Loading...
HomeMy WebLinkAboutContract 52259-A4 AMENDMENT NO. 4 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES LAS VEGAS TRAIL COMMUNITY CENTER STATE OF TEXAS CITY SECRETARY CONTRACT No. 52259-A4 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and RPGA Design Group (Consultant) made and entered into City Secretary Contract No. 52259 (The Contract) which was authorized by the City Council by M&C C-19-0323, the 19th day of November, 2019, for the Las Vegas Trail Community Center Design, Phase One; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for Phase Two Deign Services. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the design and detailing of Phase Two Schematic Design and Master Planning. The cost of this additional service is $25,400.00 plus $1000.00 in reimbursable expenses. The scope of services is described more fully in RPGA Design Group, Inc. Letter dated June 26, 2020 (revised 9/13/2020), subject: "LVTRise Community Center— Phase 11.1 — City of Fort Worth, Master Planning, Programming and Schematic Design Services Only, 8201 Calmont Avenue / Fort Worth, Texas". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment 'W'. However the total fee paid by the City shall not exceed a total of $177,888.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." City of Fort Worth,Texas OFFICIAL RECORD Standard Agreement for Professional Services AMENDMENT CITY SECRETARY Revision Date:3/20/2020 Page 1 of FT.WORTH, TX Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and bay garqA&6� administration of this contract, including By: Dana Burghdoff(Oft2,202 9:27CDT) ensuring all performance and reporting Name: Dana Burghdoff, AICP requirements. Title: Assistant City Manager Date: Oct 2, 2020 By. �a�. �• LY� Approval Recommended: Name: Brian Glass Title: Architectural Services Manager ly ��e Approved as to Form and Legality: By: Steve Cooke(Oct 1,2020 12:02 CDT) Name: Steve Cooke Title: Director, Property Management Dept. YZt p/1 By. JB Strong(Oct 1, 2014:51 CDT) Attest: Name: John B. Strong 44�000n�� Title: Assistant City Attorney �FORr �a Contract Authorization: PVo o=d 0a*000 *� By. rRonald P.Gonzales(Oct 2,202010:4 T) -aM&�j; n/a Haan oo—oc4pd Name: Mary J. Kayser bnooaoo Title: City Secretary VENDOR: RPGA Design Group, Inc 1441 W Lucio- By: Javier Ludo(SeD 23.2020 17:27 CDT) Name: Javier Q. Lucio Title: Principal Date: Sep 23, 2020 OFFICIAL RECORD CITY SECRETARY FT.WORTH, TX City of Fort Worth,Texas Standard Agreement for Professional Services AMENDMENT Revision Date:3/20/2020 Page 2 of 2 Attachment"A" 2 iI RSIP GGUP, AC. June 26, 2020 (revised 9/22/20) Ronald Clements, AIA Property Management Department City of Fort Worth 401 West 13th Street Fort Worth, Texas 76102 RE: LVTRise Community Center— Phase 11.1 —City of Fort Worth Master Planning, Programming and Schematic Design Services Only 8201 Calmont Avenue/ Fort Worth, Texas Mr. Clements, It is with great enthusiasm that RPGA Design Group, Inc. presents the following Services and Fee Proposal for the LVTRise Community Center— Phase 11.1 for the City of Fort Worth (Owner). This proposal reflects our anticipated Professional Services for assisting in the Master Planning and Programing/Schematic Design phases of the ongoing Phase II renovations for the former YMCA facilities' located at 8201 Calmont Avenue in Fort Worth, Texas. We submit the following: I. General Project Description: RPGA will meet with the Owner to clarify and define the Owner's requirements and budget prior to commencement of work. We will provide services including meeting with the City, LVTRise and Childcare Associates to develop and create a Master Plan Document for the overall site at this locations, creating architectural documents conveying the extent of the proposed Master Planning work as well as provide initial Programming and Schematic Design Services for Phase 11.1 on the south Building. a. Site Master plan working with LVTRise, Childcare Associates and the City of Fort Worth to determine and establish a long term overall plan for the entire site. The scope will include one (1) rendered site plan and two (2) perspective renderings illustrating the overall site master plan. b. Interior and Exterior renovations to South Building (a new addition is not anticipated or included in the proposed scope or fees of this proposal) II. Project Construction Budget: Funding provided by the City: $ $950,000.00 Funding provided by LVTRise: $ $950,000.00 Total Construction Budget: $ $1,900,000.00* *This cost does not include the costs for implementing the site master plan. III. The Scope of Services Desired shall include the following: A. General Services: RPGA will meet with the Owner to clarify and define the Owner's requirements and budget prior to commencement of work. RPGA will supervise and coordinate consultants' activities, review all consultants' documents and review all pertinent consultant documents with the Owner. Consultants hired independently by the Owner are excluded from RPGA's supervision and coordination. 101 S.Jennings Avenue,Suite#100 Fort Worth,Texas 76104 (817)332-9477 FAX-(817)332-9487 (888)TRY-RPGA www.rpgaarchitects.com City of Fort Worth 2 LVTRise Community Center—Phase 11.1 Revised 9/22/20 RPGA will document all design meetings with the Owner. B. Master Planning: RPGA will work with LVTRise, Childcare Associates and the City of Fort Worth to determine and establish a long term overall plan for the entire site. The scope will include one (1) rendered site plan and two (2) perspective renderings illustrating the overall Master Plan. C. Schematic Design: RPGA will design the Project in conformance with the Owner's outlined program. The design team will prepare approaches to the design. Sketch plans will be developed, providing "broad brush" concepts to illustrate the potential of the given design. RPGA will prepare a package consisting of the following: floor plans at 1/8" scale and rendered sketch elevations and or perspectives sufficient to indicate the character of the proposed Project. RPGA will work with our cost estimating consultant to provide a preliminary estimate of Construction Cost at the conclusion of this phase. D. Design Development: To be provided later under an amended contract. 1) Construction Documents: To be provided later under an amended contract. IV. Compensation: A. Based on our understanding of the scope of services to be performed for the initial phase of this project, the fees are as stated below. If during the development of the project changes are made to the scope and/or construction budget of the project, the fees will be subject to revision. Fees as quoted are good for a period of(90) ninety days from the date of this proposal. Architectural/Engineering Fees for LVTRise Community Center— Phase II Owner agrees to pay the Architect for all professional services rendered under this agreement. The Architect's fee for Basic Services will be billed on an hourly basis not to exceed the fees listed below, plus allowable reimbursable expenses. The hourly billing rates for services of the Architect and the Architect's consultants are set forth below. The rates shall be adjusted in accordance with the Architect's and Architect's consultants' normal review practices. Principals: $165.00 Project Manager: $110.00 Production Personnel: $85.00 Clerical $45.00 Basic Services Architectural,................................................................................................$ 15,900.00 Programming Schematic Design MasterPlan-------------------------------------------------------------------------------------------------$ 7,500.00 One (1) rendered site plan Two (2) perspective renderings Structural Engineering.................................................................................$ not included M.E.P. Engineering $ not included Total Basic Services Fees $ 23,400.00 101 S.Jennings Avenue,Suite#100 Fort Worth,Texas 76104 (817)332-9477 FAX-(817)332-9487 (888)TRY-RPGA www.rpgaarchitects.com City of Fort Worth 3 LVTRise Community Center—Phase 11.1 Revised 9/22/20 Basic Additional Services (as required to develop an accurate cost estimate for the subsequent phases of this project. Civil Engineer........................................................................................... $ not included Landscape and Irrigation (not included in this proposal).......................... $ not included Geotechnical Services.............................................................................. $ not included Construction Cost Estimator..................................................................... $ 2,000.00 Total Basic Additional Services Fees $ 2,000.00 Reimbursable Expenses TAS Registration and Inspection Fees..................................................... $ not included Anticipated Reimbursable Expenses:....................................................... $ 1,000.00 Total Reimbursable Expenses $ 1,000.00 Anticipated Total Consultant Fees for the LVTRise— Phase 11.1 Not to Exceed:................................................................................................. $ 26,400.00 B. Hourly Rates for Unscheduled or Requested Services (these additional services will only be provided with an authorized amendment in writing from the Owner): No Charge will be incurred for minor revisions to the plans during the design process prior to construction document phase. Compensation for major variances to the agreed-upon plans and specifications, time involved in additional services, but not initial site visits, will be billed on an hourly basis as follows: Principals: $165.00 Project Manager: $110.00 Production Personnel: $85.00 Clerical $45.00 The above listed hourly rates are subject to change with notice. The Owner can negotiate a set fee at the time, if and when needed. C. Reimbursable fees will be billed to the Owner at one and one tenth (1.10) the expense incurred by RPGA. Reimbursable expenses will include, but not be limited to, the following: a) cost of reasonable incidental charges exclusive of markup for delivery charges; cost of reproduction, postage and handling of drawings, specifications and other documents; and renderings, models and mock-ups requested by the Owner and as required in the normal preparation of Master Planning and Schematic Design documents as required for reviewing and developing the project. V. Schedule: Based on our understanding of the scope of services we estimate the schedule to be as follows: Programming 1-2 Weeks Schematic Design 2-4 Weeks This schedule anticipates a period of one week for review by the Owner for changes and clarifications at the completion of the Programming Phase. 101 S.Jennings Avenue,Suite#100 Fort Worth,Texas 76104 (817)332-9477 FAX-(817)332-9487 (888)TRY-RPGA www.rpgaarchitects.com City of Fort Worth 4 LVTRise Community Center—Phase 11.1 Revised 9/22/20 VI. Changes: If a major change is made in the scope, approach or details of the Project at the Owner's request after construction documents are underway or finished, the cost of making changes will be billed at the above hourly rates. This also applies to any changes required by new zoning or building code requirements instigated after the Projects' inception. VII. Documents: All plans and drawings will be prepared and submitted by RPGA to the Owner for review and approval on 24" x 36" or 30"x 42" bond sheets, with all plotted lettering clearly legible when the sheets are reproduced and reduced to half size. It is implicitly understood that we, RPGA Design Group, will act in the Owner's best interests and, at all times, carry out duties with reasonable diligence and expedience. We look forward to discussing this proposal with you at your earliest convenience. Thank you again for this opportunity. Yours sincerely, Javier Q. Lucio, Principal R P G A Design Group, Inc. 101 S.Jennings Avenue,Suite#100 Fort Worth,Texas 76104 (817)332-9477 FAX-(817)332-9487 (888)TRY-RPGA www.rpgaarchitects.com