HomeMy WebLinkAboutContract 46465-A1 (2)7
i
. •
Oct
6)//),-ot % /40
o DPI'
oeL'yak
cRee
•
CITY
CONTRACT MO r
AMENDMENT No0i
TO CITY SgCRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Hazen and
Sawyer, P.C.,(ENGINEER) made and entered into City Secretary
Contract No. 46465, (the CONTRACT) which was authorized by
M&C C-27183 on the 2n' day of February,
$196,485.00; and
2015 in Lhe amount of
WHEREAS, the CONTRACT involves engineering services for
the following project:
Sanitary Sewer Rehabilitation, Contract 90; and
WHE RIEA@ , it has become necessary to execute Amendment
No . 1 to the CONTRACT to include an increased scope of work and
revised fee.
NOW TUEIIEFOIIE , CITY and ENGINEER, acting herein by and
through Lheir duly authorized representatives, enter inLo the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
September Z,i%, 2015, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $38,914.00.
2.
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services per Corrned under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $235 , 399 . 00
3.
Ali other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page His--
EXECUTF;D and WaiflCTiVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth
Jesus J. Chapa
Assistant City Manager
DATE: 9, r.,)45---*
APPROVAL RE C OM E ND E D :
ENGINEER
Hazen and Sawyer, P.C.
Chamindra Dassanay'akW
Vice President
DATE:
Andrew T. Cronberg, .E.
Assistant Director, ater Department
APPROVED AS TO FORM AND i ,;GA fTY :
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
ary dJ
City Secretary
tQ
0
0
d
-0
0
tit- o
ck
0
f,
C
0
t 1'
M&C : N/A
Date: N/A
t
PhD, P.X.
OFFICIAL RECORD
CITY SECRETARY
Ft WORTH, TX
Page �2
C.
Hazen
September 21, 2015
Walter Norwood. PE
Project Manager
Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
Hazen and Sawyer
500 W. 7th Street, Suite 702 o Fort Worth, TX 76102
Re: Sanitary Sewer Rehabilitation, Contract 90 - Amendment No. 1
City Project No. 02382
Dear Walter:
As requested, we have prepared a scope of services for Amendment No. 1 for Sanitary Sewer
Rehabilitation Contract 90. The scope of services and corresponding fees are as follows:.
Description I Unit Qty
Services for Segments Not In Original Scope
Design for L2317, M 265 extension, & L 3854 768
extension,(Design already submitted for these segments)
Survey for L2317 (back of lots) , M 265 extension, L 3854
extension, -- (Survey has already been completed and design 768
submitted)
Prepare Temporary Right of Entry Letters for delivery to 187
COFW
Permit Exhibit Preparation and Coordination with
TOOT (3), & UPRR (1)' for L 8263, and M 187 for design
Additional MWBE Reports (Schedule extended 25 months)
Fee for Services Not In Original Scope
Additional Services Requested
Permit Exhibit Preparation and Coordination with
TxDOT (3), & UPRR (1)1 for L 8263, and M 187 for
Construction
Easement Document Preparation
(Metes and Bounds exhibits for L 3242, & M 202)
SUE (Quality Level A Test Holes (9 D-Holes) for Design
Fee For Additional Services
Total Fee
i
Unit
LF
LF
EA
4 EA
25 EA
$18,014.00
4 EA
7
EA
9 EA
$ 20,900.00
$38,914.00
Hazen
Work not included in the amendment include the following:
Permit application filing fees
Online submittal of permit applications
Services related to acquiring real property including but not limited to acquisition of easements,
approval of easements, preparation of additional temporary right -of -entry documents, and other
services
Progress reports beyond quantity indicated in original scope of services
MWBE reports beyond the quantity indicated in the original scope of services
Project Schedule Updates
The engineering fee of $38,914 is based on design fees of $14.40/LF and survey fees of $5.00/LF. A
detailed level of effort is attached for your reference.
The original contract between Hazen and Sawyer and the City of Fort Worth (Contract 46465) was
authorized by M&C C-27183 on the 26th day of February, 2015 in the amount of $196, 485.00. The cost
to the City for the additional design services to be performed by Hazen and Sawyer totals $38, 914.00 for
a total fee paid by the City for all work and services shall be an amount of $235,399.00 as shown in the
table below.
Item
Original Contract
Amendment No. 1
Total Contract Amount with Amendments
Amount
$ 196,485.00
$ 38,914.00
$ 235,399.00 I
Please feel free to contact me at 817-870-2630 or tiongalazenandsawver.com should you have any
questions.
Sincerely,
AeLat/ /AO
Tracey L. Long, PE
Associate
Enclosure • Level of Effort Spreadsheet
cc: Bob Reach, Hazen
Page 2 of 2
Task No.
2.0
Task Description
Staff Member
Project Management
Managing the Team
Internal Team Meetings
QNQC
Communications and Reporting
Pre -Design Coordination Meeting
Design Submittal Review Meetings
Prepare Baseline Schedule
Prepare Monthly Progress Reports with
1.2.4 Schedule
1.2.5 Prepare Monthly MWBE Reports
Conceptual Design (30-Percent)
Conceptual Design
2.1 L2317 (back of lots), M 295 Ext. L 3854 Ext
2.2 Relocation Design (L 2317 & L23071
2.3 Alignment Study,- L 2317 & L 2307
2.3.1 Alignment Study.
Service Relocation Field Work & 26 Exhibits &
2.4 2 Dwq Sheets
2.5 Phasing
2.6 Construction Estimate
Rate
3.0 Preliminary Design (60 Percentl
3.1 Preliminary Design Package
3.2 Relocation Design (L2317 & L 2307 )
3.3 Permit Coordination (TxDOT (3) and UPRR (1»1
SUE (Level A Test Holes (9 D-Holes w/ TROE
3.4 Lettersl - Utility Clearance
4.0 Final Design
Final Draft (90%) Construction Plans and
4.1 Specifications
Final Draft (90%) Construction Plans and
4.2 Specifications (L 2317 7 L 2307 Relocation)
4.3 Final (100%) Plans and Specifications
4.4 Construction Estimates (90% and 100%)
5.0 Bid Phase
5.1 Bid Support
5.1.1 Upload Documents to Buzzsaw
Sell Contract Documents and Maintain Plan
5.1.2 Holders List
5.1.3 Issue Addenda
5.1.4 Attend Bid Opening
5.1.5 Tabulate Bids and Recommend Award
5.2 Mvlar Drawings
6.0 Construction Phase Services
6.1 Construction Support
I 6.1.1 Attend Preconstruction Conference
Principal Protect Manager
Bob Reach
/ Tom Tant Tracey Long
$225
0
0
0
0
0
0
0
0
$160
0
0
0
1
1
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Sanitary Sewer Rehabilitation Contract 90 - Amendment No. 1
City Project No. 02382
Labor(hours)
Sr. Project PE CADD Administrative
Engineer
Fred Holmes Sarah Kerr
$150 $100 $100
0 0
Nicole
Pennington
$90
0 0
Subconsultant
Total Labor Cost
Expense
MWBE Non-MWBE
$o $o So
D $0
0 $0
0 18 38 0
16 36
0 0
0 0
2
2
1
0
0
0
0 0
2 2
0 16
12
0
4
20
20
0
0
0 6 4 0
2 2
$0
$0
$0
Total Expense
Travel Reproduction Cost
Task Sub Total
$0 $0 $0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0
$0 $0 $0
$0 $0 $0
$5,760 $0 $0 $0 $0 $0 $5,760
$5,360
$0
$0
$0 $5,360
$0
$0 so
$0 $0 $o
$0 $0 $0
$400 $0 $400
$3,920 $0 $11,700 $0 $0 $11,700 515,620
$3.520 $0 $3,520
$0 $0 $0
$400
$0 $11.700 $11,700 511.700
51,160 $0 $0 $0 $0 50 31,160
$400 $0 $400
0 0 $0 $0
2 2 $400 $0 $0 $400
2 0 $360 $0 $360
0 0 0 $0 $0 $0 $0 $0 $0 $0
0 6 2 0
$0 $0 $0
$o $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$0 $0 $0
$800 $0 $0 $0 $0 $0 $800
$0
$0 $0
1 6.1.2 Attend Public Meetings- 2 Total
Permit Exhibits & Coordination (TxDOT (3),
6.2 UPRR (111,
1 6.3 Record Drawings
17.0 ROW/Easement Services
Temporary Right -of -Entry Documents
7.1 (187 TROE letters)
Easement Documents
7.2 (M-202 (city 4) and L3242 (gty3) )
7.3
8.0 Survey
Design Survey (already Completed for
L 2317, M 265 Extension, L 38534 Extension -
8.1 Design already submitted)
1 8.2 Relocation Design Survey (for L 2317 7 L 2307)
Totals
• Permit Exhibits only; Does not Include Permit filing fees or
submittal online
+ Preparation of letters only; F1'V or Contractor to distribute
and acquire approvals
Description
Conceptual Design (30%)
Preliminary Design (60%1
Final Design (10%)
Survey
Subtotal
Total
0 0
0 0
0
0
0
Water Line Footage
Sewer Line Footage
(A) Total Fee
(B) Survey Fee
(C) Total Fee.(-) survey Fee
Water Fee (0% of C)
$0.00
WP
31
32
33
51
Water
$0.00
$0.00
$0.00
$0.00
$0.00
$38,913.00
0
0
0
0
768
768
4
2
32
25
7
0
78
0%
100%
100%
$38,914
$o
$38t914
Sewer Fee (100% of C)
$38,914.00
Sewer
$11,674.00
$23,348.00
$3,891.00
$0.00
$38.913.00
2
0
0
64
0
$o 1
$400
$400
$3,2001 $6,300
$2.500I
$700 $6,300
$0
$0 $3,840
$0
$0
$14,840
{Segment
IL 2317
IM 265 extension
IL 3854 extension
1 Total)
$0
$0
$3,840
$0
$10,140 $11,700
Survey LF
462
271
35
768
Relocation Survey 3150
so
$0 $0
$0 $0
$0
$50 $6,350
$50 $50
$6,300
$0
$0 $0 $3,840
$3.840
$0
$0 $50 $21,890
Project Sub Markup (10%)
Total Project cost wlSub Markup
Project Summary
Total Hours
Total Labor
Total Expense
MWBE Subconsultant
Non-MWBE Subconsultant
10% Sub Markup
MWBE Participation
Total Project Cost
No. Design Packages = 1
Services for Segments Not in Original Scope =
Fee for Relocation Services =
Fee for Additional Services =
Alignment Study =
$400
$400
$9,550
$2,550
$7,000
$0_
$3,840
$3,840
$0
$36,730.00
$2,184.00
$38,914.00
146
$14,840
$21,890
$10,140
$11,700
$2,184
26.1%
$38,914.00
$18,014.00
$0.00
$20,900.00
$0.00