Loading...
HomeMy WebLinkAboutContract 54339 Received Date: 08/25/20 Received Tlme•3:51 pm Developer and Project Information Cover Sheet: Developer Company Name: TCRG Opportunity XV,LLC Address, State,Zip Code: 1 5201 Camp Bowie Blvd.#200,Fort Worth,TX 76107 Phone&Email: 817-626-9898,pattonAtcrg com Authorized Signatory,Title: Robert L.Patton,Jr. Project Name: Risinger Road South Industrial Park Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: SW of Risinger Road and IH-35W Plat Case Number: Plat Name: Mapsco: Council District: 8 CFA Number: CFA20-0027 City Project Number: 102560 OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Page 1 of 15 Standard Community Facilities Agreement FT.WORTH,TX Rev.10/5/19[NPC] CSC No.54339 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT("Agreement") is made and entered into by and between The City of Fort Worth("City"), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and TCRG Opportunity XV, LLC ("Developer"),acting by and through its duly authorized representative. City and Developer are referred to herein individually as a"party"and collectively as the"parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Risinger Road South Industrial Park("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project,Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement("Community Facilities"or"Improvements"); and WHEREAS,as a condition of approval of the Project,Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land,pay fees or construction costs,or meet other obligations that are not a part of this Agreement.; and WHEREAS,the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance("CFA Ordinance"),as amended,is incorporated into this Agreement by reference, as if it was fully set forth herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exist between the terms and conditions of this Agreement and the CFA Ordinance,the CFA Ordinance shall control. 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been accepted by the City ("Engineering Plans")are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide City of Fort Worth,Texas OFFICIAL RECORD Page 2 of 15 Standard Community Facilities Agreement CITY SECRETARY Rev.10/5/19[NPC] FT.WORTH,TX at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: ® Exhibit A: Water ® Exhibit A-1: Sewer ® Exhibit B: Paving ® Exhibit B-1: Storm Drain ® Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements,and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). City of Fort Worth,Texas Page 3 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement,becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors,or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including,but not limited,to being prequalified,insured,licensed and bonded to construct the Improvements in the City. City of Fort Worth,Texas Page 4 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an oblige, in the amount of one hundred percent(100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions,Chapter 2253 of the Texas Government Code,and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider,which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight(48)hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed,and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. 11. Easements and Rights-of-Way Developer agrees to provide,at its expense,all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. City of Fort Worth,Texas Page 5 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO,AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS,AGENTS AND EMPLOYEES FROM ALL SUITS,ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED,BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS,INCLUDINGDEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN,PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERL Y SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT,INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES,DEATH OR DAMAGESARE CAUSED,IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS,SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH,RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR ERPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS,IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts Upon completion of all work associated with the construction of the Improvements,Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors,along with an assignment of all warranties given by the contractors,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. City of Fort Worth,Texas Page 6 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees,and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer,the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars($50.00),the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtainproof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office TCRG Opportunity XV, LLC City of Fort Worth 5201 Camp Bowie Blvd, #200 200 Texas Street Fort Worth, TX 76107 Fort Worth, Texas 76102 With copies to: City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 City of Fort Worth,Texas Page 7 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall,until the expiration of three(3)years after final payment under the contract,have access to and the right to examine any directly pertinent books, documents,papers and records of such contractor, involving transactions to the contract, and further,that City shall have access during normal working hours to all of the contractor's facilities,and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants,officers,contractors,subcontractors,and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and City of Fort Worth,Texas Page 8 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors,and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas,Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose,their attorneys,have had the opportunity to review and comment on this document;therefore any rule of contract construction or interpretation that would normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. City of Fort Worth,Texas Page 9 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of$100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. The term"boycott Israel"has the meaning ascribed to it by Section 808.001 of the Texas Government Code. The term"company"has the meaning ascribed to it by Section 2270.001 of the Texas Government Code. To the extent that Chapter 2270 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of this Agreement. 26. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services.DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES,SUBCONTRACTORS,AGENTS,OR LICENSEES. City,upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 27. Amendment No amendment,modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 28. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights,privileges,or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 29. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise,to any other person or entity. City of Fort Worth,Texas Page 10 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 30. Compliance with Laws,Ordinances,Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 31. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order,resolution,ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 32. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original,but which together will constitute one instrument. 33. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder,and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth,Texas Page 11 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 34. Cost Summary Sheet Project Name: Risinger Road South Industrial Park CFA No.: CFA20-0027 City Project No.: 102560 Items Developers Cost A. Water and Sewer Construction 1. Water Construction $ 402,546.73 2. Sewer Construction $ 475,956.73 Water and Sewer Construction Total $ 878,503.46 B. TPW Construction 1. Street $ 1,153,179.93 2. Storm Drain $ 1,312,711.31 3. Street Lights Installed by Developer $ 178,472.51 4. Signals $ - TPW Construction Cost Total $ 2,644,363.75 Total Construction Cost(excluding the fees): $ 3,522,867.21 Estimated Construction Fees: C. Construction Inspection Service Fee $77,175.00 D. Administrative Material Testing Service Fee $15,827.00 E. Water Testing Lab Fee $2,040.00 Total Estimated Construction Fees: $ 95,042.00 Choice Financial Guarantee O bons, choose one Amount Mark one Bond = 100% $ 3,522,867.21 x Completion Agreement = 100% / Holds Plat $ 3,522,867.21 Cash Escrow Water/Sanitary Sewer- 125% $ 1,098,129.33 Cash Escrow Paving/Storm Drain = 125% $ 3,305,454.69 Letter of Credit = 125% $ 4,403,584.01 City of Fort Worth,Texas Page 12 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] IN WITNESS WHEREOF,the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER TCRG Opportunity XV,LLC Dana Q ai_i Dana Burghdoff g25,202014:29 CDT) Robert L Patton Jr(Aug25 202012:54 CDT) 74 Dana Burghdoff Name: Robert L.Patton,it'. Assistant City Manager Title: President Date: Aug 25,2020 Date: Aug 25,2020 Recommended by: Evelyn erts(Aug 25,202013:44 CDT` Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Approved as to Form &Legality: Contract Compliance Manager: -•a rd A.McCracken(Aug 25-202014:15 CDT) Richard A.McCracken By signing, I acknowledge that I am the person Sr.Assistant City Attorney responsible for the monitoring and M&C No. administration of this contract,including Date: ensuring all performance and reporting requirements. Form 1295: Po�FORT�IId L.�tGty'GB'LBGL`GS� Laurie Lewis(Aug 25,202013:51 CDT) ATTEST: p'° 0 �d Name: Laurie Lewis �0`1GI C70`1T.Gt�1 d��oa Title: Interim Development Manager a� EXA`ao� Ronald P.Gonzales(Aug25,202014:40 CDT) n Mary J.Kayser/Ronald Gonzales City Secretary/Assistant City Secretary OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Page 13 of 15 Standard Community Facilities Agreement FT.WORTH,TX Rev.10/5/19[NPC] The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Attachment 2—Phased CFA Provisions ® Attachment 3 —Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Page 14 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] ATTACIEMENT"I" Changes to Standard Community Facilities Agreement City Project No. 102560 None City of Fort Worth,Texas Page 15 of 15 Standard Community Facilities Agreement Rev.10/5/19[NPC] 00 42 43 DAP-BID PROPOSAL Page l of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT 1:WATER IMPROVEMENTS 1 0241.1118 4"-12"Pressure Plug 024114 EA 6 $1,153.26 $6,919.56 2 3305.0004 10"Waterline Lowering 33 05 12 EA 2 $2,414.29 $4,828.58 _ 3 3305.0109 Trench Safety 33 05 10 LF 4200 $1.12_ $4,704.00 4 3305.0203 Imported Embed me_nt/Ba_ckfill,CLSM 33 05 10 Cy 50 _$97.16 $4,858.00 5 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 7.105 $5,562.47 $39,521.35 6 3311.0241 8"Water Pipe 3311 12 LF 395.6 $29.89 $11,824.48 7 3311.0341 10"Water Pipe 3311 12 LF 16 $18.15 $290.40 8 3311.0351 10"DIP Water 3311 10 LF 172 $44.55 $7,662.60 9 3311.0451 12"DIP Water 33 11 10 LF 152 $138.87 $21,108.24 10 3311.0461 12"PVC Water Pipe 3311 12 LF 3237 $71.34 $230,927.58 11 3311.0551 16"DIP Water 3311 10 LF 212 $167.73 $3__ 5_ 5_ 5 12 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 1 $3,511.37 $3,511.37 13 3312.0117 Connection to Existing 4"-12"Water Main 33 12 25 EA 1 $2,176.33 $2 176.33 14 3312.3003 8"Gate Valve 33 12 20 EA 1 $1,414.66 $1,414.66 15 3312.3004 10"Gate Valve 33 12 20 EA 2 $1,669.61 $3,339.22 16 3312.3005 12"Gate Valve 33 12 20 EA 10 _$2,390.16 $23,901.60 17 _ 18 19 20 21 22 i 23 - - 24 - 25 26 27 28 - 29 30 _ 31 32 33 34 _ 35 _ 36 37 38 39 _ 40 41 42 _ 43 44 45 TOTAL UNIT I:WATER IMPROVEMENTSi $402,546,73 CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Form Version May 22,2019 00 42 43—Bid Proposal_DAP(total)-PUBLIC 05-19-20 00 42 43 DAP-BID PROPOSAL Page 2 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT II:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 3301 31 LF 5190 $1.95 $10,120.50 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 17 - $174.87 _ $2__ ,972.79 3 3305.1003 20"Casing By Open Cut 33 05 22 LF 20 $63.77 $1,275.40 4 3305.0109 Trench Safety 33 05 10 LF 5190 $1.12_ $5,812.80 5 3305.0113 Trench Water Stops 33 05 15 EA 11 $464.61 $5,110.71 6 3305.0202 Imported Embedment/Backfill,CSS 33 05 10 CY 120 $87.02 $10,442.40 7 3305.1103 20"Casing By Other Than Open Cut 33 05 22 LF 91 _ $475.09 $43,233.19 8 3331.4115 8"Sewer Pipe 33 31 20 LF 1567.34 $49.38 $77,395.25 9 3331.4119 8"DIP Sewer Pipe 3311 10 LF 107 $95.99 $10,270.93 10 3331.4201 10"Sewer Pipe _ 33 31 20 LF 1239.64 $44.21 $54,804.48 11 3331.4215 15"Sewer Pipe 3331 20 LF 2178.23 $54.64 $119,018.49 12 3339.0001 Epoxy Manhole Liner 33 39 60 VF 138 $207.80 _ $28,676.40 13 3339.1001 4'Manhole 333916 EA 17 $3,849.35 $65,438.95 _ 14 3339.1003 4'Extra Depth Manhole 33 39 10 VF 144 $195.76 $28 189.44 15 14"DIP Sewer 3311 10 LF 91 $145.00 $13,195.00 _ 16 17 18 19 20 - - - 21 - - - 22 - - - - 23 -- - 24 - - - - - 25 26 27 - - 28 29 30 - - - -- - 31 -- - - - - 32 - - -- - - 33 - - 34 35 36 37 38 39 40 _ 41 42 _ 43 44 45 TOTAL UNIT II:SANITARY SEWER IMPROVEMENT $475,956.73 CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Foan Version May 22,2019 00 42 43 Bid Proposal DAP(total)-PUBLIC 05-19-20 11� 00 42 43 DAP-BID PROPOSAL Page 3 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. I Measure Quantity Unit Price Bid Value UNIT III: DRAINAGE IMPROVEMENTS 1 0241.0800 Remove Rip Rap 0241 14 SF 100 $2.06 $206.00 2 0241.1000 Remove Conc Pvmt 0241 15 SY 25 _ $15.84 $396.00 3 0241.3015 Remove 24"Storm Line 0241 13 LF 200 $17.16_ $3,432.00 _ 4 0241.3108 36"Storm Abandonment Plug 0241 14 EA 2 $500.00 $1,000.00 5 0241.4401 Remove Headwall/SET _ 0241 14 EA 4 $1,754.96 $7,019.84 6 3125.0101 SWPPP z 1 acre 31 25 00 LS 1 $6,663.13 $6,663.13 7 3305.0109 Trench Safety 33 05 10 LF 3692 $1.12 $4,135.04 8 3305.0112 Concrete Collar 33 05 17 EA 2 $479.92 $959.84 9 3341.0201 21"RCP,Class III _ 3341 10 LF 671 $67.49 $45,285.79. 10 3341.0205 24"RCP,Class III 3341 10 LF 60 $67.81 $4,068.60 11 3341.0208 27"RCP,Class III 3341 10 _LF 112 $84.21 $9,431.52 12 3341.0302 30"RCP,Class III 3341 10 _EA 26 $78.63 $2,044, 8 13 3341.0309 36"RCP,Class III c 3341 10 EA 200 $128.57 $25,714.00 _ 14 3341.1201 5x3 Box Culvert 3341 10 LF 293 $245.63 $71,969.59 15 3341.1302 6x3 Box Culvert 3341 10 LF 334 $309.56 $103,393.04 16 3341.1401 7x3 Box Culvert 3341 10 LF 65 $355.72 $23,121.80 17 3341.1501 8x4 Box Culvert 3341 10 LF 1168 $389.47 $454,900.96 18 3349.0006 Storm Junction Structure 33 49 10 EA 2 $13,500.00 $27,000.00 19 3349.0102 4'Manhole Riser 33 49 10 EA 5 $1 896.19 _ $9,480.95 20 3349.0106 Manhole Steps 33 49 10 EA 3 $168.00_ $504.00 21 3349.1005 30"Flared Headwall, 1 pipe 33 49 40 EA 2 $1,000.00 $2,000.00 22 3349.6001 10'Recessed Inlet 33 49 20 EA 16 _ $3,715.25 $59 444.00 23 3349.7001 4'Drop Inlet 33 49 20 EA 1 $4,549.45 $4,549A5 24 24"CH-FW-0 466 EA - 1 $1,000.00 $1,000.00 25 36"CH-FW-0 _ 466 EA 1 $1,200.00 $1,200.00 26 8x3 Box Culvert 3341 10 LF 763 $370.00 $282,310.00 27 Remove Storm Sewer Box 0241 13 LF 39 $50.00 $1,950.00 28 - - 29 30 31 32 - - - - - - - 33 34 35 3 f - - - - 37 38 - - 39 - - --- - 40 41 42 - -- - - - - 43 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENT $1,153,179.93 CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Form Version May 22,2019 00 42 43_Bid Proposal DAP(total)-PUBLIC 05.19-20 00 42 43 DAP-BID PROPOSAL Page 4 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 0241.1100 Remove Asphalt Pvmt 0241 15 SY 510 $6.93 $3,534.30 2 3123.0103 Borrow by Plan 31 2323 CY 3600 _ $8.50 $30,600.00 3 3124.0161 Embankment by Plan _ 31 24 00 CY 3600 $4.55 $16,380.00 4 3211.0400 Hydrated Lime 32 11 29 TN 216 $154.15 $33,296.40 5 3211.0501 6"Lime Treatment 3211 29 SY 1125 $2.92 $3,285.00 6 3211.0502 8"Lime Treatment 3211 29 SY 12490 $3.63 $45,338.70 7 3212.0302 2"Asphalt Pvmt Type D 321216 SY 1146 $8.17 $9 362.82 8 3212.0505 8"Asphalt Base Type B _ 32 12 16 SY 1146 $33.00 $37,818.00 9 3213.0101 6"Conc Pvmt 32 13 13 SY 1125 $32.45 $36,506.25 10 3213.0105 10.5"Conc Pvmt 32 13 13 SY 12490 $61.10 $763,139.00 11 3213.0301 4"Conc Sidewalk 32 13 20 SF 27565 _ $5.41 $149 126.65 12 3213.0401 6"Concrete Driveway 32 13 20 SF 850 $9.45 $8,032.50 13 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 8 $1,485.33 $11,882.64 14 3217.0001 4"SLD Pvmt Marking HAS(W) 32 17 23 LF 1925 $1.20 $2,310.00 15 3217.0003 4"BRK Pvmt Marking HAS(W) 32 17 23 LF 3240 $1.81 $5,864.40 16 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 180 $3.18 $572.40 17 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 60 _ $11.86 _ $711.60 18 3217.1002 Lane Legend Arrow 32 17 23 EA 15 $257.59 $3,863.85 19 3217.1004 Lane Legend Only 32 17 23 EA 7 $216.74 $1,517.18 20 3217.2102 REFL Raised Marker TY I-C 32 17 23 EA 85 $7.57 $643.45 21 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 95 $5.65 $536.75 22 3291.0100 Topsoil 3291 19 CY 1150 $22.66 $26 059.00 23 3292.0100 Block Sod Placement 32 92 13 SY 6900 $5.85 $40,365.00 24 3292.0400 Seeding,Hydromulch 32 92 13 SY 24200 _ $1.18 $28 556.00 25 3305.0111 Valve Box Adjustment 33 05 14 EA 10 $307.59 $3,075.90 26 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 2 $588.09 $1,176.18 27 3441.4003 Furnish/Install Alum Sign Ground Mount City 34 41 30 EA _ 7 $416.98 $2,918.86 28 3441.4110 Remove and Reinstall Sign Panel/Post 34 41 30 EA 2 $509.68 $1,019.36 29 3471.0001 Traffic Control 34 71 13 MO 12 $3,768.26 $45,219.12 30 31 32 - - -- - - 33 34 35 37 - -- - - - - 38 39 40 41 - - - - - - - - - - 42 43 _ 44 45 TOTAL UNIT IV:PAVING IMPROVEMENT $1,312,711.31 CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Foma Version May 22,2019 00 42 43 Bid Proposal DAP(total)-PUBLIC 05-19-20 00 42 43 DAP-BID PROPOSAL Page 5 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure tQuantity Unit Price Bid Value UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.0111 FURNISH/INSTALL ELEC SERV 26 05 00 EA 2 $5,354.00 $10,708.00 2 2605.3014 2"CONDT RM(RISER) 26 05 33 LF 80 $150.00 $12 000.00 3 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 4350 $9.50 $41,325.00 4 3441.1408 NO 6 INSULATED ELEC CONDR 3441 10 LF 100 $1.30 $130.00 5 3441.1409 NO 8 INSULATED ELEC CONDR 3441 10 LF 13500 $2.63 $35,505.00 6 3441.1502 GROUND BOX TYPE B,W/APRON 3441 10 EA 3 $435.57 $1,306.71 7 3441.1645 FURNISH/INSTALL TYPE 33A ARM 34 41 20 EA 20 $280.00 $5,600.00 8 3441.3003 RDWY ILLUM ASSMBLY TY 18,18A,19, 34 41 20 EA 20 $2,464.91 $49,298.20 9 3441.3302 RDWY ILLUM FOUNDATION TY 3,5,6, 3441 20 EA 20 $1,129.98 $22,599.60 10 11 12 - - 13 14 - 15 16 - - - - -17 - - - 18 19 _ - - 20 21 22 23 - - - - - - - 24 - - — - - 25 - — - — - - 2 _ 6 - - - - - 27 -- -- - - 28 - - - -- - - 29 - - 30 - - - - - 31 - — - - - 32 — - - - - - - - 33 - - — - - 34 _ 35 36 37 38 39 40 41 - 42 - 43 44 _ 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENIO $178,472.51 CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Fom Version May 22,2019 00 42 43_Bid Proposal DAP(total)-PUBLIC 05-19-20 00 42 43 DAP-BID PROPOSAL Page 6 of 6 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I:WATER IMPROVEMENTS $402,546.73 UNIT II:SANITARY SEWER IMPROVEMENTS $475,956.73 UNIT III:DRAINAGE IMPROVEMENTS $1,153,179.93 UNIT IV:PAVING IMPROVEMENTS $1,312,711.31 UNIT V:STREET LIGHTING IMPROVEMENTS $178,472.51 Total Construction Bid $3,522,867.21 This Bid is submitted by the entity named below: BIDDER: BY: Principal Brock Huggins Conatser Site Services TX, LP 5327 Wichita Street, Bldg C Fort Worth TX 76119 TITLE: Here> pes��4 T DATE: Her e> 7„`w a D Contractor agrees to complete WORK for FINAL ACCEPTANCE within 252 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH RISINGER ROAD SOUTH INDUSTRIAL PARK STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS CPN 102560 Fonn Version May 22,2019 00 42 43_Bid Proposal_DAP(total)-PUBLIC 05-19-20 MOcO lrw H&P Q z Z o o z -0 r w C z 0 0 cn w 0 z J _ = m w 0 w m 0 RISINGER RISINGER u' z 0 w m 0 0 PROJECT LOCATION TARRANT COUNTY MAPSCO F105-S VICINITY MAP (NOT TO SCALE) 6100 WESTERN PLACE, SUITE 1001 RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76107 817.412.7155 VICINITY MAP EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DR4wN BY CHECKED BY SCALE DATE ✓DB NUMBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR NTS 03/10/2020 3949-19.348 ABSTRACT NT 751, TARRANT COUNTY, TEXAS 0 250 500 1000 GRAPHIC SCALE IN FEET l� I I II I I END PROPOSED WATER MAIN W-1 BEGIN PROPOSED WATER MAIN W-2 I I PROPOSED 12"WATER MAIN W-4 EXISTING 12"WATER SSIII (CITY FILE NO.X-24272) EXISTING 48"WATER SSII (CITY FILE NO.X-20126) EXISTING 12"WATER SSIII (CITY FILE NO.X-20126) CONNECT TO EXIST 30,LINE (CITY FILE NO.X-76630,SSIII) BEGIN PROPOSED WATER MAIN W-7 R/S/N AD- - — — — ER ROAD — LOrs , EXISTING 16"WATER SSIII (88•S00 SO II (CITY FILE NO.X-16630) 10"STUB 70"STUB A O I 3 LOT, BLOCK, I I xsoxi (102=sn 11.0ei1 AOB® (osast sh Lor•.BLOCK, w I (Q ZzM SF) PROPOSED 12"WATER MAIN W-1 ( A54=� 1 (B(BBUM A I -0 CPPOR'N�N11xiN�%)V,LLO. (INSi.NO.0217134963) iCRC OPRORNNIN%V,L.LC. (INSE NO.D21713 618) EXISTING 16"WATER SSII (CITY FILE NO.X-16630) LOT , mi m' Ie444,. sr, LV x M, I (Mj�SF) PROPOSED 12"WATER MAIN W-2 EXISTING 10"WATER SSIII (CITY FILE NO.X-16630) LOT t,BIDCK, r EXIST 10"WATER LINE CONNECT TO EXIST 8"LINE I (CITY FILE NO.X-16630,SSIII) END PROPOSED WATER MAIN W-2 I LEGEND 16"W EXISTING 16" WATER LINE 10"W EXISTING 10" WATER LINE PROPOSED WATER LINE 40611 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 WATER CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED BY SCALE DATE ✓oB A/ MBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=500' 04/29/2020 3949-19.348 ABSTRACT 751, TARRANT COUNTY, TEXAS 0 250 500 1000 CONNECT TO EXISTING 4' SSMH GRAPHIC SCALE IN FEET I I I PROPOSED 4' PROPOSED 15" PUBLIC S.S. LPuBLIC SSMH -Alm i en. Advir. PROPOSED 4' PROPOSED 15" PUBLIC S.S. PUBLIC SSMH PROPOSED 4' PUBLIC SSMH PROPOSED 15" PUBLIC S.S. PROPOSED 4' PUBLIC SSMH PROPOSED 4' PROPOSED 4' PUBLIC SSMH lie PROPOSED 15" PUBLIC S.S. PUBLIC SSMH PROPOSED 8" PRIVATE S.S. STUB PROPOSED PROPOSED 4' PUBLIC SSMH PROPOSED 10" PUBLIC S.S. 14' D.I. PUBLIC S.S. PROPOSED 8" PROPOSED 4' PUBLIC SSMH BY BORE PUBLIC S.S. RISMER R — — — — PROPOSED 4' fYu*i �TMAi�i- PUBLIC SSMH 110, PROPOSED 8" PUBLIC S.S. a BLACK PROPOSED 4' PUBLIC SSMH PROPOSED 10" ( �i K O LorPUBLIC S.S. 4, .�� nan ACRES (4aZMW) PROPOSED 4' PROPOSED 8" PUBLIC S.S. I PUBLIC SSMH (e(a�,�Aalo TW.OPPON�BN� SF) LLC. PROPOSED 4' PUBLIC SSMH (INST.NO.Gx1713,L. iCRG OP—NIiY%V.L.— (INSi.NO.0 21 71 3 5 51B) PROPOSED 8" PROPOSED 8" PUBLIC S.S. PUBLIC S.S. PROPOSED 8" PUBLIC S.S. D.I.P. PROPOSED 10" PUBLIC S.S. I I ry.s44.as gal® K...x sFl KAT 2.BLACK K LOT 7.BLACK 1 Ifleet 17.726 AGNES lDT a�K 3K.,Bft17zea K� LEGEND EXISTING 15" SANITARY SEWER - PROPOSED SANITARY SEWER LINE 4060 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 WASTEWATER CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED BY SCALE DATE JOB NUMBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=500' 04/29/2020 3949-19.348 ABSTRACT N0. 751, TARRANT COUNTY, TEXAS EXHIBIT " B " - PAVING 1H-35W SBFR - PROPOSED LEFT TURN LANE LOT 5, BLOCK 1 LOT 6, BLOCK 1 PROPOSED DRIVEWAYS 1= ACRES A 4z4 (68,599 SF) 1. 4 A SF) PROPOSED 10' SIDEWALK PROPOSED MEDIAN PROPOSED LEFT TURN LANE I LOT 7, BLOCK 1 LOT 4,BLOCK 1 17.795 ACRES PROPOSED 64' WIDE ROAD 2.353 ACRES (775,139 SF) (1 OZ502 SF) PROPOSED DRIVEWAYS LOT 9X,BLOCK 1 2.W7 ACRES (98,151 SF) PROPOSED LEFT TURN LANE PROPOSED 64' WIDE ROAD BLOCK 1 5SM4 ACRES (2.455.635 SF) TCRG OPPORTUNITY XV,L.L.C. (INST.NO.D21 71 3 49 6 3) TCRG OPPORTUNITY XV,L.L.C. (INST.NO.D21 71 3 5 61 8) PROPOSED MEDIAN LOT 3, BLOCK 1 35,458 ACRES (1,544,439 SF) Q PROPOSED LEFT TURN LANE - - - PROPOSED 10' SIDEWALK PROPOSED 64' WIDE ROAD PROPOSED DRIVEWAYS LOT 1,BLOCK 1 PROPOSED HMAC _ I 1145268 TRANSITION - 0 125 250 500 PROPOSED CONCRETE PAVEMENT TRANSITION POSID HMAC PROPOSED CONCRETE SIDEWALK ® PROPOSED CONCRETE DRIVEWAY GRAPHIC SCALE IN FEET 4060 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 PAVING CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWAI BY I CHECKED BY SCALE DATE ✓08 /VUMBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=250' 06/03/2020 3949-19.348 ABSTRACT NO. 751, TARRANT COUNTY, TEXAS EXHIBIT " B " - PAVING z �PROPOSED 40' RADIUS , I SILEN T CONCRETE CUL-DE-SAC _ HOLLOW DRI VE LOT 3, BLOCK 1 Q 35.455 ACRES (1,544,439 SF) Lij J m Q U DEER CREEK NORTH ADDITION (CAB. A, SL. 11049) MA L L I CK OAKS DRI VP LOT 2, BLOCK 1 17.663 ACRES (769,395 SF) LAZY CREST C CONCRETE CUL-DE-SAC NCDO RADIUS DRI VE 0 75 150 300 PROPOSED CONCRETE PAVEMENT TRANSITION POSED HMAC PROPOSED CONCRETE SIDEWALK ® PROPOSED CONCRETE DRIVEWAY GRAPHIC SCALE IN FEET 4060 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 PAVING CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWAI BY I CHECKED BY SCALE DATE ✓oe NUMBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=150' 06/03/2020 3949-19.348 ABSTRACT N 751, TARRANT COUNTY, TEXAS EXHIBIT " B1 " - STORM hv raaw Na m-w PROPOSED 30" PUBLIC EXISTING 7'X3' PUBLIC RCB "- STORM DRAIN CONNECT TO EXISTING PROPOSED 21" PUBLIC 7'X3' PUBLIC RCB ! STORM DRAIN PROPOSED 7'X3' PROPOSED 36' PUBLIC PUBLIC RCB STORM DRAIN PROPOSED 8'X4' PROPOSED 3' WYE PUBLIC RCB INLET PROPOSED 10' PROPOSED 8'X4' RECESSED CURB INLET I PUBLIC RCB 41 PROPOSED 10'X10' I PROPOSED 21" PUBLIC PUBLIC JUNCTION BOX I STORM DRAIN LOT 7.BLOC(1 PROPOSED 12'X12' PROPOSED 10' PUBLIC '(77�5.139A�s PUBLIC JUNCTION BOX RECESSED CURB INLET PROPOSED 27" PUBLIC - —itPROPOSED 8'X4'PUBLIC RCB STORM DRAIN JPROPOSED 27" PUBLIC PROPOSED 11 21 11" PUBLIC STORM DRAIN TYPE "B" HEADWALL PROPOSED 10' PUBLIC PROPOSED 21" PUBLIC I I RECESSED CURB INLET STORM DRAIN PROPOSED 8'X3' PROPOSED 10' PUBLIC I PUBLIC RCB RECESSED CURB INLET PROPOSED 10' PUBLIC PROPOSED 36" PUBLIC RECESSED CURB INLET STORM DRAIN PROPOSED 21" PUBLIC PROPOSED 10' PUBLIC I STORM DRAIN RECESSED CURB INLET I PROPOSED 10' PUBLIC PROPOSED 27" PUBLIC RECESSED CURB INLET �BLOCK I STORM DRAIN PROPOSED 8'X3' TCRc OPPORTUNITYSXV,L.L.C. PUBLIC RCB TCRG OPPORTUNITY XV98L.L.C. PROPOSED 27" PUBLIC (INST.NO.D21 71 3 5 61 8) TYPE "B" HEADWALL I PROPOSED 12'X12' PUBLIC JUNCTION BOX PROPOSED 6'X3' PUBLIC RCB PROPOSED 21" PUBLIC PROPOSED 10' PUBLIC STORM DRAIN LOT 3, BLOC( 1 RECESSED CURB INLET 35'��39 SF) O PROPOSED 10' PUBLIC (1,544,4 PROPOSED 6'X3' PUBLIC RCB Q RECESSED CURB INLET a PROPOSED 27" PUBLIC PROPOSED 21" STORM DRAIN W g I PUBLIC STORM DRAIN PROPOSED 5'X3' PUBLIC RCB � W I Z I PROPOSED 10' PUBLIC PROPOSED 10' PUBLIC RECESSED CURB INLET RECESSED CURB INLET � PROPOSED 21" PUBLIC PROPOSED 5'X3' PUBLIC RCB STORM DRAIN PROPOSED 36" PUBLIC STORM DRAIN 0 125 250 500 PROPOSED 24" PUBLIC STORM DRAIN PROPOSED 36" PUBLIC TYPE "B" HEADWALL GRAPHIC SCALE IN FEET _ - PROPOSED 24" PUBLIC TYPE "B" HEADWALL I 4060 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 STORM CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED BY SCALE DATE ✓oB A/"HER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=250' 05/18/2020 3949-19.348 ABSTRACT N0. 751, TARRANT COUNTY, TEXAS z MAlAMTA7E MIMIM11fYfpC�'SIFM � — — PROPOSED PUBLIC STREET LIGHT POLES LOT s, BLOCK 1 LOT S. BLOCK 1.829 ACRES 1.244 ACRES (66,599 SF) (54.205 SF) LOT 7, BLOCK 1 LOT 4,BLOCK 1 17.795 ACRES L353 ACRES (775,139 SF) T (102,502 SF) Ile LOT 9X,BLOCK 1 PROPOSED PUBLIC I Z(998,15+� STREET LIGHT POLES PROPOSED ELECTRICAL SERVICE BLOCK 1 88.374 ACRES (2.455.635 SF) TCRG OPPORTUNITY XV,L.L.C. (INST.NO.D21 71 3 49 6 3) TCRG OPPORTUNITY XV,L.L.C. (INST.NO.D21 71 3 561 8) LOT 3, BLOCK 1 35.455 ACRES Q (1,544,439 SF) 0 ; c W PROPOSED PUBLIC STREET LIGHT yI POLES r Fr LOT 1.BLOCK 1 11.081 ACRES 0 125 250 500 (462,669 SF) GRAPHIC SCALE IN FEET 4060 BRYANT IRVIN ROAD RISINGER ROAD SOUTH INDUSTRIAL PARK Pacheco Koch FORT WORTH, TX 76109 817.412.7155 STREET LIGHTS AND SIGNS CFA EXHIBIT TX REG. ENGINEERING FIRM F-469 CITY PROJECT #102560 TX REG. SURVEYING FIRM LS-10008001 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED BY SCALE DATE ✓oB NUMBER AND BEING OUT OF THE GEORGE HAMILTON SURVEY, JWS RR 1"=250' 03/10/2020 3949-19.348 ABSTRACT NT 751, TARRANT COUNTY, TEXAS