HomeMy WebLinkAboutContract 47302 (2)4 CITY SEC Akzke
•
•
camigme,RECEIVED
G
DEC - 3 2015
Developer and Project Information Cover Sheet:
OF FORT WORTI-1 4.4
CITY F IARY
r ` Developer Company Name: Howard- McAnear Invetments, INC.
7
Address, State, Zip Code:
10315 North Freeway , Fort Worth, TX 76177
Phone & Email: 817-847-0101
Authorized Signatory, Title: Bubba McAnear,
Project Name and Brief Howard-McAnear Investments Inc.
Description:
Project Location: 10315 North Freeway
Plat Case Number: FS-14-218 Plat Name: Howard McAnear Addition
Mapsco:
Council District: 7 City Project Number: 02568
CFA Number: 2015-076
To be completed by st
Received by:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
DOE Number: 7450
Date:
/orZb r
5az
OFFICIAL RECOR�
CITY SECRETARY
I F7: WORN TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No.
t1fr7 30a
WHEREAS, Howard- MCAnear Investments, Inc, ("Developer"), desires to make
certain specific improvements as described below and on the exhibits attached hereto
("Improvements") related to a project generally described as Howard-McAnear Investments, Inc.
("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"), and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City -approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) , Sewer (A-1) , Paving (B) ■ , Storm Drain (B-1) ■ , Street Lights &
1Z�
Signs (C) 0
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8 Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
i. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state -
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
ii To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
iii. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
iv. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Depth intent
B. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
C. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 4 of 11
D. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
E Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
F. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
G. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such injuries. death or damages are
caused, in whole or in part, by the allecied neelieence of the City of Fort Worth, its
officers, servants, or employees.
H. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part. by the alleeed nezlieence of the City of Fort Worth, its officers,
servants. or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
I. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
J. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
K. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Howard-McAnear Investments, Inc
CFA No.: 2015-076 DOE No.: 7450
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately detelnnine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 48,895.00
2. Sewer Construction $ 105,300.00
Water and Sewer Construction Total $ 154,195.00
B. TPW Construction
1. Street $
2. Storm Drain $
3. Street Lights Installed by Developer $
4. Signals $
TPW Construction Cost Total $
Total Construction Cost (excluding the fees): $ 154,195.00
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 3,083.90
D. Water/Sewer Material Testing Fee (2%) $ 3,083.90
Sub -Total for Water Construction Fees $ 6,167.80
E TPW Inspection Fee (4%) $ -
F. TPW Material Testing (2%) $ -
G. Street Light Inspsection Cost $ -
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub -Total for TPW Construction Fees $ -
Total Construction Fees: $ 6,167.80
Choice
Financial Guarantee Options, choose one Amount (Mark one)
IBond = 100% $ 154,195.00
(Completion Agreement = 100% / Holds Plat $ 154,195.00
'Cash Escrow Water/Sanitary Sewer= 125% $ 192,743.75
JICash Escrow Paving/Storm Drain = 125% $ -
(Letter of Credit = 125% w/2yr expiration period $ 192,743.75 x
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
DEVELOPER
Howard -McAnear Investments, Inc.
Jesus J. Chapa
Assistant City Manager Name: Bubba McAnear
Title: p12��
Date:
/ "
Recommended by:
Date: A- g a=
ATTEST: (Only if required by Developer)
Wendy Choi-Babulal, EMBA, P.E.
Development Engineering Manager Signature
Water Department Name:
Douglas W. Black
Assistant City Attorney
1
M&C No.
Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
ATTEST:
S�
Mary J. Kayser
City Secretary
OFFICIAL RECORD1!
CITY SECRETARY
FL WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
11
►'
11
■
0
Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02568
None
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
PLOTTED BY: Gaddis, Bobby 0N: Tuesday, September 08, 2015 AT: 8:16 AM FILEPATH: \\ftworth\file system \Production500\001400\B001459\ Design \001\Drawings\Exhibits\CFA Exhibits\Vicinity Map.dwg
cn
01
0
co
m
y �
a D
Co 0
V c
C
W (D
Cn •
m 1‘)
n • A
•
t 433 O
4
to
co
n 0
q-
W .
V N
0
Q
a
n
O
z
n
11
r
0
11
)
0
0
Z n
D
D m
D
n O m
O vp
fx-LD�
_° rrn m
m
z
n
0
z
n
hi
hi II 11111
ILL
AYE\
ARMO\
LL
11IIWIII,II 1111 11l 1
1 Id! II li
L I. 1iliiI! 1 III I ill I „IL II 1 h Ill 1i1I I b Ip II 1I I LI,L III l!II ludll ilJJIu II{, III 1 11 II „Iielllll IIJ.1.111 4111,...16E
ibits \CFA Exhibits
11111111 1111111111111.1,1111,11111 11111111111 11 11111111 11111 I I 11111111111111111111111111111111111111111111111 I I 1111 11111111111111111111111111111111111111111111 1 . II , I 1111111
r
1-
,
LL
LEGEND
PROPOSED WATER LINE
PROPOSED FIRE HYDRANT
PROPOSED GATE VALVE
PROPOSED WATER METER
PROPOSED PLUG
DUNAWAy
550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107
Tel: 817.335.1121 • Fax: 817.335.7437
(T(REG. F-1114)
1, I 11 1 1 1
7-77%-/-/-7-771-777/77777/ /7777777
(„,
7 I
y
\\- EXISTING PRIVATE WA LINE
IV31-1--1 AL I
PROPOSED 1.5" WATER SERVICE
S89'39'37"W 332.70'
PROPOSED 8' WATER SERVICE
CONCRETE PA VEI/IENT REPAIR
PROPOSED WATER MAIN
PROPOSED 1"
WATER SERVICE
EXISTING 12" WATER MAIN
(REF X-21852/WATER
PROJECT
P265-602150174386)
EXHIBIT A
WATER IMPROVEMENTS
HOWARD - MCANEAR EQUIPMENT COMPANY
PR POSED
FIR HYDRANT
-ro
to
60
SCALE: 1"= 60 ft.
120
0
1111111111111
1111111111,11111111111 11111111111111111111 11 11111,1111 1 , 1111111 . 1 1 11 , 1 11 III 1 1111111 , 11 . , 11
1 , 1
,111111111111111111,11111,1111,11111 111111
.14
1111111111
111111111111 1111111111111111111111111 111111111
FA Exhibits \W
.43
uJ
0
0
.01
0
0
2
0.
E
LL
co
(y)
0
0
0
0
0
40
40
L.1.1
...Li
PROPOSED 4' MH WITH WATER TIGHT LID
PROPOSED 8" SS
PROPOSED 4' MH WITH WATER TIGHT LID
SS
1 _ •
PROPOSED 8" SS
EXISTING 8" SS
(X-21582)
1 N AWAy
550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107
Tel: 817.335.1121 • Fax: 817.335.7437
(T(REG. F-1114)
PROPOSED 6" STLIBOUT
T-1-V7
Crit H
PROPOSED 4' MH
TYPICAL
EXHIBIT A1.1
WASTEWATER EXHIBIT
HOWARD - MCANEAR EQUIPMENT COMPANY
LEGEND
3.3 PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY SEWER
MANHOLE
0 100 200
rillin.r1111.11111.11111111
SCALE: 1"= 100 ft.
1,111 11 m.11110.11 111111,11H.,111 1,1,1 11.1.11 11,
q1lullllui1,10111111111111111111111111111111 1 IIIIIII II III III 11111,m11111lllu1111111111,11,111111,111111111 1 11111111111111111 III11,11111II III IIIII III III III I I �IIII III II III III II, III
5 AT: 8:17 AM FILE
PROPOS D 4'
MH TYPICAL
rl
'cc.°
PROPOSED 6" STUBOUT
EXHIBIT A1.2
DUNAWAy WASTEWATER EXHIBIT
550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107
Tel: 817.335.1121 • Fax: 817.335.7437
(1X REG. F-1114)
HOWARD - MCANEAR EQUIPMENT COMPANY
Ss
PROPOSED
4- STUBQUT _
LEGEND
PROPOSED SANITARY SEWER LINE
PROPOSED SANITARY SEWER
MANHOLE
0 100 200
SCALE: 1"= 100 ft.
0
,1llw 11111111(11m11111111u1uu11 a 111111ouu 1111.111111m1111m1111111m111111111111111owooumwum uou1I(1111 11111111111111111111111111111111 1,1,1,1111111111,111 111,111wu1111 1111uua 1 1wnu1111w111 1uu,
Bidlist Item No
Dcscnpuon
3201.0151 Asphalt Pvmt Repair, Water Service
_ 241.1000 Remove Conc
3213.0101 6" Conc Pvmt
3305:0109 Trench Safety
3311.0001 Ductile Iron Water Fittings w/Restraint
3311.0441 12' Water Pipe
3312.0001 Fire Hydrant
3312.0117 Connect to Existing 4"-12' Water Main
3312..2003 1" Water Service
3312.2103 1.5" Water Service _
3312.3002 6" Gate valve _
3312.3003 _ 8" Gate Valve
3312.3006 12" Gate Valve
3125.0101
3301.0101
3305.0109
3305.0112
3331.3102
3331.3202
3331.4101
3331.4108
3331.4115
3331.4116
3339.0001
3339.1001
3339.1002
33301.0002
3339.1003
SWPPP 21 acre
Manhole Vacuum Testing
Trench Safety
Concrete Collar
4" 2-way Cieanout
6"2-way Cleanout_
4" Sewer Pipe
6" Sewer Pipe
8 Sewer Pipe
8"Sewer Pipe, CSS Backfll
Epoxy Manhole Liner
4' Manhole
4' Drop Manhole
Post -CCTV Inspection
4' Extra Depth Manhole
}toward McAnear Equipment Company Quantity Matrix
Specification Section No
Unit of
Measure 5 I
UNIT I: WATER IMPRO IEMENTS
32 01 17
02 41 15
32 13 13
33 05 10
331111
33 11 10, 33 11 12
33 12 40
33 12 25
33 12 10
33 12 10
33 12 20
33 12 20
33 12 20
LF 115
SY 111--- --
SY 111
LF 241
TN 1
LF 241
EA 1
EA '.__
EA 1
EA 1
EA 1
EA 1
EA 2
0 I 11
UNIT II: SANITARY SEWER IMPROVEMENTS
31 25 00 LS
33 01 30 EA _ 2
33 05 10 LF 241
33 05 17 EA 2
33 31 50 EA
33 31 50 EA
33 11 10, 33 31 20 LE
33 11 10, 33 31 12, 33 31 20 LF
33 11 10, 33 31 12, 33 31 20 LE _
33 11 101 33 31 12, 33 31 20 LF
33 39 60 LF
33 39 10, 33 39 20 EA
33 39 10, 33 39 20 EA
33 01 31 LF
333910,333920 VF
12
Bid
15 Quantity
115
111
111
241
1
241
1
1
1
2
T )TAL UNIT I: WATER IMPROVEMENTS
4
650 545
1
3
13
36.
241 650 545 1436
100 100
10.83 _ 10.9
2 1 3 6
1 1
1436
3.7 0.75 12.74 17.2
TOTAL UNIT VI: SANITARY SEWER IMPROVEMENTS
Sid Summary
1.
7
1436
3_
1
3
13
36
Unit Price
Bid Valu-
$143.00 $16,445.00
$10.00 _ $1,110.00
$27.00 $2,997.00
$1.00 $241.00
$3,270.00 $3,270.00
$41.00 59.881.00
$2,700,00 $2,700.00
$1,722:00 _ _ 51722.00
51,811.00 51,811.00
$2,000.00 $2,000.00
$923.00 _ $923.00
$1,327.00 _ $1,327.00
$2,234.00 $4,468.00
$48,895.001
$2.00
5100.00
$t0o
$400.00
5524.00
$524.00
$29.00
$33.00
$35.00
$131.00 _
$50.00
$4,600.00
$4,500.00
$1.00
$50.00
$2.00
$700.00
$1,436.00
51,200.00
$524.00
$1,572.00
$377.90
1,188.pp
550,260.00
$13,100,00
$545.00
527,600.00
_ $4,500.00
$1,436.00
$860.00
$105,300.001
UNIT 1: WATER IMPROVEMENTS $48,895.001
UNIT II: SANITARY SEWER IMPROVEMENT $105,300.0
Total Construction St $154,195.001