AMENDMENT No.2
TO CITY SECRETARY CONTRACT No. 50377
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc. , (ENGINEER) made and entered into City
Secretary Contract No. 50377, (the CONTRACT) , which was
administratively executed on the 3rd day of March, 2018 in the amount
of $70, 000 . 00; and
WHEREAS, the CONTRACT involves engineering services
for the following project:
Riverside Park Phase I Improvements; and
WHEREAS, the Contract was subsequently revised by Amendment No. 1
in the amount of $180, 000 which was authorized by M&C C-28871, on
September 25, 2018; and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CONTRACT to include an increased scope and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a scope of services
proposal, a copy of which is attached hereto and incorporated herein
(Attachment A) . The cost to City for the additional services to be
performed by Engineer totals $14, 500 . 00 . (See Attached Funding
Breakdown Sheet, page 4)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the revised fee paid by the City
for all work and services shall be an amount of $264, 500 . 00 .
3 .
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect.
City of Fort Worth OFFICIAL RECORD
Professional Services Agreement Amendment Template CITY SECRETARY
PMO Official Release 8/1/2012
Page 1 of 4 FT.WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City' s
designated Assistant City Manager.
APPROVED:
City of Fort Worth Kimley-Horn
and Associates, Inc.
JA1&
Valerie Washington(Oct(OctS,202010:18 CDT)
Valerie Washington Scott R. Arnold, P.E.
Assistant City Manager Vice President
DATE: Oct 5, 2020 DATE: September 22, 2020
APPROVAL RECOMMENDED:
Rzdw,rd Z e
Richard Zavala(Sep 29,202017:13 CDT)
Richard Zavala
Director, Park & Recreation Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Tonda L. Rice
Project Manager
�1
JL
AT
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012 OFFICIAL RECORD
Page 2 of 4
CITY SECRETARY
FT.WORTH, TX
APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: Oct 2, 2020
Mack(Oct 2,202012:56 CDT)
Douglas W. Black
Assistant City Attorney
400vnaa��
a
ATTEST: per° °��'-�o
I Pvo 0=0
pA000
'*oo0o
*mod
d*2 � aafl nEXA`JooOp
,R nald P.Gonzales(Oct 5,202010:3 T)
Mary J. Kayser City
Secretary
City of Fort Worth
Professional Services Agreement Amendment Template OFFICIAL RECORD
PMO Official Release 8/1/2012
Page 3 of CITY SECRETARY
FT.WORTH, TX
FUNDING BREAKDOWN SHEET
City Secretary No. 50377
Amendment No. 2
Department Fund-Account-Center Amount
Park & 34018-0800450-5330500-CO1196 $14, 500 . 00
Recreation
Total : $14, 500 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 4 of 4
Attachment A to Amendment Number 2,
Riverside Community Park
Dated August 31, 2020
Consultant shall perform the following Additional Services:
Task VIII—Cultural Resource Survey
A. Phase I Pedestrian Survey: A Phase I Pedestrian Cultural Resource Survey for the
proposed improvements at Riverside Community Park, will be provided through the use
of a subconsultant. The Phase I investigation will be completed in an effort to identify
cultural resources in the project area and make recommendations about their significance
with regard to eligibility for listing on the National Register of Historic Places (NRHP) and
designation as a Texas State Antiquities Landmark (SAL). In the event that a
recommendation for NRHP or SAL eligibility cannot be made for a site found during the
Phase I survey, Phase II testing may be recommended and subsequently required by the
THC, if the site cannot be avoided. This proposal does not include any Phase II testing or
Phase III mitigation tasks. The following be provided as part of this scope:
1. Fieldwork: The subconsultant field crew will survey the northern 15 acres of the
Riverside Community Park. Survey standards will meet the minimum requirements
accepted by the THC (2020). If archaeological sites are found during the survey,
ARC is required to record them. The following assumptions have been made in
regards to the fieldwork associated with this task.
a. The subconsultant will record up to one(1)archaeological site.
b. The City will provide access to the site.
c. If human remains are found, all activity in the vicinity of the remains will
cease. Law enforcement officials, the Engineer and the City will be notified.
2. Deliverables: The subconsultant will produce a technical report, prepared in an effort
to meet the current and published standards adopted by the THC(Council of Texas
Archeologists 2018)and present a review of the natural environment and cultural
history of the project area, a research design and methodology, and the results of the
field investigations, along with conclusions and recommendations.
3. Curation: Records and collected artifacts must be curated in perpetuity with an
approved curatorial facility, in order to fulfill requirements in the TAP. A City of Fort
Worth representative must sign the required curatorial paperwork. If any artifacts are
collected on private land, they will be returned to the landowner at their request.
4. Schedule: The Engineer requires written notice to proceed (NTP) in order to begin
work. The schedule is subject to change if weather prohibits fieldwork, human
remains are found, or an architectural historian must be consulted.
a. The TAP Application process will begin within ten (10)working days of NTP.
b. Fieldwork will begin within fifteen (15)working days of receiving the TAP, and
will be completed within five (5)working days.
c. A Preliminary/Draft version of the Cultural Survey Report will report will be
submitted to the Engineer and the City within fifteen (15)working days, for
review; and submitted to the THC within five(5)working days of City
approval.
5. Additional Services: The following items have been excluded from the scope.
a. Review of more than (1)archaeological site.
b. Review of the site by an architectural historian.
c. Review of additional project area, in excess of fifteen (15)acres
Rev.11-08
Kimley>>> Horn
Attachment "B"
COMPENSATION
City of Fort Worth, TX-Riverside Community Park Amendment#2
Special Services
Task VIII Cultural Resource Survey $14,500
Total Amendment Lump Sum Fee (Special Services) $14,500
80100
Kimley>>Morn
Attachment "C"
PROJECT SCHEDULE
City of Fort Worth, TX-Riverside Community Park Amendment#2
Task Duration
(Calendar Days)
Notice to Proceed 0
Cultural Survey Fieldwork 15
Draft Cultural Survey Report 15
Final Cultural Survey Report 5
TOTAL PROJECT DURATION (AMENDMENT#2) 35
Times for performance shall be extended as necessary for delays or suspensions due to circumstances
that the Professional does not control.