HomeMy WebLinkAboutContract 54409 CSC No. 54409
LETTER OF AUTHORIZATION
North Central Texas Council of Governments (NCTCOG)
Regional Stormwater Monitoring Program
Consultant Stormwater Monitoring Program Assistance for Fiscal
Year 2021 (FY2021)
NCTCOG has coordinated the implementation of a cooperative Regional Stormwater Monitoring
Program on behalf of the region's seven largest cities (Arlington, Dallas, Fort Worth, Garland,
Irving, Mesquite, & Plano), and the North Texas Tollway Authority (NTTA), and with their
support through the Regional Stormwater Monitoring Task Force ("Task Force"). The Regional
Stormwater Monitoring Program, formally endorsed by the Texas Commission on Environmental
Quality (TCEQ), is designed to assist participating entities to comply with the TPDES (Texas
Pollutant Discharge Elimination System) stormwater monitoring requirements, including wet
weather monitoring, for each individual permit holder, while providing a more efficient,
consistent, and cost-effective regional effort.
The NCTCOG and the City of Fort Worth ("Participant"), collectively referred to as "Parties,"
have executed an Interlocal Agreement, dated March 15, 2018, that establishes the structure
through which participating entities have agreed to participate in the Fourth Monitoring Term of
the Regional Wet Weather Characterization Program, operating from October 1, 2017 through
September 30, 2022.
The Parties are executing this Letter of Authorization to allow the NCTCOG to enter into a
phased contract with the Consultant, Atkins North America, Inc. ("Consultant"), chosen by the
Task Force through a procurement process conducted by the NCTCOG, on behalf of the
Participant, whereby the Consultant will provide regional monitoring program assistance to the
Participant for FY2021, from October 1, 2020 through September 30, 2021.
The Scope of Work (Attachment 1) for the duration of the Consultant contract, as approved by
the Task Force, is limited to those participating entities who have signed the Interlocal
Agreement and the Letter of Authorization and submitted payment for the appropriate fiscal
year.
This Letter of Authorization seeks funding and authorization to proceed with the scheduled tasks
for FY2021 for the Participant. Work under this Letter of Authorization is for the time period of
October 1, 2020 through September 30, 2021 to complete the work tasks for FY2021 included
in Attachment 1. The City of Fort Worth's share of the Consultant cost for FY2021 Consultant
Stormwater Monitoring Program Assistance is $6,314.00 (Attachment 2).
Execution of this Letter of Authorization obligates the Participant to pay $6,314.00 for FY2021.
NCTCOG will invoice the Participant for actual services expected to be received by the
Participant for FY2021. The Participant shall remit the invoiced amount to NCTCOG within thirty
(30) calendar days of receipt of the invoice.
In the event the Participant finds an error in the invoice, the Participant shall notify NCTCOG as
soon as possible within a thirty (30) calendar day period, and shall make payment no less than
ten (10) calendar days after the problem(s) are corrected or the error is resolved to the
OFFICIAL RECORD 1
CITY SECRETARY
FT. WORTH, TX
satisfaction of all Parties. If payment for invoiced goods or services is not received by the
NCTCOG within thirty (30) calendar days of receipt of the accepted invoice, NCTCOG is
authorized to charge the Participant interest in accordance with the Prompt Payment Act.
The undersigned, duly authorized to make such obligations, represent the Party's agreement to
these provisions.
Mike Eastland
Valerie Washington(Aug 7,202014:12 CDT)
(Authorized Signature) Mike Eastland, Executive Director
North Central Texas Council of
Valerie Washington Governments
Assisfar8 y Manager 8/24/2020
Date: Aug 7,2020 Date:
Approved as to form and legality
Ile 1—r4j, -A
Sr.Assistant City Attorney
�g44��11�
Attest: 00000000.o�, i� as FORraa
°o0�d
o g��d
Mary Kayser $°° �=d
City Secretary o� °°° °°°°°°°°
Date: ���nexASbbp
OFFICIAL RECORD 2
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing I aelmowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
6vL 6Q(V�-�2 /
Name of Employee/Sign tore
&LAl I'](1y o"-) l Cam? ,2,,,bc
Title f'
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Attachment 1
Scope of Work for FY 2021
Part A—Field Sample Collection,Analysis of Stormwater Samples,and BMP Analysis
The Consultant will conduct the following tasks to assist the contracting Participants in performing monitoring at
identified sites:
Tasks 1110-1510 will be conducted for Arlington,Garland, Irving, Mesquite, Plano, and NTTA.
Task 1610-1710 will be conducted for Arlington,Dallas,Fort Worth,Garland, Irving,Mesquite,Plano,and NTTA.
PROJECT MANAGEMENT AND COORDINATION
• Task 1110—Project Management;
• Task 1 120—General Training; and
• Task 1130 Annual Refresher Training.
SAMPLE ANALYSIS PROJECT PLAN(SAPP)/QUALITY ASSURANCE PROJECT PLAN(QAPP)
• Task 1210—Monitoring Plan Protocol Revision; and
• Task 1220—Field Reconnaissance and Site Selection.
FIELD SAMPLING AND ANALYSIS
• Task 1310—Storm Tracking;
• Task 1320—Mobilization to Sampling,Sites;
• Task 1330—Auto-Sample Retrieval;
• Task 1340—Equipment Maintenance;
• 'Task I350—Deployment and Decommissioning; and
• Task 1360—Analytical.
ELECTRONIC DATA MONITORING REPORTS
• Task 1410—Data Management(Four Permit Years, FY 2018-2021).
ANNUAL REPORTS
• Task 1510—Annual Report(Four Permit Years, FY 2019-2022).
FINAL SUMMARY REPORT
• Task 1610 Final Summary Report(FY 2022).
BMP ANALYSIS AND EVALUATION PLAN
Task 1710—BMP Analysis and Evaluation Plan(FY 2018-2022).
Each of the proposed tasks is described below.
PROJECT MANAGEMENT AND COORDINATION
Task 1110—Project Management
Consultant will perform project management activities to coordinate project activities, staff, and subconsultants
under this task. Project Management is expected to occur for 57 months starting October 1,2017 and ending
September 30,2022. Consultant will provide quarterly progress reports and invoices to NCTCOG and updates on
sampling events and maintenance as they occur. Project updates will be provided to Participants via the
NCTCOG. Project accounting, scheduling and coordination with internal staff, subconsultants and contract
laboratory will be conducted. Consultant will attend up to four meetings with the Task Force per year to provide
updates,scheduling and answer questions about the program. Consultant will prepare for and attend up to three
meetings with the Texas Commission on Environmental Quality(TCEQ)and/or the United States Environmental
Protection Agency(EPA) related to permit renewal or reapplication processes.
Task 1120—General Training
Consultant sampling and maintenance staff will be trained in the revised monitoring protocol. Training will
include but is not limited to: refresher on monitoring software;refresher on sampling procedures; quality
assurance and quality control(QA/QC)sample collection methods and frequency; sample documentation and
laboratory delivery protocol; maintenance tasks and required frequencies; and health and safety issues. Training
will be conducted in an office setting. New site locations will be reviewed, but will not be visited until
deployment of equipment.
Task 1130—Annual Refresher Training
Consultant will conduct brief annual refresher training sessions for field sampling and data management staff.
NCTCOG staff will be invited to attend. Training will allow for a recap of health and safety issues for specific
sites(if necessary), problematic sampling sites,security issues, new sampling locations, and any changes to the
SAPP/QAPP(if they occur). Refresher training is expected to be one day annually and not exceed two hours for
team members for each year.
SAPP/QAPP
Task 1210—Monitoring Plan Protocol Revision
Consultant will revise the Regional Storinwater Monitoring Program: Monitoring Program and Quality
Assurance Project Plan.for Wet Weather Equipment Deployment and Sampling Program: 2011 -2016. Revisions
will include:
• Updating sampling and maintenance procedures, including updating procedures based on the new list of
analytes;
• Revising maps for new sites;
• Preparing new health and safety provisions;
• Verifying laboratory analyses methodology;
• Collecting watershed and rainfall information; and
• Estimating annual flows for watersheds.
2
Consultant will provide a draft; address one round of comments from the monitoring program Participants to this
Agreement and the NCTCOG and produce a final document to NCTCOG. Documents will be provided in
electronic formats only(MS Word and Adobe pdf).
Task 1220--Field Reconnaissance and Site Selection
Consultant will perform field reconnaissance, in coordination with each Participant, to identify"Wet Weather
Candidate Stormwater Sampling Locations"in watersheds selected by each Participant. Consultant will conduct
on-site inspections of the sites, where photographs will be taken at each potential sampling site, each with the
specific site ID. Latitude and longitude will be recorded using a handheld Global Positioning System (GPS)unit.
Detailed notes on the site,surrounding area and stream channel conditions, and any other relevant information
will be recorded using a pre-approved"Candidate Wet Weather Sampling Site Evaluation Checklist and Data
Collection Form." Sketches will also be drawn of the sites showing the stream crossing, surrounding roads,
identified structures,and north arrow.
Consultant will perform field reconnaissance in the fall of 2017 through 2018 for watersheds to be sampled.
Consultant will repeat this reconnaissance in 2019 to determine if the sites previously selected are still viable.
Consultant will provide a brief Wet Weather Sampling Site Selection Memorandum to the NCTCOG that
describes the physical site locations and the rationale for selecting specific sampling sites.
FIELD SAMPLING AND ANALYSIS
Task 1310—Storm Tracking
Consultant will monitor meteorological conditions and storm fronts in order to anticipate qualified storm events.
During warm weather months when afternoon showers are common,staff will check weather conditions at least
twice a day to determine whether precipitation is likely at the site. During cold weather months, Consultant will
monitor the approach of rain-producing cold and warm fronts. Consultant will not monitor weather when proper
antecedent dry period requirements have not been met at the site. For likely precipitation events,the staff will
evaluate whether a qualified rain event may occur and take necessary action as outlined in the monitoring plan.
When tracking storms, the depth of rainfall in the previous 72-hour period will be obtained using the on-site rain
gauges and by visiting the City of Dallas Flood Control rain gauge network web site at
http://www.ci.dallas.tx.us/sts/html/fe.html,the Intellicast precipitation contour map at http://www.intellicast.com,
and the Weather Underground network of local weather stations. Weather forecasts will be obtained from the
National Weather Service web site http://www.srh.noaa.gov.
Task 1320—Mobilization to Sampling Sites
When suitable conditions are identified at one or more sampling sites, Consultant will mobilize to the appropriate
sites to retrieve automatic samples, inspect sampling equipment and to collect grab samples. Prior to
mobilization,field personnel will gather necessary equipment and data sheets,calibrate water quality meters, and
travel to the site when mobilization has been authorized. Field teams will consist of two people for safety.Field
personnel will attempt to arrive as soon as the storm starts. Consultant will use internal resources to remotely
program and turn on samplers(those with cellular modems)to assist with mobilization efforts. Consultant will
conduct tailgate safety meetings, reviewing the anticipated site hazards prior to each sampling mobilization.
Task 1330—Auto-Sample Retrieval
Consultant will collect quarterly stormwater samples in accordance with the revised monitoring plan protocol
(Task 1210). Consultant will collect composite samples of the storm event at 30-minute intervals for 120
3
minutes. Sampling will be initiated during the first flush of a storm event. Each sampling event will include
collection of a first-flush grab sample and a time-weighted composite sample. The time-weighted composite
sample will include a minimum of five aliquots.
Physical water quality measurements will be collected for each stormwater sample collected. These
measurements include water and air temperature, specific conductance, and pH. This data will be recorded on
field data forms.
Task 1340—Equipment Maintenance
Consultant will perform routine maintenance on the monitoring equipment. Routine maintenance will include
decontaminating field equipment; replacing auto-sampler composite containers;preparing sampling stations for
next storm event;checking integrity of shelters,conduit, bubbler and sampler lines and sample strainer; cleaning
on-site rain gauges where applicable, performing other site checks; and recording maintenance activities.
Maintenance activities will take place prior to each sampling quarter and immediately after each stormwater
sampling event or dry run. Maintenance activities are expected to continue for 48 months or until the sampling
activities have been completed.
Task 1350—Deployment and Decommissioning
At the beginning of the project,Consultant will perform an evaluation on the stormwater quality monitoring
equipment. Each monitoring program Participant, listed above,will deliver their monitoring equipment to the
Consultant at a time convenient to both the equipment owner and Consultant. Consultant will subcontract with a
qualified technician to replace pump tubing, pump bushings,and internal desiccant for samplers to be used during
the program term. Consultant will provide a summary of the equipment evaluation and recommendations(if
necessary)on further required maintenance action(s)to take. Consultant will update and coordinate with the
NCTCOG regarding options for repairing or replacing equipment requiring service outside of the above-
mentioned items.
Consultant will deploy and install the monitoring equipment. Staff will place equipment in the designated sites
within a safe enclosure while striving to protect the equipment from vandalism, flooding, insects, etc.The
enclosures will be anchored to the ground and piping will be used to guide the suction and bubbler tubing to the
stream. Equipment deployed may include:
• Automatic sampler;
• Tipping bucket rain gauge(specific locations only);
• Cellular modem(specific locations only);
• 12-V marine battery;
• Solar panel;
• Sampling containers;
• Bubbler tubing and bubbler stainless steel line;
• Sample and pump tubing;
• Earth anchors and steel cables;
• Storm box sample shelter;
• Protective conduit; and
• Strainer.
Consultant will perform equipment deployment twice,once in the fall of 2017 and again in December 2019.
4
At the conclusion of the sampling activities in Year 2021,Consultant will wipe clean monitoring equipment and
store the equipment for up to four weeks at the designated Consultant facility. Each monitoring program
Participant will pick up their equipment at a time convenient for both the equipment owner and Consultant.
Task 1360—Analytical
Over the course of the monitoring contract, Consultant will submit one quarterly sample per monitoring station
along with QA/QC samples(10%of the total number of samples)to a TCEQ certified laboratory. Consultant will
communicate with the laboratory regarding delivery times,weather forecast,and expected number of samples per
submittal. Samples will be packed with ice and chain-of-custody forms will be filled out prior to submittal. A list
of the analytes may be found in the revised monitoring protocol.
The laboratory will be available 24-hours a day and on holidays for sample submittal.
ELECTRONIC DATA MONITORING REPORT
Task 1410—Data Management(Four Permit Years)
Consultant will prepare quarterly summaries of the successful events including laboratory analysis,water quality
observations, and graphical representations of the rainfall and water level data. Consultant will prepare one draft
set of summaries and address one round of comments and then finalize.Consultant will submit an electronic data
deliverable in MS Excel format consistent with the NCTCOG data reporting requirements and the regional
program monitoring database format requirements and digital documents of the quarterly summaries in MS Word
and Adobe PDF formats.
ANNUAL REPORT
Task 1510--Annual Reports(Four Permit Years)
Consultant will assist in the preparation of four annual reports by providing the NCTCOG with technical review
and oversight for the report results and narrative. Consultant will compile rainfall data, laboratory data,
FLOWLINK data, annual flow and loads into a pre-approved reporting format for Arlington, Garland, Irving,
Mesquite,NTTA,and Plano. The NCTCOG will summarize the annual program components and sampling
activities for the prior year,with assistance from the Consultant,and compile GIS-based maps of the sample
locations. Consultant will assist the NCTCOG with addressing comments from Participants and finalizing the
report. Consultant assistance will include providing report templates, guidance text, and a review of the draft
version of the report.NCTCOG will conduct a final review of the annual reports and submit to TCEQ. Digital
copies will be provided for Participants by NCTCOG. Consultant and the NCTCOG will perform these activities
for four permit years(FY 2018—2021).
FINAL SUMMARY REPORT
Task 1610--Final Summary Report(One Time)
Consultant and NCTCOG will jointly develop a Final Regional Summary Report at the conclusion of the
monitoring efforts. Activities will support Arlington, Dallas, Fort Worth, Garland, Irving, Mesquite,NTTA, and
Plano. The report will allow for a statistical analysis of the data,comparison of other data sets,and make
5
recommendations for future monitoring activities. The Final Summary Report will be due by September 30,2022.
The following is a breakdown of the activities/roles for Consultant and NCTCOG:
• Consultant
o Perform analyses of data from current and previous terms, including:
■ Summary statistics (number of samples, minimum, maximum, median, arithmetic mean,
geometric mean).
■ Statistical comparisons (previous baseline data from all previous terms, Clean River
Program in-stream data, and watershed stations)
o Obtain and enter reference data(e.g. previous monitoring terms,the National Storm Water Quality
Database and the Texas Surface Water Quality Criteria [30 TAC 3071) into statistical software
package for comparisons.
o Evaluate BMP implementation effectiveness indicators for each monitored watershed for the time
frame CY 20 through CY 21 based on the quality and quantity of data collected and reported by
the Participants. For BMP data not meeting the data format requirements as described in the BMP
Analysis and Evaluation Plan, the BMP effectiveness indicator will be estimated based on water
quality data only. The report will also include suggestions on how to improve the BMP Analysis
and Evaluation Plan to incorporate data from prior program terms and to correct any deficiencies
identified during plan implementation. The suggested improvements will be recommended for
consideration during the next program term.
o Prepare statistical figures and tables including:
■ Summary table
■ Box-whisker plots
■ Results tables
o Jointly formulate results, data interpretation, and recommendations with NCTCOG and
Participants.
o Jointly address one round of comments and revisions from NCTCOG and Participants.
o Jointly finalize the report with NCTCOG by providing technical assistance with narratives,
descriptions of the program components and sampling activities, and incorporating feedback from
the NCTCOG and the Participants.
• NCTCOG
o Facilitate the development of the final report by conducting revisions, providing the Consultant
with feedback,and coordinating the incorporation of Participant feedback.
o Prepare watershed maps.
o Distribute draft and final digital copies to participants and post final copy to NCTCOG website.
BMP ANALYSIS AND EVALUATION PLAN
Task 1710—BMP Analysis and Evaluation Plan
Consultant will develop a BMP Analysis and Evaluation Plan that outlines a recommended approach for
evaluating BMPs through the regional program. The BMP Analysis and Evaluation Plan will be a guidance
document that outlines the approach to analyze BMPs. The plan will build upon previous program term efforts to
create a more robust inventory of BMP effectiveness.
The plan will provide a methodology for using BMP and water quality data to determine BMP implementation
effectiveness at the watershed scale. The plan will:
1. Identify pollutants of concern
2. Identify BMP evaluation metrics such as construction dates, implementation timelines and frequencies,
locations,drainage and/or coverage areas, and other quantifiable parameters.
6
3. Document potential sources of BMP data(i.e., Permits, SWMPs,and Annual Reports)
4. Provide a correlation between pollutant parameters and BMP metrics;and,
5. Recommend a methodology and evaluate BMP implementation effectiveness indicators based on BMP
data only,water quality data only,and a combination/aggregation of BMP and water quality data within
monitored watersheds.
The Consultant will complete a draft and final version of the BMP Analysis and Evaluation Plan within the first
year(FY18)of the program term. Submittals will include an outline of the plan,a draft, and a final version of the
plan for NCTCOG and participant review.
It is anticipated that Participants will use the plan to collect BMP data/metrics during the third(CY20)through the
fourth(CY21)years of the prograan term and to report BMP data/metrics during annual reporting activities.
Consultant assistance with BMP data/metric collection will include providing guidance to NCTCOG and
answering questions regarding data/metric requirements as described in the BMP Analysis and Evaluation Plan,
and recommendation of where BMP data could be located. Consultant will review annually collected data as part
of Task 1510. Consultant will use the plan to collect water quality data.NCTCOG will coordinate with
participants to identify appropriate sources of BMP data and create or initiate the creation of a database and maps
of collected BMP and water quality data in the monitored watersheds. Consultant assistance with database
creation and maps will include p�oviding guidance to NCTCOG and answering questions regarding data/metric
requirements as described in the BMP Analysis and Evaluation Plan.
7
Consultant Task List for FY21—Part A
(Arlington,Irving,and Plano
FY21
Task Task Name Activities
1 110 Project Management • Coordinate work of subs and internal team.
• Prepare and provide progress reports.
• Project accounting and internal meetings.
1120 General Training • No action this FY.
1130 Annual Refresher • Prepare training materials.
Training • Conduct team training for project.
1210 Monitoring Plan • No action this FY.
Protocol Revision
1220 Field Recon and Site . No action this FY.
Selection
1310 Storm Tracking • Track storms.
• Download data from sites(with modems where applicable).
• Coordinate and deploy sampling teams.
• Coordinate with laborator for delivery of samples.
1320 Mobilization to • Pre-and post-calibrate meters.
Sampling Sites . Conduct tailgate safety meetings.
• Clean meters and tools.
• Replace consumable items.
• Staff deployment to samUling sites.
1330 Auto-Sample • Inspect portable units and lines.
Retrieval . Record required observations.
• Collect samples from two sites per quarter.
• Ice down samples.
• Label jars.
• Complete chain of custody forms.
1340 Equipment • Reset and calibrate equipment (for two sites) prior to each
Maintenance quarter.
• Reset equipment due to flooding, vandalism, changes in
stream or bank that affect suction line placement, and
cleaning of strainer and bubbler lines(submerged).
1350 Deployment and • No action this FY.
Decommissioning
1360 Analytical • Place water chemistry samples on ice and deliver to
laboratory.
• Perform water chemistry analytical tests.
1410 Data Management For each successful sampling event:
• Perform data checks for consistency with monitoring plan,
laboratory QAIQC,and abnormalities(e.g. illicit discharges,
algal blooms,outliers).
• Download and process FLOWLINIC data.
• Input data into EDD, summarize activities and data in
surm-naEX sheets.
1510 Annual Report • Assist in the preparation of annual re ort.
8
1610 Final Summary • No action this FY.
Report
1710 BMP Analysis and • Assist NCTCOG with coordinating the collection of data on
Evaluation Report BMPs.
9
Consultant Task List for FY21—Part A
(Garland
FY21
Task Task Name Activities
1110 Project Management • Coordinate work of subs and internal team.
• Prepare and provide progress reports.
• Project accounting and internal meetings.
1120 General Training • No action this FY.
1130 Annual Refresher • Prepare training materials.
Training * Conduct team training for project.
1210 Monitoring Plan * No action this FY.
Protocol Revision
1220 Field Recon and Site * No action this FY.
Selection
1310 Storm Tracking • Track storms.
• Download data from sites(with modems where applicable).
* Coordinate and deploy sampling teams.
* Coordinate with laboratory for deliver of samples.
1320 Mobilization to * Pre- and post-calibrate meters.
Sampling Sites * Conduct tailgate safety meetings.
* Clean meters and tools.
* Replace consumable items.
* Staff deployment to sampling sites.
1330 Auto-Sample . inspect portable units and lines.
Retrieval • Record required observations.
• Collect samples from three sites per quarter.
* Ice down samples.
• Label jars.
* Complete chain of custody forms.
1340 Equipment • Reset and calibrate equipment(for three sites) prior to each
Maintenance quarter.
• Reset equipment due to flooding, vandalism, changes in
stream or bank that affect suction line placement, and
cleaning of strainer and bubbler lines(submerged).
1350 Deployment and * No action this FY.
Decommissioning
1360 Analytical * Place water chemistry samples on ice and deliver to
laboratory.
• Perform water chemistry analytical tests.
4410 Data Management For each successful sampling event:
• Perform data checks for consistency with monitoring plan,
laboratory QA/QC,and abnormalities(e.g.illicit discharges,
algal blooms,outliers).
• Download and process FLOWLINK data.
* Input data into EDD, summarize activities and data in
summar sheets.
1510 Annual Report * Assist in the preparation of annual report.
10
1610 Final Summary • No action this FY.
Report
1710 BMP Analysis and • Assist NCTCOG with coordinating the collection of data on
Evaluation Report BMPs.
11
Consultant Task List for FY21—Part A
(Mesquite and NTTA)
FY21
Task Task Name Activities
1110 Project Management . Coordinate work of subs and internal team.
• Prepare and provide progress reports.
• Project accounting and internal meetings.
1120 General Training • No action this FY.
1130 Annual Refresher . Prepare training materials.
Training • Conduct team trainin for project.
1210 Monitoring Plan • No action this FY.
Protocol Revision
1220 Field Recon and Site • No action this FY.
Selection
1310 Storm Tracking • Track storms.
• Download data from sites(with modems where applicable).
• Coordinate and deploy sampling teams.
• Coordinate with laboratory for delivery of samples.
1320 Mobilization to • Pre-and post-calibrate meters.
Sampling Sites . Conduct tailgate safety meetings.
• Clean meters and tools.
• Replace consumable items.
• Staff deployment to sampling sites.
1330 Auto-Sample • Inspect portable units and lines.
Retrieval • Record required observations.
• Collect samples from two sites per quarter.
• lee down samples.
• Label jars.
• Complete chain of custody forms.
1340 Equipment • Reset and calibrate equipment (for hWo sites) prior to each
Maintenance quarter.
• Reset equipment due to flooding, vandalism, changes in
stream or bank that affect suction line placement, and
cleanina of strainer and bubbler lines(submerged).
1350 Deployment and . No action this FY.
Decommissioning
1360 Analytical • Place water chemistry samples on ice and deliver to
laboratory.
• Perform water chemistrl analytical tests.
1410 Data Management For each successful sampling event:
• Perform data checks for consistency with monitoring plan,
laboratory QAIQC,and abnormalities(e.g. illicit discharges,
algal blooms,outliers).
• Download and process FLOWLINK data.
• Input data into EDD, summarize activities and data in
sum mar sheets.
1510 Annual Report • Assist in the preparation of annual re ort.
12
1610 Final Summary • No action this FY.
Report
1710 BMP Analysis and • Assist NCTCOG with coordinating the collection of data on
Evaluation Report BMPs.
13
Consultant Task List for FY21—Part A
(Dallas and Fort Worth
FY21
Task Task Name Activities
1110 Project Management • Coordinate work of internal team.
• Prepare and provide progress reports.
• Project accounting and internal meetings.
1120 General Training . No action this FY.
1130 Annual Refresher • No action this FY.
Training
1210 Monitoring Plan • No action this FY.
Protocol Revision
1220 Field Recon and Site . No action this FY.
Selection
1310 Storm Tracking • No action this FY.
1320 Mobilization to • No action this FY.
Sampling Sites
1330 Auto-Sample • No action this FY.
Retrieval
1340 Equipment • No action this FY.
Maintenance
1350 Deployment and • No action this FY.
Decommissioning
1360 Analytical • No action this FY.
1410 Data Management + No action this FY.
1510 Annual Report • No action this FY.
1610 final Summary • No action this FY.
Report
1710 BMP Analysis and • Assist NCTCOG with coordinating the collection of data on
Evaluation Report BMPs.
14
Part B—Biological Monitoring
The Consultant will conduct the following tasks to assist the Participants in performing biological monitoring:
PROJECT MANAGEMENT AND COORDINATION
• Task 2110--Project Management;
SAMPLE ANALYSIS PROJECT PLAN(SAPP)I QUALITY ASSURANCE PROJECT PLAN(QAPP)
• Task 2210—Monitoring Plan Revision;and
• Task 2220—Field Reconnaissance and Site Selection.
FIELD SAMPLING AND ANALYSIS
• Task 2310—Sampling Preparation and Maintenance;
• Task 2320—Field Sampling; and
• Task 2330—Analytical
ELECTRONIC DATA MONITORING REPORTS
• Task 2410—Data Management(Four Permit Years,FY 2018-2021).
ANNUAL REPORTS
• Task 2510 Annual Report(Four Permit Years,FYi9-22).
FINAL SUMMARY REPORT
• Task 2610—Final Summary Report(One time only, FY 2022).
Each of the proposed tasks is described below.
PROJECT MANAGEMENT AND COORDINATION
Task 2110—Project Management
Consultant will perform project management activities to coordinate project activities, staff, and subconsultants
under this task. Project management activities are expected to last up to 57 months. Quarterly progress reports and
invoices will be submitted to NCTCOG along with the Part B invoice (under this same Agreement)and progress
report. Invoice amounts and progress reports will be noted as different task items under one invoice. Project
accounting, scheduling and coordination with internal staff, subcontractors, and contract laboratory, will be
conducted. Consultant will attend up to four (4) meetings with the Task Force per year to provide updates,
scheduling, and answer questions about the program. The biomonitoring task leader will participate in one of the
four meetings.
15
SAPP/QAPP
Task 2210—Monitoring Plan Revision
Consultant will revise the Regional StormtivaterMonitoring Program: BioassessmentMonitoringPlan 2011-2016.
that will serve as a strict guide for data collection. The TCFQ Surface Water Quality Monitoring Procedures will
provide the foundation for data collection, although the methodology will be modified in accordance with site-
specific conditions. The QAPP will provide specific details on criteria for site selection, field data collection
techniques,die]water quality monitoring,habitat assessment protocols,and data quality assurance. Consultant will
prepare one draft, address one round of comments, finalize, and provide electronically to NCTCOG and the
Participants.
Task 2220—Field Reconnaissance and Site Selection
Consultant will perform field reconnaissance with the Cities of Garland, Irving, and Plano to identify two potential
sites for each of these Participants for biological monitoring. Station selection will be based on input from the three
(3) listed Participants, representativeness of typical habitats, site access, and prior sampling history. Consultant
will conduct on-site inspections for two watersheds for Garland, Irving, and Plano for potential sites. During the
site inspection, Consultant will collect photographs for each potential biological monitoring site, latitude and
longitude,and collect preliminary notes describing each site.Once all sites have been chosen,a Biological Sampling
Site Selection Memorandum will be provided to NCTCOG,Garland, Irving, and Plano describing the sites(total of
six)selected.
Consultant will perform field reconnaissance in Year 2017 through 2018 for all watersheds to be sampled.
Consultant will repeat this reconnaissance in 2019 to determine if the sites previously selected are still viable.
FIELD SAMPLING AND ANALYSIS
Task 2310—Sampling Preparation and Maintenance
Consultant will notify the Cities of Garland,Irving,and Plano prior to each sampling event. Consultant will attempt
to perform biological monitoring for the three (3) Participants during one mobilization. Mobilizations and
preparations will occur twice a year for four years. Prior to mobilization,Consultant will (within a 72-24-hour pre-
mobilization window)notify the Texas Parks and Wildlife Department of impending biological sampling activities.
Field personnel will gather and inspect the necessary equipment and perform the necessary preparatory and
calibration activities.Field teams(comprising a minimum of two for safety)will travel to the site when mobilization
has been authorized.Consultant will watch weather forecasts during expected dry periods for sampling. Consultant
will perform necessary equipment calibrations (pre- and post-), equipment maintenance, and gather appropriate
field data forms.
Task 2320—Field Sampling
Consultant will perform biological monitoring in accordance with the monitoring plan/QAPP developed for Task
2210 under this Agreement. Field sampling will include habitat attribute documentation;flow measurements;basic
water chemistry;diel water chemistry;and the collection of aquatic invertebrates, fish and mussels. Field sampling
will occur two times per year(spring and fall) for four years. At the end of two years, Consultant will move to the
second watershed(site)selected for each entity and schedule sampling for those sites.
Task 2330—Analytical
Consultant will collect a suite of water chemistry samples for each biological monitoring site two times a year for
four years. The specific water chemistry constituents will be listed in the monitoring plan/QAPP. One set of
QA/QC samples will be collected during each year of monitoring. Water chemistry samples will be delivered to a
TCFQ certified laboratory,where all samples will be packed with ice and chain-of-custody forms will be filled out
prior to submittal.
16
ELECTRONIC DATA MONITORING REPORT
Task 2410—Data Management(Four Permit Years)
Consultant will prepare summaries for each successful biological monitoring event performed for the Cities of
Garland, Irving, and Plano. Each summary will include site descriptions, data analysis including IBI metrics,
tabulated data,figures,and maps(one submittal per watershed). Consultant will prepare one draft set of summaries
and address one round of comments and then finalize. Consultant will submit an electronic data deliverable in MS
Excel format consistent with the NCTCOG data reporting requirements and the regional program monitoring
database format requirements and MS Word documents of the summaries.
ANNUAL REPORT
Task 2510—Annual Reports(Four Permit Years)
Consultant will assist in the preparation of four annual reports. Annual report activities will support the Cities of
Garland,Irving,and Plano. Consultant will compile meteorological data,summary tables,preliminary data analysis
(including IBI metrics), figures,and a brief summary of the results. Summary tables may include those for benthic
macroinvertebrates, physical habitats, fish communities, physical/chemical data, and mussels, Consultant will
develop narratives and maps for the report. Consultant will also work jointly with NCTCOG to address one round
of comments and finalize the document. Digital copies will be provided for all Participants.
FINAL SUMMARY REPORT
Task 2610—Final Summary Report(One Time)
Consultant and NCTCOG will jointly develop a Final Regional Summary Report at the conclusion of Part B. Final
Summary Report activities will support Dallas,Fort Worth,Garland, Irving,and Plano. The report will summarize
all annual reports, analyze all data, and interpret aquatic life use designations and possible ecosystem stressors for
each site. The report will be structured to enhance local understanding by conveying information in a manner that
is readily adaptable to communicate results to the public and the respective participating governing entities. The
following is a breakdown of the specific activities/roles for Consultant and NCTCOG:
• Consultant
o Input all data and perform data analysis.
o Obtain and prepare reference data for statistical comparisons.
o Prepare statistical figures and tables.
o Jointly formulate results, data interpretation, and recommendations with NCTCOG and
Participants.
o Jointly address one round of comments and revisions from NCTCOG and Participants.
o Jointly finalize the report with NCTCOG.Jointly finalize the report with NCTCOG by providing
technical assistance with narratives, descriptions of the program components and sampling
activities,and incorporating feedback frorn the NCTCOG and the Participants.
• NCTCOG
o Facilitate the development of the final report by conducting revisions, providing the Consultant
with feedback, and coordinating the incorporation of Participant feedback.
o Prepare all watershed maps.
o Distribute draft and final copies for all Participants and post final copy to NCTCOG website.
17
Consultant Task.List for FY21--Part B
(Garland, Irving,Plano
FY21
Task Task Name Activities
2110 Project Management • Provide continuous project management.
• Attend one monitoring meeting with NCTCOG and
participating entities.
• Coordination with laboratory and internal team.
2210 Monitoring Plan • No action this FY.
Revision
2220 Field Reconnaissance • No action this FY.
and Site Selection
2310 Sampling Preparation • Perform necessary equipment calibrations(pre-and post-).
and Maintenance • Perform equipment maintenance.
• Gather field data forms.
2320 Field Sampling • Conduct biological monitoring.
• Document habitat attributes.
• Perform flow measurements.
• Collect basic and diel water chemistry.
• Collect aquatic invertebrates,fish and mussels.
2330 Analytical • Place water chemistry samples on ice and deliver to
laboratory.
• Perform water chemistry analytical tests.
2410 Data Management • Prepare data summaries and electronic data deliverable.
2510 Annual Report • Develop draft annual report for biological monitoring
activities.
• Respond to one round of comments, finalize document and
distribute electronically.
2610 Final Summary • No action this FY.
Report
18
Consultant Task List for FY21—Part B
Dallas and Fort Worth
FY21
Task Task Name Activities
2110 Project Management • Provide continuous project management.
• Attend one monitoring meeting with NCTCOG and
participating entities.
2210 Monitoring Plan . No action this FY,
Revision
2220 Field Reconnaissance . No action this FY.
and Site Selection
2310 Sampling Preparation • No action this FY,
and Maintenance
2320 Field Sampling • No action this FY.
2330 Analytical • No action this FY.
2410 Data Management • No action this FY.
2510 Annual Report • No action this FY.
2610 Final Summary • No action this FY.
Report
19
ATTACHMENT 2 — Cost-share Distribution by Year per Entity for
. Chemical and Biological Monitoring (F'Y18-22)
YEARLY COST-SHARE DISTRIBUTION
PER ENTITY (FY 18-22)
Entity FY18 FY19 FY20 FY21 FY22
Arlington $ 68881 $ 57,417 $ 61,607 $ 57,417 .$' 26,236
Garland $ 91656 $ 87,204 $93,489 $ 87,204 $' s5,911
Irving $ 79986 $ 69,469 $73,659 $ 69,470 $ 34,538
Mesquite $ 59 773 $ 53,028 $ 57,218 $ 53,028 $ 22,307
Piano $ 69 596 $ 58,407 $ 61,556 $ 58,407 $ 30,915
NTTA $ 59774 $ 53,029 4 57,21$ $ 53,028 $ 22,307
Dallas $ 18,434', $:: 13;370
Fort Worth $ 6 314 $ 6,314 $ `61314 $ 6,314 $„ . 0,314
Grand Total: $1,822,083