HomeMy WebLinkAboutContract 47141 (2)CITY SECRETARY
c wIACT NO.
COMPLETION AGREEMENT
This Completion Agreement ("Agreement) is made and entered into by
and among the City of Fort Worth ("City"), and FG ALEDO
DEVELOPMENT, LLC.a Texas Limited Liability Company
("Developer"), and SOUTHWEST BANK ("Lender"), effective as of
SEPTEMBER 15, 2015...The City, the Developer and the Lender are
hereinafter collectively called the "Parties".
WITNESSETH:
WHEREAS, the Developer owns that certain tract of real property that
contains approximately 24.509 'acres that is located in the City, the legal
description of which tract of real property is marked Exhibit "A" — Legal
Description, attached hereto and incorporated herein for all purposes (which
tract of real property is hereinafter called the "Property"); and
WHEREAS, the Developer intends to develop the Property as an
addition to the City through plat FP. 014-081 or FS_;; and
WHEREAS, the Developer and the City have entered into a Community
Facilities Agreement relating to the development of MORNINGSTAR
SECTION 5, PHASE 1 (hereinafter called the "CFA"); and
WHEREAS, the City has required certain assurances of the availability
of funds to complete the streets, street signs and lights, and the water and
sewer utilities for the development of the Property (herein collectively called
the "Community Facilities"), and
WHEREAS, in order to provide such assurances as have been required
by the City, the Lender has agreed to advance certain funds to the City for
Hard Costs (which term is hereinafter defined) subject to, and in accordance
with, the terms, provisions and conditions of this Agreement; and
WHEREAS, the Developer has granted to the Lender as additional
security for the Loan (which term is hereinafter defined) a security interest in
all plans and specifications for the development of the Property (hereinafter
collectively called the "Plans"); and
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
WHEREAS, the Parties desire to set forth the terms and conditions of
such accommodations as are described above.
NOW THEREFORE, for and in consideration of the benefits to be
derived from the mutual observance by the parties of the terms and conditions
hereof, and for and in consideration of Ten Dollars ($10.00) and other good
and valuable consideration, the receipt, adequacy and sufficiency of which
are hereby acknowledged, the Parties agree as follows:
1. Recitals. The foregoing recitals are true, correct and complete
and constitute the basis for this Agreement and they are incorporated into this
Agreement for all purposes.
2. The Completion Amount. The City and the Developer agree that
the Hard Costs required to complete the Community Facilities in the
aggregate should not exceed the sum of ONE MILLION SIX HUNDRED
EIGHTY SIX THOUSAND NINE HUNDRED NINETY FIVE DOLLARS
AND FIFTY CENTS Dollars ($11,686,995.50), hereinafter called the
"Completion Amount". Notwithstanding the foregoing, it is acknowledged
that the actual costs of completion of the Community Facilities may vary as a
result of change orders agreed to by the Parties, but such variances for the
purposes of this Agreement shall not affect the Completion Amount as used
herein.
3. Adiustments to the Completion Amount. The Lender may from
time to time make advances to the Developer for the development of the
Property under the development loan that has been made by the Lender to the
Developer for the purpose of financing the costs of constructing the
Community Facilities for the Property (the "Loan") subject to, and in
accordance with, the terms, conditions and provisions of the Loan Documents
(which term is hereinafter defined) evidencing and securing the Loan. Some
of those advances shall be for Hard Costs as specified in the "Approved
Budget" relating to the Loan, a copy of which Approved Budget is marked
Exhibit "B", attached hereto and incorporated herein for all purposes, with
the Hard Costs (which term is hereinafter defined) line items highlighted.
Page 2 of 13
The term "Hard Costs" shall mean the actual costs of construction and
installation of the Community Facilities. To the extent that advances under
the Loan are for the payment of Hard Costs, the Completion Amount shall be
deemed reduced, dollar for dollar. The Lender may withhold statutory
retainage from any advances under the Loan or pursuant to this Agreement.
All such retainage withheld, to the extent it is attributable to Hard Costs,
shall also reduce the Completion Amount dollar for dollar. All retainage
withheld by the Lender for Hard Costs that are advanced to the City pursuant
to this Agreement shall be released to the City as provided in the Texas
Property Code upon expiration of the statutory retainage period.
4. Completion by the Developer. The Developer agrees to
complete the Community Facilities on or before the date for completion that
is established in the Loan Documents plus thirty (30) days (hereinafter called
the "Completion Date"), in accordance with the CFA, the Plans that are
approved by the Lender and the City and all documents evidencing or
securing the Loan (which documents are hereinafter collectively called the
"Loan Documents"). For the purposes of this Agreement, the development of
the Property shall be deemed complete upon acceptance by the City of the
Community Facilities. The City shall promptly notify the Lender and the
Developer upon such acceptance.
5. Completion by the City. In the event that either: (A) the
development of the Property is not completed by the Completion Date for any
reason whatsoever, or (B) the Developer is in default under the Loan, then the
Lender, at its sole option, may request the City to complete development. The
City may, at its sole option and at the cost and expense of the Developer,
within 10 days from receipt of Lender's request, notify Lender that it will
undertake to complete the Community Facilities and the City shall then
commence, pursue, and complete the Community Facilities in a reasonably
timely diligent and workmanlike manner in accordance with the Plans,
subject to the terms of this Agreement. The Lender and the Developer agree
Page 3 of 13
that the City may use the Plans as necessary to complete the Community
Facilities.
If the City does not timely elect to complete the construction of the
Community Facilities or if the Lender does not request the City to complete
construction of the Community Facilities, then the Lender may at its election
terminate this Agreement, or at its option, proceed to complete the
Community Facilities, or foreclose on any of its collateral, or take any and
all such action as may be provided under the Loan Documents.
6. Advance of Completion Costs to the City and Delivery of Hard
Costs Collateral to the City. In the event the Lender has requested the City
and the City has elected to complete the Community Facilities, Lender shall
transfer to the City all remaining undisbursed Hard Costs specified in the
Approved Budget within 10 days of the date that the City elected to complete
and provided Lender with written notice of such election.
The Developer hereby authorizes and instructs the Lender to make the
transfer of any remaining undisbursed Hard Costs specified in the Approved
Budget to the City within 10 days of notification that the City elects to
complete the Community Facilities.
In the event the cost to complete the Community Facilities exceeds the
moneys transferred to the City, City shall notify Lender and Developer in
writing of the need of additional funds. The additional funds required to
complete the Community Facilities shall be delivered to the City within 10
business days following notification to Lender and Developer. Failure to
deliver the additional funds shall relieve the City of the obligation to
complete the Community Facilities, in which event City shall use the Hard
Costs funds in its possession to pay the contractor(s) all funds due it/them.
Any remaining undisbursed Hard Costs shall be returned to Lender within a
reasonable time.
7. Completion by the Lender The Lender may, at its discretion,
but shall not be obligated to, undertake to complete the Community Facilities
if there is any default under any Loan Documents in lieu of requesting the
Page 4 of 13
City to complete the Community Facilities. If the Lender elects to complete
the Community Facilities, any Hard Costs it expends shall, dollar for dollar,
reduce the Completion Amount.
8. Easements. In the event the City or the Lender undertakes the
completion of the Community Facilities, the Developer (and to the extent
necessary the Lender) grants to the City and the Lender open access to the
Property and shall execute and deliver such temporary easements over and
across the entirety of the Property for the purpose of access and use for the
completion of the construction of the Community Facilities in accordance
with this Agreement. To the extent requested by the City and the Lender
written temporary construction easements in form acceptable to the City and
the Lender shall be executed by the Developer and filed of record. Nothing
in this paragraph shall reduce any rights of the Lender or obligations of the
Developer under the Loan Documents.
9. Lender's Rights. Nothing in this Agreement shall affect any
portion of the Lender's collateral for the Loan or limit or impair the Lender's
✓ ight to foreclose the same or deal with the collateral as it elects in
accordance with the Loan Documents.
10. Satisfaction of the City Requirements. The City agrees that the
assurances and covenants contained in this Agreement satisfy all
requirements of the City with respect to payment and performance bonds or
other requirements for security in connection with the development of the
Property and the completion of the Community Facilities that are contained in
the CFA or in any other agreement relating thereto, and the City hereby
accepts the assurances and covenants contained herein in lieu thereof. To the
e xtent the CFA irreconcilably conflicts with this Agreement, the provisions
o f this Agreement shall control.
11. Termination. This Agreement shall terminate upon the earlier to
occur of the following: (a) acceptance by the City of the Community
Facilities; (b) mutual written agreement of all of the Parties; or (c) the
✓ eduction of the Completion Amount to zero. However, release of the plat
P age 5 of 13
shall be governed by paragraph 12 hereof and termination pursuant to (b) or
(c) of this paragraph 11 shall not require the City to release the plat.
12. Final Plat. The Parties acknowledge and agree that the City
shall hold the final plat of the Property until the Community Facilities are
completed and accepted by the City and all Hard Costs contractors have been
paid, less retainage. Upon acceptance by the City and receipt of evidence
from the Developer showing that all Hard Costs contractors have been paid,
including but not necessarily limited to lien waivers and bills paid affidavits,
the City shall within a reasonable time file the final plat for the Property in
the Plat Records of the county where the Property is located. The purpose of
the City retaining the final plat of the Property as provided herein is to
guarantee the Developer's obligations under the CFA are completed.
13. Construction Contracts. Developer agrees to include in each
Construction contract that it enters into for the completion of the Community
Facilities the following:
a. A statement that the City is not holding any security to guarantee any
payment for work performed on the Community Facilities;
b. A statement that the Property is private property and that same may
be subject to mechanic's and materialman's liens;
c. A requirement that each contractor contracting with the Developer
release the City from any claim that is related to the Property; and
d. A requirement that each contractor contracting with the Developer
include in each subcontract the statements contained in a., b., and c.
above.
14. Miscellaneous.
A. Non -Assignment of Agreement This Agreement may not be assigned
by any of the Parties without the prior written consent of all the other
Parties.
B. Notice. Any notice required or permitted to be delivered under this
Agreement shall be deemed received on actual receipt by the
appropriate party at the following addresses:
Page 6 of 13
(i)
and/or
Notice to the City shall be addressed and delivered as follows:
City of Fort Worth
Planning and Development Department
1000 Throckmorton Street
Fort Worth, Texas 76102
Attention: CFA Division
David Schroeder, Development Manager
Email: David.Schroeder@fortworthgov.org
Confirmation Number: 817-392-2239
Attention: CFA Division
Jana Knight, Administrative Assistant
Email: Jana.Knight@fortworthgov.org
Confirmation Number: 817-392-2025
With a copy thereof addressed and delivered as follows:
Douglas W. Black
Office of the City Attorney
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas 76102
Confirmation Number: 817-392-7607
(ii) Notice to the Developer shall be addressed and delivered as
follows:
FG ALEDO DEVELOPMENT, LLC, KIM GILL
3045 LACKLAND ROAD
FORT WORTH, 76116, (817) 731-7737
(iii) Notice to the Lender shall be addressed and delivered as follows:
SOUTHWEST BANK, ALEC BARRY]
[ALEC BARRY, 817-298-5585
Page 7 of 13
2200 WEST 7Tx STREET
FORT WORTH, TEXAS 76102
A party may change its address for notice upon prior written notice to the
other parties pursuant to the terms hereof.
C. Texas Law to Apply. This Agreement shall be construed under and in
accordance with the laws of the State of Texas.
D. Parties Bound This Agreement shall be binding upon and inure to the
benefit of the Parties and their respective legal representatives,
successors and assigns.
E Leta1 Construction In case any one or more of the provisions
contained in this Agreement shall for any reason is held to be invalid,
illegal, or unenforceable in any respect, such invalidity, illegality, or
unenforceability shall not affect any other provision of this Agreement,
and this Agreement shall be construed as if such invalid, illegal, or
unenforceable provision had never been contained in this Agreement.
F. Prior Atreements Superseded. This Agreement constitutes the sole
and only agreement of the Parties with respect to the subject matter
hereof and supersedes any prior understandings or written or oral
agreements among the Parties concerning the subject matter hereof;
provided, however, that this Agreement shall not supersede, amend or
modify any of the Loan Documents or any portion thereof.
G. Amendment. This Agreement may only be amended by a written
instrument executed by all of the Parties to his Agreement.
H. Headings. The headings that are used in this Agreement are used for
reference and convenience purposes only and do not constitute
substantive matters to be considered in construing the terms and
provisions of this Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Page 8 of 13
Executed IN QUADRUPLICATE by the Parties hereto:
CITY OF FORT WORTH:
Fcrn :=Cesta '
Assistant City Manager
Date: R7
APPROVED AS TO FORM:
Douglas W. Black
Assistant City Attorney
ATTEST:
Mary J.
City Secretary
M&C:
Date:
Page 9 of 13
„c.c.
,t.p.itzteA
Met 7
DEVELOPER:
FG Aledo Development, LLC
Name: `I� mberly Gill
Title: President
Date:
LENDER: Southwest Bank
Name: A (..5.7c.
Title: Abfiegasr
°Fru:1AL RECORP
y
lad gr{r+
•
•
KIMBERLY GILL, the "Guarantor" of the Development Loan, is
executing this Completion Agreement for the sole purpose of acknowledging
that advances that are made by the Lender pursuant to this Completion
Agreement shall be deemed to be advances that are made under the Loan that
shall be subject to and covered by the Loan Documents and the Guaranty
Agreement that was executed by KIMBERLY GILL.;
By:
Name:
Title:
TIMOTHY H. FLEET, the "Guarantor" of the Development Loan, is
executing this Completion Agreement for the sole purpose of acknowledging
that advances that are made by the Lender pursuant to this Completion
Agreement shall be deemed to be advances that are made under the Loan that
shall be subject to and covered by the Loan Documents and the Guaranty
Agreement that was executed by TIMOTHY H. FLEET.
By:
Name:
Title:
911412-
tt/A VUzifE
OFFICIAL RECORD
CITY SECRETARY
::., ITIChriTiti TX
Page 10 of 13
LIST OF EXHIBITS TO THE COMPLETION AGREEMENT
EXHIBIT A - LEGAL DESCRIPTION
EXHIBIT B - APPROVED BUDGET
Page 11 of 13
EXHIBIT A
Page 12 of 13
LEGAL DESCRIPTION: Being a tract of land out of the P. J. McClary Survey, Abstract No. 907, and situated
in Parker County, Texas, and surveyed by Miller Surveying, Inc. of Hurst, Texas in October 2014, said
tract being a portion of the same tract of land described in the deed to FG Aledo Development, LLC,
recorded as Document No. 2014-10308 in the Deed Records of Parker County, Texas, and being a
portion of the same tract of land described in the deed to FWFW Holdings, Inc., recorded as Document
No. 2014-10303 in said Records and being more particularly described by metes and bounds as follows:
Beginning at a 1/2 inch "MILLER 5665' capped steel rod set in the westerly boundary line of said FWFW
tract, said rod being in the easterly right-of-way line of Farmer Road (FM Hwy. 3325) from which a
TxDOT monument found for the northwest corner of said FWFW tract bears North 08 degrees 41
minutes 26 seconds West at 3669.52 feet;
Thence North 88 degrees 56 minutes 35 seconds East a distance of 135.35 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 67 degrees 27 minutes 53 seconds East a distance of 70.16 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 79 degrees 58 minutes 11 seconds East a distance of 131.36 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 87 degrees 27 minutes 16 seconds East a distance of 335.09 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 23 degrees 06 minutes 18 seconds East a distance of 183.78 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 23 degrees 07 minutes 57 seconds East a distance of 50.00 feet to a 1/2 inch "MILLER
5665" capped steel rod set for the beginning of a curve to the right with a radius of 375.00 feet and
whose chord bears South 63 degrees 16 minutes 26 seconds East at 47.01 feet;
Thence easterly with said curve through a central angle of 07 degrees 11 minutes 13 seconds and an arc
length of 47.04 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve;
Thence South 59 degrees 40 minutes 50 seconds East a distance of 32.29 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 75 degrees 54 minutes 08 seconds East a distance of 14.29 feet to a 1/2 inch "MILLER
5665" capped steel rod set for the beginning of a curve to the right with a radius of 710.00 feet and
whose chord bears North 35 degrees 21 minutes 45 seconds East at 86.04 feet;
Thence northeasterly with said curve through a central angle of 06 degrees 56 minutes 51 seconds and
an arc length of 86.09 feet to a 1/2 inch "MILLER 5665' capped steel rod set for the end of said curve;
Thence South 51 degrees 09 minutes 50 seconds East a distance of 178.01 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 41 degrees 38 minutes 54 seconds East a distance of 61.08 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 48 degrees 42 minutes 17 seconds East a distance of 92.35 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 62 degrees 04 minutes 14 seconds East a distance of 78.83 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 64 degrees 39 minutes 14 seconds East a distance of 50.00 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 25 degrees 20 minutes 46 seconds East a distance of 54.17 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 64 degrees 39 minutes 14 seconds East a distance of 430.10 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 25 degrees 20 minutes 46 seconds East, passing at 73.33 feet a 1/2 inch "MILLER 5665"
capped steel rod set in the easterly right-of-way line of Indigo Sky Way and continuing therewith a total
distance of 133.33 feet to a 1/2 inch ' MILLER 5665" capped steel rod set;
Thence South 64 degrees 39 minutes 14 seconds West, departing said right-of-way line, a distance of
115.00 feet to a 1/2 inch "MILLER 5665' capped steel rod set;
Thence South 19 degrees 39 minutes 14 seconds West a distance of 14.14 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 64 degrees 39 minutes 14 seconds West a distance of 50.00 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence North 70 degrees 20 minutes 46 seconds West a distance of 14.14 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 64 degrees 39 minutes 14 seconds West passing at 115.00 feet a 1/2 inch "MILLER 5665"
capped steel rod set for an inner corner of said FG tract and continuing with the southerly boundary line
therewith a total distance of 305.09 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the
beginning of a curve to the left with a radius of 345.00 feet and whose chord bears South 49 degrees 39
minutes 52 seconds West at 178.46 feet;
Thence southwesterly with said curve through a central angle of 29 degrees 58 minutes 44 seconds and
an arc length of 180.52 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a
curve to the left with a radius of 30.50 feet and whose chord bears South 23 degrees 00 minutes 03
seconds West at 12.34 feet;
Thence southwesterly with said curve through a central angle of 23 degrees 20 minutes 53 seconds and
an arc length of 12.43 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve
to the right with a radius of 50.00 feet and whose chord bears South 77 degrees 38 minutes 51 seconds
West at 91.58 feet;
Thence westerly with said curve through a central angle of 132 degrees 38 minutes 29 seconds and an
arc length of 115.75 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve
to the left with a radius of 30.50 feet and whose chord bears North 47 degrees 51 minutes 22 seconds
West at 12.50 feet;
Thence northwesterly with said curve through a central angle of 23 degrees 38 minutes 56 seconds and
an arc length of 12.59 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve;
Thence North 59 degrees 40 minutes 50 seconds West a distance of 220.84 feet to a 1/2 inch "MILLER
5665" capped steel rod set;
Thence South 72 degrees 34 minutes 27 seconds West a distance of 13.45 feet to a 1/2 inch "MILLER
5665" capped steel rod set for the beginning of a curve to the left with a radius of 650.00 feet and
whose chord bears South 11 degrees 48 minutes 20 seconds East at 767.67 feet;
Thence southerly with said curve through a central angle of 72 degrees 23 minutes 13 seconds and an
arc length of 821.20 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve
to the right with a radius of 580.00 feet and whose chord bears South 42 degrees 49 minutes 23 seconds
West at 104.65 feet;
Thence southeasterly with said curve through a central angle of 10 degrees 21 minutes 07 seconds and
an arc length of 104.79 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve,
said rod being in the northerly right-of-way line of Morning Mist Trail;
Thence South 52 degrees 21 minutes 10 seconds West with said northerly right-of-way line a distance of
60.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set;
Thence South 09 degrees 49 minutes 58 seconds West continuing with said northerly right-of-way line a
distance of 13.66 feet to a 1/2 inch "MILLER 5665" capped steel rod set;
Thence South 56 degrees 45 minutes 43 seconds West continuing with said northerly right-of-way line a
distance of 225.49 feet to the beginning of a curve to the right with a radius of 570.00 feet and whose
chord bears South 73 degrees 08 minutes 57 seconds West at 321.62 feet;
Thence westerly, continuing with said northerly right-of-way line and with said curve through a central
angle of 32 degrees 46 minutes 28 seconds and an arc length of 326.05 feet to a 1/2 inch "MILLER 5665"
capped steel rod set for the end said curve;
Thence South 89 degrees 32 minutes 11 seconds West continuing with said northerly right-of-way line a
distance of 61.96 feet to the beginning of a curve to the right with a radius of 500.00 feet and whose
chord bears North 84 degrees 02 minutes 40 seconds West at 111.80 feet;
Thence westerly, continuing with said northerly right-of-way line and with said curve through a central
angle of 12 degrees 50 minutes 19 seconds and an arc length of 112.04 feet to a 1/2 inch "MILLER 5665"
capped steel rod set for the beginning of a curve to the left with a radius of 300.00 feet and whose
chord bears North 84 degrees 02 minutes 40 seconds West at 67.08 feet;
Thence westerly, continuing with said northerly right-of-way line and with said curve through a central
angle of 12 degrees 50 minutes 19 seconds and an arc length of 67.22 feet;
Thence South 89 degrees 32 minutes 11 seconds West continuing with said northerly right-of-way line a
distance of 241.25 feet to a 1/2 inch "MILLER 5665" capped steel rod set;
Thence North 45 degrees 45 minutes 37 seconds West continuing with said northerly right-of-way line a
distance of 14.22 feet to a 1/2 inch "MILLER 5665" capped steel rod set;
Thence South 88 degrees 56 minutes 50 seconds West continuing with said northerly right-of-way line a
distance of 5.16 feet to a 1/2 inch "MILLER 5665" capped steel rod set in the easterly right-of-way line of
said Farmer Road;
Thence North 01 degrees 03 minutes 10 seconds West with said easterly right-of-way line a distance of
1466.70 feet to a TxDOT monument found;
Thence North 04 degrees 25 minutes 07 seconds East continuing with said easterly right-of-way line a
distance of 50.19 feet to a TxDOT monument found;
Thence North 00 degrees 59 minutes 59 seconds West continuing with said easterly right-of-way line a
distance of 100.04 feet to a TxDOT monument found;
Thence North 06 degrees 43 minutes 22 seconds West continuing with said easterly right-of-way line a
distance of 50.14 feet to the point of beginning and containing 24.509 acres of land, more or less;
EXHIBIT B
Page 13 of 13
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - SECTION 5, PHASE 1
UNIT PRICE BID
Bidlist
Item
No.
1 13311.0161
2 3311.0261
3 3312.3002
4 3312.3003
5 3312.4109
6 3312.0112
7 3312.0001
8 3311,0001
9 3305.0109
10 3312,2003
Description
Project Item information
Specification
Section No.
Unit of
Measure
UNIT I: WATER IMPROVEMENTS
6" Water Pipe
8" Water Pipe
6" Gate Valve
8" Gate Valve
8" x 12" Tapping Sleeve & 8" Gate Valve
Connect. to Existing 12" Water Main
Fire Hydrant
Ductile Iron Water Fittings
Trench Safety
1" Water Service
33 11 12
331112
33 12 20
33 12 20
33 12 25
33 12 25
33 12 40
33 11 11
33 05 10
33 12 10
LF
LF
EA
EA
EA
EA
EA
TON
1,F
EA
004243
DAP - BID PROPOSAL.
Page I oil
9/1/2U15
Bidder's Application
Bid
Quantity
90
4,520
9
15
2
2
9
3
4,610
72
TOTAL UNIT I: WATER IMPROVEMENT;
13idder's Proposal
Unit Price
$26,001
$29.001
$840,001
$950.0(1
$3,000.UG
$700_00
$3,400.06
$5,400.00
$0.401
$780.0(11
Biel Value
$2,340.001
$131,080.01
$7,560.0Ci
$14,250.001
$6,000.00I
$1.400.001
$30,600.0
$16,2OOA(i
$1,844.Od
$56,160.01,
$267,434.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVI
Form Version April 2, 2014
OPER AWARDED PROJECTS
UJ 42 43 - CONTRACT BIDS DAP MORNINGSTAR
SECTION 5 PH
SE t - 2013 36E U9-01.15
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGST tl2 - SECTION 5, PHASE 1
UNIT PRICE BID
Bidlist
Item
No.
1
2
3
4
5
6
7
Description
Project Item Information
Specification
Section No.
Unit of
Measure
00 42 43
D:\P - BID PROPOSAI.
Page 2 of7
911 i2015
Bidder's Application
Bid
Quantity
UNIT II: SANITARY SEWER IMPROVEMENTS
3331.41 15 8" Sewer Pipe
33 31.4116 8" Sewer Pipe, CSS 13ackfill
3339.1001 4' Manhole
3339.1003 4' Extra Depth Manhole
3331.3101 4" Sewer Service, Two-way cleanout
3301.0002 Post -CCTV Inspection
3339.0002 !Manhole Vacuum Testing
8 33 39.0001 Epoxy Manhole 1.incr
9 3305.0109 Trench Safety
10 3305.0113 Trench Water Stops
33 31 20
33 11 10
33 39 20
33 39 20
33 31 50
33 01 31
33 01 30
33 39 60
33 05 10
33 05 10
LP
1,1'
EA
VI'
EA
1,r
EA
VI;
LP
EA
3,817
234
24
43
68
4,051
21
64
4,051
18
TOTAL UNIT II: SANITARY SEWER IMPROVEMENT$
Bidder's Proposal
Unit Price
$34.001
$50.001
$3,600.0(1
$150.001
$385.00
$2,80
$150.0
$25U.0
$0.40
$250, 00
13id Value
$129,778.01
$11,700.0(
$86,4UO.00
$6,450.001
$26,180.0(j
$1 1,342.80
$3,150.001
$ 16.000.00
$1.620.40
$4,500,001
$297,121, 20
CITY OF FORT \muff
STANDARD CONSTRUCTION SPECIPICA'CION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014 OU 42 43 - CONTRACT BIDS DAP MORNINOSTAI
SECTION 5 PEIA
I - 201336E- 09-01-I
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGS I'AR - SECTION 5, PHASE I
UNIT PRICE BID
Bidlist
Item
No.
1
2
3
4
5
6
7
8
9
10
11
3305.0109
3341.0409
3341.0404
3341.0309
3341.0205
3349.7001
3349.0001
3349.0002
3349.5001
3349.5002
3349.5003
Description
Trench Safety
48" RCP, Class I11
42" RCP, Class III
36" RCP, Class III
24" RCP. Class III
4' SQ. Yin! et
4' Storm Junction 13ox
5' Storm Junction Box
10' Curb Inlet
15' Curb Inlet
20' Curb Inlet
Project ltcin Information
Specification
Section No.
Unit of
Measure
UNIT III: DRAINAGE IMPROVEMENTS
33 05 10
33 41 10
3341 10
33 41 10
33 41 10
33 49 20
33 49 10
33 49 10
33 49 20
33 49 20
33 49 20
LF
I,F
LE
LE
LF
EA
EA
EA
EA
EA
EA
00 42 43
DAP - BID PROPOSAL.
Page 3 or 7
9/1/2015
Bidder's Application
Bid
Quantity
1902
31
425
899
547
1
2
2
4
6
4
TOTAL UNIT HI: DRAINAGE IMPROVEMENT*
13iddet's Proposal
Unit Price
$0.50
S135.0
$115.00
$90,001
$60.001
$3,300.00
$4,000.00
$4,900.0(
$3,200.001
$5,400.0C
$6,100.00
Bid Value
$951.0111
$4,185.0C1
$48,875.001
$80,910.0(
$32,820.0(
$3,300.01
$8,000.00
$9,800.0
$12.ROO.0(i
$32,400.O14
$24.400.01,1
$258,441.00
CITY OF FORT WORT!!
STANDARD CONSTJt1Cl'ION SPECIFICATION DOC
Form Version April 2, 2014
1ENTS - DEVELOPER AWARDED PROJECTS
00 42 43 - CONTRACT BID
DAIMORNINGS - SECTION 5 PHA
1- 2013
5
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGS C lR - SECTION 5, PHASE 1
UNIT PRICE BID
13idlisl
Item
No.
1
2
4
6
8
9
10
11
12
Description
Project Item Inlormation
UNIT IV
3213.0101 6" Cone Plant
321 1.0501 6" Lime Treatment
321 1.0400 I lydrate Lime
9999 0001 7,5" Cone Pvmt
321 1.0502 8" Lime Treatment
321 1.0400 Hydrate Lime
3213.0301 4" Concrete Sidewalk
3213.0504 Barrier Free Ramp - Type R-1
3441 4003 Furnish & Install Ground Mount Sign Post and Sign
3217.0501 24" Solid White Stop Bar Paint (W)
3217.2103 REEL Raised Marker TY 11 A -A
)999.0002 Street barricade (street dead ends)
Specification
Section No.
Unit of
Measure
PAVING IMPROVEMENTS
32 13 13 1 SY
32 11 29 SY
32 1 129 TN
32 13 13 SY
32 1 1 29 SY
32 11 29 TN
32 13 20 SE
32 13 20 EA
34 41 30 EA
32 17 23 LF
32 17 23 EA
31 36 00 LE
00 42 43
DAP• BID PROPOSAL
Page 4 of 7
9/ 1 /2015
Bidder's Application
Bid
Quantity
8,085
8,611
129.16
9,095
9,686
193,82
8006
16
11
126
112
150
TOTAL UNIT IV: PAVING IMPROVEMENT
Bidder's Proposal
Unit Price
S33.00
$3.00
$175.00
$38.00
$3.25
S175.00
$3.00
S I.000.00
$650.00
S 12,00
$5.00
$40.00
I3id Value
$266,805.0(
$25,831.581
$22,602.631
$345,610.(X
$31,480.071
$33,918.561
$24,018.0d
$16,000.0d
$7,150.0()1
S 1,512.O01
$560.0tl
S6,000.001
$781,487.84
CITY OF FORT WORTI1
STANDARD CONS'IRUC I JON SPECIFICATION DOCUMENTS - D
Form Version April 2, 2014
ELOPER AWARDED PROJuC'TS
00 42 43 - CONTRACT BIDS DAP \MORNINOSTA
SECTION 5 PHASE 1 -201336E-09•41-15
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
AIORNINGST 1R - SECTION 5, PHASE 1
UNIT PRICE BID
Bidlist
Item
No.
Description
Project Item Information
Specification
Section No.
linit of
Measure
')0 42 43
DAI' - BID PROI'USAI.
Page 5 nr 7
9/1/2015
Bidder's Application
Bid
Quantity
UNIT V: STREET LIGHTING IMPROVEMENTS
1 3441.1502 Furnish/Install Ground I3ox, Type 13
9999.0000 Rdhuy lllum Assembly TY D-25-6, 70W - ATBO - LED
TYPE 2 - 70 W - NW, Pole Type 8, Truss 3313
9999,0000 Rdwy Blum Assembly TY D-6, A'IB2 LED - Type 2 -
137W LED - NW
4 3441.3301 Furnish/Install Rdwy Ilium Foundation TY 3
5 3441.3001 Furnish/Install Rdwy Ilium Foundation TY 1
6 2605,301S 2 Inch Conduit PVC SCII 80 (T)
3441,3401 6-6-0 Triplex Alum Electric Conductor
2
3
34 41 10
34 41 20
34 41 20
34 41 20
34 41 20
26 05 33
34 41 10
EA
EA
EA
EA
EA
LF
CLF
9
14
8
14
8
1821
1821
TOTAL. UNIT V: STREET LIGHTING IMPROVEMENTS
Bidder's Proposal
Unit Price
$400.00
$1, 800,00
$2,250 00
$856.00
$953.34
$8.00
$1.94
Bid Value
$3,600.0
$25,200.0(
$18,000.O(1
$11,984.00
$7,626.72
$14,568.Od
$3,532.74
$84,511.46
CITY OF FORT NORTH
STANDARD CONSTRUCrioN SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Pu�m VCAI011 April ? 2014 00 42 43 - CONTRACT BIDS DAP MORNINGSTAR - SECTION 5 PRASE 1 - 201336E- 09-UI-15
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGST i12 SECTION 5, I'IIASE 1
UNIT PRICE BID
Bidlist
Item
No
Project Item Information
Description
Specification
Section No.
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT III: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
Contractor agrees to complete \VORK for F1NA1„4CCEP'1'ANCE withi
CONTRACT commences to run as provided in the General Conditions.
Unit of
Measure
0042•3
DAP -111D PROPOSAL
Page 7 of 7
9/1 /2015
Bidder's Application
Bid
Quantity
Total Construction I3id
END OF SEC"CION
Bidder's Proposal
Unit Price
I3id Value
$267,434.001
$297,121.201
$258,441.00 1
$781,487.84
$84,511.46
$1,688,995.501
calendar days after the dale when the
C'ITy OF roRT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2. '2014 GO 42 -13 - CONTRACT BIDS DAP PIORNINGST
C - SECTION 5 PHASE 1 - 201330E- U9-0I-15