HomeMy WebLinkAboutContract 53452-AR1 FORT WORTH, City of Fort Worth CSC No.53452-AR1
Construction Allowance Request
Project Name N.Riverside Drive From Old Denton Road to N.Tarrant Parkway City Sec# 1 53452
Client Project#(s)I CO2272
Project Construct four-lane,divided arterial street with roundabouts at Thompson Road and Summerfields Boulevard.The project will include new travel lanes,
Description lintersection improvements,drainage improvements,shared-use paths,sidewalks,street lights,etc.
Cointractorl McMahon Contracting,L.P. City Inspector Shawn Fargo
Funding Allocation Account 34014 30108 59651 Contract Time
Totals CD
Original Contract Amount 5,607,455.12 $2,720,821.43 $579,664.02 $8,907,940,57 540
Extras to Date $0.00 $0.00 $0.00
Credits to Data $0.00 $0.00 $0.00
Current CantractAmount $5,607,455.12 $2,720, 221.43 $579,664.02 $8,907,940.57 540
Amount of Proposed Allocation $98,669.5-7 $73,159.20 O.OD $171,828.77
Original Allowance Available for Allocation $144,000.00 $156,000.00 $300,000.0u
Allowance Funds Previously Allocated $0.00 $0.00
Remaining Funds Available for this Allocation $144,000.00 $156,000.00 $300,000,00
JUSTIFICATION(REASON$)FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed
Corstruction Allowance Request(with attachments)to the Construction Allowance Request: CONSTRUCT RAISED CROSSWALKS PER REVISED PLANS DATED
REVISIONS 07-13-2020(SEE ATTACHED). CHANGES TO THE BID ITEM QUANTITIES FOR ADDING THE RAISED CROSSWALKS(SEE ATTACHED).
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Construction Allowance Request. Contract Time will
be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order,if necessary. The Project/Program Manager
signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all perl'ormance
and reporting requirements.
Contractors Company Name Contracto ame Contract 5i Date
InsELotoOnspectiDn Supervisor Date Project and antra Com Hance Manager- Date
Sep 30,2020 _
Sep 30,2020
Program Manager Gate Senior Ca itai Project Officer Date
Sep 30,2020 Sep 30,2020
Assistant Director(Dept) Dafe Director,Contractinq Department(Dept) Date
LH Oct 1,2020 --��.1, Oct 1,2020
,
Assistant City Attorney Date Assistant City Manager Date
Mrs-
Oct 2,2020 Dana Rurnh� oar 2,2020
vvnp��
ATTEST: OF Fa.Rt" add
'�,a°,m c.rAa,is las,uuorsxcon 0 °° °0
9�Idd
Fo
MaryJ.Kayser,City Secretary pC1g oxd
,
d�Qn nExPSo°p
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH, TX
City of Fort worth
Construction Allowance Additions
Project Name N.Riverside Drive From Old Denton Road to N.Tarrant Parkway City Sec# 53452
Client Project# CO2272
Contractor McMahon Contracting,L.P. Inspector Shawn Fargo
ADDITIONS
Unit U
nit Cost
c.- n egra o or a ur RaisedCrosswalkwithConcrete n
1c.1-72 Variable Height u an utter patter sans Sidewalk) 200.00000000
1c.1-73 9999.0000 Specialty Concrete Pvmt Removal 30108 200.00000000 Y
c.- 5 Concrete vmt Riverside r mt
1c.2-62 9999.0000 Integral olored extured Raised Crosswalk with 10"Concrete Un 34014 355.00000000 Yc.- 9999.0000 Variable Height urb and utter At plitter Islands idewalk LF
1d-24 9999.0000 Raised Crosswalk Chevron Striping HAE 34014 8.00000000 EA $110.001
9999.0000 Raised Crosswalk Chevron Striping
3-27 9999.0000 Integral Coloredirrextured Raised Crosswalk with 10"Concrete Un 34014 85.00000000 SY 288.79
9999.0000 Variable Height Curb and Gutter Sp litter IslandsSidewalk) 34014 80.00000000 5
3-29 9999.0000 Raised Crosswalk Chevron Striping HAE 34014 4.00000000 EA 110.00
34014 142,203.20
30108 $97,169.10
59651 $0.00
Sub Total Additions 23%372.30
Change Order Additions Page 2 of 4
FORTNVORTH City of Fort Worth
Construction Allowance Deletions
Project Name N.Riverside Drive From Old Denton Road to N.Tarrant Parkway City Sec# 53452
Client Project# CO2272
Contractor McMahon Contracting,L.P. Inspector Shawn Fargo
ITEM5 TO BE REDUCED AND CREDITED TOWARD GONSTRUCTION ALLOWANCE
ITEM DESCRIPTION ut:PT Qty Unit UnitCost Total
c. Concrete Pvmt(N Riverside OrPvmt)
c. 7 9999.0000 Type A&D Paving-Integral Colored/Textured oncrete Truck TfffUF--TUT560WY
1c.2-33 3213.0102 7"Concrete Pavement(Summerfields,Thompson,Montena&Old 134014 15.00000000 SY .73 REFS
c. 5 3213.0105Concrete Pvmt N Riverside Or Pvmt 4 Y
1c.2-37 9999.0000 Type A&D Paving-Integral Colored/Textured 10"Concrete(Truck 34014 133.00000000 SY $135.30 7,
d 7. 4"BRK Pvmt Marking H 34014 5. LF
1d-04 3217.0201 8"SLD Pvmt Marking HAS(W) 34014 15.00000000 LF 2.32
d LD Pvmt Marking HAE 4 4 LF
1d-08 3217.0501 24"SLD Pvmt Marking HAE(W) 34014 210.00000000 LF $9.29
d 7. 4"BRK Pvmt Marking H 4 4 5. LF
1d-04 3217.0201 8"SLD Pvmt Marking HAS(W) 34014 15.00000000 LF 2.32
d LD Pvmt Marking HAE 4 4 LF
1d-08 3217.0501 24"SLD Pvmt Marking HAE(W) 34014 210.00000000 LF $9.28
7Concrete Pvmt Western Thompson Roundabout Leg-Dunaway 34014 51.00000000 Y $57.2Z
3-08 9999.0000 Integral Colored/Stamped 8"Concrete(Western Thompson Roundal 34014 34.00000000 SY $164.91
7 3217.0501 24"SLD Pvmt Marking HAE 4 4 LF
34014 ,533.63
30108 $24,009.90
59651 $0.00
ub Total Deletions 7,
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Construction Allowance
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Construction Allowance
co# DATE AMOUNT
Total $0.00
North Riverside Dr-Addendum 4 8/14/2020
Quantities for Added Raised Crosswalks
for
N.Riverside Drive from Old Denton Rd.to North Tarrant Pkwy.
City of Fort Worth,Texas
ADDENDUM NO.4
Project Item Information Bidder's Proposal
Item Added Deducted Total
Number Description Spec Number Unit Quantity Quantity Quantity Unit Prim Extended Prim
Unit 1c.1:Paving Improvements-Southbound Lanes,Excluding Thompson Roundabout
(FID 30108 0200431 5740010 CO2272 CO2380)
-Corresponds to area designated in red in Funding Exhibit
1c.1-35 3213.0105 10"Concrete Pvmt N Riverside Or Pvmt 32 13 13 SY 180 -180 $52.96 -$9,532.80
1 c.1-37 9999.0000 Type A&D Paving-Integral Colored/Textured 10"Concrete(Truck Apron&Outside 32 13 13 SY 107 -107 $135.30 $14,477.10
of Crosswalks
1 c.1-71 9999.0000 Integral Colored/Textured Raised Crosswalk with 10'Concrete Underlay 32 13 13 SY 290 290 $288.79 $83 749.10
1c.1-72 9999.0000 Variable Height Curb and Gutter(At Splitter Islands Sidewalk) 32 16 13 LF 200 200 $33.85 $6,770.00
1c.1-73 19999.0000 Specialty Concrete Pvmt Removal 024115 SY 200 200 $33.25 $6,650.00
UNIT 10:Paving Improvements Subtotal $73,159.20
Unit 1c.2:Paving Improvements-Remainder of Project,Excludes Unit 1c.1&Unit 3(FID
34014 0200431 5740010 CO2272 CO2380
1 c.2-33 3213.0102 7"Concrete Pavement(Summedields,Thompson,Monterra&Old Denton Pvmt) 32 13 13 SY 15 -15 $45.73 -$685.95
1 c.2-35 3213.0105 10"Concrete Pvmt N Riverside Or Pvmt 32 13 13 SY 10 220 -210 $52.96 -$11,121.60
1 c.2-37 9999.0000 Type A&D Paving-Integral Colored/Textured 10"Concrete(Truck Apron&Outside 32 13 13 SY 133 -133 $135.30 -$17,994.90
of Crosswalks
1 c.2-62 9999.0000 Integral Colored/Textured Raised Crosswalk with 10'Concrete Underlay 32 13 13 SY 355 355 $288.79 $102,520.45
1 c.2-63 9999.0000 Variable Height Curb and Gutter(At Splitter Islands Sidewalk) 32 16 13 LF 280 280 $33.85 $9,478.00
UNIT 1c.2:Paving Improvements Subtotal $82,196.00
Unit 1d.1:Signage&Pavement Marking Improvements -Southbound Lanes,Excluding
Thompson Roundabout(FID 34014 0200431 5740010 CO2272 CO2380)
1 d-03 3217.0003 4"BRK Pvmt Marking HAS(W) 32 17 23 LF 5 5 $1.22 -$6.10
1 d-04 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 15 -15 $2.32 -$34.80
1 d-06 9999.0000 8"SLID Pvmt Marking HAE(W) 32 17 23 LF 10 -10 $6.96 -$69.60
1d-08 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 210 -210 $9.28 -$1,948.80
1d-24 9999.0000 Raised Crosswalk Chevron Striping HAE(W) 32 17 23 EA 8 8 $110.00 $880.00
UNIT 1d.1:Signage&Pavement Marking Improvements Subtotal -$1,179.30
Unit 1d.2:Signage&Pavement Marking Improvements-Remainder of Project,Excludes
Unit 1c.1&Unit 3 FID 34014 0200431 5740010 CO2272 CO2380
1 d-03 3217.0003 4"BRK Pvmt Markin HAS W 32 17 23 LF 5 -5 $1.22 -$6.10
1 d-04 3217.0201 8"SLID Pvmt Marking HAS(W) 32 17 23 LF 15 -15 $2.32 -$34.80
1 d-06 9999.0000 8"SLID Pvmt Marking HAE(W) 32 17 23 LF 10 -10 $6.96 -$69.60
1d-08 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 210 -210 $9.28 -$1,948.80
1d-23 9999.0000 Raised Crosswalk Chevron Striping HAE(W) 32 17 23 EA 10 10 $110.00 $1,100.00
UNIT 1d.2:Signage&Pavement Marking Improvements Subtotal -$959.30
Unit 3:Thompson Western Roundabout Leg Improvements(FID 34014 0200431 5740010
CO2272 CO2380)
Corresponds to area designated in purple in Funding Exhibit
3-07 3213.0103 8"Concrete Pvmt(Western Thompson Roundabout Le -Dunaway Plans 32 13 13 SY 51 -51 $57.24 -$2,919.24
3-08 9999.0000 Integral Colored/Stamped 8"Concrete(Western Thompson Roundabout Leg- 32 13 13 SY 34 -34 $164.91 -$5,606.94
Dunaway Plans
3-17 3217.0501 24"SLD Pvmt Markin HAE 32 17 23 LF 60 -60 $9.28 -$556.80
3-27 9999.0000 Integral Colored/Textured Raised Crosswalk with 10'Concrete Underlay 32 13 13 SY 85 85 $288.79 $24 547.15
3-28 9999.0000 Variable Height Curb and Gutter At Splitter Islands Sidewalk 32 16 13 LF 80 80 $33.85 $2,701.00
3-29 9999.0000 Raised Crosswalk Chevron Striping HAE 32 17 23 EA 4 4 $110.00 $440.00
Unit 3:Thompson Western Roundabout Leg Improvements Subtotal $18,612.17
Bid Summary
Unit 1c.1:Paving Improvements-Southbound Lanes,Excluding Thompson Roundabout(FID 30108 0200431 5740010 CO2272 CO2380) $73 159.20
Unit 1c.2:Paving Improvements-Remainder of Project,Excludes Unit 1c.1&Unit 3(FID 34014 0200431 5740010 CO2272 CO2380) $82 196.00
Unit 141.1:Signage&Pavement Marking Improvements -Southbound Lanes,Excluding Thompson Roundabout(FID 34014 0200431 5740010 CO2272 CO2380) -$1 179.30
Unit 141.2:Signage&Pavement Marking Improvements-Remainder of Project,Excludes Unit 1c.1&Unit 3(FID 34014 0200431 5740010 CO2272 CO2380) -$959.30
Unit 3:Thompson Western Roundabout Leg Improvements(FID 34014 0200431 5740010 CO2272 CO2380) $18 612.17
Total Bid $171,828.77
END OF SECnON
NmlhR I."Ddn
Prq.N.AM2
I oft
Ad&.&-4-Q-kW S raaed Co-.W 09-14-2020.xb
9£ZL #30O 9LbZ-N lL9£Z-X 'Oa NOlN30 O10 Ol '1.MNd 1NVaaVl 'N w0a3 — 3AId(I 301Sd3AId HlaON
`"�mm ern Z5 2- ib33 S� p- Z
�3e
^ n� 9 Z • t z z�� f s i r m
^.b W Z
U z �c
W o 0o v f ZO o •.eR:/ ! E F J CD!n (J
m6 =w$m = moo W° No
ps - o_o
z Z Vl U <
o _ o2oNm w W�w a _ €x Q �° W
U o w ao k & mw�m F H~ Y S
a R$ 24 z a N o p Z a m
o
Z a Ea O Z o 0
z z z z
S tloo so&z s oN��� / •';143__"'•® ® o �md (IfO N -
dddd
t I I
I I I
I I �
� III a
I
I 8
I , \�I a
oe =
ox2 2
e$ =W
z Wr~
i
i
I I
I .s
�e
nab o-
es I
cl
I
i n
a4 Sa1313a3WWnS
i =_
�2
se
aPaa a„� o�a�
say �� =�2�2 n �
I I I
I
9 pZ
6 I
I I
^o 9i�a ogna �n��
I
M2 $n
I I
O Q I
I
I
9£ZL #300 9LbZ-N lL9£Z-X '0a NOlN30 010 Ol '1.MNd 1NVaaVl 'N w0a3 - 3AId(I 301Sd3AId HiaON
�q inn �m$� 9 Z • • Y _ ■ ise % n g\ m $o O O
w Z
.. . azw ✓'i3' {')> to Gg x U Z Z > a
Oc�
ul7:6Y
mz _ d Om �O N
wZ
z N a
8 O E 3 Z o'O (ifi
�n €x Q O
s 31 :zw a mw�m o Z O? �a cmi
S
of
n o 3 o a z =a w
Q H Na N r
a O � p o n
� r p a33 p o S " ul z z z
dada r�
o.
x� o
9 SPmm S'.p' T en
gRe oAw T" r o tl a
�z zgr
I .0�
El
•BB'6t
ME o�� gBmm germ
o
w "b
-Oa NOSdWOHlLi
-
l1
�s
m on
m gnm /
£0 a�
.z�
I
I
ammn me m�
" e
i
g�aa va
aim^ ~�I II
ITV � I
9£ZL #30O 9LbZ-N lL9£Z-X 'Oa NOlN30 O10 Ol '1.MNd 1NVaaVl 'N w0a3 — 3AId(I 3O1Sd3AId HiaON
Z
2 `— 5 W 0
i
. i3i�=i n 3 ➢= VI Z Z cV
O Z 0 in
E m Ln cn a
_� iwgm O w> O
d o0 00
0 n w Z z
w, €x 3 ¢
O 00 (if ¢ 3
m w a W 3 a
?? [If j S
aO ~ m W
p V~ S<
cn<
p �
„E Of ¢ o
QQQQ n (Ifim m, Q Z Z O -
H K
OJ
N O
om -I II LULU
Q1
>
FF'
I � �
II
II
II
II
II
�I J
I LU
x a
I J
I
W
g U)
41
I � a
e I o6"SCANDAftD
CURB
ry -
6'SCANDAFU CURB
\ m (0 odno 0L,
\ 9
J
J 3-3
Si ANDARD CURB
I
31 1-2
oNo _
- - I
I
a1 I
I
9£ZL #30O 9LbZ-N lL9£Z-X 'Oa NOlN30 O10 Ol '1.MNd 1NVaaVl 'N w0a3 — 3AId(I 301Sd3AId HiaON
� o
VD
0 0
xUZOa Ln (J
f/
- �e
r Q O W 3 a <
<Z ��� o <o o?
sp aaaa p �md U a z Z o -
pQ F
�o G
a ps $
w
5n
0
H W Q�
Z (n
W J_ j
Q
WLd Q�
>W r o n� zaw pz z-z
CS) 3 N zN w� J
Q Q w� 3p ow sri J=a w
a N ��w Y
Um a osa z� &w-Apw 'z m w=m Q
oN N z ad N„ w cn
x w � m�
¢� zgs�� � m m �' rc O
mo _ <� N� o <sm
z -moo a oo m s' U
, -
ww - wp O Npwa NN ni J p Z
mpz az w
ZK J � niz � Ow 5z.
UO z s svr wN mSza rc5 lo
z3�N 'r'^^Kw pia 3o TImaw�rc t�z xo? Sc an'z vI
W
QJ �p cia nattr_raauf z aorc w>-n <
3 i �a rz o W
ow
U O
Z w W
Q K N
K
N a
a¢
z
NIV O
�.0-S 0
zo
pG - 5 �
�! �g - &off - - Q N
zz
0 88
5
oa a us m o
u g� m
¢
O <5 � �; w Q u _
zoi
w?nNEYE
rcz -
$o lzo.
a&
rc�pic
>op<
gr3
z�`�w'g rcp
From: James Proulx
To: White,Derek A;Manuel Rocha;Fargo.Shawn;Lopez.Raul;Austin Baird.PE(TX.AR.LA.ND.NM.OK)
Subject: RE:CO#1 Discussion-CO2272 N. Riverside Drive From Old Denton Road to N.Tarrant Parkway
Date: Wednesday,August 12,2020 11:00:36 AM
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
Derek,
The Concrete removal item will have a different unit rate for a few reasons, here they are:
1. The paving being removed is 10"thick instead of 8"thick like the original pay item accounts
for.
2. The areas are small in comparison to the bulk demo of the original contract.
3. We had to saw cut the paving into blocks for easier removal to not destroy the lime sub-grade
underneath that we reused.
4. We had to use smaller equipment and take more time to remove carefully to not damage the
new paving around the demo areas.
These are the reasons as to why the original concrete removal item will not work for the plan
revision work. We would lose money at that rate.
The item# 1D 1-02 should be item# 1D 1-04 and have a rate of$2.32 per LF
The item 1D 1-03 should be item# 1D 1-06 and have a rate of$6.96 per LF
This are the items I can shed light on.The other comments you have need to be addressed by the
design engineer. I am not 100%sure how to address those.
Thanks,
James Proulx
McMahon Contracting
972)263-6907 x 28 Office
817)458-6561 Cell
From:White, Derek A<Derek.White@fortworthtexas.gov>
Sent:Tuesday, August 11, 2020 4:04 PM
To:James Proulx<JamesPr@mcmahoncontracting.com>; Manuel Rocha
<ManuelR@mcmahoncontracting.com>; Fargo, Shawn <Shawn.Fargo@fortworthtexas.gov>; Lopez,
Raul <Raul.Lopez Roura@fortworthtexas.gov>; Austin Baird, PE (TX, AR, LA, ND, NM, OK)
<abaird@bhbinc.com>
Subject:CO#1 Discussion -CO2272 N. Riverside Drive From Old Denton Road to N.Tarrant Parkway
Gents,
See my comments on C01 proposal.
Thanks,
Derek
Derek A. White, PhD, PE
Senior Project Manager
City of Fort Worth
Transportation and Public Works
200 Texas Street
Fort Worth,TX 76102
Office: (817) 392-2383 1 Cell: (817) 682-3181
Email: derek.whiteCcDfortworthtexas.gov
City of Fort Worth—
Working together to build a strong community.
FORT WORTH,:
From: Austin Baird,PE(TX,AR,LA,ND,NM,OK)
To: White,Derek A
Cc: Akram Awad,PE;Lopez,Raul;Konstantine Bakintas,PE
Subject: Fwd:CO#1 Discussion-CO2272 N. Riverside Drive From Old Denton Road to N.Tarrant Parkway
Date: Friday,August 14,2020 11:08:17 AM
Attachments: Addendum 4-Ouantities for Raised Crosswalks 08-14-2020.pdf
ATT00001.htm
Addendum 4-Ouantities for Raised Crosswalks 08-14-2020.xls
ATT00002.htm
WARNING:The sender of this email could not be validated and may not match the person in the"From"field.
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
Derek,
As we discussed in field today, attached is an updated copy of the raised crosswalk change
order documents. This should capture all of the previous comments as well as the fact that we
have created a new bid item number for the small quantity concrete removal which the doesn't
work at the same price as the bulk as the original bid price.
If you have any other comments please just let me know.
Austin Baird, PE (TX,AR, LA, ND, NM,OK)
Principal I Senior Civil Engineer
Baird, Hampton&Brown
3801 William D.Tate,Suite 500
Grapevine,Texas 76051
817.251.8550 phone
817.565.4043 mobile
abaird(o)bhbinc.com
TBPELS Firm#44,#10011300,#10011302,#10194146
bhbinc.com I Linkedln I Facebook
Begin forwarded message:
From: "Akram Awad, PE" <aawad@bhbinc.com>
Date: August 14, 2020 at 10:43:38 AM CDT
To: "Austin Baird, PE (TX, AR, LA,ND,NM, OK)" <abaird@bhbinc.com>
Subject: RE: CO#1 Discussion- CO2272 N. Riverside Drive From Old
Denton Road to N. Tarrant Parkway
Austin,
Please see the attached quantities for the crosswalks.The Remove Concrete Pvmt line
item is now shown as 9999.0000—Specialty Concrete Pvmt Removal.
Thank you,
Akram Awad, PE
Civil Engineer
Baird, Hampton&Brown
3801 William D.Tate,Suite 500
Grapevine,Texas 76051
817.251.8550 x324 phone
aawad(fthbinc.com
TBPELS Firm#44,#10011300,#10011302,#10194146
bhbinc.com I Link In I Facebook
From:Akram Awad, PE
Sent:Thursday, August 13, 2020 4:06 PM
To:Austin Baird, PE (TX, AR, LA, ND, NM, OK) <abaird@bhbinc.com>
Subject: RE: CO#1 Discussion -CO2272 N. Riverside Drive From Old Denton Road to N.
Tarrant Parkway
Austin,
Please see the updated quantities per comments received. Please note the "remove
conc pvmt" line item price was given to us by the contractor and was not from the
C620 form.
Thank you,
Akram Awad, PE
Civil Engineer
Baird, Hampton&Brown
3801 William D.Tate,Suite 500
Grapevine,Texas 76051
817.251.8550 x324 phone
aawad(fthbinc.com
TBPELS Firm#44,#10011300,#10011302,#10194146
bhbinc.com I Linkedln I Facebook
From:Austin Baird, PE (TX, AR, LA, ND, NM, OK) <abaird(@bhbinc.com>
Sent:Thursday,August 13, 2020 8:54 AM
To:Akram Awad, PE<aawad(@bhbinc.com>
Subject: Fwd: CO#1 Discussion -CO2272 N. Riverside Drive From Old Denton Road to N.
Tarrant Parkway
Akra m,
Can you take a look at this and we can discuss later today.
Austin Baird, PE (TX,AR, LA,ND,NM, OK)
Principal I Senior Civil Engineer
Baird, Hampton & Brown
3801 William D.Tate,Suite 500
Grapevine,Texas 76051
817.251.8550 phone
817.565.4043 mobile
abairdnu_.bhbinc.com
TBPELS Firm#44,#10011300,#10011302,#10194146
bhbinc.com I Linkedln I Facebook
Begin forwarded message:
From: "White, Derek A" <Derek.White(@fortworthtexas.gov>
Date:August 11, 2020 at 4:04:26 PM CDT
To:James Proulx<JamesPr(@mcmahoncontracting.com>, Manuel Rocha
<ManuelR(@mcmahoncontracting.com>, "Fargo, Shawn"
<Shawn.Fargo(@fortworthtexas.gov>, "Lopez, Raul"
<Raul.Lopez Roura(@fortworthtexas.gov>, "Austin Baird, PE (TX,AR, LA,
ND, NM, OK)" <abaird(@bhbinc.com>
Subject:CO#1 Discussion-CO2272 N. Riverside Drive From Old Denton
Road to N.Tarrant Parkway
Gents,
See my comments on C01 proposal.
Thanks,
Derek
Derek A. White, PhD, PE
Senior Project Manager
City of Fort Worth
Transportation and Public Works
200 Texas Street
Fort Worth,TX 76102
Office: (817) 392-2383 1 Cell: (817) 682-3181
Email: derek.white(@fortworthtexas.gov
City of Fort Worth—
Working together to build a strong community.