Loading...
HomeMy WebLinkAboutContract 52870-A1 AMENDMENT No. I CSC No. 52870-A1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Gupta & Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 52870 (the CONTRACT) on the 2nd day of October 2019 in the amount of $33, 415; and WHEREAS, the CONTRACT involves engineering services for the following project: Sendera Ranch Pump Station Improvements . WHEREAS, it has become necessary to execute Amendment Mo. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional professional services to be performed by Engineer totals $5, 000 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $38, 415.00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: OFFICIAL RECORD Page CITY SECRETARY FT.WORTH,TX City 0-f Fort worth, ENGINEER: Gupta & Associates, 7nc. 011 2 47;Ia� e-4a-4-M6� J,� -�L Dana Burghdoff(Oct 2,202W:44 CDT)(,(,/ Dana Burghdoff Puneat GuLpta, P .E. Assistant City Manager Vice President DATE: Oct 5, 2020 DATE: . September 22, 2020 APPROVAL RECOMMENDED: chpis-foyhor Harder Christopher Harder(Sep 30,2020 17:05 CDT) Chris Harder, P .E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Ma tin Phillips, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: Date: 1295�i') : Mack(Oct 2,2020.16:07 CDT) Douglas W. Black Senior Assistant City Attorney oftr - EST: '6;1. as oo 0.00 L. gj�.p %,1�0' ir,1.o o 00—o o . o o 'for Ronald P.Gonzales(Octg;2020 08:49 CDT) PUo' o o oo oe Mary J. Kayser o o 1-o oo City Secretary OFFICIAL RECORD Page -2- CITY SECRETARY FT.WORTH,TX GAIGupta&Associates, Inc 13717 Neutron Road CONSULTING ENGINEERING Dallas,Texas 75244 TBPE#F-2593 972-490-7661 July 20, 2020 Fort Worth Water Department 2500 SE Loop 820 Fort Worth,TX 76140 Attn: Mr.Samuel Rivera Loubriel Re: Meadow Lakes Lift Station—Generator Addition Design Scope Thank you for the opportunity to present our scope and fee for the Meadow Lakes Lift Station—Generator. Fort Worth Water Department (FWWD) has requested GAI to provide electrical detailed design services for the addition of the generator and automatic transfer switch. GAI has assumed the following: 1. Size and provide specification for a new generator. 2. Size and provide specification for a new automatic transfer scheme. 3. Provide a basic one line diagram to assist the suppliers in bidding the generator and ATS. 4. Site plan,wire/conduit sizing,ductbank routing,installation details,connectivity and all other related items will be performed by the Owner. 5. Bidding services will be performed by the Owner. 6. Construction phase services will be performed by the Owner. 7. Owner will facilitate electrical service from the power company. Services identified above are for design phase services only. Two specifications and one drawing will be provided,unless otherwise noted above. Bid phase and construction phase are excluded. Proposed Engineering Fee(GAI) Item Engineering Description Fee 1 Base Electrical Design $5,000 Total $5,000 Sincerely, Puneet Gupta, P.E. Gupta and Associates, Inc. 9/29/2020 M&C Review Official site of the City of Fort worth,Texas CITY COUNCIL AGENDA FoRTOR I-1 DATE: 8/27/2019 REFERENCE**M&C 19- LOG NAME: 60SENDERA RANCH PUMP STATION NO.: 0071 IMPROVEMENTS CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Service Agreement with Oncor Electric Delivery Company, LLC in the Amount of$147,233.14 to Provide a Secondary Electric Feed to the Sendera Pump Station and Generator Upgrade, Provide for Equipment Purchases, (Collectively, the Sendera Ranch Pump Station Improvements, Capital Project No. 102231), a Component of the Total Project Amount of$600,000.00, and Adopt Appropriation Ordinance (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations for the Sendera Ranch Pump Station Improvements Project in the Water and Sewer Capital Projects Fund in the amount of $600,000.00 from available funds; and 2. Authorize the execution of an Agreement with Oncor Electric Delivery Company LLC in the amount of $147,233.14 to provide a secondary electric feed to the Sendera Pump Station (City Project No. 102231). DISCUSSION: The Sendera Ranch Pump Station has six medium voltage pumps operating at 4160 Volts. The pump station has become a critical element with respect to the city's ability to provide water service to the community in this area due to increased and anticipated development. Frequent storms in the spring and summer caused power outages that also impacted the Sendera Pump Station which has only one electrical supply service. Additionally, the current generator at this pump station does not have the capacity to run the pumps and most other electrical equipment at the site during these power outages. In storm events, staff must transport a large portable generator capable of running the pumps and other equipment at the site to ensure service to our customers is uninterrupted. Oncor Electric Delivery Company, LLC, proposes to provide the pump station with a secondary feed to supplement the existing feed, giving the site additional protection against power outages, for a fee of$147,233.14. Gupta and Associates, Inc. proposes to provide the necessary design services for a fee of $33,415.00. Staff considers the proposed fees to be fair and reasonable for the scope of services proposed. The total project cost of$600,000.00 is inclusive of the agreements mentioned above and the purchase of a larger generator and pump as well as other supporting equipment which will be installed by City staff. The project is located in COUNCIL DISTRICT 7. A Form 1295 is not required for this contract because: This contract will be with an electric utility: Oncor Electric Delivery Company, LLC A Form 1295 is not required for this contract because: This contract will be with an electric utility: Oncor Electric Delivery Company, LLC apps.cf,vnet.org/counci l_packet/mc_review.asp?I D=27220&counci(date=8/27/2019 1/2 9/29/2020 M&C Review FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water and Sewer Capital Projects Fund. The Fiscal Year 2019 Water Operating Budget includes appropriations of$23,865,180.00 for the purpose of providing Pay-As-You-Go Funding for Water Capital Projects. After this transfer for Fiscal Year 2019, the balance will be $5,754,786.00. Funding for the Sendera Ranch Pump Station Improvements Project is depicted in the table below: FUND Existing Additional IlProject jAppropriations Appropriations Total* IW&S Capital I �$600,000.00 Projects- Fund $0.00 $600,000.00 56002 (Project Total I$0.00 I$600,000.00 1$600,000.00 * Numbers rounded for presentation. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference# Amount -] ID ID Year (Chartfield 2) Submitted for City Manager's Office by_ Dana Burghdoff(8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Martin Phillips (8293) ATTACHMENTS 60SENDERA RANCH PUMP STATION IMPROVEMENTS -Exhibit.pdf 60SENDERA RANCH PUMP STATION IMPROVEMENTS -MAP.pdf 60SENDERA RANCH PUMP STATION IMPROVEMENTS 56002 A019.docx apps.cfwnet.org/council_packet/mc_review.asp?ID=27220&councildate=8/27/2019 2/2