HomeMy WebLinkAboutContract 38956 (2)CITY OF FORT WORTH, TEXAS
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
STATE OF TEXAS Is
KNOWN ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
THIS AGREEMENT, entered into the 21 day of, July 2009, by and between the
CITY OF FORT WORTH, a municipal corporation of Tarrant and Johnson Counties,
Texas, acting herein by and through Fernando Costa, its duly authorized Assistant City
Manager, the "City", and T. Smith Inspection & Testing Services, "Engineer".
WITNESSETH
That for and in consideration of mutual covenants and agreements herein contained, the
parties hereto mutually agree as follows.
ARTICLE I
SERVICES
Section 1. Engineer hereby agrees to perform as a per job independent contractor
such professional services as may be requested by the City during the term of this
agreement. These professional services shall be performed in connection with
geotechnical investigation for bridge foundations, drainage structures, retaining walls,
levees, dams, roads, landfills, utilities and other civil works as may be required during the
life of this contract and include laboratory analysis, field work, and reports. These
services shall also include material testing, of Construction and vertical structure,
Environmental study as needed.
Section 2. In addition to the' professional engineering services to be performed under
Section 1 above, Engineer shall render the following professional services:
1. Attend such conferences with City officials as may be determined
necessary to ensure the drilling, testing, and analysis will proceed in an
economical and orderly manner.
2. Advise the City on special aspects of each project as maybe requested by
the City.
3. Furnish all necessary personnel, drilling equipment, laboratory testing
equipment, and materials necessary to perform all testing and other work required
and contemplated under this contract and at such time and in such manner so as
not to delay the geotechnical investigation by the City. Engineer shall also
furnish all necessary barricades, signs and other warning devices and--their
OITY ��CR�TARI�
To WORTH, TX
furnish all necessary barricades, signs and other warning devices and their
appurtenances so as to comply with all applicable local, state and federal laws,
rules and regulations.
ARTICLE II
CITY'S OBLIGATIONS AND COMPENSATION
Section 1. All testing or other work to be performed under this contract will be
specified in writing by the Department of Transportation and Public Works City of Fort
Worth. City shall not pay for any testing or other work performed by Engineer or its
subcontractors that has not been ordered in writing. It is specifically agreed that Engineer
shall not be compensated for any alleged additional work resulting from oral orders of
any person.
City shall make available to Engineer in the performance of the contract, ali existing
plans, maps, field notes, statistics, computations, and other data in its possession relative
to the sites designated for investigation. City assumes no responsibility for the accuracy
of such data furnished to Engineer by the City, its agents, contractors, or subcontractors.
Section 2. City agrees to pay Engineer for testing services on a unit price per authorized
test basis. The unit price to be paid for each authorized service shall not exceed the unit
price amount set out in the schedule of Fees and Services, attached hereto, marked
"Attachment A", and incorporated herein for all purposes incident to this contract. In no
event shall the total contract price paid by the City for all services performed hereunder
exceed the sum of Two Hundred Thousand Dollars ($200,000.00) per year.
The method of payment shall be as follows: Payment for services rendered shall be due
upon completion of the particular services so ordered and receipt by City of Engineer's
invoice for payment of same.
Acceptance by Engineer of said payment shall operate as and shall release the City from
all claims or liabilities under this contract for anything related to, done, or furnished in
connection with the services for which payment is made, including any act or omission of
the City in connection with such services.
ARTICLE III
TERM
Section 1. The term of this Agreement shall commence on the effective date and shall be
for a term of one (1) year, unless terminated in accordance with the terms of this
Agreement.
Section 2. City, in its sole discretion, shall have the right, but not the obligation, to renew
this Agreement two (2) times, each for a period of one (1) year from the termination date
provided that Engineer shall agree in writing to continue such agreement pursuant to the
same conditions as contained herein at units pricing satisfactory to City.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 2 of 9
Section 3. The City has the option to extend the term of this Agreement, or any renewal
period, as necessary for Engineer to complete work on any project entered into prior to
the expiration of the Agreement.
ARTICLE IV
INDEPENDENT CONTRACTOR
Engineer shall operate hereunder as an independent contractor, and not as an officer,
agent, servant, or employee of the City. Engineer shall have exclusive control of and the
exclusive right to control the details of the work to be performed hereunder and all
persons performing same, and shall be solely responsible for the acts and omissions of its
officers, agents, employees, contractors and subcontractors. The doctrine of respondent
superior shall not apply as between City and Engineer, its officers, agents, employees,
contractors, and subcontractors, and nothing herein shall be construed as creating a
partnership or joint venture between City and Engineer.
ARTICLE V
PROFESSIONAL COMPETENCE AND INDEMNIFICATION
Section 1. To the best of its professional ability, all work performed by Engineer shall
comply in all aspects with all applicable local, state and federal laws and with all
applicable rules and regulations promulgated by the local, state and national boards,
bureaus and agencies. Approval by the City shall not constitute or be deemed to be a
release of the responsibility and liability of Engineer or its officers, agents, employees,
contractors and subcontractors for the accuracy and competency of its drilling, testing,
and reporting, and other engineering services performed hereunder.
Section 2. In this connection, Engineer shall indemnify, hold harmless and defend the
City and all of its officers, agents, servants and employees from and against any and all
claims or suits for property damage or loss and/or personal injury, including death, to any
and all persons of whatsoever kind or character, including but not limited to employees of
Engineer, employees of subcontractors, and all other persons performing work incident to
this contract which may rise out of or be connected with directly or indirectly.
a. The negligent, defective or deficient execution, performance, attempted
performance or non-performance of this contract by Engineer.
b. Any act, omission, defect, deficiency or negligence of Engineer in drilling
and testing, reporting, recommendations or any other engineering services;
c. Any neglect in the safeguarding of the work by Engineer or its
subcontractors;
d. Failure by Engineer or its subcontractors to properly execute the work;
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 3 of 9
e. Defective work or materials; and/or
f. Striking, cutting, impaling or tearing any cables, utility lines, pipes and
other matter located beneath the surface due to the negligence or wrongful acts of
Engineer.
Engineer shall likewise indemnify, and hold harmless, City for any and all injury or
damage to City property arising out of, or in connection with, any and all acts or
omissions of Engineer, its officers, agents, employees or subcontractors.
ARTICLE VI
INSURANCE
Section 1. Engineer shall not commence work under this contract until it has
obtained all insurance required under this Article and the City has approved such
insurance, nor shall Engineer allow any subcontractor to commence work on its
subcontract until all similar insurance of the subcontractor has been so
approval given by the City; provided, however, Consultant may elect
subconsultant as an additional insured under its liability policies.
Commercial General Liability
$5,000,000 each occurrence
$5,000,000 aggregate
Automobile Liability
obtained and
to
add any
$1,000,000 each accident (or reasonably equivalent limits of
coverage it written on a split limits basis). Coverage shall
be on any vehicle used in the course of the PROJECT.
Worker's Compensation
Coverage A: statutory limits
Coverage B: $100,000 each accident
$500,000 disease - policy limit
$100,000 disease - each employee
Professional Liability
$1,000,000 each claim annual aggregate
Section 2. Additional Insurance Requirements
a. Except for employer's liability insurance coverage under Engineer's worker's
compensation insurance policy and professional liability insurance, the City,
its officers, employees and servants shall be endorsed as an additional insured
on Engineer's insurance policies.
GEOTECHNICALSERVICES
ANNUAL CONTRACT
Page 4 of 9
b. Certificates of insurance shall be delivered to the Department of Transportation
and Public Works' contract administrator, 1000 Throckmorton Street, Fort
Worth, TX 76102, prior to commencement of work.
c. Any failure on part of the City to request required insurance documentation
shall not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the City a mum thirty
days notice of cancellation, non -renewal, and/or material change in policy terms
or coverage. A ten days notice shall be acceptable in the event of non-payment
of premium.
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A: VII or equivalent measure of financial strength
and solvency.
f. Deductible limits, or self -funded retention limits, on each policy must not
exceed $10,000.00 per occurrence unless otherwise approved by the City.
g. Other than worker's compensation insurance, in lieu of traditional insurance,
City may consider alternative coverage or risk treatment measures through
insurance pools or risk retention groups. The City must approve in writing any
alternative coverage.
h. Workers' compensation insurance policy(s) covering employees employed on
the project shall be endorsed with a waiver of subrogation providing rights of
recovery in favor of the City.
i. City shall not be responsible for the direct payment of insurance premium
costs for Engineer's insurance.
j. Engineer's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self -funded or commercial coverage
maintained by City shall not be called upon to contribute to loss recovery.
k. In the course of the contract, Engineer shall report, in a timely manner, to
City's officially designated contract administrator any known loss occurrence
which could give rise to a liability claim or lawsuit or which could result in a
property loss.
1. Engineer's liability shall not be limited to the specified amounts of insurance
required herein.
m. Upon the request of City, Engineer shall provide complete copies of all
insurance policies required by these contract documents.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 5 of 9
n. If insurance policies are not written for specified coverage limits, Umbrella or
Excess Liability insurance for any difference is required. Excess Liability
shall follow form with the primary coverage.
ARTICLE VII
ASSIGNMENT AND AMENDMENT
Section 1. City and Engineer each bind themselves, and their respective legal successor
and assigns, to this agreement. Laboratory, its successors and assigns, shall not assign,
sublet or transfer any interest in this agreement without prior written consent of the City.
Section 2. No modification, addition, deletion, revision, alteration or other change to this
Agreement shall be effective unless and until such change is reduced to writing and
executed by the parties.
ARTICLE VIII
TERMINATION OF CONTRACT
Section 1. City may terminate this contract at any time, for any cause, by notice in
writing to Engineer. Upon receipt of such notice, Engineer shall immediately discontinue
all services and work hereunder and the placing of all orders or the entering into contracts
for supplies, assistance, facilities, and materials, in connection with the performance of
this contract and shall proceed to cancel promptly all existing contracts insofar as they are
chargeable to this contract.
Section 2. If City chooses to terminate this contract under Article VIII, Section 1, upon
receipt of notice of termination, Engineer shall discontinue services rendered up to the
date of such termination based upon calculations in Article II, Section 2 and the attached
incorporated Schedule of Fees and Services (Attachment "A").
Section 3. All reports, whether partial or complete, prepared under this contract,
including the original drawings, whether furnished by the City, its officers, agents,
employees, consultants, engineers, or contractors, or prepared by Engineer, shall be or
become the property of the City, and shall be furnished to the City prior to or at the time
such services are completed, or upon termination or expiration of this agreement.
ARTICLE IX
RIGHT TO AUDIT
(a) Engineer agrees that the City shall, until the expiration of three (3) years after final
payment under this contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of Engineer involving transactions
relating to this contract. Engineer agrees that the City shall have access during
normal working hours to all necessary facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of
this section. City shall give Engineer reasonable advance notice of intended audits.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 6 of 9
(b) Engineer further agrees to include in all its subcontracts hereunder, a provision to the
effect that the subcontracting consultant agrees that the City shall, until the expiration
of three (3) years after final payment under the subcontract, have access to and the
right to examine any directly pertinent books, documents, papers and records of such
subconsultant, involving transactions to the subcontract, and further, that City shall
have access during normal working hours to all subconsultant facilities, and shall be
provided adequate and appropriate work space in order to conduct audits in
compliance with the provisions of this article. City shall give Engineer and any
subconsultant reasonable advance notice of intended audit.
(c) Engineer and subconsultants agree to photocopy such documents as may be requested
by the City. The City agrees to reimburse Engineer for the cost of copies at the rate
published in the Texas Administrative Code in effect as of the time copying is
performed.
ARTICLE X
MINORITY AND WOMAN BISUNESS ENTERPRISE
(M/WBE) PARTICIPATION
In accordance with City Ordinance No. 15530, the City has goals for the participation of
minority business enterprises and woman business enterprises ("M/WBE") in City
contracts. Engineer acknowledges the M/WBE goal established for this contract and its
commitment to meet that goal. Any misrepresentation of facts (other than a negligent
misrepresentation) and/or the commission of fraud by the Engineer may result in the
termination of this agreement and debarment from participating in City contracts for a
period of time of not less than three (3) years.
ARTICLE XI
OBSERVE AND COMPLY
Engineer shall at all times observe and comply with all federal and State laws and
regulations and with all City ordinances and regulations which in any way affect this
agreement and the work hereunder, and shall observe and comply with all orders, laws
ordinances and regulations which may exist or may be enacted later by governing bodies
having jurisdiction or authority for such enactment. No plea of misunderstanding or
ignorance thereof shall be considered. Engineer agrees to defend, indemnify and hold
harmless City and all of its officers, agents and employees from and against all claims or
liability arising out of the violation of any such order, law, ordinance, or regulation, whether
it be by itself or its employees.
ARTICLE XII
VENUE
Should any action, whether real or asserted, at law or in equity, arise out of or under this
Contract, venue for said action shall be exclusively in Tarrant County, Texas.
GEOTECHNICAL SERVICES
ANNUAL CONTRACT
Page 7 of 9
ARTICLE XIII
NO THIRD PARTY BENEFICIARIES
This Agreement shall inure only to the benefit of the parties hereto and third persons not
privy hereto shall not, in any form or manner, be considered a third party beneficiary of
this Agreement. Each party hereto shall be solely responsible for the fulfillment of its
own contracts or commitments.
ARTICLE XIV
SEVERABILITY
The provisions of this Agreement are severable, and if any word, phrase, clause,
sentence, paragraph, section or other part of this Agreement or the application thereof to
any person or circumstance shall ever be held by any court of competent jurisdiction to
be invalid or unconstitutional for any reason, the remainder of this Agreement and the
application of such word, phrase, clause, sentence, paragraph, section, or other part of
this Agreement to other persons or circumstances shall not be affected thereby and this
Agreement shall be construed as if such invalid or unconstitutional portion had never
been contained therein.
ARTICLE XV
NOTICES
All written notices called for or required by this Agreement shall be addressed to the
following, or such other party or address as either party designates in writing, by certified
mail, postage prepaid, or by hand delivery:
1. CITY OF FORT WORTH: William A. Verkest, Director
Department of Transportation and Public Works
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Copies to: Fernando Costa, Assistant City Manager
City Manager's Office
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
GEOTECHNICALSERVICES
ANNUAL CONTRACT
Page 8 of 9
2 ENGINEER:
T. Smith Inspection &Testing Services
7353 Airport Freeway,
Fort Worth, TX 76118
IN WITNESS THEREOF, the parties hereto have made and executed this agreement in
multiple originals the day and year first above written, in Fort Worth, Tarrant County,
Texas.
Executed this the ay of
ATTEST:
City Secretary
APPROVED AS TO FORM
AND UrIUAt 611 I ,
Assistant ity Attorney
Contract Authorizatiox
- L110C'
Date
GEOTECFINICALSERVICES
ANNUAL CONTRACT
Page 9 of 9
CITY OF FORT WORTH
BY• /ritrt� LL/�
Fernando Costa
Assistant City Manager
APPROVAL RECOMMENDED:
William A. Verkest,.P . Director
Transportation/Public Works Dept.
Engineer Firm:
T. Smith Inspection
Services
Terry mith
Owner
&
Testing
A�OBL?ti CERTIFICATE OF LIABILITY
Bradley Insurance 1415 Summit Avenue Agency
Fort Worth, TX 76102
817-332-8288
uvsum m a r m
Terry Smith
222 W. Exchange Ave. #200B
Fort Worth, Tx 76106
817-589-9933 see add'1 #
-9,lJ L f.,,
A�Professional
3/5/2009
7HIS GEKi7FlCATE IS
ONLY AND coNFFR.
1 .• • 1 M. 1Tills
NAIL#
1
2,000,000 accurenee
�����szv IA6-a15741 IOT/19/08 107/19/09 �2 000 000 aaareant
�ESCfl6'f10NOF OPEM710N9lLOC•ATW i1S/YENiClFS! EXCLLL40NSA00�8Y BJOORSENFMI SPECIAL PF'�VLgON$
The City of Fort Worth Texass, it's employees are shown as additional insured
with respects to General Liability and Auto Liability with Wavier of
Subrogation for the work of the insured on various projects under the contract
2007 Street Maintenance Program Management and inspection services awarded the
insured,
The City of For Worth Texas
1000 Throckmorton treat
Fort Worth, TX 76102
SRLS Texas, LLC
ACO17D2512001lOtl)
.4TTu1�►�.r_1
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Concrete
Compression Test Cylinders (Min. 4 per set), each
Air Content/Slump/Temperature/Next Day Cylinder Pick up, hour
Vehicle charge in case of usage
Flexural Beams, each
$16.00
$38.00
$25.00
$27.00
(Min 3 hours)
*** Coring (4" DIA to 6" depth 4/trip)
***$59.00
per add inch $6.35
(Min 4 per trip)
2" Coring for depth isolation to 6" each additional inch
Thickness Measurement, each
$42.00
$9.00
(Min 4 per trip)
Patching of Core Holes, each
$6.00
Coring Technician Time, hour
Flexural Test of Beams, each
$38.00
$27.00
Compression Test, each
$58.00
$105.00
Sawing and/or Capping Cores & Cylinders, each
Compression Test of Cores, each
Compression Test Specimen Hold
Mix Design Review, each
Mix Design Formulation w/Aggregate Tests Include Specific Gravity/Sieve
Analysis/Unit WT-200, each
Additional Mix Design Utilizing Above Mix Analysis, each
$580.00
$210.00
Mix Design Formulation Revision, each
Engineering Tech (NICET) for Quality Assurance Monitoring of Onsite Work,
hour
$210.00
$48.00
Pre -pour Reinforcing Steel Placement Inspection, hour
$38.00
Sampling for In lab Test, hour
$42.00
Equipment Charge
N/C
Minimum Vehicle Charge
$30.00
Batching Mix Design in Preparation for Making Lab Confirmation Cylinders
or Beams, hour
$38.00
Batch Plant Observation Supporting Concrete Placement, hour
$48.00
Concrete Flatness, Sq. Ft.
per sq. ft. $0.02
min. $530.00
Certified Welding Inspector, hour
$65.00
Field Gradation Equipment, test
N/C
Slump Test, each
Include in Technician
time
*** Includes Cost of Technician Time Coring and Patching Core Holes
Page 1 of 5
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
HMAC
++ Density Nuclear Method, hour
++ $47.00
Core In place Density, each
$34.00
Coring HMAC Technician Time, hour
$59.50
(Min 4/trip)
Core Depth Measurement, core
Patching Core Holes, each
Min Vehicle Charge
4" DIA./6" Depth, core
$45.00
Each Additional Inch, Inch
$6.50
*** Rolling Pattern Nuclear Gauge, hour
*** $47.00
Nuclear Moisture Density Gauge, day
Included in rate
Extraction and Gradation, each
$180.00
Lab Density, each
$45.00
Stability Test, each
$170.00
Maximum Specific Gravity, each
$78.00
Disposal Fee
N/C
Batch Plant Hot Bin Analysis, each
$58.00
Material Sampling For In Lab Tests, hour
$42.00
*** Includes Gauge Charge
++ First hour and half $165.00 any additional time after that is $47.00 per
hour, (includes Technician Time, Mobilization, Vehicle, Trip and Gauge
Charge),
Page 2 of 5
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Professional
Chief Engineer/Scientist, hour
$145600
Senior Technician, hour
$48.00
Senior Project Engineer/Professional Engineer, hour
$125*00
Project Engineer/Scientist/Geologist, hour
Graduate Engineer/Project Manager, hour
Staff Scientist/Geologist/Engineer, hour
$105.00
$88.00
$88.00
Project Inspector, hour
$48.00
Clerical, hour
$32400
Drafter, hour
$38900
Engineering Technician, hour
$44.00
Engineering and Report Review, hour
$105400
Page 3 of 5
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
Geotechnical
Undisturbed Soil Sample, each
$12.00
(pet' ft)
Visual Classification, each
$12.00
Classification ASTM D-2487, each
$105.00
Sample Extrusion, each
N/A
Sample Preparation, each
$10.00
Atterburg Limits RAW PI, each
$50.00
Soil w/Additive, each
$55.00
Bar Lineal Shrinkage, each
$20.00
Moisture Density Relationship (Proctor)
Standard (ASTM 13-698), each
$150.00
Moisture Density Relationship (Proctor)
Modified (ASTM D-1517), each
$179.00
THD 113E, each
$190600
Unit Weight, each
$30.00
Unit Weight (Dry Rodded), each
$30.00
-200 Sieve Analysis, each
$32.00
Laboratory Moisture Content, each
$8.00
Sieve Analysis (Fine Aggregate), each
$62.00
Sieve Analysis (Large Aggregate), each
$62.00
Sieve Analysis (Finer than 200 Sieve), each
$35.00
Lime or Cement Series Determination (5points), each
$275.00
Optimum Lime Content, each
$215.00
pH Series (6 points), each
$215.00
Specific Gravity, each
$45.00
Absorption, each
$25.00
Los Angeles Abrasion (Large Aggregate), each
$235.00
Los Angeles Abrasion (Small Aggregate), each
$215.00
Texas Wet Ball Mill, each
$175,00
Gradation (Lime or Cement Stabilized), each
Limed Soil Depth Measurement, each
++$47.00/Hr
++$47.00
++ In Place Moisture Density (Nuclear Method Technician), hour
Grain Size Analysis (Mechanical and Hydrometer), each
$155900
Unconfined Compression Test Including Moisture, each
$35.00
Unconfined Compression Test Soil, each
$30.00
Unconfined Compression Test Rock, each
$40.00
Confined Compression Test (UU), each
$104.00
Triaxial Test Unconsolidated Undrained, speci
$85.00
Triaxial Test Multiple Stage, stage
$335.00
Triaxial Consolidated Undrained w/Pore Pressure Measurement, s eci
$675.00
Triaxial Consolidated Drained Multiple Stage, stage
$675.00
Triaxial Consolidated Drained Single Stage, stage
$335.00
Triaxial Consolidated Drained Three Stage, stage
$800000
Consolidated Test, each
$375.00
Direct Shear Consolidated Drained Sand & Gravel, point
$225.00
Direct Shear Consolidated Drained Silt & Clay, point
$375900
Direct Shear Consolidated Undrained Sand & Gravel, point
$200.00
Direct Shear Consolidated Undrained Silt & Clay, point
$225.00
Page 4 of 5
C IZ 10111 l_1
FEE SCHEDULE
For Construction Material Testing and Geotechnical Borings
California Bearing Ratio, each
$275.00
THD Triaxial, each
$840.00
Percent Swell, each
$90.00
Permeability Test Falling Head, each
$225.00
Permeability Test Triaxial, each
$325900
Permeability Test Flex Wall, each
$325.00
Permeability Test Fixed Wall, each
$225.00
Permeability Test Clay Soils, each
$310.00
Permeability Test Granular Soils, each
$275.00
Permeability Test Pressure Head wBeck Pressure Saturation, each
$375.00
Electrical Resistivity, THD Method, each
$105400
Truck Mounted Mobilization, mile and trip
Mile - $3.75
Trip - $325.00
Buggy/Ave Mounted, mile and trip
Mile - $6.00
Trip - $450.00
Per Diem Per Man, day
$95.00
Intermittent Soil Sampling w/Truck @ 5' Intervals 0-25' Depth, foot
$12.00
Intermittent Soil Sampling w/Truck @ 5' Intervals 25-50' Depth, foot
$13.50
Intermittent Soil Sampling w/Truck @ 5' Intervals 50-100' Depth, foot
$16.00
Continuous Soil Sampling w/Truck 0.10' Depth, foot
$16.00
Intermittent Soil Sampling w/ATV @ 5' Intervals 0-25' Depth, foot
$13.00
Intermittent Soil Sampling w/ATV @ 5' Intervals 25-50' Depth, foot
$14.50
Intermittent Soil Sampling w/ATV @ 5' Intervals 50400' Depth, foot
$17.00
Continuous Soil Sampling w/ATV 040' De th, foot
$15.00
Continuous Soil Sampling w/ATV 10-50' Depth, foot
$19.00
Auger Drilling Without Sample, foot
$10.00
Rock Coring w/NX Size, Core Barrel 0.25' Depth Carbide Bit, foot
$19.00
Rock Coring w/NX Size, Core Barrel 25-50' Depth Carbide Bit, foot
$21.00
Rock Coring w/NX Size, Core Barrel 50-75' Depth Carbide Bit, foot
$22.00
Rock Coring w/NX Size, Core Barrel 75400' Depth Carbide Bit, foot
$26.00
Rock Coring w/NX Size, Core Barrel 50-75' Depth Diamond Bit, foot
$28.00
CME 5' Continuous Sampler 0-50' Depth, run
$16.00
Per FT
Stand By or Access Time, hour
$175.00
Drilling w/Auger Rig, hour
$150900
Minimum Drill Fee
$700.00
Post Injection Sub -grade Evaluation Per Boring Including Moisture and Free
Swell Determination
$575.00
Minimum Post Injection Charge
$1100.00
Field Time Engineer, hour
$105.00
*** Includes Gauge Charge
++ First hour and half $165.00 any additional time after that is $47.00 per
hour, (includes Technician Time, Mobilization, Vehicle, Trip and Gauge
Charge),
Page 5 of 5
http://apps.ctWnet.org/ecounciI/printmc.asp?id=11941&prin"— ue&
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 7/21/2009
DATE. Tuesday, July 21, 2009 REFERENCE NO.: C-23668
LOG NAME: 20CIPGEOTECH
SUBJECT:
Authorize Agreements in an Amount Not to Exceed $200,000.00 with Terracon Consultants, Inc., T. Smith
Inspection and Testing Services, Globe Engineers, Inc., Fugro Consultants, Inc., Professional Service
Industries, Inc., and HVJ Associates Inc., for Geotechnical and Construction Materials and Environmental
Testing Services for Various Construction Projects
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute agreements with Terracon
Consultants, Inc., T. Smith Inspection and Testing Services, Globe Engineers, Inc., Fugro Consultants, Inc.,
Professional Service Industries, Inc. and HVJ Associates Inc., for geotechnical and construction materials
and environmental testing for various construction projects. The term of each agreement is one year with two
one-year renewal options. The annual not -to -exceed value of each contract is $200,000.00,
DISCUSSION:
Since 1982, the City has periodically negotiated contracts with firms to perform geotechnical, construction
materials and environmental testing services for various City projects. These "requirement contracts"
provide the City with additional capacity as needed and allow for rapid response to departmental needs with
pre -established unit prices.
In April 2009 City staff solicited and received Statements of Qualifications for professional services and is
recommending the approval of contracts with the listed professional testing firms for providing onsite testing
services. Eleven different firms responded to a Request for Qualifications. Of those eleven, the following six
firms were selected for this annual contract.
Terracon Consultants, Inc.
T. Smith Inspection and Testing Services
Globe Engineers, Inc.
Fugro Consultants, Inc.
Professional Service Industries, Inc.
HVJ Associates Inc.
The M/WBE office provided a waiver of the goal for this project because the purchase of goods and
services is from sources where subcontracting or supplier opportunities are negligible.
Staff is recommending that the City enter into contracts with all six firms selected by a staff committee that
ranked the respondents on published criteria.
Funding for the geotechnical and construction materials and environmental testing services is currently
1 of2
7/22/2009 10:37 AM
http:Happs.cfWnet.org/ecounci I/pr i ntmc. asp? i d=1 1941 &pri nt=true&.
available through various Capital Improvement Program Funds,
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital budgets,
as appropriated, of various Capital Improvement Program Funds,
FUND CENTERS:
TO Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
1. MWBE waiver.pdf (CFW Internal)
FROM Fund/Account/Centers
Fernando Costa (6122)
William A. Verkest (7801)
Andy Anderson (8648)
2 of 2 7/22/2009 10:37 AM