Loading...
HomeMy WebLinkAboutContract 49185-SI1 FORT WORTH 10:53 am CSC No.49185-SI1 TO: City Secretary's Office FROM: Janie Morales Interim Assistant Director >a,�-sC�,uor� 7 Ja kScarlea Morales(Se012,2020 10.1050T) CC: Rich McCracken, Sr. Assistant City Attorney DATE: September 22, 2020 SUBJECT: Community Facilities Agreement for Urban Air Project—CSC 49185 On 6/3/2017, the City and 8747 Harmon, LLC ("Developer") executed a community facilities agreement ("CFA") for the Urban Air Project, City Secretary Contract Number 49185. The CFA was executed based upon an engineer's estimate of probably construction costs, which included construction of water, sanitary sewer, paving and storm drain improvements. After execution of the CFA,the Developer decided to have the water and sanitary sewer improvements constructed through the City's miscellaneous projects process. Additionally, the bids by the contractors for the paving and storm drain work differed significantly from the estimates in the CFA. A copy of the contract between the Developer and the contractor and the unit bid prices is attached to this memorandum. An amendment to the CFA was never executed to reflect the removal of the water and sanitary sewer work and the actual cost of the paving and storm drain work. No change orders were necessary to the contracts between the developer and their contractors as those contracts were in the actual amount of the bids. This project is completed and the paving and storm drain work has been accepted by the City. A copy of this memorandum should be filed with the contract in the City Secretary's Office to reflect why the amounts in the CFA differ from the final green sheet for the Project. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 52 43-1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 23rd day of January, 2018 is made by and between the 5 Developer, 8747 Harmon, LLC authorized to do business in Texas ("Developer"), and 6 Rockwood Alliances, Inc., authorized to do business in Texas, acting by and through its duly 7 authorized representative,("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1.WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for 12 the Project identified herein. 13 Article 2.PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part 15 is generally described as follows: 16 URBAN AIR 17 City Project No. 100959 18 Water Project No. N/A 19 Sewer Project No. N/A 20 Article 3.CONTRACT TIME 21 3.1 Time is of the essence. 22 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 23 Documents are of the essence to this Contract. 24 3.2 Final Acceptance. 25 The Work will be complete for Final Acceptance within 180 calendar days after the date 26 when the Contract Time commences to run as provided in Paragraph 12.04 of the 27 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 28 29 3.3 Liquidated damages 30 Contractor recognizes that time is of the essence of this Agreement and that Developer 31 will suffer financial loss if the Work is not completed within the times specified in 32 Paragraph 3.2 above,plus any extension thereof allowed in accordance with Article 10 of 33 the Standard City Conditions of the Construction Contract for Developer Awarded 34 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 35 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 36 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 37 that as liquidated damages for delay (but not as a penalty), Contractor shall 38 pay Developer per separate agreement between Developer and Contractor Dollars ($) 39 for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance 40 until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH URBAN AIR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO. 100959 Revised June 16,2016 00 52 43-2 Developer Awarded Project Agreement Page 2 of 4 41 Article 4.CONTRACT PRICE 42 Developer agrees to pay Contractor for performance of the Work in accordance with the 43 Contract Documents an amount in current funds of Two Hundred Eighty Two 44 Thousand Two Hundred Two Dollars Three Cents($282,202.03). 45 Article 5.CONTRACT DOCUMENTS 46 5.1 CONTENTS: 47 A. The Contract Documents which comprise the entire agreement between Developer and 48 Contractor concerning the Work consist of the following: 49 1. This Agreement. 50 2. Attachments to this Agreement: 51 a. Bid Form(As provided by Developer) 52 1) Proposal Form(DAP Version) 53 2) Prequalification Statement 54 3) State and Federal documents (project specific) 55 b. Insurance ACORD Form(s) 56 c. Payment Bond(DAP Version) 57 d. Performance Bond(DAP Version) 58 e. Maintenance Bond(DAP Version) 59 f. Power of Attorney for the Bonds 60 g. Worker's Compensation Affidavit 61 h. MBE and/or SBE Commitment Form(If required) 62 3. Standard City General Conditions of the Construction Contract for Developer 63 Awarded Projects. 64 4. Supplementary Conditions. 65 5. Specifications specifically made a part of the Contract Documents by attachment 66 or, if not attached, as incorporated by reference and described in the Table of 67 Contents of the Project's Contract Documents. 68 6. Drawings. 69 7. Addenda. 70 8. Documentation submitted by Contractor prior to Notice of Award. 71 9. The following which may be delivered or issued after the Effective Date of the 72 Agreement and,if issued,become an incorporated part of the Contract Documents: 73 a. Notice to Proceed. 74 b. Field Orders. 75 c. Change Orders. 76 d. Letter of Final Acceptance. 77 78 CITY OF FORT WORTH URBAN AIR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.100959 Revised June 16,2016 00 52 43-3 Developer Awarded Project Agreement Page 3 of 4 79 Article 6.INDEMNIFICATION 80 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 81 expense, the city, its officers, servants and employees, from and against any and all 82 claims arising out of, or alleged to arise out of, the work and services to be performed 83 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 84 under this contract. This indemnification provision is specifically intended to operate 85 and be effective even if it is alleged or proven that all or some of the damages being 86 sought were caused, in whole or in part, by any act, omission or negligence of the city. 87 This indemnity provision is intended to include, without limitation, indemnity for 88 costs, expenses and legal fees incurred by the city in defending against such claims and 89 causes of actions. 90 91 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 92 the city,its officers,servants and employees,from and against any and all loss,damage 93 or destruction of property of the city, arising out of,or alleged to arise out of,the work 94 and services to be performed by the contractor, its officers, agents, employees, 95 subcontractors, licensees or invitees under this contract. This indemnification 96 provision is specifically intended to operate and be effective even if it is alleged or 97 proven that all or some of the damages being sought were caused, in whole or in part, 98 by any act, omission or negligence of the city. 99 100 Article 7.MISCELLANEOUS 101 7.1 Terms. 102 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 103 the Construction Contract for Developer Awarded Projects. 104 7.2 Assignment of Contract. 105 This Agreement, including all of the Contract Documents may not be assigned by the 106 Contractor without the advanced express written consent of the Developer. 107 7.3 Successors and Assigns. 108 Developer and Contractor each binds itself, its partners, successors, assigns and legal 109 representatives to the other party hereto, in respect to all covenants, agreements and 110 obligations contained in the Contract Documents. 111 7.4 Severability. 112 Any provision or part of the Contract Documents held to be unconstitutional, void or 113 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 114 remaining provisions shall continue to be valid and binding upon DEVELOPER and 115 CONTRACTOR. 116 7.5 Governing Law and Venue. 117 This Agreement, including all of the Contract Documents is performable in the State of 118 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 119 Northern District of Texas,Fort Worth Division. CITY OF FORT WORTH URBAN AIR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.100959 Revised June 16,2016 00 52 43-4 Developer Awarded Project Agreement Page 4 of 4 120 121 7.6 Authority to Sign. 122 Contractor shall attach evidence of authority to sign Agreement, if other than duly 123 authorized signatory of the Contractor. 124 125 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 126 counterparts. 127 128 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 129 Contractor: Developer: Rockwood Alliance,Inc. 8747 Harmon,LLC (S 6-f- ature) (Signature) Saleem Fernandez Michael Browning (Printed Name) (Printed Name) Title: Owner Title: Manager Company Name: Company name: Address: 1141 W. 24th St., Suite B Address: 317 S. Jenkins, Suite C City/State/Zip: Houston, TX 77008 City/State/Zip: Grapevine,TX 76051 1/23/2018 01/23/2018 Date Date 130 CITY OF FORT WORTH URBAN AIR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS—DEVELOPER AWARDED PROJECTS CITY PROJECT NO.100959 Revised June 16,2016 00 42 43 DAP-BII)PROPOSAL Page 3 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT III:DRAINAGE IMPROVEMENTS 1 0241.0800 Remove Rip Rap 0241 13 SF 258 $2.10 $541.80 2 0241.4401 Remove Headwall/SET 0241 14 EA 2 $941.89 $1 883.78 3 3349.0005 8'Storm Junction Box 33 49 10 EA 1 $8 500.00 $8 500.00 4 3341.1201 5x3 Box Culvert 3341 10 LF 598 $407.00 $243 386.00 5 3137.0104 Medium Stone Riprap,dry 31 3700 SY 45 $61.44 $2 764.80 6 3341.0201 21"RCP,Class III 3341 10 LF 30 $64.00 $1 920.00 7 3341.0205 24"RCP,Class III 3341 10 LF 28 $75.00 $2 100.00 8 3349.1000 Headwall,Box Culvert 33 49 40 CY 5.42 $548.53 $2 973.03 9 3349.1002 21"Flared Headwall,1 pipe 33 49 40 EA 2 $1 533.26 $3 066.52 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 _ 35 _ 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $267,135.93 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vasion Sept=ba 1,2015 00 42 43 Bid Proposal_DAP.xIs 00 42 43 DAP-BII)PROPOSAL Page 4 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 3213.0301 4"Conc Sidewalk 32 13 20 SF 1763 $3.94 $6,946.22 2 3213.0101 6"Cone Pvmt 32 13 13 SY 197 $32.58 $6,418.26 3 3211.0501 6"Lime Treatment 3211 29 SY 233 $3.25 $757.25 4 0241.1300 Remove Cone Curb&Gutter 0241 15 LF 55 $4.28 $235.40 5 0241.1100 Remove Asphalt Pvmt 0241 15 SY 15 $7.15 $107.25 6 13211.0400 Hydrated Lime 3211 29 TN 4 $150.43 $601.72 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 _ 35 _ 36 37 38 39 40 41 42 43 44 45 TOTAL UNIT IV:PAVING IMPROVEMENTS $15,066.10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vasion Sept=ba 1,2015 00 42 43 Bid Proposal_DAP.xIs 00 42 43 DAP-BID PROPOSAL Page 7 of 7 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT III:DRAINAGE IMPROVEMENTS $267,135.93 UNIT IV:PAVING IMPROVEMENTS $15,066.10 Total Construction Bid $282,202.03 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 180 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vasion Sept=ba 1,2015 00 42 43_Bid Proposal_DAP.xIs