Loading...
HomeMy WebLinkAboutContract 47172 (2)art COMMACT r a+m f.d fel‘l kip OCR' 212015UPI 0V . FORT nRIt SPNIETIVai Developer Company Name: Developer and Project Information Cover Sheet: Summer Creek South Development, Ltd. Address, State, Zip Code: 3045 Lackland Rd, Fort Worth, TX 76116 Phone & Email: 817-717-7133, fleet@lacklandholdings.com Authorized Signatory, Title: Tim Fleet, General Manger Project Name and Brief Summer Creek South Phase 4 Description: Project Location: 9000 Summer Creek Rd Plat Case Number: FP-13-020 Plat Name: Summer Creek South Phase 4 Mapsco: <Mapsco> Council District: 6 CFA Number: 2015-078 To be completed by staffs Received by: az7 ky1 VI /S • City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 1 of 11 City Project Number: 02220 DOE Number: 7179 Date: OFFICIAL RECORD SwtmTX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Summer Creek South Development, Ltd, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Summer Creek South Phase 4 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ,, Sewer (A-1) ©, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to • meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers. servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 11 Cost Summary Sheet Project Name: Summer Creek South Phase 4 CFA No.: 2015-078 DOE No.: 7179 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total $ 431,045.50 $ 215,929.50 $ 215,116.00 B. TPW vv Construction n 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total $ 742, 978.69 $ 575, 321.44 $ 91, 857.00 $ 75,800.25 Total Construction Cost (excluding the fees): $ 1,174, 024.19 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 8,620.91 D. Water/Sewer Material Testing Fee (2%) $ 8,620.91 Sub -Total for Water Construction Fees $ 17,241.82 E TPW Inspection Fee (4%) $ 26,687.14 F. TPW Material Testing (2%) $ 13,343.57 G. Street Light Inspsection Cost $ 3,032.01 H. Signals Inspection Cost $ H. Street Signs Installation Cost Sub -Total for TPW Construction Fees $ 43,062.72 Total Construction Fees: $ 60,304.54 Choice Financial Guarantee Options, choose one Amount (Mark one) lBond=100% $ 1,174,024.19 'Completion Agreement = 100% / Holds Plat $ 1,174,024.19 'Cash Escrow Water/Sanitary Sewer= 125% $ 538,806.88 'Cash Escrow Paving/Storm Drain = 125% $ 928,723.36 'Letter of Credit = 125% w/2vr expiration period $ 1,467,530.24 City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 x ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Jesus J. Chapa Assistant City Manager Date: i ia -°?- 3 VS Recommended by: Wendy Ch7-Babulal, EMBA, P.E. Development Engineering Manager Water Department Douglas V3. Wiersig, P.E. Director Transportation & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. Af/4e Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 11 DEVELOPER Summer Creek South Development, Ltd. Name: Tim Fleet Title: General Manager Date: ATTEST: (Only if required by Developer) Signature Name: ATTEST: Mary J. « a ser City Secretary 1' OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included X 0 0 0 El El El El 0 Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACHMENT "1" Changes to Standard Agreement Community Facihties Agreement City Project No. 02220 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 11 FORT WORTH THE (a i 1 IT OF FORT WORTH , TEXAS PLANS FOR THE CONS11RUCTION OF PAVING, DRAINAGE, SANITARY SEWER, WATER AND s !Mt!. LIGHT IMPROVEMENTS TO SERVE SUMMER CREED. SOUTH - PHASE 4 BETSY PRICE MAYOR DAVID COOKE CITY MANAGER DOUGLAS W. WIERSIG, P.E. DIRECTOR, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT JOHN ROBERT CARMAN DIRECTOR. WATER DEPARTMENT D.O.E NO. 7179 CITY PROJECT NO. 02220 WATER PROJECT NO. P285-8051502220 SEWER PROJECT NO. P2757081302220 PLAN FILE NO. W-2299 (BLOCKS 11,13,16,17AND 18) LOCATION MAP WPBCP N0. 1122-V COMOI. MOM too. p DEVELOPER SUMMERCREEK SOUTH DEVELOPMENT, LTD. 3045 LACKLAND ROAD FT. WORTH, TEXAS 76116 (817) 717-7136, (817) 377-3951 (FAX) WI3L R ENOIa en.c..�., rv. ZNC- rilliS CONSUL77NC ENGINEERS (, F-1 869) 1308 NORIIOOO DRIVE • SUITE 200 • DWFETRO TEXAS 78022 (817)2B:-117s LOCAL • (817)589-2900 METRO • (817)589-0990 FAx APRIL 2015 INDEX OF SHEETS UNIT 1 — WATER AND SANITARY SENFR IMPROVDA911S SHEET DESCRIPTION tom z row. LAY (1aax , a x) 3 YTLt 1tAr (MET z Tr z) M mm4{.IOIO 41 (OTT 0 TOR AON/WQ'L Iwo MULL um uwr Mewl MKTA_ 100 u,wT WPM WM 14111111.1011.1112 MI NO Lim mac UItTMY aMm nortfl,LOC 1.1p. LDC left r LDC 10.12 UTILITY MINIS OCT 1 O 4) 1 1/71.177 TNIS (SCt 2 s Q tM Ut11RT TOOTS (Sat 10 4) 1e VRLm OtTNu (Mr 4 a P) ' UNIT II — DRAINAGE AND PAVING IMPROVEMENTS SHEET DESCRIPTION 12 13 14 1. t0 17 Ta a 13 a 211 at 220 350 co a a 11 31 a 37 MAa1a $NA Ar NlpaLa.1C eleuT1M OUT MONO PAI Dow 1 or 3) Mete PUN marl an Sala TUN (PUT 3 Or l) mos rusmontsonow Ile ONK . aid. Me TO STA. Oaem rom11a LSIn7IE/M9rl IN[ -RA 1471.00 10 3TA. 5P10.11111 Peer LMAOyftSbMt Ku MC. wA. 4414.e To M. Io,e PeIe M.LOrIttleeef MIL LAR-RA 1*4113 a RA. ,O.ao lime MILfNAewi MILL LAM. NA. IMe TO an. 2I11t.71 teem cupwcaittrituvermc part - R1. 0.e.71 To RA. TWO ?NMI LAM1LVLp/6LMM mM . RA. i.e TO RA. 1.03.011 1111111 _I* LIIY1YLLt/1aef.'N' r Wp'C .R1M MOP KCITLEM a011p tnNO MNu mar 1 ..) Mlle WAILS (DIT I 0 A) MIN GALS / MT 3 Or A) XR1e Tate OMIT 4 R 4) It umm-C LMrpr ITL2r waxy is a16't_01 TAILS arm RCT IIIm1tpLML r MARC Riau rice W,aao ..o. rpwal* TNLN WIC LMIMOLCOCUIT r macs a terms 1>r, OOO11WRTIM M NM prnetnn* TAW TIM eAa TAUS mar 1 Or 2) IT NAtI KTae (Oar a Cr 2) r11001 NImS TANS (Cat 1 O A PaefAT UeNC TALU NW 1 O 2) E. DOUGLAS WIERSIG,, P tonctoo. TirF IflTA101 Nm RAMC MCC OCTMRDICKT .�„ -.. Pc RECOM DED:1 1 REVERED: ED: V t/ X-22538 a co N Eg O n O zo 91113/v/r DATE / / DATE g 14'Ad DATE C X-22588 Sig a. Nat 00 vmmi (y Nn � y 6 $z° 0 O 0 $a` 3 Ise v ui to. • , = .0 00) to CO mit 1< e5 apz .5W O Oa. am o f m - O r U v 0 3• t M tzi s. tz NO -016 suMME pxA 13 0 , a 1 G.C. FlLEpR i.C. T. 7 IJ /// 0°526.52" / 12 R.2350.0a T.115.41' L-232de L0w7526'oa•E 23254' 0874,00- R-e91.24' T-15.45' L-130.55. 1.0-N01.43'491 130.5( 5697A'37'W 125.63'� nlsrAxT'R>:e MD`� Ja 71 211;5oUrN --EK_ --ourr- P,rrt -our- lase II .. 10 rr•I m Ia. EE x4 be 48 •• 47 ' . 45 101 el --,L--I-- 1--4,-- -I- ARIA JI �- - -- - - r-T \ 2 I J I 4 II J I B l B 9 !0 \,101 \ f01 I -74 - 4:=11 1 10 11 { 1 Y -i L T Y I I' , I I 1J i� Y1 / ® \.. c711 511 �g 5ry DOOB 3. / P; p Yr SV � Fit t ° t 0. �0. ra\ ' m\ A x .y- fuss e--LNE'' (. GRASSY BILL IANP.•° -'-,. ,.v.7 awn . 40 5597a4rW 1415.86' SOUTHWEST COMMUNITY PARK CAS/NET 8 , SLIDE 1832 RR T.CL s 5u Gsa. nDAn0.m.OT p.m21IT 3n6nfC L.n.i 120 M2]mpY 22' L-151P �!0Or N. DETAIL °r' 21aafT T L-2LN' N-2o dat; gl S / / T 'CO L-}7E 16 ,se 1,5 !I n T1 J 9D I - - C r00 - PY~ - 5004a23% t Q Do Na9Ta3rl 1 aD 1711C47 �= �: 1; 2°' " ra 7r -MILLER Summing, Inc, Relonm -Carpi& •Nw,W9 O2WcaLta N4Trx7gW 11 S1T 1[62 2., SOvi en 4 I ? ea I r J^ 1 n CI me 874 V I t 21 II Ba C� 1 T -- { C.3� �- 28 I „ BJ i1: I4 I yA_-..Cvy� ) SS • Lt kr ! VQa JG8.1 L k2 ,0 . l+ l ,r MAr { 2 ,•wS I err tQ 15 I 100 0 100 200 WAPNIC SCALD ,N 'TET SCALE r.100' / al 2a. 2a P9W10 ara >.Am d1ppT LOCATION MAP PUBLJC OPEN SPACE RESTRICTION F9 SUIUCTA . 064CT. 91 PLANT av w!I ML D 4G 24• P. HOW MOTE 112. C' GAIL 9 41/0116 OUT NOT WIO m aCMUM Tun MOM IR Acon1NICiw ILY* Mtn WM= a aim max , RCN eel >Oa 010OTS J,Iml1W IIOTC.T WRTWC=ST OOI W R I6Y1O PT TIC OTT f mm. V IDIT Olm MN IRE MOIOIIY Wt*ttm LINE TABLE I LINE I LI L2 LENGTH 50..00 is au BEARING I . - e,•, L3 70.53 LE 40.92 fit' 4.35 Iffrariglial La u... ,. •i. 1,9 0 co 11• 1.11 1.1 31AO pY yT4L'1 ,J L41 1 i CURVE RADIUS C, :70,114aEL..dT::: 250.00 CZ 1a+• bsPR �aC43'07.24tl3107.21 I E6 4{7_44_ 937.76 07 CO 6T'49• TTI:1244- 962.24 60.00 I CI I 471TR"' 50.00 O pOTp•M&Ma CURVE -ABLE TANGENT LENGTH 39,10 n.6p 76.71 96.72 7.99 15.64 55.65 175.44 22.36 44.75 40.44 61.73 47.03 50.27 50.01 01.22 123.31 711.11 70 130 78.55 CHORD BEARING CHORD LENGTH] vIT441227 77.36 N?r&rn w r1.9e:5z'e 3113111•P2.9 ICJr 1 ITiYQ:1 N3Yt4:29 r1. E 14'29•E $4,1 544'i.H:Y r1l'1At1'4'r•9 A FINAL PLAT OF LOTS 13-32. BLOCK( 11: LOTS 24-49. BLOCK( 13; LOTS 18-33, BLOCK 18, LOTS 1-22 BLOCK 17 AND LOTS 1-7, BLOCK 18 SUMMER CREEK SOUTH 65.45 15.47 175.42 44.70 51.20 723.23 I 0.9 70.90 70.72 AN ADDITION TO THE CITY OF FORT WORIM. TARRANT COUNTY, TEXAS THE J.J. ALBIRADO SURVEY, ABSTRACT NO. 4 AND THE R.J. WARE SURVEY, ABSTRACT NO. 2008 FEBRUARY 2015 87 RESIDENTIAL LOTS 21.554 ACRES 4 COMMON AREAS OWNERAlM70MIT SUMMERCR K SOUM DEVELOPMENT. LIE. 3045 1AC13AN0 ROAD TORT WORTH, 10U5 76116 r61 717_7136 51 377-305, TAX ACT: LARRY GILL 1WS PLAT RILE W COUNTY CLERK'S PILE NO ENaN21R 1306�NOM40 0 RELOI p W. SUITE 200 01000,113, TEXAS 76022 617) 569_2000 METRO 617) 589-09D0 TAX CON ACT: 104 WELCH PHASE FOUR DAMP RI!lKYG utLEt AIR110210, via 400 UIO-ORES OWLLVA1 HURST. TAUS 76054 (61» 577-1052 MEINO 017 577-0072 PAX CON ACT: JASOR ROLO(GS 20- PP-013-020 PP-95-022 SHEET T Or 2 111111111i1111111111111111111111111111111111111111111111111111I 11111111111111111111111111111111111YIi1111111i1111111111111111 II III 11111111111111111111IiliI11111111111111111 1111 I I 11111 III I lillllillll ll l 11111111111111111 III III 1 1111111111 III I I II 11111111111111111 1 11111111 Ilillil 'Hum' lllllllillllllilllllllllllllll II 11 1 1 III Illlllll lilllllllllllll111 11 U COLUMBUS I TRAIL 0 7L D"�wAY ZDANCE TRAIL SUMMER :3d0 LOCATION MAP "SUMMER CREEK SOUTH, PHASE 4" N.T.S. BRUSH, W RISINGER ROAD BREEZWIND LN PROJECT LOCATION D.O E NO. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO. P275-7061302220 STREET/STORM DRAIN NO. W-2299 CITY PROJECT NO. 02220 X-22536 WELCH ENGINEERING, INC. CONSULTING ENG/NEERS _Illllllll1lllllillillillillliiilillilliiiiiliiliiill,lil411oliiIliiiiiiinliiii IIi IiIiiiiiiiililiulil llll lllllliiiiii4111iiillil!IllJIIIIIIlio,1IIIIII,III1IIIIIIIIIIIIIIIIIi IIIli11IIIIlihIIIIIIIIIIIIII'IIIII'I I IIIIIIIIIIIIIII1lIiIIII IIIIIIII hill I IIII IIIIIIIIIIIIIIIIIIIIlllllllllliIlIlllllllllliliillili II I llllllllill lill�lllll�ll IIIII II IIII iII IIIII III II II IIII _ 1 1 0 ACED B BRUSHr ;- COURT% tit � t- of CE1 UkRI\IR BRUSH D �' I _I . I 1 1 i i I r [ger-T-T" w it 1- _ _41 11 h -GAS Y HILL LANE `r— �- -I-L L - _- -- 100% DEVELOPER'S COST 8" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES EXHIBIT "A" WATER IMPROVEMENTS "SUMMER CREEK SOUTH, PHASE 4" EX B"W l , PROP toe SCALE: 1 "=300' D.0 E N0. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO. P275-7061302220 STREET/STORM DRAIN NO. W-2299 CITY PROJECT N0. 02220 X-22536 WELCH ENGINEERING, INC. CONSUL 77NG ENGINEERS euaudlelw;111111il1ie1i1ln 111111 ellhll 111 IIIId1 IIIJwllllllll llllulllil Iu111111111111111111111111111111111111 l luu 11 1111 11 111111 11111111111111111111111111111111 lldllluhl1ll1IIJ 11111111HJ 111111111111111111111111111111111111 1111111 lltlllllllill ldnlllllulllllll 111111ulilullllll uli 111ull l l III 1111111111111111111111111111111111111111 111 11 uuu 1111 1 1 1 11I1111111111ll 1111111111 ltlllillllli 11111111111l111111ll1 ri l e eNJllll llelll ulllil JI!Iudd u6 Jill Ii1AI illilil 11111 c rn 0 0 1 CERAR BRUSH \ COURT\ \ U iiii... r9E0 (►R BR9S11 DRIVE 'j N\ ./i I 1 i L'C 0 Elf 8 W 1 T_¢ es%__ _. I \� \ \ \�/� Ex :-SS i goo°' / MEM II rtri - i-r i t_LCiLAZE. _z.-41-w-i1 N /GRA \ tow Nj ev X.1-st / / / I� t _ .-(110r 81. 100% DEVELOPER'S COST --1111)-- 8" SANITARY SEWER UNES AND ASSOCIATED APPURTENANCES EXHIBIT "A-1" SEWER IMPROVEMENTS "SUMMER CREEK SOUTH, PHASE 4" 1 1 —�-=s P OP b owel EX sass SCALE: 1 "=300' D.O.E NO. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO. P275-7061302220 STREET/STORM DRAIN NO. W-2299 CITY PROJECT NO. 02220 X-22536 WELCH ENGINEERING-, I NC. CONSULTING ENGINEERS 1011111111 uAuu lJ uu 1,I IOIud uJ illl'J1 I11111 Wu11 III 11111111111111111111 11 1 i s CEDAR RF USF11 COURT\ \ .r ek- So% LI hill II I t1 a 1111111111.11111111111111i hill II II I I nut 11111111111 1 Ulliii i 1 !%...CiT E AR �DRUS I DRIVE `(NN i' ` e �m� I i 1 t t i I \/ 1 1 1 I 1 1 t j I .I. �-IL1 L 100% DEVELOPER'S COST 6" PAVEMENT W/2% CROSS SLOPE ON 6" UME SUBGRADE EXHIBIT "B" PAVING IMPROVEMENTS "SUMMER CREEK SOUTH, PHASE 4" 7 • •1 I� I I i \\ 29' 6 •8 SCALE: 1 "=300' D.0 E NO. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO. P275-7061302220 STREET/STORM DRAIN N0. W-2299 CITY PROJECT NO. 02220 X-22536 WELCH ENGINEERING, INC. CONSUL 77NG ENG/NEERS • • 11111I Wien 11 II III illlAil hdllm 11111 l lw1111 1 11111111111111,1111 1 i II,Illi Il a 1i111 llllln;I.JJIIIII,J,IJJIld l 1111,, ,II 1111111 II 11111111111111 hill Ih li Illldllll lihnhiilllhiin 11 uluiluluiil lllllilllullu III luuulmepi ullu lWUWluulllu /CEDR B USH� ; - CO\URT� Lj j 1 1 1 I i . I otT- ED/MR BRUSH DRIVE N. �i' 1 rnmi i i i i i i L I \N re N �— / V• h'q \\4 , \ivxT t// / ---4 err- 1 T 1 — 11r9 jT—_1-- ti ;:i I I __ ___ _____ _ __ , _d_l_LLI. __ _ _,_ . 10', 15, OR 20' INLET- 7 100% DEVELOPER S COST STORM SEWER AND INLET AND ASSOCIATED APPURTENANCES EXHIBIT "B-1" DRAINAGE IMPROVEMENTS "SUMMER CREEK SOUTH, PHASE 4" eft SCALE: 1 "=300' D.0 E N0. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO P275-7061302220 STREET/STORM DRAIN NO. W-2299 CITY PROJECT NO. 02220 X-22536 WRI Ci-I ENGINEERING, I NC. CONSUL T/NG ENG/NEERS lu ulul I I J u l in II i u I III I IIII I I II I1IJlllll l 1111 1111111111114111111111111 I I II IIII In II I III. I I I l 1 Ilelnllllulltl 1111111111111 I II1I6 Lliln L,II III uulllliltll II IIi IIIII4II,IIW bolll II Iilll I /CEDAF B�tUS -- \ COURT` \ -61 1111111111n1111 1111111111111111111111 i1 1 1 1 1 1 1I CEDAR I 1 I IL I CA II I 1 1 N`/i ll RUSH DRIVE `. NN i' \ 414-121 z I SO I frbsg— / 1 I \ \ -71 I I I t I l I I 1 I 1 1 ,.4 I I o.-I w W III O T_a ^r- I GRASSY H1 i\ LL LANE I tillEti ` .. y/� \ A / / * -- PROPOSED STREET UGHT (100% DEVELOPER'S COST) - PROPOSED STREET SIGN (100% DEVELOPER'S COST) ■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) * -- EXISTING STREET UGHT EXHIBIT "C" STREET LIGHTS "SUMMER CREEK SOUTH, PHASE 4" • SCALE: 1 "=300' 0.0E NO. 7179 WATER NO. P265-6061502220 SANITARY SEWER NO. P275-7061302220 STREET/STORM DRAIN NO. W-2299 CITY PROJECT NO. 02220 X-22536 WELCH ENGINEERING, G, I NC CONSULTING ENGINEERS SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item Noi 3311.0161 3311.0261 3312.3002 3312.3003 3312.0117 3312.0001 3311.0001 3305.0109 3312.2003 3312.2004 Project Item Information Description 6" PVC Water Pipe 8" PVC Water Pipe 6" Gate Valve 8" Gate Valve Connect. to Existing 4-12" Water Main Fire Hydrant Ductile Iron Water Fittings Trench Safety I" Water Service +I I" Water Service to HOA lots 1 1 00 42 43 DAP - BID PROPOSAL Page 1 of 7 8/24/2015 Bidder's Application Specification Unit of Bid Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 33 I 1 12 LF 33 11 12 LF 33 12 20 33 12 20 33 12 25 33 12 40 33 11 11 33 05 10 33 12 10 33 12 10 EA EA EA EA TON LF EA EA 50 3,795 5 9 2 5 3 3,845 90 4 TOTAL UNIT I: WATER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 Bidder's Proposal Unit Price $20.00 $31.00 $800.00 $1,100.00 $1,000.0C $2,700.0C $2,000.00 $0.10 $650.00 $750.00 Bid Value $1,000.00 $II7,645.0C $4,000.00 $9,900.00 $2,000.0C $13,500.00 $6,000.00 $384.50 $58,500.0C $3,000.0C $215,929.50 0042 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 1158C- 08-24-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item NoI 3331.4115 3331.4116 3339.1001 3339.1003 3339.0001 3331.3102 3301.0002 3339.0002 3305.0109 3305.0113 Project Item Information Description UNIT I 8" PVC Sewer Pipe 8" PVC Sewer Pipe, CSS Backfill 4' Manhole 4' Extra Depth Manhole Epoxy Manhole Line 4" Sewer Service, Two-way cleanout Post -CCTV Inspection Manhole Vacuum Testing Trench Safety Trench Water Stops 00 42 43 DAP - BID PROPOSAL Page 2of7 8/24/2015 Bidder's Application Specification Unit of Bid Section No. I Measure Quantity I: SANITARY SEWER IMPROVEMENTS 33 31 20 LF -1-- 3,272 33 11 10 LF 128 33 39 20 EA 21 33 39 20 VF 25 33 39 60 VF 16 33 31 50 EA 90 33 01 31 LF 3,400 33 01 30 EA 21 33 05 10 LF 3,400 33 05 10 EA 5 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 Bidder's Proposal Unit Price $28.00 $50.00 $2,700.0C $150.00 $225.00 $400.00 $3.00 $150.0C $0.5C $400.00 Bid Value $91,616.0 $6,400.0 $56,700.0 $3,750.0 $3,600.001 $36,000.001 $10,200.001 $3, I50.001 $1,700.001 $2,000.001 $215,116.00 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 1 I58C- 08-24-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item Not 3305.0109 3341.0309 3341.0208 3341.0205 3341.0201 3349.0001 3349.5001 3349.5003 Project Item Information Description Trench Safety 36" RCP, Class III 27" RCP, Class III 24" RCP, Class III 21" RCP, Class III 4' Storm Junction Manhole Box 10' Curb Inlet 20' Curb Inlet 00 42 43 DAP - BID PROPOSAL Page 3of7 8/24/2015 Bidder's Application Specification Unit of Bid Section No. I Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS 33 05 10 33 41 10 33 41 10 33 41 10 33 41 10 33 49 10 33 49 20 33 49 20 LF LF LF LF LF EA EA EA 424 140 188 55 41 1 3 2 TOTAL UNIT III: DRAINAGE IMPROVEMENT$ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 Bidder's Proposal Unit Price $0.501 $185.001 $155.00 $I35.0C $130.00 $4,600.00 $3,250.00 $4,750.00 Bid Value $212.00 $25,90o.Od $29,140.00 $7,425.00 $5,330.001 $4,600.00 $9,750.00 $9,500.00 $91,857.00 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 1158C- 08-24-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item Noi 3213.0101 3211.0501 3211.0400 3213.0301 3213.0501 3441.4003 3471.0001 Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page 4of7 8/24/2015 Bidder's Application Specification Unit of Bid Section No. I Measure Quantity UNIT IV: PAVING IMPROVEMENTS 6" Cone Pvmt 6" Lime Treatment (8%) Hydrate Lime 4" Concrete Sidewalk Barrier Free Ramp - Type R- I Furnish & Install Ground Mount Sign Post and Sign Traffic Control 1 32 13 13 j SY 32 11 29 SY 32 11 29 TN 32 13 20 SF 32 13 20 EA 34 41 30 EA 34 71 13 MO 13,593 14,477 217 1820 8 5 3 1 TOTAL UNIT IV: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 Bidder's Proposal Unit Price $35.73 $2.15 $159.00 $4.75 $1,405.00 $475.00 $585.00 Bid Value $485,677.89 $31,125.55 $34,503.0C $8,645.00 $I 1,240.00 $2,375.00 $1,755.00 $575,321.44 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 1158C- 08-24-IS SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item Not 3441.1502 9999.0000 3441.3301 2605.3015 3441.3401 Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page 5 of 7 8/24/2015 Bidder's Application Specification Unit of Bid Section No. Measure Quantity UNIT V: STREET LIGHTING IMPROVEMENTS Furnish/Install Ground Box, Type B Rdwy Illum Assembly TY D-25, 70W LED Signle Furnish/Install Rdwy Illum Foundation TY I, 2 and 4 2 Inch Conduit PVC SCH 80 (T) 6-6-6 Triplex Alum Electric Conductor 34 41 10 34 41 20 34 41 20 26 05 33 34 41 10 EA 16 EA 16 EA LF CLF 16 1095 1095 TOTAL UNIT V: STREET LIGHTING IMPROVEMENT' CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 Bidder's Proposal Unit Price $525.00 $2,765.00 $835.00 $5.85 $3.10 Bid Value $8,400.0C $44,240.0C $13,360.0C $6,405.75 $3,394.5C $75,800.25 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 11580- 08-24-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM SUMMER CREEK SOUTH PHASE 4 UNIT PRICE BID Bidlist Item Nol Project Item Information Description Specification Section No. Unit of Measure Bid Summary UNIT 1: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS 00 42 43 DAP - BID PROPOSAL Page 7 of 7 8/24/2015 Bidder's Application Bid Quantity Total Construction Bid Contractor agrees to complete WORK for FINAL ACCEPTANCE CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fomr Version April 2, 2014 Bidder's Proposal Unit Price Bid Value $215,929.50 $215,116.00 $91,857.00 $575,321.44 $75,800.25 $1,174,024.19 days_ , i calendar days after the date when the 00 42 43 Bid Proposal DAP SUMMER CREEK SOUTH PHASE 4 - 1158C- 08-24-15