HomeMy WebLinkAboutContract 42940-CO1CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 4.130M
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) L $1,385,421.81
JUSTIFICATION li WOMS) FOR CHANGE ORWER
The storm drain manhole @Sta. #0 +23 was in conflict with sanitary sewer on Templeton Dr, water department decided to install two 4'
square storm drain manholes and connect both with 21" RCP pipe to avoid the conflict.
Contractor found 4" water line on Hamilton Ave@ Templeton it was in conflict with new sewer line and sewer manhole, contractor had
to tower the section in conflict. Water department investigated the 4" water line and there is no line item for repair with permanent asphalt
pavement trench repair after contractor install new 8" water line
Some sewer services needed to be relocated on
abandoned.315 and 309 Templeton. , J
Two sewer services needed to be connectedO
by:
they were connected on old sewer line and it is going to be
sewer on Merrimac St and 2906 and 2915.
OFFICIAL RECORD
CITY SECRETARY
J. Kaiser, Cit� S tary a 5,�4
FT. WORTH, TX
It is unders od and agreed that the cceptance of th s Change ractor constitutes an accord and slitisfaction and re resents a nt
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
i. :: F'.i t � _ t ra �i iY.•i ,i.t P -. ►_"_i t.: ;[= �r
Reliable Paving_ Vp
,�i. �' i`•'�1 ^ +i" i �
Cap V I °--F Z
FORT WORTH;.
City of Fort Worth CITY SECRETARY,) j L O
11
K'M In
Change Order Request CONTRACT NO.
Project Namel 2007 Critical Capital Project council District 9 Part V City Sec # 1 42940
Client Project #(s)l 00981
Project Description Water,Sanitary Sewer, Paving and Drainage Improvements DOE 5925
Contractorl Reliable Paving
Change Order# Date 6/7/2012
City Project Mgr. I Gopal Sahu
City Inspector I Ariel Duarte
Dept.
TPW Water Sewer tract Time
Original Contract Amount
TCD
$649,509.30 $189,147.15 $269,681.00 210
Extras to Date
Credits to Date
Pending Change Orders (in M &C Process)
Contract Cost to Date
$649,509.30 $189,147.15 $269,681.00 $1,108,337.45 210
Amount of Proposed Change Order
T1 3,700.00 $19,1 95.00 12,848.00 45,743.00 33
Revised Contract Amount
$663,209.30 $208,W2 .15 $282,529.00 $1,154,080.45 243
Original Funds Available for Change Orders
$25,000.00 $9,457.85 $15,484.00 $49,941.85
Remaining Funds Available for this CO
$25,000.00 $9,457.85 $15,484.00 $49,941.85
Additional Funding (if necessary)
$9,737.15 $9.737 15
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 4.130M
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) L $1,385,421.81
JUSTIFICATION li WOMS) FOR CHANGE ORWER
The storm drain manhole @Sta. #0 +23 was in conflict with sanitary sewer on Templeton Dr, water department decided to install two 4'
square storm drain manholes and connect both with 21" RCP pipe to avoid the conflict.
Contractor found 4" water line on Hamilton Ave@ Templeton it was in conflict with new sewer line and sewer manhole, contractor had
to tower the section in conflict. Water department investigated the 4" water line and there is no line item for repair with permanent asphalt
pavement trench repair after contractor install new 8" water line
Some sewer services needed to be relocated on
abandoned.315 and 309 Templeton. , J
Two sewer services needed to be connectedO
by:
they were connected on old sewer line and it is going to be
sewer on Merrimac St and 2906 and 2915.
OFFICIAL RECORD
CITY SECRETARY
J. Kaiser, Cit� S tary a 5,�4
FT. WORTH, TX
It is unders od and agreed that the cceptance of th s Change ractor constitutes an accord and slitisfaction and re resents a nt
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
i. :: F'.i t � _ t ra �i iY.•i ,i.t P -. ►_"_i t.: ;[= �r
Reliable Paving_ Vp
,�i. �' i`•'�1 ^ +i" i �
if,:�
� 1. F .:. [f�: {�Ali�1, :: ''. .- tt:,
�.
K'M In
b;i;
M 7S
c ��
0
v
orn
N
N_
O
N
#
co
U
d
_a
U
E
co
m
m
a* Q
W
v
O
a) `o
m U
m a
r N
U
C '+
,n U
N
'C O
CA
Q A
L
p (D
If o
CL E
U = _ (D
t4 m
U �
C =
m
U m
C
a) m
O d
IL (D
m 3
Q (D
m U)
� m >
U m 7
r-- ao m IL
m
N oo 3: C7
(D I
p� E Z o o
3 m (D a m
z S -tz t5
.. D (D O o
OC ° y C1
s o U
i
u
a
3
3
S
i
0
s
I
II
�
INI
i
u
a
3
3
S
i
0
s
N
O
N
GJ
(6
d
N
C
+_+
Q
L
L
O
�..�
II
III
IIII
IIII
III
uiin��
iii
�
��
IIII
IIIII
���
��
�
N
O
N
GJ
(6
d
N
C
+_+
Q
L
L
O
�..�
0
v
rn
N
N
�k Q
N
O
m`
N
tz
k
c0
U
N
co
_a
cu d
t cn
U �
U
m
0
a>
O
N
�k Q
m`
O
� U
cu d
t cn
U �
U
uy
N
LO
0
O
L
O d
N
LL 13
E
OO
o
E
U
a)
cu
U
o
`�
U
C
-a
=
aS
O
0)
C
a)
_O
(6
�
d
3
—
CL
as
aD
CO
U
_
m
>
ca
a
U
cq
2 U
o
N°
rn
o°
m
m
m a
C7
x
a)
E
cu
Z
�*
a)
c
d
m
cu
3
N
p
d
d
0
`
O a)
U
N
d
a
N
4-
O
N
GJ
OA
M
CL
H
C
O
v
v
L
E
L
O
CU
tio
C
L
U
AMAAIDO
ABLE
E � � .
PAVING INC
May 10, 2012
Ariel Duarte
City of Fort Worth
8851 Camp Bowie West
Fort Worth, TX 76116
Re: 2007 Critical Capital Project, Part V Group 9D
DOE 5925
1903 N. Peyco • Arlington. Texas 76001
Phone (817) 467 -0779 • FAX (817) 467 -9148
Ariel,
Below is pricing for requested items. In addition we respectfully request 30 additional
days. Please review.
1.
Lower existing 4" water line
1 LS @ $ 3,700.00
$
3,700.00
2.
Re -route 4" sewer laterals
250 If @ $43.00 If
$
10,750.00
3.
Additional c/o at house
6 @ $145.00 ea
$
870.00
4.
4' square storm drain MH
2 @ $4,800.00 ea
$
9,600.00
5,
6.
21" RCP pipe
100 If @ $85.00 If
$
8,500.00
7.
Stabilized sand
120 If @ $40.00 If
$
4,800.00
8.
4" Tap on 21" pipe
2 @ $750.00 ea
$
1,500.00
6' Wood fence
100 If @ $29.00 If
$
2,900.00
9.
4 Chain link fence
100 If @ $23.00 If
$
2,300.00
Total
$44,920.00
Sincerely,
Steven Lancaster
For Reliable Paving, Inc.
ABLE
E L � ,N�.
PAVING,
May 1 u, 1012
Ariel Duarte
City of Fort Worth
8851 Camp Bowie West
Fort Worth, TX 76116
Re: 2007 Critical Capital Project, Part V Group 9D
DOE 5925
1903 N. Peyco • Arlington. Texas 76001
Phone (817) 467 -0779 • FAX (817) 467 -9148
Ariel,
Below is pricing for requested items. In addition we respectfully request 30 additional
days. Please review.
1.
Lower existing 4" water line
1 LS @ $ 3,700.00
$
3,700.00
2.
Re -route 4" sewer laterals
250 If @ $43.00 If
$
10,750.00
3.
Additional c/o at house
6 @ $145.00 ea
$
870.00
4.
4' square storm drain MH
2 @ $4,800.00 ea
$
9,600.00
5.
21" RCP pipe
100 If @ $85.00 If
$
8,500.00
6.
Stabilized sand
120 If @ $40.00 If
$
4,800.00
7.
4" Tap on 21" pipe
2 @ $750.00 ea
$
1,500.00
8.
6' Wood fence
100 If @ $29.00 If
$
2,900.00
9.
4' Chain link fence
100 If @ $23.00 If
$
2,300.00
Total
$44,920.00
Sincerely,
Steven Lancaster
For Reliable Paving, Inc.
P t
O
U
CO
C
O
v
L
0
U
a
H
U
OS
L
N
W
t
U
m
cc
CL
a
O
1 1
O O O
O O
asi 00
00 V- N
0000 0000
t0
t0 00 LA
V V
(�I
to
1-4 1-4
N
N N
-Gq- AA- :A-
-64- -b4 irk
irk ILpr
i
00 00
i
V- ON V-
II II
C)
i!4 F
iA 4!4 iA
{/} A/} 40:1-
N
Ln U
O
M
M Co M
O O
�
O O
O
a
OLi
^O N
O
.
t0
Ir
at O
CL
3
vl� -w,
-(Oj�4
irk irk 4,P,
p
C7 Q.
d'
CL
O et
00 00
U
-J
rn
to
p``
W
OD In et
at at
_�
fj
r
V V
O = CJ
{/w- iA
V)- in- in-
A& 4& fJl�
a3
zS
rn
to
a+ X oo Ln
a�
t
1 c o
000
N
in
W4
u
O' � N a1
00 �
'�
C1 -2
a0i000�i
`O
'°0
n��aa0u
U o,
w
c
o
z
E U
0
a L �O
O
N
N
L � VI
O
L
0
0
+�+
N fp C
_�
O p p
p U O
>
`i
`-'
"C
O
� O O z
O
0
T
,,
7 �O
O L
D�
lL C
z zzt; o
�,�
o u
Ea c
�LL
C
U Z
N p
E
u
a o U
m
� � i
Ln
u M
c
C ' c
O
0 >. >, p
�
.21
O0
E
aammUu�<�-
O
u<&
0
UaQ
O
U
CO
C
O
v
L
0
U
a
H
U
OS
L
N
W
t
U
m
cc
CL
a