Loading...
HomeMy WebLinkAboutContract 46382 (2)CITYSECP&TAY,CONTRACTwo. � 3rz_- Developer and Project Information Cover Sheet: Developer Company Name: FIRST TEXAS HOME, INC. Address, State, Zip Code: 500 CRESCENT COURT, STE. 350, DALLAS, TX, 75201 Phone, E-Mail: 214.613.3400, KHARDESTY@FIRSTTEXASHOMES.COM Authorized Signatory/Title: KEITH HARDESTY Project Name and Brief Description: PRESIDIO WEST PHASE V WATER, SEWER, PAVING, STORM DRAIN, STREET LIGHTS& SIGNS TO SERVE PRESIDIO WEST PHASE V Project Location: SALVIA DRIVE & WHITE BEAR TRAIL Plat Case No.: FP-014-041 Mapsco: 20V Council District: 7 CFA: 2014-078 DOE: 7299 To be compl ted by staf Received by:/ /�����/ Date: Plat Name: PRESIDIO WEST PHASE V City Project No: 02368 OFFICIAL RECORD MY SECRETARY �\ ;"T. WORTH, COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ( `Improvements") related to a project generally described as PRESIDIO WEST PHASE V ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Proj ect. NOW, THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that the said acceptance process requires the Developer's contractor(s) to submit an 2 affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub -contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City - approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X Sewer (A-1) X, Paving (B) X, Storm Drain (B-1) X, Street Lights & Signs (C) X E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. 3 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether• or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said 5 contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Cost Summary Sheet Project Name* PRESIDIO WEST PHASE V CFA No.: 2014-078 DOE No.: 7299 An Engineer's Estimate of Probable Cost is acceptable However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options (Choose one) Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period $ 1,126,695.43 Amount �$ 7,343.26 7,343.26 14,686.52 28,302.90 14,151.45 2,078.39 1,225.00 45,757.74 60,444.26 Mark choice 1,126,695.43 1,126,695.43 X 458,954.00 949,415.29 1,408,369.29 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has execut d this instrument in 1qdruplicate, at Fort Worth, Texas this �91)--*---- day of ���9 20 CITY OF FORT WORTH - Recommended by: Water Department (./3eal s 6Z4ALE Wendy Chi- abulal, EMBA, P.E. Development Engineering Manager Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. ,(A. Date: ATTEST: Mary'J. Kayse City Secretary ATTEST: Signature (Print) Name: La ad Q. SJcL Transportation & Public Works Department Doug14 W. Wiersig, P.E. Director Approved by City Manager's Office c'teafrAssia./ Fernando Costa Assistant City Manager DEVELOPER: l.� v Signature Print Name: KEITH HARDESTY Title: DFW DIVISION PRESIDENT tC '! '! IS )) :1, i•k;:1 ' iJ 1li� it) '1! )1l�\ 1, i1I1r, 51 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Location Map Exhibit A: Water Improvements Water Estimate Exhibit A-1: Sewer Improvements Sewer Estimate Exhibit B: Paving Improvements Paving Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Estimate /1 El AL r El S ►1 (Remainder of Page Intentionally Left Blank) I:\SLO\WFXK3905\700 CA0D\728 Exhibits\CFA\CFA.dwg, 8/20/2014 8:55 AM, Liner, Michelle 31VOS 01 10N 0 BN & SF RR oa FM 1 . BL ! _ ND R 0 TURE NORTH RIVERSIDE DRIVE OLD DE T OLD_ DEN TON RD 0 0 0 0 H I:\SLD\WFXK3905\700 CADD\728 Exhibits\CFA\CFA.dwg, 1/15/2015 2:16 PM, Miller, Scott EX. 8" WL PRESIDItl WEST PHASE III LEGEND PROPOSED WATER LINE PROPOSED GATE VALVE PROPOSED FIRE HYDRANT CONNECT TO EXISTING 0 5 22 F 23 2a 25 26 \ c\ �\\ �\ ( \ I0 W PR SI D EST PHASE IV + EXISTING WATER LINE — — — — EXISTING GATE VALVE — M — EXISTING FIRE HYDRANT — -- — LIMITS OF PROJECT PRES1610 WEST PHASE IV FUTURE PHASE 13. cf 12" W-1 CONNECT TO EXISTING LOT 15 BLOCK 2 PRIVATE OPEN SPACE & DRAINAGE EASEMENT 12"�.- SCALE:1" = 250' WATER EXHIBIT 'A' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 0J I:\SLD\WFXK3905\700 CADD\728 Exhibits\CFA\CFA.dwg, EX. 6 SS PRESIDIO WEST / PHASE III CONNECT TO EXISTING O 6 5 4 3 ----- SS-6 -, N UULtN 5 SINttI 17 18 -1 r 15 i6 2 7 19 20 • 22 23 2 25 14 13 26 O \\ PR SI 10 WEST PHASE IV \ \ LEGEND PROPOSED SANITARY SEWER PROPOSED MANHOLE EXISTING SANITARY SEWER EXISTING MANHOLE LIMITS OF PROJECT \ 2 12 17 1 /9 28 29 30 31 PROPOSED SEWER LINES ARE 8" UNLESS OTHERWISE INDICATED 20 32 0 33 Nd 22 18 23 19 24 20 25 21 26 22 23 24 25 SS-7 END & PLUG 26 2 27 28 028 PRESIDIO WEST PHASE IV \ \\ FUTURE PHASE 4 SS-1 3 2 SCALE:1" = 250' LOT 1X BLOCK 2 PRIVATE OPEN SPACE t DRAINAGE EASEMENT WASTEWATER EXHIBIT 'A-1' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 t u c J m uo v 0 N m 0 co 0 0 0 0 0 0 M 0 0 -J N 0 3RESIDIO WEST i PHASE III PR SI ID 0 WEST PHASE IV LEGEND PROPOSED 29'B/B ROADWAY/50'ROW PROPOSED 37'B/B ROADWAY/60'ROW PROPOSED 4'SIDEWALK (BY HOMEBUILDER) PROPOSED 4'SIDEWALK (BY DEVEOPER) PROPOSED ADA RAMPS (BY DEVELOPER) O EST PHASE IV FUTURE PHASE LOT I BLOCK 2 PRIVATE OPEN SPACE & DRAINAGE EASEMENT SCALE:1" = 250' PAVING EXHIBIT 'B' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 LIMITS OF PROJECT 0 I:\SLD\WFXK3905\700 CADD\728 Exhibits\CFA\CFA.dwg, 12/11/2014 1:01 PM, Santoscoy, C EX. 36' PRESIDIO WEST / PHASE III 9 8 0 7 6 5 4 E1DDLENECK STREET 2 17 16 r-- i 15 16 1 19 14 20 PR SI 10 WES PHASE IV LEGEND PROPOSED STORM DRAIN LINE PROPOSED INLET PROPOSED MANHOLE EXISTING STORM DRAIN LINE LIMITS OF PROJECT -� FUTURE PHASE ,c;;p�(\NG SCALE:1" = 250' LOT 1% BLOCK 2 PRNATE OPEN SPACE & DRAINAGE EASEMEM 3-9 X4' MSC 3-9 X4 MBC STORM DRAIN EXHIBIT 'B-1' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3905\700 CADD\728 Exhibits\CFA\CFA.dwg, 8/20/2014 8:57 AM, Liner, Mic `PRESIDI0 WEST PHASE III 9 17 8 7 O 6 5 4 FlDDLENECK STREET 18 —Mr1 15 9 1 I 114 PR SI 10 WEST PHASE IV LEGEND PROPOSED SINGLE STREET LIGHT .-ill EXISTING SINGLE STREET LIGHT LIMITS OF PROJECT 3 2 16 FUTURE PHASE t0T IX mac 2 PRIVATE OPEN WAGE & DRAINAGE EASEMENT SCALE:1" = 250' 0 STREET LIGHTS EXHIBIT'C' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 I:\SLD\WFXK3905\700 CADD\728 Exhibits\CFA\CFA.dwg, 8/20/2014 8:58 AM, Liner, Michelle 9 17 PRESIDIO WEST j PHASE 111 8 7 0 6 5 4 FIDOLENECK STREET 18 Al IA 15 1 4—_ 19 20 • 22 23 24 14 13 3 16 17 12 1 20 11 10 9 25 \ \ �n 26 O 7 \ OG \ 27 PR SI ID 0 WEST PHASE IV \ 28 29 LEGEND PROPOSED STREET SIGN • PROPOSED STREET SIGN LIMITS OF PROJECT Op 30 20 18 19 21 21 22 22 � 23 0 23 24 25 26 \ 4 27 31 32 33 E 24 25 26 \ \ 27 #28 PRES1L10 EST PHASE IV FUTURE PHASE As / 4 © 5� 32 / •7 \ets 3 2 LOT 1X BLOCK 2 PRIVATE OPEN SPACE ! DRAINAGE EASEMENT SCALE:1" = 250' • • STREET SIGNS EXHIBIT 'C-1' PRESIDIO WEST PHASE V JACOBS 777 MAIN STREET FORT WORTH, TX 76102 PHONE 817-735-6000 Bidlist Item No. WATER ONSITE 3305.0109 3311.0241 3311.0441 3312.0001 3312.0117 3312.2003 3312.3003 3312.3005 3311.0001 Project Item Information Description Trench Safety for Water 8" Water Pipe 12" Water Pipe Fire Hydrant (inc 6" Gate Valve) Connection to Existing 4"-12" Water 1" Water Service 8" Gate Valve 12" Gate Valve Ductile Iron Water Fittings w/ Restraint WATER OFFSITE 3305.0109 Trench Safety for Water 3311.0441 12" Water Pipe 3312.0001 Fire Hydrant (inc 6" Gate Valve) 3312.3005 12" Gate Valve t CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Unit of Measure LF LF LF EA EA EA LF EA TN LF LF EA EA Specification Section BID QTY Bid No. PG.4 Quantity 330510 331110,331112 33 11 10, 33 11 12 33 12 40 33 12 25 33 12 10 3312 20 33 12 20 33 11 11 Bidder's Proposal Unit Price 3008 3008 $0.10 2711 2711 $17.20 297 297 $37.00 4 4 $3,175.00 5 5 $650.00 75 75 $690.00 6 6 $1,200.00 1 1 $2,200.00 2.1 2.1 $6,100.00 TOTAL WATER ONSITE IMPROVEMENTS BID 33 05 10 331110,331112 33 12 40 3312 20 1108 1108 $0.10 1108 1108 $37.00 1 1 $3,175.00 2 2 $2,200.00 TOTAL WATER OFFSITE IMPROVEMENTS BID TOTAL WATER IMPROVEMENT BID Bid Value $300.80 $46,629.20 $10,989.00 $12,700.00 $3,250.00 $51,750.00 $7,200.00 $2,200.00 $12,810.00 $147,829.00 $110.80 $40,996.00 $3,175.00 $4,400.00 $48,681.80 $196,510.80 Bidlist Item No. Description SANITARY SEWER ONSITE 1 'SANITARY SEWER OFFSITE I 3301.0002 Post -CCTV Inspection LF 33 01 31 1094 1094 $1.40 $1,531.60 3301.0101 Manhole Vacuum Testing EA 33 01 30 5 5 $100.00 $500.00 3305.0109 Trench Safety LF 33 05 10 1094 1094 $1.00 $1,094.001 3305.0113 Trench Water Stops EA 33 05 15 1 1 $250.00 $250.001 3331.4115 8" Sewer Pipe LF 33 11 10, 33 31 12. 33 31 20 1072 1072 $25.40 $27,228.801 3331.4115 8" Sewer Pipe CSS Backfill LF 34 11 10, 33 31 12, 33 31 20 22 22 $36.00 $792.00 3339.1001 4' Manhole EA 33 39 10, 33 39 20 5 5 $2,340.00 $11,700.00 I 3339.1003 4' Extra Depth Manhole VF 33 39 10. 33 39 20 7.1 7.1 $100.00 $710.00 3305.0116 Concrete Encasement for Utility Pipes LF 33 05 10 22 I 22 $60.00 $1,320.00 TOTAL SANITARY SEWER OFFSITE BID $45,126.40 Project Item Infomtation Bidder's Proposal Unit of Measure Specification Section No. BID QTY PG.6 BID QTY PG.7 BID QTY Bid Quantity PG.8 Unit Price Bid Value 3301.0002 3301.0101 3305.0109 3305.0113 3331.3101 3331.4115 3331.4115 3339.1001 3339.1003 3305.0116 9999.0002 9999.0003 3339.0001 Post -CCTV Inspection Manhole Vacuum Testing Trench Safety Trench Water Stops 4" Sewer Service (SDR-26) 8" Sewer Pipe 8" Sewer Pipe CSS Backfill 4' Manhole 4' Extra Depth Manhole Concrete Encasement for Utility Pipes 4" Sewer Service (SDR-26 MOD) Connect to Existing Sanitary Sewer Epoxy Manhole Liner CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 LF EA LF EA EA LF LF EA VF LF EA EA EA 33 01 31 33 01 30 33 05 10 33 05 15 33 31 50 33 11 10, 33 31 12, 33 31 20 34 11 10, 33 31 12. 33 31 20 33 39 10, 33 39 20 33 39 10, 33 39 20 33 05 10 33 31 50 00 00 00 33 39 60 20 660 1508 2188 $1.40 $3,063.20 7 7 $100.00 $700.00 20 660 1508 2188 $1.00 $2,188.00 1 1 $250.00 $250.00 38 38 $590.00 $22.420.00 20 638 1464 2122 $25.40 $53,898.80 22 44 66 $36.00 $2,376.00 7 7 $2,340.00 $16,380.00 9.9 4.4 14.3 $100.00 $1,430.00 22 22 $60.00 $1,320.00 32 32 $550.00 $17,600.00 4 4 $500.00 $2,000.00 1 1 $1,900.00 $1,900.00 TOTAL SANITARY SEWER ONSITE BID $125,526.00 TOTAL SANITARY SEWER BIDI $170,652.401 Bidlist Item No. PAVING 0241.1300 3137.0104 9999.0005 9999.0006 3211.0501 3211.0502 3213.0101 3214.0102 3213.0301 3213.0501 3471.0001 9999.0007 9999.0008 9999.0009 9999.0010 Project Item Information Bidder's Proposal Description Remove Concrete Curb & Gutter 6" Dry Rock Riprap Hydrated Lime Ca 321bs/SY Hydrated Lime (a 421bs/SY 6" Lime Treatment 8" Lime Treatment 6" Conc Pvmt, 3,600 psi (&. 28 days 7" Conc Pvmt, 3,600 psi 28 days 4" Conc Sidewalk Barrier Free Ramp, Type R-1 Traffic Control Remove EOR Barricade Install Standard EOR Barricade Pavement Header Relocate Existing Barricade CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Unit of Measure Specification Bid Quantity Unit Price Section No. LF 02 41 15 SY 31 37 00 TON 00 00 00 TON 00 00 00 SY 32 11 29 SY 32 11 29 SY 321313 SY 331313 SF 32 13 20 EA 32 13 20 MO 34 71 13 EA 00 00 00 EA 00 00 00 LF 00 00 00 SY 00 00 00 Bid Value 146 $10.00 $1,460.00 62 $100.00 $6,200.00 137 $148.50 $20,344.50 85 $148.50 $12,622.50 8524 $2.50 $21,310.00 4040 $2.60 $10,504.00 7974 $31.30 $249,586.201 3832 $32.65 $125,114.80 1840 $3.90 $7,176.00 8 $1,750.00 $14,000.00 1 $1,500.00 $1,500.00 3 $750.00 $2,250.00 1 $1,500.00 $1,500.00 112 $8.00 $896.00 3 $1,500.00 $4,500.00I TOTAL PAVING BID $478,964.001 Project Item Information Bidder's Proposal Bidlist Item No. Description Unit of Specification Section Bid Measure No. Quantity Unit Price Bid Value STORM DRAIN 3305.0109 Trench Safety LF 33 05 10 815 $0.50 $407.50 241.4201 Remove Existing Drop Inlet EA 02 41 14 2 $900.00 $1,800.00 3137.0104 6" Dry Rock Riprap SY 31 37 00 265 $50.00 $13,250.00 3341.0201 21" RCP, Class III LF 33 41 10 168 $40.00 $6,720.00 3341.0205 24" RCP, Class III LF 33 41 10 224 $44.00 $9,856.00 3341.0208 27" RCP, Class III LF 33 41 10 233 $51.00 $11.883.00 3341.0302 30" RCP. Class III LF 33 41 10 107 $56.00 $5,992.00 3341.1601 3-9' x 4' Box Culvert LF 33 41 10 83 $1,100.00 $91,300.00 3349.5001 10' Curb Inlet EA 33 49 20 3 $3,200.00 $9,600.00 3349.5002 15' Curb Inlet EA 33 49 20 4 $3,950.00 $15,800.00 9999.0011 10' Curb Inlet - Inlet Too Only EA 00 00 00 1 $2.400.00 $2,400.00 9999.0012 Temporary Swale Grading EA 00 00 00 1 $3,900.00 $3,900.00 9999.0013 3-9' x 4' TXDOT PW Headwall EA 33 49 40 2 $26,000.00 $52,000.00 9999.0014 Connect to Existing Storm Sewer EA 00 00 00 4 $250.00 $1,000.00 9999.0015 3' x 3' Drop Inlet EA 00 00 00 1 $2,700.00 $2,700.00 TOTAL STORM DRAIN BID $228,608.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Bidlist Item No. Project Item Information Bidders Proposal Description Unit of Specification Measure Section No. Bid Quantity Unit Price Bid Value STREET LIGHTS 2605.3001 1 1/4" CONDT PVC SCH 80 (T) LF 26 05 33 1375 $7.07 $9,721.25 3441.1502 Ground Box Tvoe B. w/ADron EA 34 41 10 2 $648.00 $1,296.00 3441.3301 Rdwv Illum Foundation TY 4 EA 35 41 20 14 $1,042.00 $14,588.00 9999.0016 2-#6, #10CU Aluminum Wire Gage LF 00 00 00 1375 $2.02 $2,777.50 9999.0017 ATB-90W-TYP2-NW LED Luminaire EA 00 00 00 14 $496.64 $6,952.96 9999.0018 Street Light Pole - Type D25-6, Galvanized EA 00 00 00 14 $1,187.43 $16,624.02 TOTAL STREET LIGHTS BID $51,959.73 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120