HomeMy WebLinkAboutContract 47323 (2)A. (
tiECi.iVED
DEC -9 2015
CITY SECRETAW
CONTRACT NO.
Developer and Project Information Cover Sheet:
Developer Company Name: Centergy, West 7`h LP
Address, State, Zip Code: 8235 Douglas Avenue Ste 900, Dallas TX 75225
Phone & Email: 214-368-7200, wmiller@centergyretail.com
Authorized Signatory, Title: West Miller, Principal
Project Name and Brief Left Bank - Streetscape and Street Light Improvements
Description:
Project Location: Harrold Street between West 7th Street and Dakota St
Plat Case Number:
Plat Name: Evans -Pearson Westwood Addition & K.M. Van
Zandt's Addition
Mapsco: <Mapsco> Council District: 9 City Project Number: 02699
CFA Number: 2015-115 DOE Number: None
To be completed by staffs
Received by: Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
g
COUNTY OF TARRANT §
City Secretary
Contract No. ij'73?3
WHEREAS, Centerav, West 7th L,P., ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related to
a project generally described as Left Bank - Streetscape and Street Light Improvements ("Project")
within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City -approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ❑, Sewer (A-1) ®, Paving (B) 0, Storm Drain (B-1) ❑, Street Lights & Signs
(C)
0
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the followings
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and perfoimance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer -awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state -approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces, to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries. death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure contemplated
herein, whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further, Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two (2) years from the date of this Agreement (and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Project Name:
Cost Summary Sheet
Left Bank - Streetscape and Street Light Improvements
CFA No.: 2015-115 DOE No.: None
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2 Sewer Construction
Water and Sewer Construction Total
B. TRW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
E TPW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
Financial Guarantee Options, choose one
I Bond = 100%
'Completion Agreement = 100% / Holds Plat
ICash Escrow Water/Sanitary Sewer= 125%
'Cash Escrow Paving/Storm Drain = 125%
'Letter of Credit = 125% w/2yr expiration period
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
Developer's Cost
$
$
$ 1,032,341.52
$ 1, 032, 341.52
$ 1,032,341.52
Sion
41,293.66
$
41,293.66
41,293.66
Amount
1,032,341.52
1,032,341.52
1,290,426.90
1,290,426.90
Choice
(Mark one)
x
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
Jesus J. Chapa
Assistant City Manager
Date: (4? 'q
Recommended by:
4//14
Wendy Chi-Babulal, EMBA, P.E.
Development Engineering Manager
Water Department
(
Douglaa . Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. Af/� ,'.
Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
DEVELOPER
Centergy West 7th L.P.
Nalne:� West Miller
Title: Principal
Date: ////j//
ATTEST: (Only if required by Developer)
jamiwa &Nam.
$ignature
Name: SUMairlik
Y t. t e i•
ATTEST:
AAA ^.A Ao,AA AIN4 AA 14 A A A Ij AAA AAAA ALA
SAMANTHA NEIMER
My Commission Expires
August 22, 2016
I I I
o%Iari J. Kayser
City Secretary
v Y 4 i
•
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Location Map
❑ Exhibit A: Water Improvments
❑ Water Cost Estimate
❑ Exhibit A-1: Sewer Improvements
❑ Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
❑ Storm Drain Cost Estimate
0 Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
0
■
■
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02699
None
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
WHITE SETTLEMER T RD
\NI
0
BURY
5310 Harvest Hill Road, Suite 100
Dallas, Texas 75230
Tel. (972) 991-0011 Fax (972) 991-0278
TBPE # F-1048 TBPLS # F-10107502
Copyright ® 2015
DATE: September 23, 20151 SCALE. AS SHOWN
L
6-1
PROJECT
LOCATION
ti
WHITE SETTLEMER
-37
-
z
PENNS
Qi
W ROSEDALE ST
HEMPHILL ST
STREETSCAPE & STREET
LIGHT IMPROVMENTS
To SERVE LEFT BANK
CENTERGY RETAIL, LLC
8235 Douglas Avenue, Suite 900
Dallas, Texas 75225
Contact - West Miller, 214 368 7200 (Ofc), 214.616.3060 (Mbl)
DRAWN BY: JRN I FILE- VICINITY MAP.DWG
YL VANIA AVE
S MAIN ST
AIRPORT FWY
E HATTIE ST
•
Not to Scale
VICINITY MAP
PROJECT No. 0104157-30004
F \D10415n30004\7th And Harro'd - Fat tAbdh\ENGINEERING\CFA's\eft Bank - Streetscape 8 Lighting Improvemenis\CA01Uanty Map dwg modified by mpatton on Sep 23, 157 46 AM
0 100 200 300 400
1 "= 200'
1.
a
LEGEND
PROPOSED SIDEWALK
l -1- -�- - JyLSD
- ..O_�nt
OT
EF EFT
PROPOSED ADA ACCESSIBLE ,-hl
BARRIER FREE RAMP
REF 4
TIRTO CROSSWALK PAR
ET1100040 RIG
139
BURY
5310 Harvest Hill Road, Suite 100
Dallas, Texas 75230
TeL (972) 991-0011 Fax (972) 991-0278
TBPE # F-1048 TBPLS # F-10107502
Copyright ® 2015
DATE: September 23, 20151 SCALE: AS SHOWN
91.
0191
PASS FOR
E RANT
S FOR
ST 5T- STREET
rt ��`� '
I ... PAR P.xi etwuUG, . \
Ear
400EZI STOP
FOR OTT
0 ROLE CROSSWALK MID STEP
3:€43
WESI Fill-E1REET
Um . ...)
rf,aixEs.,
1 1.'iI�
a—€; en
--, gir
Ilia te
•
ree4 :
Elf
•
1d•-
:4.,
111:
vac
/20
take
nap.
Eglaty-
rl pS, r
�_:o plp
drug.,
NR' •
;N
!Ta . •
4.3-
r..•MEC
UM lilt:.
F DETER CO
PIR.K OR
poRTo
003
eICCE= 3ER W
CET A
AOCEWSLE ROAR
SEE PJJ/S FOR
NEBRASKA STREET" °ireCT
T/R0/4 CROSTGOK PO STOP
OF FORT EGON R DETAIL
DSO
Tr ROC OROSSGALK PAR
1.0.0-KG PEE OTT OF FORT
RE RIOSFOR
a
ORGY CROSSEGLISA/0 STOP
DSO
0
LEAF AVENUE
STREETSCAPE & STREET
LIGHT IMPROVMENTS
TO SERVE LEFT BANK
CENTERGY RETAIL, LLC
8235 Douglas Avenue, Suite 900
Dallas, Texas 75225
Contact - West Miller, 214.368.7200 (Ofc), 214.616.3060 (Mbl)
DRAWN BY: JRN 1 FILE: EXHIBIT PAVING (SIDEWALK, RAMPS, S PVMT MARKINGS) DWG
.1 K£---svc R00EEr__
foie . na,c awr'8r-u»
OSTS MO DIMS
171
i
cc
4
U
EXHIBIT Be
SIDEWALK, RAMPS,
& PVMT MARKINGS
PROJECT No
0104157-30004
1010415700304171h And Harrold - Fat Wodh\ENGINEERING\CFA's\Left Bank - Streetscape & Lighting Improvements1CAO\ExhIM 8 - Paving (S4erralk, Ramps. & Pvmt Markings) dory modified by pwemecer on Oct 9. 15 4 21 PM
KGB
-"Q
100 200 300 400
1 "=200'
LEGEND
BRANCH CIRCUIT AND COttOUC ORS, SJES AS INDICATED
SERVICE PROVIDER HANDHOLE NTTH SECONDARY FOR
STREET TIGHT SERVICE
GROUND BOX
UTILITY COMPANY TRANSFORMER
COiRACTOR PANEL
POLE (REFER TO DETAIL)
LUMRIBRE (REFER TO DETNL)
PROPOSED TREE (T0 BE INCLUDED IN SEPARATE MA:NTEtWIC
AGREEMENT WITH THE PARKS DEPARTMENT)
SSE rrro
REF DETAI.IDEI
m.^
BURY
5310 Harvest Hill Road, Suite 100
Dallas, Texas 75230
Tel. (972) 991-0011 Fax (972) 991-0278
TBPE # F-1048 TBPLS # F-10107502
Copynght ® 2015
TO FUTURE
PROP STRaT
RE DET.1.001
so
TOFUTURE
HOUSE PMa
WE5T-711-1 SWEET - -
no tom man ..n
LK
PROP STREET
2' SDI al
a1-COIT-� POLE
TVA y spas
PROP STREET
LIGHT POLE my
0
STtfSTREET
SWCEET
TO FUTURE
HOUSE PME.
i.
STREETSCAPE & STREET
LIGHT IMPROVMENTS
TO SERVE LEFT BANK
CENTERGY RETAIL, LLC
8235 Douglas Avenue, Suite 900
Dallas, Texas 75225
Contact - West Miller, 214.368.7200 (Ofc), 214.616.3060 (Mbl)
TOFUTURE
DAROTASTREET __- -
t—
a
SE 60 Pot rasp
EksairiftBY
TO FUTURE
MOOSE PAVEL
NEBRASKA STREET
llbsrn ETLIGHtEA EV-SiT,a.vun
-a
0
SSTREETLEET
TO
TO FUTURE
HOUSE FASO.
11
f
WESTSLiLSJRF.,ET__ -
uH
OAS MO COM
GREENLEAF AVENUE
P II
O
O
ee
i
cr
cc—
o:
EXHIBIT Ca STREET
LIGHTS
DATE: September 23, 20151 SCALE: AS SHOWN
DRAWN BY: JRN
FILE' EXHIBIT C- STREET LIGHTS DWG
F \0104157\33030417th And Harrold - Fort Wodh\ENGINEERING\CFA'S\Lef Banc - Streetscape & Lighting Improvements \CAO\E, h:brt C - Street Lights dng modhfied by yl1eme:er on Oct 9, 15 4 42 PM
PROJECT No. 0104157-30004
1
0 100 200 300 400
1"=200'
LEGEND
b SIGN
BURY
5310 Harvest Hill Road, Suite 100
Dallas, Texas 75230
Tel. (972) 991-0011 Fax (972) 991-0278
TBPE # F-1048 TBPLS # F-10107502
Copyright ® 2015
DATE: September 23, 20151 SCALE: AS SHOWN
1
STOP
ss CDOES M
c ��n
STOP
IHJ
o-;r
�I:I1
'4v
•
STREETSCAPE & STREET
LIGHT IMPROVMENTS
To SERVE LEFT BANK
CENTERGY RETAIL, LLC
8235 Douglas Avenue, Suite 900
Dallas, Texas 75225
Contact - West Miller, 214.368.7200 (Ofc), 214.616.3060 (MbI)
DRAWN BY: JRN I FILE: EXHIBIT Ci- STREET SIGNS DWG
gra
C
/ \
STOP
• CROSS TWFie
772
EXHIBIT Cl:
STREET SIGNS
PROJECT No. 0104157-30004
a
= %0104157\i0004\7th McI Harrold - Fort WodhkENGINEERING\CFASLLeft Bank - Streetscape 8 Lighting Improvements\CADIExhbd Cl - Street Sgns dxg modified by foe -meter on Oct 9, 15 4 29 PM
11/2/2015
ITEM NO.
BID ITEM
CFA- LEFT BANK - STREETSCAPE & LIGHTING IMPROVEMENTS QUANTITY MATRIX
SECTION A - STREETSCAPE/LANDSCAPE IMPROVEMENTS
1 Conduit Box
2 2" CONDT PVC SCH 80 (T)
3 4" Conc Sidewalk
4 Barrier Free Ramp, Type M-1
I 1
5 24" SLD Pvmt Marking HAE (W)
6 Lane Legend Arrow
7 Lane Legend Sharrow
8 NO 2 Insulated Elec Condr
9 NO 6 Insulated Elec Condr
10 Ornamental Assrnbly, Complex (20')
11 Furnish/Install Alum Sign Ground Mount City Std.
12 Rdwy Illurn Foundation TY 14
UNITSHEET NO. (PERTINENT SHEETS ONLY)
017 I 018 1 019 1 024 025 { 026 1 027 ( 028 1 029 1 033 1 034 1 035 1 040 1 041 1 042 I 044 ( 045 1 046
ITEM TOTAL
EA 8 I 11 1 4 I { I I { { I I I I 23
LF 1141 1 929 1 968 I 3038
SF 3811417548I19345I I I I I ( { { I I I I 65007
EA 1 1 ( 1 1 I 1 ( 34 ( 8 1 10 1 1 1 1 1 1 52
LF ( I 11386 I 378 I 691 I I I I I I I I I I 2455
EA. 1 1 1 I ( 1
EA. I I 11 I I I I I I I I I I I 1
LF 80 1 120 1 80 { ( ( ( I 280
LF 4564 13716 1 3872 ( I I ( I I I ( 12152
EA 9 I 5 I 9 ( I { I 23
EA I I ( 12 1 7 1 11 I I 30
EA 9 I 5 I 9 I { 23
UNIT PRICE BID
Bidlist Item)
No.
1 2605.2101
2 2605.3011
3 3213.0301
4 3213.0503
5 3217.0501
6 3217.1002
7 3217.1007
8 13441.1405
9 13441.1408
10 13441.3022
11 13441.4003
12 19999.0002
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
00 42 43
DAP - BID PROPOSAL
Page l of l
Bidder's Application
Specification Unit of Bid
Section No. Measure Quantity
STREETSCAPE AND STREET LIGHT IMPROVEMENTS
Conduit Box
2" CONDT PVC SCH 80 (T)
4" Conc Sidewalk
Barrier Free Ramp, Type M-1
24" SLD Pvmt Marking HAE (W)
Lane Legend Arrow
Lane Legend Sharrow
NO 2 Insulated Elec Condr
NO 6 Insulated Elec Condr
Ornamental Assmbly, Complex (20 j
Furnish/Install Alum Sign Ground Mount
Rdwy Ilium Foundation TY 14
26 05 33
26 05 33
32 13 20
32 13 20
32 17 23
32 17 23
32 17 23
34 41 10
3441 10
34 41 20
34 41 30
34 41 20
STREETSCAPE AND STREET LIGH
EA 23
LF 3038
SF 65007
EA 52
LF 2455
EA 1
EA 1
LF 2801
LF 121521
EA 231
EA 301
EA 231
T IMPROVEMENTS
Bid Summary
STREETSCAPE AND STREET LIGHT IMPROVEMENTS
Total Construction Bid
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
Bidder's Proposal
Unit Price
$1,050.09
$15.70
$8.00
$400.00
$1.50
$250.00
$250.00 1
$6.751
$1.501
$12,451.051
$250.00 1
$4,411.401
Bid Value
$24,152 07
$47,696.60
$520,056.00
$20,800.00
$3,682.50
$250.00
$250.00
$1,890.00
$18,228.00
$286,374.15
$7,500.00
$101,462.20
$1,032,341.52
$1,032,341.52
$1,032,341.52
237 calendar days after the date when the
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal_DAP-Streetscape Street Light Improvements.xlsx