HomeMy WebLinkAboutContract 42905cmr sECRErnev coN►nncr No. � LL FACILITIES RELOCATION AGREEMENT This Facilities Relocation Agreement ( "Agreement ") made and effective as of the date last signed below is by and between Barnett Gathering, LP, with principal offices at: 810 Houston St, Fort Worth, TX 76102, ( "Utility Owner "), and The City of Fort Worth, ( "City ") whose mailing address is: 1000 Throckmorton St, Fort Worth, TX 76102. Recitals City is in the process of developing and constructing a runway expansion project at Alliance Airport which includes the relocation of the BNSF Main Line (the "Project "), and which will likely impact gas gathering pipelines owned by Utility Owner ( "Facilities "); and City has undertaken the obligation of removal, relocation, or other necessary adjustment of existing utilities impacted by the Project; and The Project is expected to interfere with the present location of Utility Owner's existing Facilities; and City has requested that Utility Owner locate its Facilities to accommodate the Project and enter into an Agreement with the City providing for that relocation and for the reimbursement to Utility Owner of the eligible expenses Utility Owner incurs related to relocating those Facilities. Agreement 1. City will reimburse Utility Owner for 100% of Utility Owner's actual reasonable costs incurred in connection with the preliminary survey, design and acquisition of materials, surface site right of way, and work necessary to locate the Facilities described by the scope of work in Attachment A to this Agreement. 2. The cost of the preliminary survey, design, materials, and administration is estimated not to exceed $40,000, as shown in the attached detailed estimates (Attachment A), which amount will be invoiced by Utility Owner to City and paid to Utility Owner when the work has been completed and Utility Owner has received all applicable invoices. Utility Owner will provide notice in writing to City if the actual costs contemplated by this Agreement will exceed the estimate by more than ten percent (10 %) prior to incurring those costs. However, this estimate does not limit City's duty to reimburse Utility Owner under this Agreement. The reimbursement will not exceed the actual costs of labor, survey, engineering, and material costs, and overhead incurred by Utility Owner in accomplishing the work contemplated by this Agreement. Utility Owner must provide a detailed description of all costs with each invoice submitted to City. 3. This Agreement will inure and be binding upon th�ccessors an s of the parties hereto. OFFICIAL RE, CITY SECRETARY Page 1 of 3 FT. VWRTi#, TX I 4. This AGREEMENT may be executed in counterparts and each counterpart hereof will be deemed to be an original instrument but all such counterparts together will constitute one and the same instrument IN WITNESS WHEREOF, the parties hereto have affixed their signatures: City of Fort Worth Fernando Costa Assistant City Manager Date: 23/.Z Recommended: ): Nick J. Dungey Title: President Date: 4, • �� Z O� �j �-� / Douglis W. Wiersig Director, Transportation Zublic Works Department Approved as to Form and Legality: Douglas W. Black Assistant City Attorney ATTEST: City Sec Date: �z 5;/� M &C Date: — Page 2 of 3 lJ �Mr OFFICIAL RECORD: CITY SECRETARY FT. WORTH, TX STATE OF TEXAS § COUNTY OF TARRANT § The foregoing instrument was acknowledged before me on this J day of 2012. by Fernando Costa, Assistant City Manager, on behalf of the City a Fort Worth. (SEAL) EVONIA DANIELS MY COMMISSIOA EXPIRES July 10, 2013 STATE OF TEXAS § COUNTY OF TARRANT § Notary Public My Commission Expires 7- 10 :S,/3 The foregoing instrument was acknowledged before me n this day of 201&nby , on behalf of Barnett Gatherin .P. (SEAL) TIFFANY -- IF� F N W. PETERS Notary Pubflc * * STATE OF TEXAS OF�`'y My Comm. Exp.06/22/2013 Page 3 of 3 Notary tBic My Commission Expires FOFFICIAL RECORD! CITY SECRETARY FT. WORTH, TX n BARNETT GATHERING, LP COST ESTIMATE -PIPELINE PROJECT Project: BNSF PIPELINE RELOCATION Cost Center NO.( *) AFE No. Sec(s): Township: Range: Survey: County: TARRANT State: Gen.Acct: ( *) Cost Center determines Gen.Acct. 0.010 Land and Land Rights 0 0.020 Right of Way Acquisition $0 $0 0.030 Right of Way Condemnation 0.040 Right of Way & Easement Damages 0.050 Survey & Locating 0.180 Drafting 0.060 Inspection; Pipeline, Construction 0.065 Structures & Improvements 0.090 Dehydration 0.130 Catalysts & Chemicals 0.140 Start-Up Costs 0.150 Pipe: 'OD Sch. Gr. Ft @ $/ft "OD Sch. Gr. Ft @ $/ft 'OD Sch. Gr. Ft @ $/ft Total Pipe & Fittings 0.160 Interconnect Costs 0.170 Instrumentation 0.200 Compressors & Related Equipment 0.210 Generators 0.230 Buildings 0.240 Installation - Compressors Laying 4' @ $ /ea. Road Crossing @ $ /ea. Creek Crossing @ $ /ea. Scraper Station @ $ /ea. Meter Run @ $ /ea. Valve Setting @ $ /ea. Miscellaneous @ $ /ea. Total P/L Installation Costs: Total Installation Costs: 0.250 Contract Services & Labor 0.270 Valves & Fittings Scraper Traps @ $ /ea. 0.290 Measuring & Regulating Equipment 0.320 Other Equipment (rental) 0.330 Purchase Price Allocation 0.340 Telecommunication Equipment 0.350 Vehicles - Owned 0.360 Vehicles - Capital Leases 0.370 Storage Facilities & Equipment 0.380 Outside Engineering 0.390 Environmental Permits 0.400 Consultants 0.410 Office Costs 0.420 Insurance / Bonds 0.430 Legal, General 0.440 Shop Tools & Equipment 0.460 Lab & Testing Equipment 0.470 Training 0.555 Taxes 0.300 Dynegy Emp Labor & OH - Corp 0.310 Dynegy Emp Labor & OH - Field SUBTOTAL CONTINGENCIES @ % TOTAL COST ESTIMATE 1104882 AFE Estimate 10,000 30,000 0 0 0 $0 $0 0 0 0 0 0 0 0 $0 $0 0 $0 $40,000 $40,000