HomeMy WebLinkAboutContract 54552 Received Date•09/29/20
Received Time:8:04 AM
Developer and Project Information Cover Sheet:
Developer Company Name: KFH-CRG(TEXAS)L.P.
Address, State,Zip Code: 35 E.Wacker Drive, Chicago, IL, 60601
Phone&Email: 312-994-1595, saundersc@claycorp.com
Authorized Signatory, Title: Caroline P. Sanders , Secretary
Project Name: Hemphill Multifamily
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: F401 Hemphill
Plat Case Number: Plat Name: Jennings South Addition
Mapsco: Council District: 2R
CFA Number: CFA19-0064 City Project Number: 102088
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017 FT. WORTH, TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 54552
WHEREAS, KFH-CRG (TEXAS) L.P., ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements")related to
a project generally described as Hemphill Multifamily ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017 CITY SECRETARY
Page 2 of 11
FT. WORTH, TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs
(C) ®.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 4 of 11
I Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such iniuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2) will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Hemphill Multifamily
CFA No.: CFA19-0064 City Project No.:
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 31,785.00
2.Sewer Construction $ 19,620.00
Water and Sewer Construction Total $ 51,405.00
B. TPW Construction
1.Street $ 7,760.00
2.Storm Drain $ 106,102.00
3.Street Lights Installed by Developer $ 101,540.60
4. Signals $ -
TPW Construction Cost Total $ 215,402.60
Total Construction Cost(excluding the fees): $ 266,807.60
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,028.10
D. Water/Sewer Material Testing Fee(2%) $ 1,028.10
Sub-Total for Water Construction Fees $ 2,056.20
E. TPW Inspection Fee(4%) $ 4,554.48
F. TPW Material Testing(2%) $ 2,277.24
G. Street Light Inspsection Cost $ 4,061.62
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 10,893.34
Total Construction Fees: $ 12,949.54
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 266,807.60 x
Completion A reement= 100%/Holds Plat $ 266,807.60
Cash Escrow Water/Sanity Sewer-125% $ 64,256.25
Cash Escrow Paving/Storm Drain=125% $ 269,253.25
Letter of Credit=125%w/2 r expiration period $ 333,509.50
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed to be effective on September 15,2019.
CITY OF FORT WORTH DEVELOPER
KFH-CRG(TEXAS)L.P.
0aX.1,gu"A&J�E By: CRG—Tilton,LLC, its general partner
Dana Burghdoff( p28,20 17:11CDT) By: CRG Services Management,LLC,its
Dana Burghdoff Manager
Assistant City Manager
Date: Sew,2020
Caroline 5aunder Sep25,202009:22CDT)
Recommended by:
Name: Caroline P. Saunders
Title: Secretary
.rynR2 (Sep25,202009:28CDT) '
Sep25 2020
Evelyn Roberts/Jennifer Ezernack Date:
Project Assistant
Planning and Development
Contract Compliance Manager:
Approved as to Form &Legality:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Richard A McCracken(Sep 28,202016:19 CDT) administration of this contract, including
Richard A. McCracken ensuring all performance and reporting
Sr. Assistant City Attorney requirements.
M&C No. N/A
Date: Laurie Lewis(Sep 25,2020 09:46 CDT)
Form 1295: N/A Name: Laurie Lewis
b-��QoagIl� Title: Development Manager
ATTEST: c�'lo
���oo
�o
o
Ovo o=a°
Ronald P.Gonzales(Sep 29, 07: ) a�Q hEXASod�
Mary J. Kayser/Ronald Gonzales
City Secretary/Assistant City Secretary
OFFICIAL RECORD
City of Fort Worth,Texas CITY SECRETARY
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017 FT. WORTH, TX
Page 9 of 11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 102088
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Hemphill Multifamily
CFA Official Release Date: 02.20.2017
Page 11 of 11
004243
DAP-BID PROPOSAL
Page of2
SECTION 00 4243
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Specification Bid
No. Description Unit of Measure Section No. Quantity Unit Price Bid Value
UNIT I:WATERIMPROVEMENTS
28, 3305.0202 IniportedEnrbedment/Backfill,CSS CY 330510 4 $1Q0.00_ $400�00_
29 3311.0001 Ductile Iron Water Fittings w/Restraint TON 33 1111 1
30 3311.0043 4"Water Pipe,Select Backfill LF 33 11 10,33 11 12 33 $4$,00_ $1,485 00
31 3311.0143 6"Water Pipe,Select Backfill LF 3311 10,33 11 12 68 $50=00 53,400.00
32 3312.0001 Fire Hydrant EA 33 1240 1
33 3312.0117 Connection to Existing 4%12"Water Main EA 33 1225 3 $1,000.00 _$3,000=00.
„34, 3312.2003 1"Water Service EA 33 1210 1 $500,00 $500,00_
35 3312.2801 3"Water Meterand Vault EA 33 12 11 1 $10,000.00_� $10,0_00_00
36 3312.3002 6"Gate Valve EA 33 12 20 1 1,200.00 200 00
37 3312.4003 8"x 4"Tapping Sleeve&Valve EA 33 12 25 1
38 _ 3312.4004 8"x 6"Tapping Sleeve&Valve EA 33 12 25 1 $2,30,0.00 $,2,300.00,_
TOTAL UNIT I:WATER IMPROVEMENTS $31,785.00
UNIT II:SANITARY SEWER IMPROVEMENTS
1. 3331.3201 6"Sewer Service EA 1333150 2 $1,0.00.00
2 a3331.4109 6"Sewer Pipe,CSS Backfill LF J33 a lo,33 31 12,3 51 $45.00,._ •$2,295.000
3 3339.1001 4'Manhole JEA 133 39 10,33 39 20 4 $2,000.0...0. .$8,000.00,
5 3301.0101 Manhole Vacuum Testing EA 1330130 4 $250 09, 1 $1,000 00
6 3305.0103 Exploratory Excavation of Existing Utilities IEA 33 05 30 4 $500:00 $2 000 00.
7 3305.0109 Trench Safety ILF 1330510 200 $1.00- .1 .$20_0_.00
8 3305.0114 Manhole Ad Major w/Cover JEA 133 05 14 4 $500.00 1 $2,000.00
9 3305.0116 Concrete Encasement for Utility Pipes CY 33 05 10 25� $125.00 $3,125.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS1 $19,620.00
UNIT III:DRAINAGE IMPROVEMENTS
2 13341.0201 21"RCP,Class III 1334110 1 97 $80 00, $7,760,00
TOTAL UNIT III:DRAINAGE IMPROVEMENTS1 $7,760.00
UNIT IV:PAVING IMPROVEMENTS
1 0241.0401 Remove ConcreteDrive SF 02 41 13 1200 $0.80 $960 00
2 0241.1000 Remove Conc Pvmt SY 02 41 15 240 0,80 192.00
$.___
3 3110.0101 Site Clearing LS 31 1000 1 $500400 $500.00
4 3123.0103 Borrow by Plan CY 31 23 23 20
5 3125.0101 SWPPP >_1 acre LS 31 25 00 2 $1 130.00 $2,260:00
6 3201.0123 6'Wide Asphalt Pvmt Repair,Arterial LF 32 01 17 150 $35.00 $5,250,00
7 3201.0150 Asphalt Pvmt Repair,Sewer Service LF 32 01 17 51 $35,00,. 1,785.00_
8 3201.0151 Asphalt Pvmt Repair,Water Service LF 32 01 17 68 _$30.00 _.� $2,040 00
g 3211.0501 6"Lime Treatment SY 321129 210 $10,000,00•� $10,00000
10 3213.0101 6"ConcPvmt SY 321313 210 $52.00. 30,920.00
. l $1_.__
3213.0301 4"Conc Sidewalk SF 32 13 20 4403 $5.75 _ $25,317,00,
12 3213.0502 Barrier Free Ramp,Type U-1 EA 32 13 20 1 $gt)D 00 $900_00_
13 3213.0506 Barrier Free Ramp,Type P-1 EA 32 1320 3 $900y00, .$2_,70_0.00
14 3216.0101 6"Conc Curb and Gutter LF 32 1613 991 _ $26;88 i_ _$26,638.00
15 3217.0001 4"SLD Pvmt Marking HAS(W) LF 32 17 23 80 $3.00 I $240.00
1,6 3293,0101 Plant 3"Tree EA 32 93 43 28 $575.00. :�: 516„100.00
TOTAL UNIT IV:PAVING IMPROVEMENTS1 $106,102.00
401 HEMPHILL STREET-MULTI-FAMILY
CITYPROJECTNO.
004243
DAP-BID PROPOSAL
Page 2 of2
SECTION 00 4243
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Bid
Description Unit of Measure Unit Price Bid Value
No. Section No. Quantity
UNIT V:STREET LIGHTING IMPROVEMENTS
1 3441.1408 NO 6 Insulated ElceCondr LF 34 41 10 240 $2.20 1 $528.00_
2- 3441,1409 NO 8 Insulated Elec Condr LF 34 41 10 825 2,p0
.$1,65.0.00
g 3441.1502 Ground Box Type B,w/Apron EA 34 41 10 2
4 3441.1771 Furnish/Install 120-240 Volt Single Phase Metered Pe EA 34 41 20 1 `$7 008.60- $7 0,008.6
-_ ___
5 3441.3037 Furnish/Install 10'-14'Washington Standard LightP EA 344120 13 $3,923A0 50,999.00
6 3441.3303 Rdwy Illum Foundation TY 7 EA 344120 13 $1,550.00 ,I ,$20 150.00
7 2605.3015 2"CONDT PVC SCH 80(T) LF 26 05 33 835 _$23.00_ $19,205.00
8 I I I I
45
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS 1 $101,540.60
Bid Summary
UNIT I:WATER IMPROVEMENTS $31,785.00
UNIT II:SANITARY SEWER IMPROVEMENTS $19,620.00
UNIT III:DRAINAGE IMPROVEMENTS $7,760.00
UNIT IV:PAVING IMPROVEMENTS $106,102.00
UNIT V:STREET LIGHTING IMPROVEMENTS $101,540.60
Total Construction Bid $266,807.60
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 180 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
401 HEMPHILLSTREET—MULTI-FAMILY
CITYPROJECTNO.
00 45 12
DAP PREQUALIFICATIONSTATEMEVT
Page I of 1
SECTION 00 4512
DAP—PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s)listed. In the"Major Work
TyTe"box provide the complete major work type and actual description as provided by the Water
Department for water and sewer and TPW for paving.
Major Work Type Contractor/Subcontractor Company Name Prequalification
Expiration Date
Improvement work for the North Texas Contracting,Inc.
Water, Sewer,Drainage and
Paving
Street Lighting Improvements Bean Electric
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
Cadence McShane Construction 13'Y: Cr- g Morris
5057 Keller Springs Road,#500
Addison,Texas 75001
TITLE: Senior VP
DATE: 8.16.19
END OF SECTION
CITY OF FORT WORTH 401 HEMPHILL STREET—MULTI-FAMILY
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT—DEVELOPER AWARDED PROJECTS
Form Version September 1,2015
III
u
men�;,�e���� r
.:�' �ssill a• r�
:s
N
ME
MUMS
,t
i w w�
� a � 0 30 60
Z3
> o�
Q "z I I GRAPHIC SCALE IN FEET
c�
0 I UTILITY LEGEND
oQ
Q d I PROPERTY BOUNDARY
O J Q I w PROPOSED WATERLINE
QI PROPOSED FIRE HYDRANT
m Q I I PROPOSED GATE VALVE
N �1
W I I
x 00
w 00I I
I �
� � I
II
I L1j I
INSTALL: '
(1) — STD FIRE HYD. ASSY
N46
14. 1 J ��
> '
30.Of LF OF 6" W.L.
EXISTING 8" WATER LINE
X-10538-4
8X M 8X3
HEMPHILL STREET INSTALL:
(80' WIDE RIGHT-OF-WAY) -C9 (1) - 8"X6" ANCHOR TEE
ASPHALT PAVEMENT w (1) - 6" GATE VALVE
1, CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT 'A' WATER LINE
550 Bailey Avenue •Suite 400 . Fart Worth,Texas 76107 401 H E M P H I L L STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 1 OF 2
:Lu }
w
pC 3
' I
(J) Z 0 30 60
= �w
2 �aa
o J GRAPHIC SCALE IN FEET
LU
a UTILITY LEGEND
LU m _
Q PROPERTY BOUNDARY
INSTALL: I W PROPOSED WATER LINE
. a
(1) — 1 1/2" CORPORA TION v PROPOSED WATER METER
STOP PROPOSED GATE VALVE
x PROPOSED PLUG
PROPOSED REDUCER
16.1 f LF 1.5" IRRIGA TION LINE
INSTALL:
(1) - 3" DOM. WATER METER
(1) - 5'X8' WATER METER VAUL T
INSTALL:
I INSTALL:
(1) - 4"X3" REDUCER (1) - 6" PLUG
w
_ N 1'41'22"E 370_00' 1 _
32.9f LF 4" DOM. LINE
L
EXISTING 8" WATER LINE
X-10538-4
M„8-X3 -X3
INSTALL:
(1) - 8"X4" TAPPING SLEEVE 37.8t LF 6" FIRE LINE
(1) - 4" GATE VALVE INSTALL:
HEMPHILL STREET (1) - 8"X6" TAPPING SLEEVE
(80' WIDE RIGHT-OF-WAY) (1) — 6" GA TE VAL VE
ASPHALT PAVEMENT
_3
/)�fO7
CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT 'A' WATER LINE
550 Bailey Avenue •Suite 400 . Fart Worth,Texas 76107 401 H E M P H I L L STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 2 OF 2
0 30 60
GRAPHIC SCALE IN FEET
UTILITY LEGEND
PROPERTY BOUNDARY
8°ss PROPOSED SAN.SEWER LINE
PROPOSED SAN.SEWER MANHOLE
n EXISTING SAN.SEWER MANHOLE
EXISTING 10" SANITARY SEWER
(X-00252)
V)
— — co
w
S0°4622"W 390-05'
— - - - - - - - - -
0
EXISTING SSMH
I
— — 15.8f LF 8" PVC PIPE
w INSTALL:
5 }N ;S„ (1) — STD 4' DIA SSMH
z3
LU I INSTALL:
Q I� I (1) — STD 4' DIA SSMH
0 oQ
a
O a
m¢ I or
-
m
v 00
— — — — — — —
w I
,� CITY PROJECT NUMBER 102088
�WDUNAWAy EXHIBIT 'A1' SAN. SEWER
550 Bailey Avenue•Suite 400 -Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 1 OF 2
LIEILI' w 0 30 60
F� Ell GRAPHIC SCALE IN FEET
UTILITY LEGEND
PROPERTY BOUNDARY
a°ss PROPOSED SAN.SEWER LINE
PROPOSED SAN.SEWER MANHOLE
n EXISTING SAN.SEWER MANHOLE
ti
ro
X
M w
J L
LLI
I
ILL
N Ln o z
_ �w
�a
a
DC
00 a;
LU ?
I� w ma'
� a
I �
EXISTING SSMH
W
o`
I N
C6
INSTALL: INSTALL:
(1) — STD 4' DIA SSMH (1) — STD 4' DIA SSMH
Si F
34.81+ LF 8" PVC PIPE
N4378'38"W
14.14' EXISTING 10" SANITARY SEWER
(X-14758 L-248R 12)
i
N1°41'22"E 370.00'
I� X
I
�I
HEMPHILL STREET
(80' WIDE RIGHT-OF-WAY)
ASPHALT PAVEMENT
CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT 'A1' SAN. SEWER
550 Bailey Avenue•Suite 400 .Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 2 OF 2
UTILITY LEGEND
0 40 80
PROPERTY BOUNDARY
• • • • • • • • • SAWCUT LINE
PROPOSED 3,50E PSI ND
CEMENT CONCRETE
CRETE SIDEWALK EWALKW/ 0
GRAPHIC SCALE IN FEET
#3 BARS @ IS"O.C.E.W.
PROPOSED ASPHALTIC PAVEMENT
4391- LF CURB
505E LF FULL-DEPTH SAWCUT
1,852E S F. 6" ASPHALTIC — —
PA VEMENT
W. BROADWAY AVENUE gm
(VARIABLE WIDTH RIGHT-OF-WAY)
ASPHALT PAVEMENT
88 38' _�14.08'
660t S.F. 4" CONC. SIDEWALK
o ° ADJACENT TO CURB
PROPOSED
PROPOSED U-1 D536 TYPE P-1 RAMP
RAMP
N46.41'22"E
14. 14'
I o
1,615E SF 4" CONCRETE p
SIDEWALK
REMOVE EXISTING CURB & 13
3 DRIVE APPROACH. I N
LLu a INSTALL 439E LF CURBING
IZ
I- OM
I
J =a . +W�
aLU
N I I >
J
CL Q a , ID
2 1
w
I >
IEl
1 E,
CITY PROJECT NUMBER 102088
1 DUNAWAY EXHIBIT 'B' PAVING PLAN
550 Bailey Avenue•Suite 400 .Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 1 OF 2
UTILITY LEGEND
0 40 80
PROPERTY BOUNDARY
• • • • • • • • • SAWCUT LINE
PROPOSED 3,50E PSI ND
CEMENT CONCRETE
CRETE SIDEWALK EWALKW/ GRAPHIC SCALE IN FEET
#3 BARS @ IS"O.C.E.W.
PROPOSED ASPHALTIC PAVEMENT
* I I
MATCH LINE
I
N1.41'22"E I > f
w } 370.00' I 0
W 3 f-
pC �w ❑ W
U-) o REMOVF EXISTING CURB & Q
J =a 3 DRIVE APPROACH. >
J d. INSTALL 378E LF CURBING
jr
02a.
En
* I�
� a 2,128 S.F. 4" CONCRETE I,
_ 00 SIDEWALK o
486t LF FULL—DEPTH SAWCUT
727E S F. 6" ASPHALTIC I N
* a PA VEMENT
PROPOSED TYPE P-1 °
RAMP U-)
SD N43.1838"W PROPOSED TYPE P-1 °
. •o - 1 RAMP
E
® W. PETER SMITH STREET
(VARIABLE WIDTH RIGHT-OF-WAY)
-L ASPHALT PAVEMENT
CITY PROJECT NUMBER 102088
1' DUNAWAY EXHIBIT 'B' PAVING PLAN
550 Bailey Avenue•Suite 400 .Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 2 OF 2
1
0 30 60
"""
W
E) GRAPHIC SCALE IN FEET L 3
In c~ o�
UTILITY LEGEND I N
�a
PROPERTY BOUNDARY FZ
w
PROPOSED STORM DRAIN 1�n Ln F�-
PROPOSED CURB INLET ,� J I Q
EXISTING CURB INLET 00 LIJ V J d
I00 w ma
a
Iz
I
I
86.0t LF 21" RCP
I
N414�
CONNECT TO
EX. CURB INLET
N1'41'22"E 370. . CURB INLET
EXISTING STORM DRAIN
(14-18-001-073)
HEMPHILL STREET
(80' WIDE RIGHT-OF-WAY)
ASPHALT PAVEMENT
0
,% CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT 'B1' STORM SEWER
550 Bailey Avenue •Suite 400 . Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 2 OF 2
L U WI 0 30 60
Z 3
wl oZ�
a 4 GRAPHIC SCALE IN FEET
a �Q
a
0 a UTILITY LEGEND
a =
O W N PROPERTY BOUNDARY
m Q PROPOSED STORM DRAIN
coQ PROPOSED CURB INLET
\ F� D EXISTING CURB INLET
Q
v wl
II
I
I I
wl I
I
I
III � I
7.51- LF 21" RCP
�< N46°41'22"E o CONNECT TO 41'22"F .370 nn'
14.14 EX. CURB INLET
EX. CURB INLET
EXISTING STORM DRAIN
(14-18-001-073)
HEMPHILL STREET
(80' WIDE RIGHT-OF-WAY)
ASPHALT PAVEMENT
1, CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT 'B1' STORM SEWER
550 Bailey Avenue •Suite 400 . Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 1 OF 2
UTILITY LEGEND
0 40 80
PROPERTY BOUNDARY
* PROPOSED PEDESTRIAN LIGHT
Q PROPOSED GROUND BOX 0 �?!�
GRAPHIC SCALE IN FEET
------------
W. BROADWAY AVENUE
(VARIABLE WIDTH RIGHT-OF-WAY)
ASPHALT PAVEMENT
�+r
.��N46.41288'1 214.08' EZ
14.14'
I
PROPOSED GROUND BOX
to
W o
• �I I�
^ PROPOSED PED. LIGHT
w 3w (TPICAL 6 PLCS) d'
iz II o
oM I
cn _~ I I
J =Q
J C9 a W
�-
a
� Q 1
_ bw
* I a
I �
I I �
I
® 1 KATCH INE
CITY PROJECT NUMBER 102088
DUNAWAy EXHIBIT T' STREET LIGHTS
550 Bailey Avenue•Suite 400 .Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 1 OF 2
UTILITY LEGEND
0 40 80
PROPERTY BOUNDARY
* PROPOSED PEDESTRIAN LIGHT
❑d PROPOSED SERVICE PEDESTAL
Q PROPOSED GROUND BOX
PROPOSED TRANSFORMER GRAPHIC SCALE IN FEET
(BY OTHERS)
I
M T H LINE
C I
* LU t
w }
^ I � �
11J 3 ❑
o
oc ( W w
� o Q
J =a >
a
J PROPOSED PED. LIGHT
o= (TYPICAL 7 PLCS)
�En o 0
Lu o a o
_ 00 Mo 0
I
* II C141I
PROPOSED
GROUND BOX PROPOSED GROUND
N43'18'38"W MOUNT PEDESTAL
1 ,14' SERWCE °
*
® W. PETER SMITH STREET
(VARIABLE WIDTH RIGHT-OF-WAY)
ASPHALT PAVEMENT
,� CITY PROJECT NUMBER 102088
�'DUNAWAy EXHIBIT T' STREET LIGHTS
550 Bailey Avenue•Suite 400 .Fart Worth,Texas 76107 401 H E M P H I LL STREET
Tel:817.335.1121
(TXREG. F-1114) SHEET 2 OF 2