HomeMy WebLinkAboutContract 53181-CO2 CSC No. 53181-0O2
FORT w0 RT H City of Fort Worth
Change Order Request
Project Name:1 Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No.(s): 66016-0700430-CO1783 I DOE No. N/A CItyPiroj.No.:J 101002
Project Description: Extend low pressure in Watercress Drive and connecting Streets.Install grinder pumps at each home.
Contractor; William J.Schulz,Inc.DBA:Circle C Construction Change Order# Date: 1 8/2412020
City Project Mgr. Walter Norwood City Inspector; I Ronald Rackley
Phone Number: 817-392-5026 Phone Number. (817)392-7148
Dept. Sewer Paving Totals Contract Time
(Calender days)
Original Contract Amount ,905,476.50 $610, 07.50 6,415,584. 0 730
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date ,905,476.50 $510, 07.60 $5,415,584.00 730
Amount of Proposed Change Order $93,596.50 $0.00 $93,596.50
Revised Contract Amount 4,999,073.00 $5100107.50 $5,509,180.50 730
Original Funds Available for Change Orders $147,164.00 $25,505.00 $172,669.00
Remaining Funds Available for this CO $147,164.00 $25,505.00 $172,669.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1,73%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $6,769,480.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This change order allows for the relocation of a portion of Peninsula Club Drive to the middle of the right of way and for the abandonment of
an 8"water line in watercress Drive.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
ContrBoter's Company Name I ContraetorName Contractor S1 nature Date
iam J.Schulz,Inc.DBA:Circle C Construq Terri Skelly �, }' ,_� -2/.ZOEa
Ins e r Date ProjectMana er —' Date
Assistant Director Water dept) Date Con ruolion Supervisor(Water Dept) t)ate
M1rkro Mrx Nx _ . S. Aug 31,2020
Assistant Clty Attorney Date Assistant Gity Manager Date /(/
—� sepi,zozo � Sep1,2020
Council Mon(If Required)
M&C Number N/A M&C Date Approved NIA OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
F_ ORT WORTH City of Fort Worth
Change Order Additions
Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No.(s): 56016 0700430 C01783 DOE No.E= City Proj.No.: 101002
Project Extend lour pressure in Watercress Drive and connecting Streets.Install grinder pumps at each home.
Description
Contractor William J.Schulz,Inc.DBA:Circle C Construclion Change Order' 2 Date: 8/24/2020
City Project Mgr. Waiter Norwood City Inspector Ronald Rackley
ADDITIONS
DB Qt ._ Unit- Unit-Cost: Total
Aspha t Base Type B Sewer 1 683.00 SY J$58.50 $39,955,50
35 2"Surface Course Type"D"Mix Sewer 683.00 SY $15.00 $10,245.00
37 10"Pavement Pulverization Sewer 683.00 SY $10.00 $6,830.00
38 26 Ib/SY Cement Modification Sewer 9,00 TN $275.00 $2,475.00
40 6"Concrete Driveway Sewer 1,358.00 SF $25.00 $33,950.00
41 4"6"Gravel Driveway On 6"Compacted Subgrade Sewer 1 1.00 EA $2,500.00 $2,500.00 i
45 Remove Asphalt Roadway Pvmt Peninsula Club Circle) Sewer 698.00 SY $10.00 $6,980.00
56 Seeding,Hydromulch Sewer 992,00 SY $8.00 $7,936.00
70 Relocate Fire Hydrant Sewer 1,00 EA $1,200.00 $1,200.00
71 Remove 6"Water Line Fire Hydrant Lead) Sewer 25.00 LF $25.00 $625.00
72 Valve Box Adjustment(6'for FH) Sewer 1.00 EA $400.00 $400.00
73 Site Clearing Sewer 1.00 LS $2,500.00 $2,500.00
74 Utility Abandonment Grouting(8"Water Line) Sewer 1,300.00 LF $20.00 $26,000.00
8
Sewer $141,596.50
Paving
Page 1 of 1 Addifions Sub Total $141,596.50
F Dwr VVIOPTH City of Fort Worth
Change Order Deletions
Project Name Watercress Low Pressure Sewer Extension City Sec No.: 53181
Project No.(s): 56016-0700430•CO1783 DOE No. N/A City Proj.No,: 101002
Project Description Extend low pressure in Watercress Drive and connecting Streets,Install grinder pumps at each home.
Contractor William J.Schulz,Inc.DBA:Circle C Construction Change Order: Date 812412020
City Project Mgr, Walter Norwood City Inspector: Ronald Rackley
DELETIONS
-
65 Construction Allowance ISewer 0.96 EA 1 $50,000.00 $48,000.00
i
I
E
R
1
F
r
Sewer $48,000.00
Paving
Page 1 of 1 Deletions Sub Total $48,000.00
M/WBE Breakdown for this Change Order
MWE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Name of Employee
s �L
prz>
Title
q.044Udd�
FORr400.0
Q�
�o
Ovo o=d
ATTEST: i� �o�*oo0 l( *�
QQ �EAgo4.0-
�bIlaoaa'O'
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX