HomeMy WebLinkAboutContract 46465-A1 (2)7 i . • Oct 6)//),-ot % /40 o DPI' oeL'yak cRee • CITY CONTRACT MO r AMENDMENT No0i TO CITY SgCRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Hazen and Sawyer, P.C.,(ENGINEER) made and entered into City Secretary Contract No. 46465, (the CONTRACT) which was authorized by M&C C-27183 on the 2n' day of February, $196,485.00; and 2015 in Lhe amount of WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 90; and WHE RIEA@ , it has become necessary to execute Amendment No . 1 to the CONTRACT to include an increased scope of work and revised fee. NOW TUEIIEFOIIE , CITY and ENGINEER, acting herein by and through Lheir duly authorized representatives, enter inLo the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September Z,i%, 2015, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $38,914.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services per Corrned under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $235 , 399 . 00 3. Ali other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page His-- EXECUTF;D and WaiflCTiVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Jesus J. Chapa Assistant City Manager DATE: 9, r.,)45---* APPROVAL RE C OM E ND E D : ENGINEER Hazen and Sawyer, P.C. Chamindra Dassanay'akW Vice President DATE: Andrew T. Cronberg, .E. Assistant Director, ater Department APPROVED AS TO FORM AND i ,;GA fTY : Douglas W. Black Senior Assistant City Attorney ATTEST: ary dJ City Secretary tQ 0 0 d -0 0 tit- o ck 0 f, C 0 t 1' M&C : N/A Date: N/A t PhD, P.X. OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX Page �2 C. Hazen September 21, 2015 Walter Norwood. PE Project Manager Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 Hazen and Sawyer 500 W. 7th Street, Suite 702 o Fort Worth, TX 76102 Re: Sanitary Sewer Rehabilitation, Contract 90 - Amendment No. 1 City Project No. 02382 Dear Walter: As requested, we have prepared a scope of services for Amendment No. 1 for Sanitary Sewer Rehabilitation Contract 90. The scope of services and corresponding fees are as follows:. Description I Unit Qty Services for Segments Not In Original Scope Design for L2317, M 265 extension, & L 3854 768 extension,(Design already submitted for these segments) Survey for L2317 (back of lots) , M 265 extension, L 3854 extension, -- (Survey has already been completed and design 768 submitted) Prepare Temporary Right of Entry Letters for delivery to 187 COFW Permit Exhibit Preparation and Coordination with TOOT (3), & UPRR (1)' for L 8263, and M 187 for design Additional MWBE Reports (Schedule extended 25 months) Fee for Services Not In Original Scope Additional Services Requested Permit Exhibit Preparation and Coordination with TxDOT (3), & UPRR (1)1 for L 8263, and M 187 for Construction Easement Document Preparation (Metes and Bounds exhibits for L 3242, & M 202) SUE (Quality Level A Test Holes (9 D-Holes) for Design Fee For Additional Services Total Fee i Unit LF LF EA 4 EA 25 EA $18,014.00 4 EA 7 EA 9 EA $ 20,900.00 $38,914.00 Hazen Work not included in the amendment include the following: Permit application filing fees Online submittal of permit applications Services related to acquiring real property including but not limited to acquisition of easements, approval of easements, preparation of additional temporary right -of -entry documents, and other services Progress reports beyond quantity indicated in original scope of services MWBE reports beyond the quantity indicated in the original scope of services Project Schedule Updates The engineering fee of $38,914 is based on design fees of $14.40/LF and survey fees of $5.00/LF. A detailed level of effort is attached for your reference. The original contract between Hazen and Sawyer and the City of Fort Worth (Contract 46465) was authorized by M&C C-27183 on the 26th day of February, 2015 in the amount of $196, 485.00. The cost to the City for the additional design services to be performed by Hazen and Sawyer totals $38, 914.00 for a total fee paid by the City for all work and services shall be an amount of $235,399.00 as shown in the table below. Item Original Contract Amendment No. 1 Total Contract Amount with Amendments Amount $ 196,485.00 $ 38,914.00 $ 235,399.00 I Please feel free to contact me at 817-870-2630 or tiongalazenandsawver.com should you have any questions. Sincerely, AeLat/ /AO Tracey L. Long, PE Associate Enclosure • Level of Effort Spreadsheet cc: Bob Reach, Hazen Page 2 of 2 Task No. 2.0 Task Description Staff Member Project Management Managing the Team Internal Team Meetings QNQC Communications and Reporting Pre -Design Coordination Meeting Design Submittal Review Meetings Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2.4 Schedule 1.2.5 Prepare Monthly MWBE Reports Conceptual Design (30-Percent) Conceptual Design 2.1 L2317 (back of lots), M 295 Ext. L 3854 Ext 2.2 Relocation Design (L 2317 & L23071 2.3 Alignment Study,- L 2317 & L 2307 2.3.1 Alignment Study. Service Relocation Field Work & 26 Exhibits & 2.4 2 Dwq Sheets 2.5 Phasing 2.6 Construction Estimate Rate 3.0 Preliminary Design (60 Percentl 3.1 Preliminary Design Package 3.2 Relocation Design (L2317 & L 2307 ) 3.3 Permit Coordination (TxDOT (3) and UPRR (1»1 SUE (Level A Test Holes (9 D-Holes w/ TROE 3.4 Lettersl - Utility Clearance 4.0 Final Design Final Draft (90%) Construction Plans and 4.1 Specifications Final Draft (90%) Construction Plans and 4.2 Specifications (L 2317 7 L 2307 Relocation) 4.3 Final (100%) Plans and Specifications 4.4 Construction Estimates (90% and 100%) 5.0 Bid Phase 5.1 Bid Support 5.1.1 Upload Documents to Buzzsaw Sell Contract Documents and Maintain Plan 5.1.2 Holders List 5.1.3 Issue Addenda 5.1.4 Attend Bid Opening 5.1.5 Tabulate Bids and Recommend Award 5.2 Mvlar Drawings 6.0 Construction Phase Services 6.1 Construction Support I 6.1.1 Attend Preconstruction Conference Principal Protect Manager Bob Reach / Tom Tant Tracey Long $225 0 0 0 0 0 0 0 0 $160 0 0 0 1 1 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract 90 - Amendment No. 1 City Project No. 02382 Labor(hours) Sr. Project PE CADD Administrative Engineer Fred Holmes Sarah Kerr $150 $100 $100 0 0 Nicole Pennington $90 0 0 Subconsultant Total Labor Cost Expense MWBE Non-MWBE $o $o So D $0 0 $0 0 18 38 0 16 36 0 0 0 0 2 2 1 0 0 0 0 0 2 2 0 16 12 0 4 20 20 0 0 0 6 4 0 2 2 $0 $0 $0 Total Expense Travel Reproduction Cost Task Sub Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,760 $0 $0 $0 $0 $0 $5,760 $5,360 $0 $0 $0 $5,360 $0 $0 so $0 $0 $o $0 $0 $0 $400 $0 $400 $3,920 $0 $11,700 $0 $0 $11,700 515,620 $3.520 $0 $3,520 $0 $0 $0 $400 $0 $11.700 $11,700 511.700 51,160 $0 $0 $0 $0 50 31,160 $400 $0 $400 0 0 $0 $0 2 2 $400 $0 $0 $400 2 0 $360 $0 $360 0 0 0 $0 $0 $0 $0 $0 $0 $0 0 6 2 0 $0 $0 $0 $o $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $800 $0 $0 $0 $0 $0 $800 $0 $0 $0 1 6.1.2 Attend Public Meetings- 2 Total Permit Exhibits & Coordination (TxDOT (3), 6.2 UPRR (111, 1 6.3 Record Drawings 17.0 ROW/Easement Services Temporary Right -of -Entry Documents 7.1 (187 TROE letters) Easement Documents 7.2 (M-202 (city 4) and L3242 (gty3) ) 7.3 8.0 Survey Design Survey (already Completed for L 2317, M 265 Extension, L 38534 Extension - 8.1 Design already submitted) 1 8.2 Relocation Design Survey (for L 2317 7 L 2307) Totals • Permit Exhibits only; Does not Include Permit filing fees or submittal online + Preparation of letters only; F1'V or Contractor to distribute and acquire approvals Description Conceptual Design (30%) Preliminary Design (60%1 Final Design (10%) Survey Subtotal Total 0 0 0 0 0 0 0 Water Line Footage Sewer Line Footage (A) Total Fee (B) Survey Fee (C) Total Fee.(-) survey Fee Water Fee (0% of C) $0.00 WP 31 32 33 51 Water $0.00 $0.00 $0.00 $0.00 $0.00 $38,913.00 0 0 0 0 768 768 4 2 32 25 7 0 78 0% 100% 100% $38,914 $o $38t914 Sewer Fee (100% of C) $38,914.00 Sewer $11,674.00 $23,348.00 $3,891.00 $0.00 $38.913.00 2 0 0 64 0 $o 1 $400 $400 $3,2001 $6,300 $2.500I $700 $6,300 $0 $0 $3,840 $0 $0 $14,840 {Segment IL 2317 IM 265 extension IL 3854 extension 1 Total) $0 $0 $3,840 $0 $10,140 $11,700 Survey LF 462 271 35 768 Relocation Survey 3150 so $0 $0 $0 $0 $0 $50 $6,350 $50 $50 $6,300 $0 $0 $0 $3,840 $3.840 $0 $0 $50 $21,890 Project Sub Markup (10%) Total Project cost wlSub Markup Project Summary Total Hours Total Labor Total Expense MWBE Subconsultant Non-MWBE Subconsultant 10% Sub Markup MWBE Participation Total Project Cost No. Design Packages = 1 Services for Segments Not in Original Scope = Fee for Relocation Services = Fee for Additional Services = Alignment Study = $400 $400 $9,550 $2,550 $7,000 $0_ $3,840 $3,840 $0 $36,730.00 $2,184.00 $38,914.00 146 $14,840 $21,890 $10,140 $11,700 $2,184 26.1% $38,914.00 $18,014.00 $0.00 $20,900.00 $0.00