Loading...
HomeMy WebLinkAboutContract 47324 (2)AA F DEC —9 2015. cirstt 8Ecp,? Developer and Project Information Cover Sheet: Developer Company Name: Centergy, West 7th LP Address, State, Zip Code: 8235 Douglas Avenue Ste 900, Dallas TX 75225 Phone & Email: 214-368-7200, wmiller@centergyretail.com Authorized Signatory, Title: Project Name and Brief Description: Project Location: Plat Case Number: West Miller, Principal Left Bank - Traffic Signal Improvements Harrold Street between West 7th Street and Dakota St Plat Name: <Plat Name> Mapsco: <Mapsco> Council District: 9 CFA Number: 2015-113 To be completed by staff* Received by: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 1 of 11 City Project Number: 02558 DOE Number: 7439 Date: OFFICIAL RECORD 1TY SECRETARY �T WoR7HTX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS COUNTY OF TARRANT City Secretary Contract No. I/73? 4 WHEREAS, Centergy, West 7th L,P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Left Bank - Traffic Signal Improvements ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) 0, Sewer (A-1) ❑, Paving (B) ■, Storm Drain (B-1) 0, Street Lights & Signs (C) E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following* i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state -approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 11 Project Name: Left Bank- Traffic Signal Cost Summary Sheet CFA No.: 2015-113 DOE No.: 7439 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total P. TP AJ Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TRW Inspection Fee (4%) F. TPW Material Testing (2%) G Street Light Inspsection Cost H. Signals Inspection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Agreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 Developer's Cost $ $ $ $ 182,818.00 $ 182,818.00 $ 182,818.00 $ 7,312.72 $ $ $ 7,312.72 7,312.72 Amount 182,818.00 182,818.00 228, 522.50 228,522.50 Choice (Mark one) x ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Jesus J. Chapa Assistant City Manager Date: )? " � Recommended by: u/a Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager Water Department Douglas W. Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. 44 Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 11 DEVELOPER Centergy, West 7th LP Name: West Miller Title: Principal Date: /�l et A ATTEST: (Only if required by Developer) aThiltAtik(R)1 Signature Name: S aM0.►•M0. Nketi Mph %A AA AeAAp.m ��3t+t.AAAAAAa A.1\ AtNAAAAN+t& ATTEST: SAMANTHA NEIMER My Commission Expires August 22, 2016 !silt v 1 1 t r .. ,. t:. .. .. ... 1.* 1 t I eta__ ary J. Kayser City Secretary OFFICIAL RECORD CITY SECRETARY F% WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment M Attachment 1 - Changes to Standard Community Facilities Agreement M Location Map ❑ Exhibit A: Water Improvments ❑ Water Cost IA stimate ❑ Exhibit A-1: Sewer Improvements ❑ Sewer Cost Estimate ❑ Exhibit B: Paving Improvements ❑ Paving Cost Estimate ❑ Exhibit B-1: Storm Drain Improvements ❑ Stoll Drain Cost Estimate M Exhibit C: Street Lights and Signs Improvements M Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 10 of 11 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02558 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 11 of 11 WHITE SETTLEMERT RD .a 9"' J\' BURY 5310 Harvest Hill Road, Suite 100 Dallas, Texas 75230 Tel. (972) 991-0011 Fax (972) 991-0278 TOPE#F-1048 TBPLS#F-10107502 Copyright ©2015 DATE November 2, 2015 I SCALE: AS SHOWN PROJECT LOCATION MONTGOMERY ST W WHITE SETTLEMER UNIVERSITY DR W7THS ti R 2- z z Ln En 0 W PENNS YL VANIA A VE W ROSEDALE ST HEMPHILL ST TRAFFIC SIGNAL IMPROVMENTS To SERVE LEFT BANK CENTERGY RETAIL, LLC 8235 Douglas Avenue, Suite 900 Dallas, Texas 75225 Contact - West Miller, 214.368.7200 (Ofc), 214,616.3060 (Mbl) DRAWN BY JRN I FILE: VICINITY MAP DWG S MAIN ST 5T AIRPORT FWY E HATTIE ST Not to Scale VICINITY MAP PROJECT No 0104157-30004 F10104157130004\7lh And Harrold- Fort Worth\ENGINEERING\CFA§\Left Bank- Traffic Signal lmprovementslCAD\U nrty Map dwg mod,fed by mpatton an Sep 23 157 51 AM 50 100 150 200 1' =100' __INSTALL 4" DBL YELLOW (270") TIE INTO EXISTING . - -- - LEGEND SIGNS METRO (STREET NAME & BLOCK #) R9-3a (NO PEDESTRIAN CROSSING SYMBOL) W3-3 (ADVANCE TRAFFIC CONTROL. SIGN) sN6P ostr oxr INSTALL 8" WHITE - -R3�8 VAR - - t(180') INSTALL 24" WHITE CROSSWALK IIIIIUII r—+ INSTALL 24'WITE CROSSWALK LINSTALL 8" WHITEz(150')- INSTALL 24" WHITE STOP BAR (48') BURY 5310 Harvest Hill Road, Suite 100 Dallas, Texas 75230 Tel. (972) 991-0011 Fax (972) 991-0278 TBPE # F-1048 TBPLS # F-10107502 Copynght ® 2015 Contact - \ \ LINSTALL 8" YELLOW MARK MOUNT MAST ARM SIGNAL POLE GROUND INSTALL 24" WHITE STOP BAR (25') INSTALL 24" WHITE STOP BAR (48') INSTALL 4" DOUBLE YELLOW QUANTITY 3 2 1 INSTALL PEDESTRIAN BUTTONS & R10-3e SIGN ASSEMBLY UNIT AT POLE: 1 AT T1-T5 TIE INTO EXISTING` - R3-51 ONLYau R3.8 VAR TRAFFIC SIGNAL IMPROVMENTS TO SERVE LEFT BANK CENTERGY RETAIL, LLC 8235 Douglas Avenue, Suite 900 Dallas, Texas 75225 West Miller, 214.368.7200 (Ofc), 214.616.3060 (Mbl) EXHIBIT C-2 TRAFFIC SIGNAL IMPROVEMENTS: SIGNING AND PAVEMENT MARKINGS DATE: September 23, 20151 SCALE: AS SHOWN DRAWN BY: GJ I FILE: EXHIBIT C-3 - TRAFFIC SIGNAL IMPROVEMENTS DWG G \104157300041&gnat De gn\ExhIMt C-3- Traffic Signal lmprovementsd+.g modified by mune on Sep 28.151253 PM PROJECT No. 0104157-30004 11/2/2015 CFA- LEFT BANK UNIT IV TRAFFIC SIGNAL IMPROVEMENTS AT WEST SEVENTH & HARROLD QUANTITY MATRIX ITEM NO. 1 BID ITEM UNIT i 006 SHEET NO. (PERTINENT SHEETS ONLY) SECTION A - TRAFFIC SIGNAL IMPROVEMENTS 1 Remove Sidewalk SF 1 300 2 Furnish/Install Elec Sery Pedestal EA 2 3 2" CONDT PVC SCH 80 (T) LF 35 4 2" CONDT PVC SCH 80 (B) LF 104 1 5 3" CONDT PVC SCH 80 (T) LF 375 1 6 3" CONDT PVC SCH 80 (B) LF 465 1 7 4" Cone Sidewalk SF ( 180 8 Barrier Free Ramp, Type M-3 EA 1 1 9 4" SLD Pvmt Marking HAS (Y) LF 10 8" SLD Pvmt Marking HAS (W) LF 11 8" SLD Pvmt Marking HAS (Y) LF 12 24" SLD Pvmt Marking HAE (W) LF 13 Lane Legend Arrow EA 14 Lane Legend Bike EA 15 Remove 4" Pvmt Marking LF 16 Remove 8" Pvmt Marking LF 17 Remove Lane Legend Arrow EA 18 Remove Lane Legend Only EA ITEM TOTAL 300 2 35 104 375 465 180 1 270 1 270 330 330 105 105 303 1 303 4 1 4 2 1 2 370 I 370 130 1 130 3 1 3 1 1 11/2/2015 CFA- LEFT BANK UNIT IV TRAFFIC SIGNAL IMPROVEMENTS AT WEST SEVENTH & HARROLD QUANTITY MATRIX ITEM NO. BID ITEM UNIT 19 Remove Lane Legend Bike EA 20 3-Sect Signal Head Assmbly EA 21 4-Sect Signal Head Assmbly 22 5-Sect Signal Head Assmbly 23 Ped Signal Head Assmbly 24 2" Ped Push BTN Station W/ Sign EA 25 Audible Ped Pushbutton Station 26 Furnish/Install BBU System EXT Mounted EA 27 Furnish/Install Model 712 Preemption Detector EA 28 Furnish/Install Preemption Cable 29 Fumish/Install Radar Cable 30 3/C 14 AWG Multi -Conductor Cable 31 20/C 14 AWG Multi -Conductor Cable 32 NO. 6 Insulated Elec Condr 33 NO. 8 Insulated Elec Condr 34 NO. 6 Bare Elec Condr SLD LF 35 NO. 8 Bare Elec Condr 36 Ground Box Type D, w/ Apron EA 37 Furnish/Install 10' - 14' Ped Pole Assmbly EA SHEET NO. (PERTINENT SHEETS ONLY) 006 008 009 2 010 ITEM TOTAL 2 5 1 I I 5 EA 1 1 1 1 1 EA 1 1 1 1 1 EA 4 1 1 1 4 4 1 1 1 4 EA 4 1 1 1 4 3 1 1 1 3 LF 360 1 1 1 360 LF 375 1 1 1 375 LF 1110 1 1 1 1110 LF 385 1 1 1 385 LF 405 1 1 1 405 LF 260 1 1 1 260 220 1 1 1 220 LF 360 1 1 1 360 7 1 1 1 7 2 1 1 1 2 11/2/2015 CFA- LEFT BANK UNIT IV TRAFFIC SIGNAL IMPROVEMENTS AT WEST SEVENTH & HARROLD QUANTITY MATRIX SHEET NO. (PERTINENT SIIEETS ONLY) ITEM NO. BID ITEM UNIT ITEM TOTAL 006 008 009 010 38 Furnish/Install Type 41 Signal Pole EA 1 39 Furnish/Install Type 42 Signal Pole EA 1 40 Furnish/Install Type 43 Signal Pole EA 1 41 Furnish/Install Mast Arm 16' - 36' EA 2 42 Furnish/Install Mast Arm 40' - 48' EA 1 43 TY 1 Signal Foundation EA 2 44 TY 3 Signal Foundation EA 2 45 TY 4 Signal Foundation EA 1 46 Signal Cabinet / BBU Foundation EA I 47 Install Controller & Cabinet, Ground MNT EA 1 48 Install Alum Sign Ground Mount EA 1 49 Install Alum Sign Ex Pole Mount EA 1 50 Install Alum Sign Ex Pole Mount EA 2 51 Remove Sign Panel and Post EA 5 52 Furnish/Install ATC Cabinet 352i EA 2 53 Furnich ATC 2070-LDx controller EA 2 54 2- channel vector card EA 1 55 Furnish/Install ATB2-TYP2-138W-NW-NL-7PIN Luminaires (or approved equivalent) EA 3 56 Provide Iteris Vantage Vector Detection System EA 2 57 Traffic Control (Subsid Items: 6" Chain Link Fence, Temp. HMAC, and Water Filled Barriers) MO 1 1 1 1 2 5 2 2 1 3 1 00 42 43 DAP- BID PROPOSAL Page 1 of 2 UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 0241.0100 2605.0111 2605.3015 2605.3016 2605.3025 2605.3026 3213.0301 3213.0505 3217.0002 3217.0201 3217.0202 3217.0501 3217.1002 3217.1006 3217.4301 3217.4303 3217.4402 3217.4404 3217.4406 3441.1001 3441.1002 3441.1003 3441.1011 3441.1021 3441.1031 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description Remove Sidewalk Furnish/Install Elec Sery Pedestal 2" CONDT PVC SCH 80 (T) 2" CONDT PVC SCH 80 (B) 3" CONDT PVC SCH 80 (T) 3" CONDT PVC SCH 80 (B) 4" Conc Sidewalk Barrier Free Ramp, Type M-3 4" SLD Pvmt Marking HAS (Y) 8" SLD Pvmt Marking HAS (W) 8" SLD Pvmt Marking HAS (Y) 24" SLD Pvmt Marking HAE (W) Lane Legend Arrow Lane Legend Bike Remove 4" Pvmt Marking Remove 8" Pvmt Marking Remove Lane Legend Arrow Remove Lane Legend Only Remove Lane Legend Bike 3-Sect Signal Head Assmbly 4-Sect Signal Head Assmbly 5-Sect Signal Head Assmbly Ped Signal Head Assmbly 2" Ped Push BTN Station W/ Sign Audible Pedestrian Pushbutton Station Specification Section No. Bidder's Application Unit of I Bid Measure Quantity TRAFFIC SIGNAL IMPROVEMENTS 02 41 13 26 05 00 26 05 33 26 05 33 26 05 33 26 05 33 32 13 20 32 13 20 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 32 17 23 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 3441.1209 Fumish/Install BBU System EXT Mounted 3441.1221 Furnish/Install Model 712 Preemption Detector 3441.1224 Fumish/Install Preemption Cable 3441.1234 Furnish/Install Radar Cable 3441.1315 20/C 14 AWG Multi -Conductor Cable SF EA LF LF LF LF SF EA LF LF LF LF EA EA LF LF EA EA EA EA EA EA EA EA EA EA EA LF LF LF 300 2 35 104 375 465 180 1 270 330 105 303 4 2 370 130 3 1 2 5 1 1 4 4 4 1 3 360 375 385 Bidder's Proposal Unit Price $2.00 $6,500.00 $12.00 $15.00 $15.00 $18.00 $8.00 $400.00 $2.00 $2.00 $2.00 $2.00 $200.00 $200.00 $1.00 $1.00 $150.00 $150.00 $150.00 $950.00 $1,050.00 $1,250.00 $750.00 $50.00 $1,650.00 $7,250.00 $1,785.00 $2.15 $2.65 $6.00 Bid Value $600.00 $13,000.00 $420.00 $1,560.00 $5,625.00 $8,370.00 $1,440.00 $400.00 $540.00 $660.00 $210.00 $606.00 $800.00 $400.00 $370.00 $130.00 $450.00 $150.00 $300.00 $4,750.00 $1,050.00 $1,250.00 $3,000.00 $200.00 $6,600.00 $7,250.00 $5,355.00 $774.00 $993.75 $2,310.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fonn Version April 2, 2014 00 42 43_Bid Proposal_DAP - Traffic Signal Improvements.zlsx 00 42 43 DAP- BID PROPOSAL Page 2 of 2 44 45 46 47 48 49 50 51 52 53 54 55 56 57 UNIT PRICE BID Bidlist Item No. 31 32 33 34 35 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item lnfonnation Description 3441.1322 3/C 14 AWG Multi -Conductor Cable 3441.1408 NO 6 Insulated Elec Condr 3441.1409 NO 8 Insulated Elec Condr 3441.1413 NO 6 Bare Elec Condr SLD 3441.1414 NO 8 Bare Elec Condr 36 3441.1503 Ground Box Type D, w/Apron 37 3441.1606 Install 10' - 14' Ped Pole Assmbly 38 3441.1611 Furnish/Install Type 41 Signal Pole 39 3441.1612 Furnish/Install Type 42 Signal Pole 40 3441.1613 Furnish/Install Type 43 Signal Pole 41 3441.1623 Furnish/Install Mast Arm 16' - 36' 42 3441.1624 Furnish/Install Mast Arm 40' - 48' 43 3441.1701 TY 1 Signal Foundation 3441.1703 TY 3 Signal Foundation 3441.1704 TY 4 Signal Foundation 3441.1712 Signal Cabinet / BBU Foundation 3441.1724 Install Controller & Cabinet, Ground MNT 3441.4005 Install Alum Sign Mast Arm Mount 3441.4006 Install Alum Sign Ground Mount 3441.4007 Install Alum Sign Ex Pole Mount 3441.4108 Remove Sign Panel and Post 9999.0001 Furnish/Install ATC Cabinet 352i 9999.0002 Furnish ATC 2070-LDx Controller 9999.0003 2-Channel Vector Card 9999.0004 Furnish/Install ATB2-TYP2-138W-NW-NL-7PIN Luminaires (or approved equivalent) 9999.0005 Provide Iteris Vantage Vector Detection System 9999.0006 Traffic Control (Subsid Items: 6" Chain Link Fence, Temp. HMAC. and Water Filled Barriers) Specification Section No. 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 3441 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 10 34 41 30 34 41 30 34 41 30 34 41 30 Bidder's Application Unit of Bid Measure Quantity LF 1110 LF 405 LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 34 71 13 MO 260 220 360 7 2 1 1 1 2 1 2 2 1 1 1 5 2 2 1 1 1 2 2 3 1 TOTAL TRAFFIC SIGNAL IMPROVEMENTS Bid Summary TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION Bidder's Proposal Unit Price $2.50 $1.50 $1.25 $1.50 $1.25 $850.00 $1,000.00 $2,585.00 $3,275.00 $3,831.00 $1,830.00 $2,650.00 $1,050.00 $2,850.00 $4,200.00 $2,500.00 $3,500.00 $750.00 $450.00 $350.00 $150.00 $17,175.00 $4,915.75 $4,350.00 $1,150.00 $7,575.00 $5,500.00 calendar days after the date when the Bid Value $2,775.00 $607.50 $325.00 $330.00 $450.00 $5,950.00 $2,000.00 $2,585.00 $3,275.00 $3,831.00 $3,660.00 $2,650.00 $2,100.00 $5,700.00 $4,200.00 $2,500.00 $3,500.00 $3,750.00 $900.00 $700.00 $150.00 $17,175.00 $4,915.75 $8,700.00 $2,300.00 $22,725.00 $5,500.00 $182,818.00 $182,818.00 $182,818.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 00 42 43_Bid Proposal_DAP - Traffic Signal Improvcments.xlsx