Loading...
HomeMy WebLinkAboutContract 53037-AR2 CSC No.53037-AR2 FORT WORTH-., City of Fort Worth y Construction Allowance Request Project Name Parker Henderson Road(from Mansfield Highway to Kellis Street City Sec# 1 53037 Client Project#(s)l C01419 Project Water main replacement,pulverization of existing roadway,full reconstruction from Lifestyle Cir.To David Strickland Rd.,replacement of multibox culvert at Description Prairie Dog Creek and construct sidewalks. Contractor McClendon Construction Company,Inc. CA# 2 Date 8/7/2020 Alejandra Ayala,PE City Inspector Steven Aguirre City Project Mgr.1 Dept. UNIT I WATER UNIT II UNIT II ALT UNIT III Contract Time STORMWATER STORM WATER PAVING&DRNG Totals CD Original Contract Amount $935,257.60 $1,842,785.85 $1,140,788.00 $3,746,091.40 $7,664,922.85 Extras to Date Credits to Date Current Contract Amount $935,257.60 $1,842,785.85 $1,140,788.00 $3,746,091.40 $7,664,922.85 Go to ADD&DEL Tabs to Enter CA Backun $0.00 1 $0.00 1 $0.00 1 $54,818.50 1 $54,818.50 30 Original Allowance Available to Allocation $100,000.00 $10Q000.00 $0.00 I S150,000.06—f $350,000.00 Allowance Funds Previously Allocated $73,063.30 $0.00 $0.00 1 $0.00 $73,063.30 Remaining Funds Available for this Allocation $26,936.70 $100,000.00 $0.00 1 $0.00 $126,936.70 JUSTIFICATION(REASONS)FOR CHANGE ORDER IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all materials for the construction of a temporary 6"private water line which needed to be re-routed further downstream in order to construct the toe wall of the culvert and gravity walls. A construction plan has been included for reference. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Name Contractor(Name) Date McClendon Construction Company,Inc. Inspector/Inspection Supervisor Date Project Manager Date � x Aug 20,2020 'Wr#w" Aug 20,2020 Program Manager Date Date �5 Aug 20,2020 Assistant Director(Dept) Date Director,Contracting Department(Dept) Date Aug 20,2020 Aug 20,2020 Assistant City Attorney Date Assistant City Manager Date Aug21,2020 ion Aug22,2020 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort worth Construction Allowance Additions Project Name Parker Henderson Road(from Mansfield Highway to Kellis Street City Sec# 53037 Client Project# C01419 Contractor McClendon Construction Company,Inc. PM Alejandra Ayala,PE Inspector Steven Aguirre Construction Allowance Submittal# Date 817I2020 ADDITIONS unit UnitCost Total p,valve,&water main. a-roue existing water service for Willow 48 Springs MHP out of Construction Zone UNIT III 1.00000000 LS $54,818.50 $54,818.50 UNIT I WATER 0.00 UNIT II STORMWATER $0.00 UNIT II ALT STORM WATER $0.00 III PAVING&D $54,818.50 Sub Total1bons 5 Change Order Additions Page 2 of 4 FnK�R]H City of Fort Worth Construction Allowance Deletions Project Name Parker Henderson Road from Mansfield Highway to Kellis Streel City Sec# 53037 Client Project# C01419 Contractor McClendon Construction Company,Inc. PM Alejandra Ayala,PE InspectorF Steven Aguirre Construction Allowance Submittal# Date 817I2020 OtLt I ION5 Unit UnitCost Total UNIT I WATER 0.00 UNIT 11 STORMWATER $0.00 UNIT 11 ALT STORM WATER0.00 III PAVING&0 $0.00 Sub Totale e ions Change Order Deletions Page 3 of 4 M/SBE for this Construction Allowance M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Construction Allowances co# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. i Name employee/Signatule Sr. Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature pa444nn4� F�RT��dd °°ooa �0 Pvo o=d ATTEST: a�a* 00000000 *� C� r/ U e� ��4 nEXA5o4.0 Mary J.Kayser,City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX ML 9 McCLENDON CONSTRUCTION CO., INC. P.O. Box 999 Burleson, Texas 76097 (817)295-0066 Fax (817)295-6796 July 9, 2020 City of Fort Worth Attn: Alex Ayala Re: Parker Henderson Road Private Waterline Options Alex, Below are the prices for the 2 waterline options to serve the Willow Springs community as discussed onsite. Description Quantity Unit Price Extended Price Option 1: 1 LS $ 54,818.50 $ 54,818.50 6" Tap, Valve, and water main. Re-Route existing water service for Willow Springs MHP out of Construction Zone (per attached drawings)Add 30 CD to Contract Additional contract time requests are as described in each option above. Respectfully, Justin Blair M9 k900 L£9Z-)1 £495Z-X 'SS S11-19)I'9 01.Q8Z"Sf19)*AAui 0191dSNVW QVO'd NOS'd3GN9H'd9X'dVd C3 2<N�.... � o o N oowcwiaut u�wo� `a 0 0 "' F--o'oaa�ioorcw- 'uin <Y w R: o «wF0.� - oaf am st ZWo>W�- �r '6w Nyyyy �•,,: :�'0�:�1y •,8-_ p O ap, W W O °_< p aab� a E> a f- �i,�`:. '_` ,'• Ify w ''°4 y O CL W3 Na FU y z¢U � U o v aaaa Q_� Wg _ oi,M a 0 'ate awn`^°— lv�m � an w oaa ^, W t 13 O F�? Ow Ow Elw El 0 Elw 000aaWoao o N�� ahm _r`q� ��\\��\ r\ ainww avlau 'Pa�R mrc"'• Perry Perry m�`r rna'o_°• ��� �Inww v+ \ \ \ \ I rN F•iO•. rho; a„�'O1". F�� F„�u°1i, a,'Ea eP I N ___— vJ nw a�w 'w maw viaw viaw innw aoa000aa a 19 ZE as \\ \ ^ e \\ I \ J cnR•i 0 ..,vl oo N�YI OW wr =y I \ Vw z �\ o� LLJ U N voY t W —I 1 "O S 9qb / byo• O�N, if� auk e;n^ I Z � � "••�� o v �mN I S � � I I Wd lO:Zb�S 61.OZ/6t/S •% 8 u P•l0-yPo/•}I•a -fOSSI\al:lad-Pua-�old'a oyaip-£0\a.oyou0-90\slaa45\N�J�\l0\fOSSI\alga-Oud\Sauo45o9\lowalw•uaw�ola P!u9\\