1 MI
" • CALAVERASROAD
1
AA, 1,11,11„111, 1,111,AL Ni11,1111, .IA1,141111,1 11,1111,11,1 ,A 1 1,,A1111.11111,111,111,1111111,11, 11111111,11111,1141.1111,1111111111116,11,1,1111.10111111111111AIA1111.1A.MA14,11401,,I,i1.111111A1111111W1111111111,1/110WAN11111111111111.41111111116111A1
t
---
''--------,,-,---
..,-••• _ ___.•••=,,,=—..-7.- ..7...- 1-,s' -: L--,,,,,, -- —
._, t.. ..,.... ......_,..._ .....,4
\s%
1
I
I I
•• BoDROP DAY ROAD •
II----
----1
L 1
-..-TVLiri.q.E• ROAD_ ...1L477'=4"'-7- -
11 ":1
>to
0
,I11 ,11.111111i111 1.1 hill W6111,1111, III 1111 .11111,1,11,1111,11i 1 i1111,411,,A1,,I,1111,11um111,11111111,11,4111111i5l0o.11111moW111t11.1111141,,,iimillileil111ili,111.4,11,.,11tiominillib11.1,111,1,11,41i,Lilogill1,111e111.:11011111aZZI
Dote: Jul 29, 2015, I h20orn User ID, inoranee
Fee: S: \ projects \ 610 \ J11\ 00 \ Design \ MN\ CehrbIls \ EX150609 — SPA Slorm.drr9
= 1./) C) r9 ';'• b -= 5' 1 ic3 _to. m to i
1 x 2 z
! G m
zi P 4
! 2 _I
X
1 -: 0 xiCI
i 0
6. 7
...4
NIVIKI V\11:1018 - 1.8
SVX21 `1-11.1:10M 11:10d
" 8 I
I- 3SVHd addnis VINVEI31
CALAVER*5440/4D
/
--N
LR
hill ....
LJ
zfr
NUM
iT
W
w•
- U
i
1 I Nei lI llluulYY 1 it 1 11111111eu1uIl111Y ur�1�I��I11��1111u11�1JW'1111111 1 Y umY,uYY1W441W11YWWIIe II��W�e11:.II.�u��iiiw�,IJ111JJWYIeu1YUYYJ1111Y'+�,�,1md1u�44���Y+��i m�111I41 eu�WewudlYl��,�IIIIII1WJIei1111Ia IJ11JJ111��I�I�WIWWYWWY�WY
j JUWuuluYuonmamWn11 J1Y1uowJ1WYI,W�euuaaJ,o��el�nlo�JI�Y�I�Inlwm�n��IY,y�yln 1,wnm�m����������4m�I,�I����I�wuuJYl FYI ���J�n�mdnl o�IIII IJ��,mw�ruudalmul�uuul n�J�IouaL�in��wW�nJm�ammneoJe���almuuWo4. IJei���m�� W�y�',y
E o JOB NO. 61038-00
O.
DATE JULY 2015
it1 re; DESIGNER JPAA0 lc
-
rye CHECKED XXX DRAWN XXX
- SHEET 1 of 1
C—IeuelWudllJl Y14JInIW11„III Iuuu� 1�III111iu1m IIYYM14YJid.�n�OJYluI1�lYWlunbwa.uWdw OIWmNwdWW111.me1�
o F� v,W.1 n.4u.,111� 1ASm um d PRODUCE) FRW ILATERUL N T W l lY�YS�1 „ D 1 CJA �n.kAus., II I I1 11 Y1I1 Y i 1*u 1�1��111W III11�am111Em Ye��l111Y I I VERT)11JWIY W.1 1mI1 1I1 1. 11Y 1111111 I�a1� „'EAR 'EARWIG
11E I 1 I11IIIIITmt.1I1I a YIIIJ �IYII � Im�1W1WY.�1 OQ1lETtf HAS am PRODUCE!) TROY WTr%YL 1RAT WAS SfOli➢ A1O/YR TPJNSVT® EIEtiRbY.Ai1Y AI✓D YAY IL11E !IDI &/LiEY1FTitl ATEIiIl RELY GU ON ill/1 lLWIAf1PY WTEA S BE.VtatG 11£ fLCTLTN1i'E mama 9(NAi1Lff AND 9=/.L
A` i� nm- BUY
`;�` tTYP.)
I
N\
PHei.SE2 6I
RAL BOY
Ow)
II(43I15
41
12 1
1
8
•�[Off �,, T��
4
G
9
7
n
F
•
t
a
2
/ l��Yrop.)tT LIGHT
fir..
�� - Lf L4J1i ' - $E)MO PUNT
1
HERITAGE TRACE PARKWAY
SAJJ4ST1 i3ft�:VAI
•
rJ
/ / 1
/
/
/
ri
1
SCALE: 1 "= 300'
TEHAMA BLUFFS PHASE 1
FORT WORTH, TEXAS
EXHIBIT C - STREET LIGHT
PAPE-DAWSON
ENGINEERS
BOD YEST SE eats sr. I FC1PT anent
SUITE 330
TEXAS 76702 1 H0E: 817.8763658
FAA.* ST7.8703669
TEYAS MOST OF FOITESSOWL E)AG+E.>ZS Rif REGISTRADEN / 470
•
•
•
LIIII i1114111111i11111141
MEI
os
N
E
i
1 re
OAyt
x
tu
e'
a
ors
14,
-
-va
us
SHEET
rl
L
n
NAME SIGN
{
•
HERITAGE TRACE PARKWAY
-;--r-
!l i?
SCALE: 1 "= 300'
=;1 IYIYJ11;alw we'�JILtl Ouii pi a geJ.;A wiAaN Odi YJ nurv�" idYtlJ;Le.e eaidu.,.w6;4nJmL �W.�diLlJnwp�iW iIII!d 6,iu;uWieu.IduiWbeelueh aw.e nLWJullIkteJJBId.uFYInpIJ11141114InJi4uL;IIY1YIu1WLI14I11Li;4FOWllJIWluld I iiIW'a.u'WlLiulueW I,iIIIJ;Idl;l;ll;'1 ,lYoilitlne JumOAnd ueiWniliNJeuidu,liLL;n muhiueue itluWWJidW.YUJO,e II;nIw5III lA ubn Wu;d;nillIgi I g dYlnJ
JOB NO. 61038-00
DATE JULY 2015
DESIGNER
CHECKED
EAP
XXX DRAWN XXX
1 of 1
TEHAMA BLUFFS PHASE 1
FORT WORTH, TEXAS
EXHIBIT Cl- STREET NAME SIGNS
PAPE-DAWSON
ENGINEERS
500 NEST 3 m - FOFT NORTH 7EXAS 76702 I PTTo a BI»
SUITE 350 FAlO 817.670.3669
TOGS B0I10) OF PROxrctIoult EAJOAIZERS, Ted R6S1RATION / fA
1II''!Llie �,;IReiti.,LYAD RA .mud;;��aEN''!!I!!!!I�WI NTLY o�;..,um!�''mEL�YIm Iv mm.�, tiY9iYILATEP �u ��AR mSE.m�tae„ww
or t'W1 fl41 HAS ����uu,,.�tUi„ o��RW wu ���nJL THAT �Wu�����m�i a.„���r����, ��; fl4F, �.��i�w�������d.u)SLTa�m�a��..�.ou,���.�.uui ATug m „�������„�.. e�u��anN�oo����nu.u��m, gig,
iris m1AEENf HER PROOIHSD FROM MATERIAL THAT WAS SIOIiD FIL/0R &TJrslfiED E11H:TRfti.AN.Y AND NA NAAE BEEN g1111IXiUi7LY QT93a RELY 01C OR fHl1 IVA?:OPY W1EA C �AbN 71E fdHTSANPS O'd0N/1 SIXl1VRE AIA SEAL
ITEM NO. BID ITEM
1 12" PVC Water Pipe
2 8" PVC Water Pipe
Fire Hydrant
4 Ductile Iron Water Fittings w/ Restraints
5 Connection to Existing 4".12" Water Main
6 Connection to Existing 24" Water Main
7 12"x10" Twin; Sleeve & Valve
8 24"x12" Tapping Sleeve & VD ve
9 F" Water Service
10 11/2" Water Service
11 Meter Box (Irriradon)
12 8" Gate Valve w/ Box
13 12" Oatc Valve w/ Box
14 4" Condt PVC SCH 40 iT)
15 Trench Safety
16 Concrete Encasement
UNIT
LF.
LP.
EA.
TON
EA.
EA.
EA.
EA.
EA
EA
EA.
EA.
EA.
LF.
LF.
CY
WATER IMPROVEMENTS
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
5 6 7 8 9 10
954 895 722 447 3018 $33.70 $101,706.60
438 504 942 $18.60 $17,521.20
3 1 4 $3,300.00 $13,200.00
0.8 1.1 1.2 1.2 1 0.3 5.6 $3,800.00 $21,280.00
1 1 $500.00 $500.00
1 1 $700.00 $700.00
1 1 $5,100.00 $5,100.00
1 1 $9,800.00 $9,800.00
59 18 77 $710.00 $54,670.00
5 1 6 $1,100.00 $6,600.00
5 1 6 $240.00 $1,440,00
2 5 7 $1,200.00 $8,400.00
1 3 1 5 $2,100.00 $10,500.00
402 402 $8.00 $3,216.00
438 504 954 895 722 447 3960 $0.20 $792.00
3 7 10 $375.00 $3,750.00
UNIT TOTAL $259,175.80
SEWER IMPROVEMENTS
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 11 12 13 14 15
1 8" PVC Sewer Pipe I LF. 1133 419 742 407 655 3356 $24.00 $80,544.00
2 8" PVC Sewer Pipe, CSS Backlit LE. 40 40 40 110 20 250 $31.50 $7,875.00
3 4' Manhole EA. 7 3 5 3 5 23 $2,400.00 $55,200.00
4 4" Sewer Service EA. 27 18 21 11 77
$520.00 $40.040.00
5 Trench Water Stops LF. 1 1 2 4 2 10 $250.00 $2,500.00
6 Manhole Vacuum Testing EA. 7 3 5 3 5 23 $110.00 $2,530.00
7 Post -CCTV In. pection 1P. 1133 419 742 407 655 3356 $1.50 $5,034.00
8 Trench Safety 12. 1133 419 742 407 655 3356 $1.00 $3,356.00
9 Waste Water Access Chamber E.A. 1 1 $2,350.00 $2,350.00
10 Concrete Encasement CY 4 4 $375.00 $1,500.00
11 Epoxy Manhole liner V.F. 10 23 33 $195.00 $6,435.00
I
UNIT TOTAL $207,364.00
PAVING IMPROVEMENTS
SHEET NO
ITEM NO. BID ITEN UNIT 22 37 38 39 40 41 42 43
1 6" Concrete Pavement S.Y. 1808 1952 1900 1942 2121 3103 1978
I
2 6" Lime Stabilized Subgrade S.Y. 1932 2049 2035 2050 2254 3267 2086
I
3 Hydrated Lime (301bstsy) TON 29 31 31 31 34 49 31
I
4 18" Sawcut Existing Asphalt LF. 92 88
5 4" Sidewalk S.Y. 22 234 56 647 403
6 Barrier Free Ramp, Type R-1 EA. 2 2 2 4
7 Barrier Free Ramp, Type P-I EA. 2
8 Barrier Free Ramp, Type P-2 E.A. 2
I
9 Traffic Control M.O. 2
I
UNIT TCTAL
ITEM TOTAL UNIT PRICE ITEM TOTAL COST
14804 $33.25 $492.233.00
15673 $2.40 $37,615.20
236 $140.00 $33,040.00
180 $3.50 $630.00
1362 $37.25 $50,734.50
10 $1,750.00 $17,500.00
2 $1,450.00 $2,900.00
2 $1,550.00 $3,100.00
2 $1,500.00 $3,000.00
$640,752.70
1
DRAINAGE IMPROVEMENTS
SHEET NO ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 52 53 54 55 56 57
1 21" RCP LF. 110 30 140 $41.00 $5,740.00
2 24" RCP, Clas III LP. 115 60 31 206 $45.00 $9,270.00
3 27" RCP, Clas III LF. 188 13 201 $50.00 $10,050.00
4 30" RCP, Class IE LP. 296 40 336 $70.00 $23,520.00
5 36" RCP, Clas IR LP. 193 482 246 921 $76.00 $69,996.00
6 48" RCP Class III LF. 434 434 $118.50 $51,429.00
7 4'x3'Box Culvert LP. 113 113 $154.00 $17,402.00
I
8 5'x3'Box Culvert LF. 176 176 $182.00 $32,032.00
I
9 4'Storm Junction Box EA. 1 3 4 $4,900.00 $19,600.00
I
10 5' Storm Junction Box EA. 2 2 $3,800.00 $7,600.00
11 4'Drop Inlet EA. 1 2 3 $3,500.00 $10,500.00
12 5' Drop Inlet EA. 1 1 2 $3,800.00 $7,600.00
13 10' Recessed Inlet EA. 1 1 $5,200.00 $5,200.00
14 10'Curb Iola EA. 6 2 2 10 $3,200.00 $32,000.00
15 15' Curb Inlet EA. 1 1 $3,900.00 $3,900.00
16 Concrete Collar EA. 1 1 2 I $400.00 $800.00
17 Medium Rock Rip -Rap S.Y. 73 80 10 163 $50.00 $8,150.00
I
18 TxDOT (FW-S) Flared Wingwalls EA. 1 1 2 $6,800.00 $13,600.00
I I
19 TxDOT Precast S.E.T., Type 11(SETP-PD) EA. 1 1 $2,500.00 $2,500.00
I I
UNI i TOTAL $330,889.00
ITEM NO. BID ITEM UNIT 68
1 Rdwy Mum Assembly TY 1, 2, and 4 EA. 19
2 Rdwy Blum Foundation TY 8, 11, D-25 and D-30 EA. 19
3 Ground Box Type B EA. 6
4 1 1/4" Condi PVC Sch 80 (T) LF. 4133
5 NO 6 Insulated Elec Condr LP. 12399
STREET LIGHT IMPROVEMENTS
UNIT TOTAL
SHEET NO.
ITEM TOTAL UNIT PRICE ITEM TOTAL COST
19 $1,220.00 $23,180.00
19 $2,412.00 $45,828.00
6 $512.00 $3,072.00
4133 $4.27 $17,647.91
12399 $0.85 $10,539.15
$100,267.06