HomeMy WebLinkAboutContract 54184-CO1 CSC No.54184-COl
t°ORT WORTH City of Fort Worth
Change Order Request
Project Name:1 Emergency Response-Trinity River Bank Erosion Affecting M-280-B and M-338-8 City Sec No.: r 54184
Project No.(s): 59607-0700430-102939-001780 1 DOE No. N f A City Proj.No.:I N/A
Project Description: Emergency Repair of 904nch sewer main,by-pass pumping and site restoration
Contractor; William J.Schultz,Inc.dba Circle C Construction Co. Change Order# u Date; 1 9/10/2020
City Project Mgr.1 Tony Sholola City Inspector; I David Johnson
Phone Number; 817-392-6054 Phone Number: 817-392-8455
Dept, Sewer Unit 1 Sewer Unit 2 Sewer Unit 3 Totals Contract Time
(Calender days)
Original Contract Amount $1,600,000.00 1,600,000,00
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,600,000.00 $1,600,000.00
Amount of Proposed Change Order 1,630,000.00 1,630,000.00
Revised Contract Amount 3,230,000.00 $3,230,000.00
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding(if necessary) $1,630,000.00 $1,630,000.00
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 101.88%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,000,000.00
JUSTIFICATION(REASONS)FOR CHANGE ORDER
This Change Order authorized by the attached memorandum of September 1,2020 which supplements
the July 10,2020 emergency memorandum-resulting in City Secretary Contract No.54184 with William
J.Schultz, Inc. dba Circle C Construction Co.for emergency services to repair a 90-inch sewer main, by-
pass pumping and site restoration.
The change order will provide additional funding for increased work scope as described in the attached
supplement memorandum dated September 1,2020.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name Contractor Signature Date
William J.Schultz,Ina dba Circle C Constmolion co. Teri Skelly
Inspe for Date_ Project Manager of Dat
/ AD �vny o, `� W O
Director Water Dept Date Constr ction Su eNIIsor Water Dept) Da_to
Sep 11,2020 - i � p
An1stqatpityAfforney Date Assistant City Manager Date
Sep 11,2020 , ..rghdoff( p15, Z:slcun Sep 15,2020
Council Actlon(ff Required) OFFICIAL RECORD
M&C Number NIA M&C Date Approved CITY SECRETARY
FT. WORTH, TX
FORT WOa-rm City of Fort Worth
Change Order Additions
Project Name Emergency Response-Trinity River Bank Erosion Affecting M-280-B and M-338-B City Sec No.: 54184
Project No.(s): 59607-0700430-102939-001780 I DOE No, N/A City Proj.No.: N/A
Project Emergency Repair of 90-inch sewer main,by-pass pumping and site restoration
Description
Contractor William J.Schultz,Inc.dba Circle C Construction Co. Change Order: Date: 9/10/2020
City Project Mgr. Tony Sholola City Inspector David Johnson
ADDITIONS
DEPT I Qty JUnit I Unit Cost Total
2 lAdditional Work Scope Sewer Unit 1 0 LS $1,630,000,00 1,630,000.00
Sewer Unit 1 $1,630,000.00
Sewer Unit 2
Sewer Unit 3
Page 2 of 4 Additions Sub Total $1,630,000.00
FORT NORTH City of Fort Worth
Change Order Deletions
Project Name EmergencyRespanse-TdnftyRiver Bank EroslonAfredngM-2WBandM-3S8 City Sec No.: 54184
Project No.(s); 1 59607-0700 330-102939-001780 DOE No. N/A City Proj.No.: NIA
Project Description Fmergenry Repair of 90-inch sewer main,by-pass pumping and site restoration
Contractor William J.Schultz,Inc.dba Cirde C ConstmcUon Co. Change Order: Date 9/10/2020
City Project Mgr. Tony Sholola City Inspector: David Johnson
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Sewer Unit 1
Sewer Unit 2
Sewer Unit 3
Page 3 of 4 IDelellons Sub Total
M/WBE Breakdown for this Change Order
MWBE Sub Type of Service I Am]tlis
ET
Total
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performanc and reporting requirements.
r—
Signature
Tony Sholola
Name of Employee
Assistant Water Director
Title
IF
g44�an�1��
~o
Ovo o=d
ATTEST:
��O� Epp*o *�
Il�nEXASoo
Mary J. Kayser
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
INTEROFFICE MEMO
Date: September 1,2020
To: Dana Burghdoff,Assistant City Manager
From: Chris Harder,P.E.,Water Director
Via: Doug Black, Senior Assistant City Attorney
Cynthia Garcia,Assistant Director,Purchasing
Subject: Supplement to July 10,2020 Memorandum,City Secretary Contract Nos 54184 and 54186
for Emergency Sewer Work and Engineering Design for Trinity River Bank Erosion
Affecting M-280-B and M-33 8-B Emergency Response.
On June 27—June 29, 2020, a major rain event flooded the job site for the river bank erosion emergency
repair project resulting in destruction of the access ramp to the edge of the river and damaging the sheet
pile cutoff wall that provided temporary support for the two sewer mains. In addition, the 90-inch sewer
main closest to the river has apparently shifted northward over time and developed cracks allowing raw
sewage to flow into the river.Staff remediated the sewage spill as soon as it was discovered.To immediately
address this situation, Circle C Construction was engaged to repair the pipe (CSC 58184: $1,600,000.00)
and Freese and Nichols was engaged to provide the necessary design (CSC 54186: $200,000.00). During
the course of the design work, it was confirmed that the 90-inch pipe closest to the river was out of its
original alignment, apparently pushed by shifting soils over time,Additional construction and design effort
to extend the pipe repair an additional 300 feet, including installation of a new manhole, is necessary to
properly realign and reinforce the sewer main and place it back in service. By-pass pumping operations
continue and will remain in place for the duration of this repair.
This memo is submitted to request authorization for funding supplemental emergency services as outlined
above at a total cost of approximately$1,700,000.00 ($1,630,000,00 for construction and$70,000.00 for
design and construction assistance).
A change order and an amendment will be processed to the existing contracts with Circle C Construction
and Freese and Nichols,respectively, and actual costs will be reconciled at the end of the project.
APPROVED FOR EMERGENCY PROCUREMENT:
Cl.��sfr�rl Narr7er
Recommended: Christopher Rarder(Sep 1,202014:15 CDT)
Chris Harder,P.E.,Director,Water Department
sweez
Approved as to form and Legality: oehd fua 1.7020 rr:.i rnrf
Douglas W.Black, Sr.Assistant City Attorney
Approve:
Cynthia Garcia,Assistant Director,Purchasing
Dana$urghcloff
Dana., h,doH ep 2,2010 U8:59 CDT)
Approve:
Dana Burghdoff,Assistant City Manager
N sit •' � ,,� '.;l��l _�, l }'{�
f
` t
�': ^(r��'�U�i•-jam'/ �%.� �: ,'i < � •h i�
}r sib Sine e{ frr
r r� s� t:� • � •.� - _ i
1. �u 1, • .� ��r
'X" } 1. +K;Y.. r h L�lt��• S. _� !� N _
r ,EyA i
..Y.
�`� 4}}� 1�; •� �� ,k ti f{.t t�t _3 � 5 :is
{ 1 r c
:1.,L��."' ^.' ':• �,TAv.•f�• rl}. � .�..j:$ �ti�i .�i ll'7if .'�'..
r_ r
I• _ S�- � \ '1 � \\, k� - �Y�-�S mil; tI
`F��"`-,mac- �I I � • _ 1�':
a.
CV
h �,• r.�r; j;-t.,;
�P WIN
�1 \� '/s �R`- ��� s_.t�t . '' 1' r.: �• 'll�� r4;�j !Ott 6t\ ! �t; �)•�
! rl � ��. \ f Lail' .! ���•'
-
Y r Vit,
'ram /..-� •� r � t r�l [ - ` + ^.