Developer and Project Information Cover Sheet:
der Company Name:Jennings Apartment Ventures, LLC
Address, State, Zip Code: 7934 Wrenwood Boulevard, Suite A, Baton Rouge, LA 70809
Phone, E-Mail: 225-218-8960;225-235-3140, rob(a�venturesdevelopmentaroup.com
Authorized Signatory/Title: Robert McConnell
Project Name and Brief Description: Jennings Apartments
WATER, WASTEWATER, PAVING, STORM DRAIN & STREET LIGHTS
Project Location: 400 South Jennings Avenue
FS-13-146
Plat Case No.:
Mapsco: Council District: 9
CFA: 2015-052 DOE: 7445
To be com lete ' bv sta
Received by: ; { Date:
Plat Name: ] JENNINGS SOUTH ADDITION
1
•
City Project No: 02561
•
`I L1u��
'�r •)ramc]`�1 •ti4. Liz: ~(tb •
is
j
r'%�:.-a t tl
N � U
COMMUNlfY FACILITIES S AGREEMENT
MENT
TH114, STATE OF TEX S § City Secretary
COUNTY OF
4ta
Contract No. 0// ✓ A
WH IR EAS, the undersigned Developer ("Developer") desires to make certain
specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Jennings Apartments
("Project") within the City of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the
Improvements or Project; and
WHIH R AS9 any future City participation in this CFA is subject to the availability
of City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHE'+ AS9 the Developer and the City desire to enter into this Community
Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the
Proj ect.
NOW, THERFIT+'O ' E, For and in consideration of the covenants and
conditions contained herein, the City and the Developer do hereby agree as follows:
General. Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March
2001, approved by the City Council of the City of Fort Worth, as amended, is
hereby incorporated into this Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder and to cause all
contractors hired by Developer to comply with the Policy in connection with
the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6,
Section II, of the Policy and recognizes that there shall be no reduction in the
collateral until the Project has been completed and the City has officially
accepted the Improvements. Developer acknowledges that the said
acceptance process requires the Developer's contractor(s) to submit an
2
affidavit of bills paid signed by its contractor and consent of surety signed
by its surety to ensure the contractor has paid any sub -contractors and
suppliers in full. Additionally, the contractor must also provide in writing
that the contractor has been paid in full by Developer for all the services
provided under their contract.
C Developer agrees to cause the construction of the Improvements
contemplated by this Agreement and that said construction shall be completed
in a good and workmanlike manner and in accordance with all City standards
and the City -approved construction plans, specifications and cost estimates
provided for the Project and the exhibits attached hereto.
D. The following checked exhibits are made a part hereof: Water (A) X, Sewer
(A-1) X, Paving (B) X, Storm Drain (B-1) X, Street Lights (C) X
E The Developer shall award all contracts for the construction of the
Improvements in accordance with Section II, paragraph 7 of the Policy and the
contracts shall be administered in conformance with paragraph 8, Section II, of
the Policy.
F. For all Improvements included in this Agreement for which the Developer
awards construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed,
said contractor to meet City's requirements for being prequalified, insured,
licensed and bonded to do work in public streets and/or to perform
water/waste water construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance
bond m the names of the City and the Developer for one hundred percent
(100%) of the contract price of the Improvements, and a maintenance bond
m the name of the City for one hundred percent (100%) of the contract price
of the Improvements valid for a period of two (2) years from the date of
final acceptance insuring the maintenance and repair of the constructed
infrastructure during the term of the maintenance bond. All bonds to be
furnished before work is commenced and to meet the requirements of
Chapter 2253, Texas Government Code.
3
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the
amounts required by the City's standard specifications and contract
documents for developer -awarded infrastructure construction contracts.
The City shall be named as additional insured on all insurance required by
said documents and same will be evidenced on the Certificate of Insurance
(ACORD or other state -approved form) supplied by the contractor's
msurance provider and bound in the construction contract book.
iv. To require its contractor to give at least 48 hours' advance notice of intent
to commence construction to the City's Construction Services Division so
that City inspection personnel will be available; to require the contractor to
allow the construction to be subject to inspection at any and all times by
City inspection forces, to not install or relocate any sanitary sewer, storm
drain, or water pipe unless a responsible City inspector is present and gives
his consent to proceed, and to make such laboratory tests of materials being
used as may be required by the City.
v. To require its contractor to have fully executed contract documents
submitted to the City in order to schedule a Pre -Construction Meeting. The
submittal should occur no less than 10 working days prior to the desired
date of the meeting. No construction will commence without a City -issued
Notice to Proceed to the Developer's contractor.
vi. To delay connections of buildmgs to service lines of sewer and water mains
constructed under this Agreement until said sewer and water mains and
service lines have been completed to the satisfaction of the Water
Department.
G. Developer shall provide, at its expense, all engineering drawings and
documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to
serve the development or to construct the Improvements contemplated herein.
I. City shall not be responsible for any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the
community facilities to be mstalled hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the
City harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this Agreement.
K Developer agrees to provide, at its expense, all necessary rights of way and
easements across property owned by Developer and required for the
construction of the current and future improvements provided for by this
Agreement
L The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to any
property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said
Developer, his contractors, subcontractors, officers, agents or employees,
or in consequence of any failure to properly safeguard the work, or on
account of any act, intentional or otherwise, neglect or misconduct of said
DEVELOPER, his contractors, sub -contractors, officers, agents or
employees, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and
hold harmless the City, its officers, agents and employees from and against
any and all claims, suits or causes of action of any nature whatsoever,
whether real or asserted, brought for or on account of any injuries or
damages to persons or property, including death, resulting from, or in any
way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees. Further, Developer will require its
contractors to indemnify, and hold harmless the City for any losses,
damages, costs or expenses suffered by the City or caused as a result of said
5
contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner, free from defects, in conformance with
the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the
Improvements, Developer will assign to the City a non-exclusive right to
enforce the contracts entered into by the Developer with its contractor along
with an assignment of all warranties given by the contractor, whether express or
implied. Further, Developer agrees that all contracts with any contractor shall
include provisions granting to the City the right to enforce such contracts as an
express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and
material testing fees equal to two percent (2%) for a total of 4% of the
developer's share of the total construction cost as stated in the construction
contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to
four percent (4%) and material testing fees equal to two percent (2%) for a
total of 6% of the developer's share of the total construction cost as stated in
the construction contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the
construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years,
provided, however, if construction of the Improvements has started within
the two year period, the developer may request that the CFA be extended
for one additional year.
ii. Nothing contained herein is intended to limit the Developer's
obligations under the Policy, this Agreement, its financial guarantee, its
agreement with its contractor or other related agreements.
iii. The City may utihze the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements
if at the end of two (2) years from the date of this Agreement (and any
extension period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's fmancial guarantee to cause the
completion of the construction of the Improvements or to cause the payment
of costs for construction of same before the expiration of two (2) years if
the Developer breaches this Agreement, becomes insolvent or fails to pay
costs of construction and the financial guarantee is not a Completion
Agreement. If the financial guarantee is a Completion Agreement and the
Developer's contractors and/or suppliers are not paid for the costs of
supplies and/or construction the contractors and/or suppliers may put a lien
upon the property which is the subject of the Completion Agreement
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Project Name: Jennings Apartments
CFA No.: 2015-052
Cost Summary Sheet
DOE No.: 7445
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any
additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E. TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options (Choose one)
Bond = 100%
Completion Agreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Paving/Storm Drain = 125%
Letter of Credit = 125% w/2yr expiration period
Developer's Cost
Amount
$
$
$58,392
$71, 960.00
130, 352.00
183, 214.70
82,712.00
91, 995.60
357, 922.30
488, 274.30
2,607.04
2,607.04
5,214.08
10, 637.07
5,318.53
3,679.82
19,635.42
24, 849.50
488,274.30
488, 274.30
162, 940.00
447, 402.88
610,342.88
Mark choice
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed
in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City
Secretary, with the corporate seal of the City affixed, and said Del,/ loper has executed this
instrument in quadruplicate, at Fort Worth, Texas this / day of fY?fi ) &P1
,20 f%.
1
CITY OF FORT WORTH - Recommended by:
Water Department
•,
ev2A1
Wendy Ch Wabulal, EMBA, P.E.
Development Engineering Manager
1
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. neit‘-
Date:
ATTEST:
any J. Kayser
City Secretary
ATTEST:
nra
Signature
(Print) Name: Diivid W
Transportation & Public Works Department
Douglas W/.)Wiersig, P.E.
Director
Approved by City Manager's Office
7esus1i Ghtph
Assistant Carty Manager
DEVELOPER:
•
Jennings Apartment Ventures, LLC
Avitlitt Cavil
Signature Ve4nrvrperdm.,t 6n', tLc,4, frr
Print Name: Robert
McConnell
Print McConnell
Title: /Nqm49 /, nbtg
9
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be included
as Attachments to this Agreement
Included
L
8
in
z
/1
►1
Attachment
Location Map
Exhibit A: Water Improvements
Water Estimate
Exhibit A-1: Sewer Improvements
Sewer Estimate
Exhibit B: Paving Improvements
Paving Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Estimate
Exhibit C. Street Lights and Signs Improvements
Street Lights and Signs Estimate
(Remainder of Page Intentionally Left Blank)
is St
W Petersrnith 5t
W Tucker -St
NORTH
W TerreAve
W-Vi
N Broa
e a:Ave
'stets
PROJECT SITE I
W`Annie $t
0
E Vicke
E Tuck
p
E Annie St
:E Hattie St
LOCATION MAP
N.T.S.
06/10/2015 226P1
COVER SHEET
JENNINGS APARTMENTS
FORT WORTH SOUTH
UJIU-ZCIiAPS Fcrt Waft
500 Wool 71h WW1 Suits 000
Fat Worth, Tom 7002 4728
Phan (8D) 0354000 Fox 030 335.1025
1
CD/1➢/2016 2:20PM
1
STORM DRAIN
CROSSING
am. lea
•
EXISTING 8"
WATER L! I E
W. BROADWAY AVE.
NEW 8" WATERLINE
\mmi (LOWERING)
NEW 8" GATE VALVE
( '-EXISTING 8"
WATER LINE
1
1
—w—
OFF 111
-w
.aegraemeemaames eras
EXISTING 6"
WATER LINE
•
C
6" FIRE
HYDRANT LEAD
NEW F7RE
HYDRANT
L
6" F7RE SERVICE
6" DOM. SERVICE
w
EXISTING FIRE
HYDRANT
J
EXISTING FIRE
HYDRANT
EXISTING 8"
GATE VALVE
PETER met 2'H s7t Tw_ __
SCALE: 111 = 80'
0 40
-w-
EXHIBIT A
WATER LINE
JENNINGS APARTMENTS
FORT WORTH SOUTH
UU[[FZO[JAPS
80 160 00WW«i711West, a a 0 Worth
Fat Worth, Texas 76102-4728
April 14, 2015 Phone OW) 83543000 Fax MU) ash 1025
1
1
1
1
1
1
1
MONO
O6/19/2O15 220
1
1
---SS
W. BROADWAY AVE.
EXISTING 8"
WASTEWATER LINE
a
NEW i8" PVC
WASTEWATER UNE
s
WNW
1
SS-
1
NEW 4' DIA.
MANHOLE •
W. PETER SMITH ST.
—SS— ss
NORTH
(
NEW 4'1 DIA.
MANHO
NEW 8' SS
SERVICE
NEW 8' SS
SERVICE
I1 r7
f
I
4 DIA.
OLE
vi
EXHIBIT Al
WASTEWATER
JENNINGS APARTMENTS
FORT WORTH SOUTH
11T111^az
1 In
a a Fore Worth
0 40 80 160 s00 West 7tt Street, Silts Sop
Fat Worth, Texas 76102-4728
April 14, 2015 Phone hem S3 •0000 Fax OM3351025
SCALE: 1 " = 80'
1
1
1
INNS
BRONCIJ 06/111/2ofs 221PM k\PRO.) \A»50t\oL_CNIL\EXHIBITS \CFA FXHIBIR\COUR 9 — PAVMCDN
S40Z `176 Iudy
01
or
m
o' r.
II
CO
O
i
1
l'
-_
•
S. JENNINGS AVE.
\. 1
i
•
J
utenarAv 06/12/2015 2:27PM k PRIIAPX.65201 \PM-PPANDQ4»n PPP E714802\ MOW 91 - STOPP:7.0
/
gig! 0 Z
z
1g5E1 * 0 —I x
t2
0 (r)
m
X I
l X >
-0
> 0 11
0) —I
O E
c m
co
z
..,••••••••••••• ••••••• .1.11111 wiemometemetm........ • 1•Na• ••••• weft
HEMPHILL STREET
EXIS77NG 30" RCP
EXISTING
36" RCP
LEGEND
W. BROADWAY AYE.
PULL BOX -
PULL BOX
W. PATER SMITH ST.
CITY OF FORT WORTH STANDARD
DECORATIVE LIGHT POLE
sU SCH 40 PVC PIPE
NORTH
SCALE: 1 " = 80'
0� 40 80 160 Soo Wed 7Ih artist sit. eoo
Fat Wain Taal 76102-4728
April 14, 2015 Phone (so) 985-0000 Fox (e17)8361025
11111••• lane
SCH 40 PVC
SCH 40 PVC
_ga / 4.)
PULL BOX
�s
SCH 40 PVC
l
PULL BOX
1
i
EXHIBIT C
STREET LIGHTS
JENNINGS APARTMENTS
FORT WORTH SOUTH
ITT-ZOLUS
UNIT PRICE BID
Bidlist Item)
No.
1-01
1-02
1-03
1-04
1-05
1 06
1-07
1-08
1-09
1-10
1-11
1-12
1-13
1-14
1-15
0241.1012
0241.1013
0241.1302
0241.1302
0241.1218
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
00 42 43
DAP - BID PROPOSAL
Page 1 of 6
Bidder's Application
Specification Unit of I Bid
Section No. Measure Quantity
UNIT I: WATER IMPROVEMENTS
Remove 6" Water Line
Remove 8" Water Line
Remove 6" Water Valve
Remove 8" Water Valve
4"-12" Water Abandonment Plug
3312.0117
3312.2203
-----------
3312.2801
3311.0061
3311.0161
330_5.0003
3312.0001
3311.0001
3305.0109
3201.0112
Connection to Existing 4"-12" Water Main
2" Water Service
6" Water Meter and Vault
4" PVC Water Pipe
6" PVC Water Pipe
8" Waterline Lowering
Fire Hydrant
Ductile Iron Water Fittings w/ Restraint
Trench Safety
5' Wide Asphalt Pvmt Repair, Residential
02 41 14 _ _ LF _ 60
02 41 14 LF 20
02 41 14 EA 2
341 14 1
02 41 14 EA
33 12 25 _ EA
33 12 10 EA - 1
33 12 11 EA 1
33 11 12 LF 20
33 11 12 LF 70
33 05 12 EA 1
33 12 40 EA 1
33 11 11 TON 0.27
33 05 10 LF 90
32 01 17 LF 90
TOTAL UNIT I: WATER IMPROVEMENTS
C II Y OF FORT WORTH
STANDARD CONSTRUCIION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
Bidder's Proposal
Unit Price
$10.00 _.
$10.00 _
$250.00
$250.00 _
$478.00
_ $796.00
$2,000 00
$11,516.00
$26.00
$29.00
$2,905.00
$3,300.00
$47,925.93
0-50
$185.00
Bid Value
$600.00
$200A0
$500.00
$250.00
$956.00
$3,980.00
$2,000.00
$11,516.00
$520.00
$2,030.00
$2,905.00
$3,300.00
$12,940.00
$45.00
$16,650.00
$58,392.00
00 42 43_Bid Proposal_DAP - CFA Breakout 060215
UNIT PRICE BID
Bidlist Item)
No.
2-01 .0241 2013
2-02 0241.2201
2-03 0241.2103
3331.4115
Remove 8" Sewer Line
Remove 4' Sewer Manhole
8" Sewer Abandonment Plug
8" Sewer Pipe
2-04
2-05 3331.3301 & Sewer Service
2-06 3331.3302 8" 2-way Cleanout
2-07 3339.1001 4' Manhole
2-08
2-09
2 11
2-12
2-13
2-14
Concrete Encase Sewer Pipe
Manhole Vacuum Testing
Trench Safety
Post -CCTV Inspection
Trench Water Stops
6' Wide Asphalt Pvmt Repair, Residential
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description Specification I Unit of
Section No. Measure
UNIT II: SANITARY SEWER IMPROVEMENTS
02 41 14 LF_
02 41 14 EA
02 41 14 EA
33 11 10, 33
31 12, 33 31
20 __
33 31 50 EA
33 31 50 EA
33 39 10, 33
39 20 3 -
03 30 00 CY 3.5
-
33 01 30 EA 3
33 05 10 LF 255
33 01 31 LF 215
0330.0001
3301.0101
_ 3305.0109
3301.0002
3305.0113
3201.0113
00 42 43
DAP - BID PROPOSAL,
Page 2 of 6
Bidder's Application
33 05 15
32 01 17
LF
EA
Bid
Quantity
150
1
1
215
2
2
EA 2
LF 255
TOTAL UNIT 11• SANITARY SEWER IMPROVEMENTS
CITY OF FORT WORTFI
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fonn Version April 2, 2014
Bidder's Proposal
Unit Price I
Bid Value
$11.00 $1,650.00
$478.00 $478.00
$150.00 $150.00
$37.00
$250.00
$661.00
$2,400.00 - _ _-_$175.00
$150.00
$0.50
$1.00
$150.00
_ $200,00
$7,955.00
„$500,00
$1,322.00
$7,200.00
$612.50
$450.00
_$215.00
$300.00_
$51,000.00
$71,960.00
00 42 43 Bid Proposal_DAP - CFA Breakout 060215
UNIT PRICE BID
Bidlist Item)
No,
1
3-01 3341.0205
3-02 3349.0001
3-03 9999.0000
3-04 3305.0109
3-05 3201.0112
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
24" RCP, Class III
4' Storm Junction Box
Connection to Existing Inlet
Trench Safety
5' Wide Asphalt Pvmt Repa
Specification
Section No.
00 42 43
DAP - BID PROPOSAL
Page 3 of 6
Bidder's Application
Unit of I Bid
Measure Quantity
UNIT I11: DRAINAGE IMPROVEMENTS
33 41 10 LF
33 49 10 EA
00 00 00 EA
33 05 10 LF
32 01 17 LF
r, Residential
Bidder's Proposal
Unit Price I
300 $69.00
2 __$4,496.00
1 $1,070.00
300 $0.50
280 $185.00
TOTAL UNIT III: DRAINAGE IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSIRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
Bid Value
$20,700,00
$8,992.00
$1,070.00
$150.00
$51,800,00
$82,712.00
00 42 43_Bid Proposal_DAP - CFA Breakout 060215
UNIT PRICE BID
Bidlist Item)
No.
•
4-01
4-02
4-03
4-04
4-05
4-06
4-07
4-08
4-09
4-10
4-11
4-12
4-14
4-15_
4-16
4-17
0241.0401
0241.0402
0241.1300
0241.0100
3213.0501
3213.0506
9999.0000
3216.0101
0241.1506
3213.0401
3213.0101
3213.0301
3217.0501
3217.0001
3217.0002
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Specification
Section No.
00 42 43
DAP- BID PROPOSAL
Page 4 of 6
Bidder's Application
Unit of I Bid
Measure Quantity
UNIT IV: PAVING IMPROVEMENTS
Remove Concrete Drive
Remove Asphalt Drive
Remove Conc Curb&Gutter
Remove Sidewalk
Barrier Free Ramp, Type R-1
Barrier Free Ramp, Type P-1
Returned Curb Ramp
6" Conc Curb and Gutter
2" Surface Milling
6" Concrete Driveway
6 Conc Pvmt
4" Conc Sidewalk
24" SLD Pvmt Marking HAE (W)
4" SLD Pvmt Marking HAS (W)
4" SLD Pvmt Marking HAS (Y)
Handicap Parking Striping w/ HC
4-18 3471.0001 Traffic Control 34 71 13 MO
4-19 9999.0000 Repair Disturbed Jennings Avenue Bike 00 00 00 LS
and Road Striping
9999.0000
02 41 13 SF
02 41 13 SF
02 41 15 LF
- 02 41 13 SF
32 13 20
32 13 20
00 00 00
EA
EA
700
450
1250
4700
32 16 13 LF 980
02 41 15 SY 1350
32 13 20 SF 1320
32 13 13 SY 500
32 13 20 SF 8330
32 17 23 LF 24
32 17 23 LF 170
32 17 23 LF 100
Symbol 00 00 00 LS 1
Bidder's Proposal
Unit Price
$1.85
$2.74_
$2.00
$1 07
$2,500.00
$2,500.00
$1,000.00
$20_00 .._.
$37,00
$4 85
$46.90
$5.29
$10.00
$10.00
$10.00
$250.00 ,.
3 $5,000.00
1 $500.00
TOTAL MIT IV: PAVING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIITCATIONDOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
Bid Value
$1,295.00
_ $1233,00
$2,500.00
$5,029.00
_ $2,500.00
$7,500.00
$1,000.00
$19,600_00
$49,950.00
$6,402.00
$23,450.00
$44,065.70
$240.00
$1,700.00
$1,000.00
$250.00
$15,000.00
$500.00
$183,214.70
00 42 43 Bid Proposal_DAP - CFA Breakout 060215
UNIT PRICE BID
Bidlist Item)
No.
5-01
5-02
5-03
5-04
505
5-06
5-07
5-08
5-09
5-11
5-12
2605.0111
2605.2101
2605.3001
2605.3011
3441.1407
3441.1409
3441.1410
3441.3110
9999.0000
9999.0000
9999.0000
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Specification
Section No.
00 42 43
DAP - BID PROPOSAL
Page 5 of 6
Bidder's Application
Unit of I Bid
Measure Quantity
UNIT V: STREET LIGHTING IMPROVEMENTS
Furnish/Install Elec Sery Pedestal
Conduit Box
1 1/4' CONDT PVC SCH 80 (T)
2" CONDT PVC SCH 40 (T)
NO 4 Insulated Elec Condr
NO 8 Insulated Elec Condr
NO 10 Insulated Elec Condr
Install Lighting Fixture
Install Light Pole
Installing Light Pole Base
Light Pole Bases
26 05 00 EA 2
26 05 33 EA 4
26 05 33 LF 746
26 05 33 LF 544
34 41 10 LF 80
34 41 10 LF 5120
34 41 10 LF 5120
-
34 41 20 EA 23
00 00 00 EA 23
00 00 00 EA 23
00 00 00 EA 23
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
Bidder's Proposal
Unit Price
$5,830.00
$ 940.00
$6.30
$6.90
$1.03
$0.53
$0.41 _
$102.00
$102.00
$800.00
$1,745.00
I
Bid Value
$11,660.00
$3,760.00
$4,699.80
$3,753.60
$82 40
$2,713.60
$2,099_20
$2,346.00
$2,346.00
$18,400.00
$40,135.00
$91,995.60
00 42 43_Bid Proposal DAP - CFA Breakout 060215
UNIT PRICE BID
Bidlist Item)
No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Specification
Section No
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
00 42 43
DAP - BID PROPOSAL
Page 6 of 6
Bidder's Application
Unit of I Bid
Measure Quantity
Total Construction Bidl
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCT ION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
Bidder's Proposal
Unit Price I
Bid Value
$58,392.00
$71,960.00
$82,712.00
$183,214.70
$91,995.60
$488,274.30
49d -- `-=calendar days after the date when the
00 42 43_Bid Proposal_DAP - CFA Breakout 060215