FORT WORTH City of Fort Worth
- -� Construction Allowance Request
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 1 53179
Client Project#(s)l CO2101
Project Silver Creek Roadway Improvements Phase 2 between Brewer High School and Live Oak
Description
Contractor Texas Bit/Texas Materials Group,Inc. CA# 4 Date 7/29/2020
City Project Mgr.I Alejandra Ayala City Inspector John Crowley
Dept. UNIT I UNIT II Contract Time
Totals (CD)
Original Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64
Extras to Date
Credits to Date
Current Contract Amount $3,507,396.93 $1,411,506.71 $4,918,903.64
Go to ADD&DEL Tabs to Enter CA Backup $0.00 $21,652.85 $21,652.85
Original Allowance Available to Allocation $200,000.00 $100,000.00 $300,000.00
Allowance Funds Previously Allocated $77,739.60 $64,034.20 $141,773.80
Remaining Funds Available for this Allocation $122,260.40 $14,312.95 $136,573.35
JUSTIFICATION(REASONS)FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACT SHALL: Furnish all materials for extending the grading limits near STA
140+00. Item Numbers: Unit II#11-Unclassified Excavation,#25-Top Soil and#26 Hydromulch. This Construction Allowance is to add additional quantity to the Item
Numbers mentioned above. See attached plan sheet.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will
be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager
signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance
and reporting requirements.
Contractor's Company Name Contractor(Name) Contract Signature Date
Texas Bit I Texas Materials Group Inc.
Inspector/Inspection Supervisor Date Project Manager Date
cl ul bwtofq Aug 7,2020 p g 0.mm n Aug 10,2020
Program Manager Data Date
P-OA Aug 18,2020
Assistant Director(Dept) Data Director,Contracting Department(Dept) Date
re,1e fig � s�� Aug 19,2020 - Aug 19,2020
Assistant City Attorney I Date lAssistant City Manager Date
Aug 21,2020 Aug 22,2020
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort worth
Construction Allowance Additions
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179
Client Project# CO2101
Contractor Texas Bit I Texas Materials Group,Inc. PM Alejandra Ayala Inspector John Crowley
Construction Allowance Submittal# ® Date 7I2912020
ADDITIONS
Unit UnitCost Total
11 3123.0101 Unclassified Excavation by Plan UNIT II 1,430.00000000 Y 13.75
25 3291.0100 Topsoil UNIT II 68.00000000 Y —0
26 3292.0400 Sieding,Hydromulch UNIT II 613.00000000 Y 1.35
UNIT 1 $0.00
UNIT 11 $21,652.85
Sub Total Additions 21,652.85
Change Order Additions Page 2 of 4
FORT WOR-131 City of Fort Worth
1p�— Construction Allowance Deletions
Project Name Silver Creek Roadway Improvements Phase 2 City Sec# 53179
Client Project# CO2101
Contractor Texas Bit I Texas Materials Group,Inc. PM Alejandra Ayala Inspecto John Crowley
Construction Allowance Submittal# ® Date 712912020
DELETIONS
Unit UnitCost Total
UNIT 1 $0.00
UNIT 11 $0.00
Sub Total Deletions 00
Change Order Deletions Page 3 of 4
MISBE for this Construction Allowance
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Construction Allowances
CO# DATE AMOUNT
Total 1 $0.00
Request for Information — Initiation Form
Form should be completed by Contractors Project Manager or Designated Representative
Project Name: SILVERCREEK ROAD IMPROVEMENTS- RFI#:
PHASE 2
Project No. (CPN): CO2101 Date Submitted: 06/19/2020
Contractor: TexasBit Response Needed by(NLT):
City Project Manager: Alex Ayala Design Engineer: MV ENGINEERING, INC.
RFI Title (Short Description): additional contouring to maintain 3 to 1 slope
Attachments Image 1W Document 0
RFI Reference Data (If Applicable):
Specification Section No. Spec Page No Paragraph No.
Drawing Sheet No. 30 Drawing Detail Title: Other:
RFI Question or Clarification Needed: (Describe the issue and clearly state the question. Provide field data related to the
issue, including street location,distance measurements and pictures if applicable.)
Reference Grading Plan Sheet 30 and pictures. At the proposed end of contour we'll
have about an 8 ft drop. In order to maintain a safer transition, we propose to extend
the contour another 24 ft into the property to maintain a 3:1 slope.
If accepted it will generate another couple hundred yards of unclassified excavation
that wasn't accounted for in the contract quantity.
Contractors Recommendation: (Please do not leave blank. Provide the contractors recommended solution based on his
knowledge of the project and existing conditions to assist with accelerating the response)
extend the contour the additional 24 ft.
Does the Contractors Recommended Solution require a Change Order? : Yes ❑ No x❑
Potential Impact to the City of Fort Worth (Schedule, Scope, Cost):
1430 CY Unclassified Excavation @ $13.75/CY = $19,662.50
68 CY Topsoil @ $17.10/CY = $1,164.70
613 SY Hydromulch @ $1.35/SY = $827.55
Is This RFI Stopping ALL work on the project? Yes ❑ No ❑
If yes,why was this issue not foreseen and sufficient response time provided?
I I
W20'ON lO3POad ulO Z 3SHHd S1NAAzIAMJdWI CIVMA AAAHO?:OAIIS
I I
ryM
I - 0
a w w a
a a e Ofaa
o `* o w z = o zw 0 0Z� w
- W U 1 '
QU' K O zWW2 LL Ir
�c
oo � z K 00
LEE
w m
aaaa a a w w p< m3 pia u� LEI -
2W s E8
I I
I I
II � z I
I
I
t11S
00 OO+Z9
I I
1 �
/ I
I 6
00,00+9ti1 H1S
3NIlHO1bW
�
U¢ I
I I
IWtl b0 95 01 610Z/Z/b 6p'01-atl9+'IS\L33H5\N94\Maa IIS Mlj eb-81-£\51'J3f OHd\0 I
I I
I I
I I
I I
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
i
Name employee/Signatule
Sr. Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
4.00uoppq�
��. FORr �da?
ATTEST: .... ....0*d
aaQ��nEZAg4°�
Mary J.Kayser,City Secretary