HomeMy WebLinkAboutContract 53046-FP1 City Secretary 53046 -FP1
Contract No.
FORTWORTH., Date Received Aug 25,2020
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: IDEA PUBLIC SCHOOL ALTA MESA
City Project No.: 102116
Improvement Type(s): Water ® Sewer
Original Contract Price: $217,876.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $217,876.00
and jacab Au 25 2020
a nil jacob(Aug 25,202012:00 CDT) g
Contractor Date
President
Title
Modern Contractors, Inc.
Company Name
t AuQ 25 2020
,aI Kime(Aug 25,202012:26 CDT) b
Project Inspector Date
PP-&O E /A
FRED EHIA(Aug 25,202013:28 CDT) Aug 25,2020
Project Manager Date
Laurie Lewis Aug 25,2020
Laurie Lewis(Aug 25,202014:27 CDT)
CFA Man a r Date
Da�u (Aug 25,20 14:31 CDT Aug 25,2020
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: IDEA PUBLIC SCHOOL ALTA MESA
City Project No.: 102116
City's Attachments
Final Pay Estimate
Change Order(s): ❑ Yes ® N/A
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 180 WD Days Charged: 152
Work Start Date: 12/16/2019 Work Complete Date: 8/7/2020
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name IDEA PUBLIC SCHOOL-ALTA MESA
Contract Limits
Project Type WATER&SEWER
City Project Numbers 102116
DOE Number 2116
Estimate Number 1 Payment Number 1 For Period Ending 8/25/2020
WD
City Secretary Contract Number Contract Time 18WD
Contract Date Days Charged to Date 152
Project Manager NA Contract is 100.00 Complete
Contractor MODERN CONTRACTORS,INC.
4149 BEDFORD ROAD
BEDFORD, TX 76021
Inspectors OWEN/ KIME
Tuesday,August 25,2020 Page 1 of 4
City Project Numbers 102116 DOE Number 2116
Contract Name IDEA PUBLIC SCHOOL-ALTA MESA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/25/2020
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 6"WATER PIPE 20 LF $30.00 $600.00 20 $600.00
2 8"WATER PIPE 29 LF $30.00 $870.00 29 $870.00
3 8"WATER VALVE 2 EA $1,300.00 $2,600.00 2 $2,600.00
4 6"GATE VALVE 2 EA $900.00 $1,800.00 2 $1,800.00
5 FIRE HYDRANT 1 EA $2,600.00 $2,600.00 1 $2,600.00
6 12"WATER VALVE 5 EA $2,000.00 $10,000.00 5 $10,000.00
7 DUCTILE FITTINGS 0.75 TN $4,000.00 $3,000.00 0.75 $3,000.00
8 TRENCH SAFETY 80 LF $0.10 $8.00 80 $8.00
9 3"WATER METER AND VAULT 1 EA $11,000.00 $11,000.00 1 $11,000.00
10 12"WATER LINE LOWERING 1 EA $20,685.00 $20,685.00 1 $20,685.00
Sub-Total of Previous Unit $53,163.00 $53,163.00
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 8"SANITARY SEWER PIPE 3070 LF $40.00 $122,800.00 3070 $122,800.00
2 4'MANHOLE 9 EA $3,600.00 $32,400.00 9 $32,400.00
3 TRENCH SAFETY 3130 LF $0.10 $313.00 3130 $313.00
4 MANHOLE VACUUM TESTING 9 EA $150.00 $1,350.00 9 $1,350.00
5 TRENCH WATER STOP,CLSM 4.25 CY $1,000.00 $4,250.00 4.25 $4,250.00
6 8"SANITARY SEWER PIPE,CSS BACKFILL 60 LF $60.00 $3,600.00 60 $3,600.00
--------------------------------------
Sub-Total of Previous Unit $164,713.00 $164,713.00
--------------------------------------
Tuesday,August 25,2020 Page 2 of 4
City Project Numbers 102116 DOE Number 2116
Contract Name IDEA PUBLIC SCHOOL-ALTA MESA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/25/2020
Project Funding
Contract Information Summary
Original Contract Amount $217,876.00
Change Orders
Total Contract Price $217,876.00
Total Cost of Work Completed $217,876.00
Less %Retained $0.00
Net Earned $217,876.00
Earned This Period $217,876.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $217,876.00
Tuesday,August 25,2020 Page 3 of 4
City Project Numbers 102116 DOE Number 2116
Contract Name IDEA PUBLIC SCHOOL-ALTA MESA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 8/25/2020
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN/ KIME Contract Date
Contractor MODERN CONTRACTORS,INC. Contract Time 180 WD
4149 BEDFORD ROAD Days Charged to Date 152 WD
BEDFORD, TX 76021 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $217,876.00
Less %Retained $0.00
Net Earned $217,876.00
Earned This Period $217,876.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $217,876.00
Tuesday,August 25,2020 Page 4 of 4
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: IDEA Public School-AltaMesa
PROJECT NUMBER: 102116
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Open Cut 8" inch PVC 29 LF
Open Cut 6" inch PVC 20 LF
FIRE HYDRANTS: 1 VALVES(16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES: Taken/Passed
NEW SERVICES: N/A
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Open Cut 8" SDR-26 PVC 3,070 LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
N/A
DENSITIES: Taken/Passed
NEW SERVICES: 8" SDR-26 PVC 25 LF
TRANSPORTATION AND PUBLIC WORKS
. a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax: (817) 392-7845
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
August 7, 2020
Modern Contractors, Inc.
4149 Bedford Road
Bedford,TX 76021
RE: Acceptance Letter
Project Name: IDEA Public School Altamesa
Project Type:Water&Sanitary Sewer
City Project No.: 102116
To Whom It May Concern:
On August 7, 2020 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on August 7,2020,
which is the date of the final inspection and will extend of two(2)years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817)
392-8424.
Sincerely,
PRE75 &HIA
FRED EHIA(Aug 25,202013:28 CDT)
Fred Ehia, P.E., Project Manager
Cc: Neal Kime, Inspector
Mark Owen, Inspection Supervisor
Edwin R. Rodriguez,Sr.,Senior Inspector
Victor V.Tornero,Jr., P.E., Program Manager
Raymond L. Goodson,Jr., Inc., Consultant
Modern Contractors, Inc., Contractor
HKS, Inc., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.08/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
a
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Anil Jacob,
President Of Modern Contractors, Inc.,known to me to be a credible
person, who being by me duly sworn,upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Water, Sewer, Paving, Storm Drain, Street Light&Traffic Signal
Improvements to serve Idea Public Schools-Altamesa- CPN 102116
BY M_ C,��,Ltz
Anil Jacob, President
Subscribed and sworn before me on this date 14 of August, 2020.
C4✓YI.e.CG. iCJLG�. 'Z p
��� i
Notary Public
Tarrant County, Texas
PAME=BULLER-BUCKLEYNotary tD
y6712
My
i
i
i
AIA
== Document G707T"' - 1994
Consent of Surety to Final Payment Bond No. 107042838
PROJECT:(Name and address) ARCHITECT'S PROJECT NUMBER: OWNER ❑
Water,Sewer,Paving,Storm Drain, Street Light&
Traffic Signal Improvements CONTRACT FOR: ARCHITECT ❑
To serve Idea Public Schools-Altamesa
CPN 102116 General Construction CONTRACTOR ❑
TO OWNER: (Name and address) CONTRACT DATED: SURETY [ICity of Fort Worth July 23rd,2019
1000 Throckmorton St. OTHER ❑
Fort Worth,TX 76102
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insert name and address of Sure(y.)
Travelers Casualty and Surety Company of America
1301 E.Collins Blvd.,Ste. 11.1c
Richardson,TX 75081
on bond of SURETY,
(Insert name and address of Contractor.)
Modern Contractors,Inc.
4149 Bedford Rd.
Bedford,TX 76021
,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve
the Surety of any of its obligations to
(Insert name and address of Owner.)
City of Fort Worth
1000 Throckmorton St.
Fort Worth,TX 76102
as set forth in said Surety's bond. OWNER,
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: August 12th,2020
(Insert in writing the month followed by the numeric date and year.)
Travelers Casualty and Surety Company of America
(Su• ty) ----
( ignature of authorized representative)
Attest: Robbie Martin,Attorney-in-Fact
(Seal) (Printed name and title)
CAUTION:You should sign an original AIA Contract Document,on which this text appears in RED.An original assures that
changes will not be obscured.
AIA Document G707TM—1994.Copyright @ 1970 and 1994 by The American Institute of Architects.All rights reserved.WARNING:This AIA®
Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any
portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.Purchasers
are not permitted to reproduce this document.To report copyright violations of AIA Contract Documents,e-mail The American Institute of Architects'legal
counsel,copyright@aia.org.
Travelers Casualty and Surety Company of America
''� Travelers Casualty and Surety Company
TRAVELERS J St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company, and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the
"Companies"),and that the Companies do hereby make,constitute and appoint Steve Burleson,Staci Gross,Robbie Martin,Josh Andrajack,
Brenda Bledsoe,Garland R.Martin,Tina McLelland,and Connie M.Dubski of Wichita Falls,Texas,their true and lawful Attorney-in-Fact tosign,
execute,seal and acknowledge any and all bonds, recognizances,conditional undertakings and other writings obligatory in the nature thereof onbehalf
of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds
and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrument to be signed,and their corporate seals to be hereto affixed,this 17th day of January,
2019.
•
COWL
~, cow
M1
State of Connecticut
By:
City of Hartford ss. Robert L. Raney, enior Vice President
On this the 17th day of January, 2019, before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of
Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St.Paul Fire and Marine Insurance Company,and that
he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by
himself as a duly authorized officer.IN WITNESS WHEREOF, I hereunto set my hand and official seal.
My Commission expires the 30th day of June, 2021 j* wBY
nup,..10 Anna P. Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and
Surety Company of America,Travelers Casualty and Surety Company,and St.Paul Fire and Marine Insurance Company,which resolutions are now in full
force and effect,reading as follows:
RESOLVED,that the Chairman,the President,any Vice Chairman,any Executive Vice President,any Senior Vice President,any Vice President,any
Second Vice President,the Treasurer, any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign
with the Company's name and seal with the Company's seal bonds,recognizances,contracts of indemnity,and other writings obligatory in the nature of
a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and
revoke the power given him or her;and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation
is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED,that any bond, recognizance, contract of indemnity,or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when(a) signed by the President, any Vice Chairman, any Executive Vice President, any
Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any
Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or(b)duly executed(under seal, if
required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one
or more Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any
Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any
Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in-Fact for
purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or
certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified
by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to
which it is attached.
I,Kevin E.Hughes,the undersigned,Assistant Secretary of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,
and St. Paul Fire and Marine Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney
executed by said Companies,which remains in full force and effect.
Dated this 12th day of August 2020
T�•a r•'4 * Kevin E.Hughes,Assistant Secretary
To verify the authenticity of this Pox+er ofAnorney,please call us at 1-800-421-3880.
Please refer to the above-named Attorney-in-fart and the details of the bond to which this Power of Attorney is attached.