Developer and Project Information Cover Sheet:
Developer Company Name: FG Aledo Development, LLC
Address, State, Zip Code: 3045 Lackland Blvd, Fort Worth, TX 76116
Phone & Email: 817-717-7133 kgill@sableholdings.com
Authorized Signatory, Title: Kim Gill, General Manager
Project Name and Brief Morningstar - Off -site Water Westside IV
Description:
Project Location: FM 3325, Parker County
Plat Case Number: None
Plat Name: None
Mapsco: 760D Council District: ETJ Adjacent to CD 3 City Project Number: 02605
CFA Number: 2015-057 DOE Number: 7474
To be completed by staffs
Received by: Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT §
City Secretary
1/7/3'?
Contract No.
WHEREAS, FG Aledo Development, LLC, ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Morningstar - Off -site Water Westside N ("Project")
within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City -approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Signs (C)
■
■
E The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
Water (A) , Sewer (A-1) ■, Paving (B) ❑, Storm Drain (B-1) ❑, Street Lights &
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such injuries. death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused. in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7of11
Cost Summary Sheet
Project Name: Morningstar - Off -site Water Westside IV
CFA No.: 2015-057 DOE No.: 7474
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total $ 993,387.35
993.387.35
8
B. TRW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
S
s
s
$
$ 993,387.35
Construction Fees:
C. Water/Sewer Inspection Fee (2%) $ 19,867.75
D. Water/Sewer Material Testing Fee (2%) $ 19,867.75
Sub -Total for Water Construction Fees $ 39,735.50
E TRW Inspection Fee (4%)
F. TPW Material Testing (2%)
G. Street Light Inspsection Cost
H. Signals Inspection Cost
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees
Total Construction Fees:
$ 39,735.50
Choice
Financial Guarantee Options, choose one Amount (Mark one)
IBond=100% $ 993,387.35
ICompletion Agreement = 100% / Holds Plat $ 993,387.35
!Cash Escrow Water/Sanitary Sewer= 125% $ 1,241,734.19
'Cash Escrow Paving/Storm Drain = 125% $ 1Letter of Credit = 125% w/2yr expiration period $ 1,241,734.19
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page Sof11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
Jesus J. ehapa
Assistant City Manager
Date / &///,06
Recommended by:
Wendy Chi B abulal, EMBA, P.E.
Development Engineering Manager
Water Department
dit
Douglas W. Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Fonn & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. *ha -
Date :
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
DEVELOPER
FG Aledo Development, LLC
Name: I��iin�Gill
Title: General Manager
Date:
WI 2.A \
r
ATTEST: (Only if required by Developer)
Signature
Name:
ATTEST:
Mary J.
City SecrLary
•
OPRCIML RECoRg
CITY SECRETARY
Fr WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
X
X
0
El
■
n
■
■
Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02605
Paragraph O. i. is hereby revised to read as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material testing fees
equal to two percent (2%) for a total of 4% of the Developer's share of the total construction
cost as stated in the construction contract. Upon project completion and as a condition of
releasing the Financial Guarantee, the Developer shall pay in cash any difference between the
4% share of the total construction cost and the actual total inspection and material testing
costs.
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 10 of 11
Locflr0
o fd G+leaf l+er ® _ dKei
Ro cr t r
1
;
=
2
; 0
70
0
7:)
rn
0
—0
rn
-1st
0
— n
— r1
:rq
71
rn
70
-a
70
rn
Go
X 0 0
-< =I •
M
11
%**1 Z
VoZo
c-. 0 •
M•
0 •••••1
0 (71
•
0 c•
0
CA 0
r.)
cn
co
4-
0
r—
0
ZP
rri
33 I
rot
0
—4 -0
CO xi
a 0
-0
2AI
i;//11.1
;Mr76.29
V2L-1-'21/.45- I275„
7.
\ •
ram 0
ccit)
"
A / 7? \ tE71:. „CTICIZP
Li r c.. • 4 III
?''' ..•1 2
OLD WEATHERFORD ROAD
6\0
.. .
- - J. •
-^ - • ,•
r_=.**---- =--- r ------
\ \ N.—
-
‘ —
Su.. W. gay
L
_J
/--,
IT? <
rn
c"1
r
I a
1 0_
r
4.d
>
—I
0
r-
1
(,,,,,,,5,11,,...,,,,,kg.,,,,,,,,,,,ima.,.,,,,,,,k,,,,,,,),,,,,„....,..,,,,,,,..,,,...4.,i,,,,,,,,,.).,.,),...,,,...,,,.... .,. ... ,,,,,,t,,,,,,,,,,,th.,.,,,,,,,,..,.,, .,.,,,,,,,,,..,,,,,..,,,,,,,,,,..,,.....,,,,..., ,,,,,..,-,,, .,,,,i,,,.,,,,,,,,,,,,,,..)....),,,.,,,,,,,,.,... .tYtt H..ti 0 tiiiitti i i Lit,. i !hitt...! 1 • nttifill.t1 dd.!! titttilitittaitiAtill.att Anti tti1114Illitillemitt..m..tatttitilt litlYit..daw tlitttul al ittli t
iLIIIIHXa
X 0 0
I =I
• -•< •
• m m
_ xl •
—4 Z
..40Z0
0 •
M •
0 V
--I -I• s
z
0 CYI
•
0 0
IV 0
0)
0 4a
0
(31
o
co
cA,
3Nn HaLVIN
> 0 Co
— 0 > 3 2
"12
1:1>
23
3 °
m
z > <
< z m
w• rn 6
ril > m
w z
the
>
0
0
0
Z
rrl
M (J)
-
-n
rn
z
21:2; PA?
765
cry,
92'•/' / 942
Cr. ir Cs,
OLD WEATHERFORD ROAD
trittitalt11111.1411.1111tgalluittli I lY /Mit 1.1 A.
.4141..0111 '41•11a.
z-; 1.1 IT ... ,1:'!<••••
0)
0
r-
rT1
ttmtit
I I
0
••••
;3)
• --
••.
fri%: /•:',c,•711;c1
CD
e
z
C)
cci
• -
I >
Cr) xi
OLD WEATHERFORD ROAD
CONNECTOR
• 4.-121 ' (-; ,T.J) if 4' A C.' :•••• /C..%
7it,c(),77 7L-i ).;,)
••••111.
0
—r1
r-
rn
UNIT PRICE BID
Bidlist Item
No.
1*
2*
3*
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
MAIN BID
Specification
Section No.
Unit of
Measure
UNIT I: WATER IMPROVEMENTS
3311.0161 8" Water Pipe
3311.0441 12" Water Pipe
331 1.0541 16" Water Pipe
3305.2005 16" Water Carrier Pipe
3305.1105 30" Casing by Other than Open Cut
3305.0116 Concrete Easement for Utility Pipes
3312.3003 8" Gate Valve
3312.3005 12" Gate Valve
3312.3006 16" Gate Valve w/ Vault
3312.1002 2" Combination Air Valve assembly for Water
3312.6002 6" Blow Off Valve
331 1.0001 Ductile Iron Water Fittings w/Restraint
3312.0106 Connection to Existing 16" Water Main
3312.0117 Connection to Existing 4"-12" Water Main
3125.0101 SWPPP > 1 acre
3305.0109 Trench Safety
3471.0001 Traffic Control
0241.0500 Remove and Repair Existing Fence
0241.0401 Remove and Repair Concrete Drive
0241.0402 Remove and Repair HMAC Drive
0241.1 100 Remove and Repair 2" HMAC Pavement (OWR)
3123.0101 Strip, Grade and Establish Grades from Sta
73+00 to 81+00
9999.0001 Replace and Re-establish 2" Gravel Road
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Fonn Version Apnl 2, 2014
33 11 12
33 11 10
33 11 12
33 11 10
33 11 12
33 05 24
33 05 22
33 05 10
33 12 20
33 12 20
34 12 20
34 12 30
33 12 60
33II II
33 12 25
33 12 25
31 25 00
33 05 10
34 71 13
02 41 13
02 41 13
02 41 13
0241 15
31 23 16
02 41 13
LF
00 42 43
DAP - BID PROPOSAL
Page I of 3
CFA WS4
7/12/2015
Bidder's Application
Bid
Quantity
20
LF 2,305
LF 8,011
LF
LF
CY
EA
EA
EA
EA
EA
129
129
10
1
4
5
5
2
TON 5
EA
EA
LS
1
1
1
LF 10,465
MO
LF
SF
SF
3
305
123
621
SF 1,098
L.S.
1
SF 450
Bidder's Proposal
Unit Price
$29.00
$48.00
$59.00
$200.00
$675.00
$150.00
$950.00
$2,500.00
$14,000.00
$7,800.00
$5,800.00
$6,900.00
$3,000.00
$2,500.00
$3,800.00
$1.00
$6,000.00
$6.00
$65.00
$7.25
$9.45
$20,000.00
$20.00
Bid Value
$580.00
$110,640.00
$472,649.00
$25,800.00
$87,075.00
$1,500.00
$950.00
$10,000.00
$70, 000.00
$39,000.00
$11,600.00
$34,500.00
$3,000.00
$2,500.00
$3,800.00
$10,465.00
$18,000.00
$1,830.00
$7,995.00
$4,502.25
$10,376.10
$20,000.00
$9,000.00
201336N - 00 42 43 - ENGINEERS ESTIMATE - CFA - DAP - WS4 - 07-12-15
UNIT PRICE BID
Bidlist Item
No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
24 3137.0102 Large Stone Riprap, dry
25 9999.0002 Relocated Existing Pole Lights
26 3305.0110 Utility Markers
MAIN BID
CFA
00 42 43
DAP- BID PROPOSAL
Page 2 of 3
WS4
7/12/2015
Bidder's Application
Specification Unit of Bid
Section No. Measure Quantity
31 37 00
34 41 10
33 05 26
SY 205
EA
LS
3
1
Bidder's Proposal
Unit Price
$125.00
$2,000.00
$6,000.00
TOTAL UNIT I: WATER IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2. 2014
Bid Value
$25,625.00
$6,000.00
$6,000.00
$993,387.35
201336N - 00 42 43 - ENGINEERS ESTINIATE - CFA - DAP - WS4 - 07-12-15
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
00 42 43
DAP- BID PROPOSAL
Page 3 of 3
CFA WS4
7/12/2015
MAIN BID
UNIT PRICE BID Bidder's Application
Bidlist Item
No.
Project Item Information
Description
Specification
Section No.
Bid Summary
UNIT I: WATER IMPROVEMENTS
Bid Items 1, 2, 3 shall consist of the following pipe materials
1,2&3 18" PVC,DR14
12" PVC, DR14
16" PVC, DR18
Unit of Bid
Measure Quantity
Total Construction Bid
Bidder's Proposal
Unit Price
Bid Value
$993,387.35
$993,387.35
Contractor agrees to complete WORK for FINAL ACCEPTANCE within # dscs calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2. 2014
201336N - 00 42 43 - ENGINEERS ESTIMATE - CFA - DAP - WS4 - 07-12-15