Loading...
HomeMy WebLinkAboutContract 47321 (2)DEC --9 ? !t CITY OF FORT WORT 14 orris " r Nv. Developer Company Name: Hillwood Alliance Services, LLC :sr\ D CITY SECRET CONTRACT NO. eveloper and Project Information Cover Sheet: Address, State, Zip Code: 13 600 Heritage Pkwy Ste. 200 Phone: 817-224-6000 E-Mail: Russell.laughlin@hillwood.com Authorized Signatory/Title: Russell Laughlin / Senior Vice President, Properties Division 732 Project Name and Brief Description: Alliance Town Center -Feather Grass Lane & General Worth Dr. Project Location: Intersection of General Worth Drive and North Riverside Dr. Plat Case No.: FP-15-011 /FP-15-013 Plat Name: Alliance Town Center/General Worth Dr. Mapsco: 21Y CFA: 2015-063 To be completed}jstaff.• Received by: Council District: 4 DOE: 7475 City Project No : 02588 Date: /eine 1 • • • OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. LJ'7&OLII WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Alliance Town Center Feather Grass Ln & General Worth Dr. ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said 2 acceptance process requires the Developer's contractor(s) to submit an affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. b. The following checked exhibits are made a part hereof: Water (A) Sevve Paving (B) X- Stoirrn Drain (13-1) X : Street Lights & Signs {C) X E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Pohcy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, hcensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name: Alliance Town Center Feather Grass Ln & General Worth Dr CFA No.: 2015-063 DOE No.: 7475 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer TPW Construction Cost Total Developer's Cost Z24,424;50 2a4 $44.00- 202,35&bo 1,211,618.50 Total Construction Cost (excluding the fees): $ 1,211,618.50 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ D. Water/Sewer Material Testing Fee (2%) $ Sub -Total for Water Construction Fees $ E TPW Inspection Fee (4%) $ 40,370.74 F. TPW Material Testing (2%) $ 20,185.37 G. Street Light Inspsection Cost $ 8,094.00 H. Street Signs Installation Cost S -$ MOO, Sub -Total for TPW Construction Fees $ 69,630.11 Total Construction Fees: $ Financial Guarantee Options (Choose one) 'Bond = 100% 'Completion Agreement = 100% / Holds Plat 'Cash Escrow Water/Sanitary Sewer= 125% 'Cash Escrow Paving/Storm Drain = 125% 'Letter of Credit = 125% w/2yr expiration period 69,630.11 Amount Mark choke I $ 1,211,618.50 1,211,618.50 1,514,523.13 1,514,523.13 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this • � instrument in quadruplicate, at Fort Worth, Texas this I ) day of oeaenther r � ,20- CITY OF FORT WORTH - Recommended by: Water Department Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. /(l ie Date: A E • (.„ Mary J. Kayser City Secretary ATTEST: Gtooncico cta • Transportation & Public Works Department Ci Douglas Wiersig, P.E. Director Approved by City Manager's Office Jesus J Chapa Assistant City Manager DEVELOPER: Hillwood Alliance Services, LLC a Texas limited liability company Print Name: L. Russell Laughlin Title: Vice President — Land Development 9 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 'HI P E l ' I LAND a>I! eaon:'D0. In 11a ITEM NO. 3110.0101 SiteClearin- 3123.0103 Borrow byl;j 3123.0101 UnclassifieC- 3125.0101 SRPPP21"- 3213.0103 8"Cone 3211.0502 8"Lime To 3211.0400 Hydrated Li 3212.0503 '6" Asphalt 1 3211.0400 Hydrated 3213.0301 4"Cone Si 3213.0506 (Barrier Fr.. 3292.0400 !Seam 11 3 9999.0001 lCcm i uct Co 9999.0002 IConnect to 9999.0003 Traffic Con( 9999A004 4" CONDT- 9999.000�0 9999.0006 16" COND' J 3217.1002 tme Le enr 3217.1004 3217.0202 3217.0101 3217.0501 3217.0001 3217.0004 3217.0003 3441.4006 3441.4007 9999.0007 3341.0201 3342.0208 3341.0302 3341.0305 3341.0309 3341.0402 3341.0409 3341.1201 3349.0001 3349.0002 3349.0003 9999.0008 9999.0009 3349.5001 3137.0102 3137.0102 3292.0400 3349.5002 241.4401 3349.7001 3305.0109 Lane Legen7 8° SLD Pert- " SLD Pew 24" SLD Pv= 4" SLD Pen- `‘, 4" BRK Pn= 4" BRKPv[L Install Alum= Alum- End ofRoac= 21" RCP. Ce- 27" RCP, err 30" RCP. C.= 33"RCP. C#. 36"RCP,CK 42" RCP. C1= 48"RCPcCh 5x3 Box Cd" 4' Stmm Jun 5' Storm Jun 6' Stotm J STD 42 RC TxDOT Std.' 10' Curb Lnlf Large Stone' Large Stone' Seedin ,, R' 15'CurbW Remove H 4' Drop Inlet Trench Saf 26053015 2" CONDT'. 3441.1502 Ground Box 34413003 RdwyNum. 9999.0010 Rdwylllum, 3441.3201 (LED Ugh AMADOR DR SITE- • �..1111111111111111111111111111111111 II jr..., GOLDEN TRIANGLE BLVD w0 o✓ co 0 w z mw w CO 0 Z p� HERITA:3E Z.../TRACE P \1/40w cc W J LL ' NORTH TARRANT \PARKWAY II II 11111111111111 N BEACH ST BASS:NOOD BLVD I NORTH NOT TO SCALE ALLIANCE TOWN CENTER FEATHER GRASS LN & GENERAL WORTH DR DATE:JULY 2015 VYLJuJMIOJfu61YLWYWSYULJW'WduuSlwoJYtll4mWYPmedBo„dmowmmuul' d�uvu'r'u�uoWun��al�e r„nmw�r�ii%�Wmi How Ail Lill ficidivi lid Hall mill Hiram, OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 PHONE: 817-562-3350 ENGINEER: P E LOTO N II"' LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 uwiuuwm�uauu�amdui�wmuiauimtli�iu��m�����auuii iiu ����md�d ��m�e��mi i wnomwii nor iiiwo,o��W�aiwddal�,iWWidi w��o��u�u ��luu���an �wiauo���WW��iuu'�o�xMw�el�a��ne.��,aasrau���iuv 37' B-B / 72' ROW 61' B-B / 72' ROW Illll I IIII I I I i iui 111 i I1O1 4' 37' B-B / 72' ROW--40-‘1 H, 1 w NIL hill GENERAL WORTH DRIVE LEGEND PROPOSED CONCRETE PAVEMENT SIDEWALK BY DEVELOPER H.C. RAMPS BY DEVELOPER EXHIBIT B - PAVING CL 0 z ALLIANCE TOWN CENTER FEATHER GRASS LN & GENERAL WORTH DR GRAPHIC SCALE DATE:JULY 20 5 h II Hu.1 ,0 tl 1111,hdllllil I 1111111h iiyl4111141111114u'of IIl!hlp4WYY4 YIIIY�IIUYY4Jm��i��Yll1III'l lJaiYW�inWI;mWYAul4I�WrdOwW,�rawnlY 111 �^ u,u��niiiJin i6114IIII Jm6ia WiYllLu1W WiY J,Itl16f1WWUYJllnllil,OW,W&10d,,,1 Nnn�Il�Wuv4'J JYLJu uWil'�uiiii iWIIDUWu3�u0W10 OWNER / DEVELOPER& HILLWOOD ALLIANCE SERVICES, L.P. ENGINEER& 1i!11 PELOTON 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 I`II LAND SOLUTIONi 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 EX 30" RC 18" RCP T a nisousgernma 0 EX 24" RCP l EX 21" RC 21" RCP 18" RCP \-42" RCP 30" RCP LEGEND EX 27" RCP 21" RCP 27" RCP 42" RCP 18" RCP GENERAL WORTH DRNE m x 21" RCP 33" RCP P ROPOSED STORM DRAIN INLET EXIST STORM DRAIN INLET P ROPOSED STORM DRAIN MANHOLE P ROPOSED STORM DRAIN HEADWALL EXHIBIT B1- STORM DRAINAGE 18" RCP 48" RCP 36" RCP 42" RCP 5'x3' RCB ALLIANCE TOWN CENTER FEATHER GRASS LN & GENERAL WORTH DR GRAPHIC SCALE DATE: JULY. 2015 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 ENGINEER' li!II P E LOTO N h LAND SOLUTION/ 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 00 2O O GENERAL WORTH DRIVE • 0 LEGEND PROPOSED STREET LIGHTS EXIST STREET LIGHTS EXHIBIT C - STREET LIGHTS 0 NORTH 300' rL - Idh ai.l I I, Ii, le„ i..I. Jlnhid: I ui ALLIANCE TOWN CENTER FEATHER GRASS LN & GENERAL WORTH DR GRAPHIC SCALE DATE: JULY,y 2015 lahliaiiiiiiffidahhII itli iffithiluidikiidihikui II,Io'Wlllluuulhi micakialliWIIIIWWYWitl1AW :11 ill11111111'Il1,J 1111 1,II'aili�W��WYJWYII'IIIY IdJUYY�I OWNER / DEVELOPER° HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 auliu IiWm ii u�euaDm�,�n�l i IIIIII I IlIIn1i'ollul ,,.wn i uai ui1�il�a1 nuwiiw�u uo�„�a,,.�u�uuno-��,uWl WASSUil ENGINEER• UII PELOTON I'I I LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 .mr1r1uu,thd�I�L Wi i i ne wi rl uu�lw�el eli li. t GENERAL WORTH DRIVE LEGEND PROPOSED STREET NAME SIGNS EXIST STREET NAME SIGNS EXHIBIT C1- STREET NAME SIGNS t0 0 w ALLIANCE TOWN CENTER FEATHER GRASS LN & GENERAL WORTH DR GRAPHIC SCALE DATE:JULY 2015 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 ENGINEER: li!11 P E LOTO N I�I I LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350