Loading...
HomeMy WebLinkAboutContract 47141 (2)CITY SECRETARY c wIACT NO. COMPLETION AGREEMENT This Completion Agreement ("Agreement) is made and entered into by and among the City of Fort Worth ("City"), and FG ALEDO DEVELOPMENT, LLC.a Texas Limited Liability Company ("Developer"), and SOUTHWEST BANK ("Lender"), effective as of SEPTEMBER 15, 2015...The City, the Developer and the Lender are hereinafter collectively called the "Parties". WITNESSETH: WHEREAS, the Developer owns that certain tract of real property that contains approximately 24.509 'acres that is located in the City, the legal description of which tract of real property is marked Exhibit "A" — Legal Description, attached hereto and incorporated herein for all purposes (which tract of real property is hereinafter called the "Property"); and WHEREAS, the Developer intends to develop the Property as an addition to the City through plat FP. 014-081 or FS_;; and WHEREAS, the Developer and the City have entered into a Community Facilities Agreement relating to the development of MORNINGSTAR SECTION 5, PHASE 1 (hereinafter called the "CFA"); and WHEREAS, the City has required certain assurances of the availability of funds to complete the streets, street signs and lights, and the water and sewer utilities for the development of the Property (herein collectively called the "Community Facilities"), and WHEREAS, in order to provide such assurances as have been required by the City, the Lender has agreed to advance certain funds to the City for Hard Costs (which term is hereinafter defined) subject to, and in accordance with, the terms, provisions and conditions of this Agreement; and WHEREAS, the Developer has granted to the Lender as additional security for the Loan (which term is hereinafter defined) a security interest in all plans and specifications for the development of the Property (hereinafter collectively called the "Plans"); and OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX WHEREAS, the Parties desire to set forth the terms and conditions of such accommodations as are described above. NOW THEREFORE, for and in consideration of the benefits to be derived from the mutual observance by the parties of the terms and conditions hereof, and for and in consideration of Ten Dollars ($10.00) and other good and valuable consideration, the receipt, adequacy and sufficiency of which are hereby acknowledged, the Parties agree as follows: 1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for this Agreement and they are incorporated into this Agreement for all purposes. 2. The Completion Amount. The City and the Developer agree that the Hard Costs required to complete the Community Facilities in the aggregate should not exceed the sum of ONE MILLION SIX HUNDRED EIGHTY SIX THOUSAND NINE HUNDRED NINETY FIVE DOLLARS AND FIFTY CENTS Dollars ($11,686,995.50), hereinafter called the "Completion Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of the Community Facilities may vary as a result of change orders agreed to by the Parties, but such variances for the purposes of this Agreement shall not affect the Completion Amount as used herein. 3. Adiustments to the Completion Amount. The Lender may from time to time make advances to the Developer for the development of the Property under the development loan that has been made by the Lender to the Developer for the purpose of financing the costs of constructing the Community Facilities for the Property (the "Loan") subject to, and in accordance with, the terms, conditions and provisions of the Loan Documents (which term is hereinafter defined) evidencing and securing the Loan. Some of those advances shall be for Hard Costs as specified in the "Approved Budget" relating to the Loan, a copy of which Approved Budget is marked Exhibit "B", attached hereto and incorporated herein for all purposes, with the Hard Costs (which term is hereinafter defined) line items highlighted. Page 2 of 13 The term "Hard Costs" shall mean the actual costs of construction and installation of the Community Facilities. To the extent that advances under the Loan are for the payment of Hard Costs, the Completion Amount shall be deemed reduced, dollar for dollar. The Lender may withhold statutory retainage from any advances under the Loan or pursuant to this Agreement. All such retainage withheld, to the extent it is attributable to Hard Costs, shall also reduce the Completion Amount dollar for dollar. All retainage withheld by the Lender for Hard Costs that are advanced to the City pursuant to this Agreement shall be released to the City as provided in the Texas Property Code upon expiration of the statutory retainage period. 4. Completion by the Developer. The Developer agrees to complete the Community Facilities on or before the date for completion that is established in the Loan Documents plus thirty (30) days (hereinafter called the "Completion Date"), in accordance with the CFA, the Plans that are approved by the Lender and the City and all documents evidencing or securing the Loan (which documents are hereinafter collectively called the "Loan Documents"). For the purposes of this Agreement, the development of the Property shall be deemed complete upon acceptance by the City of the Community Facilities. The City shall promptly notify the Lender and the Developer upon such acceptance. 5. Completion by the City. In the event that either: (A) the development of the Property is not completed by the Completion Date for any reason whatsoever, or (B) the Developer is in default under the Loan, then the Lender, at its sole option, may request the City to complete development. The City may, at its sole option and at the cost and expense of the Developer, within 10 days from receipt of Lender's request, notify Lender that it will undertake to complete the Community Facilities and the City shall then commence, pursue, and complete the Community Facilities in a reasonably timely diligent and workmanlike manner in accordance with the Plans, subject to the terms of this Agreement. The Lender and the Developer agree Page 3 of 13 that the City may use the Plans as necessary to complete the Community Facilities. If the City does not timely elect to complete the construction of the Community Facilities or if the Lender does not request the City to complete construction of the Community Facilities, then the Lender may at its election terminate this Agreement, or at its option, proceed to complete the Community Facilities, or foreclose on any of its collateral, or take any and all such action as may be provided under the Loan Documents. 6. Advance of Completion Costs to the City and Delivery of Hard Costs Collateral to the City. In the event the Lender has requested the City and the City has elected to complete the Community Facilities, Lender shall transfer to the City all remaining undisbursed Hard Costs specified in the Approved Budget within 10 days of the date that the City elected to complete and provided Lender with written notice of such election. The Developer hereby authorizes and instructs the Lender to make the transfer of any remaining undisbursed Hard Costs specified in the Approved Budget to the City within 10 days of notification that the City elects to complete the Community Facilities. In the event the cost to complete the Community Facilities exceeds the moneys transferred to the City, City shall notify Lender and Developer in writing of the need of additional funds. The additional funds required to complete the Community Facilities shall be delivered to the City within 10 business days following notification to Lender and Developer. Failure to deliver the additional funds shall relieve the City of the obligation to complete the Community Facilities, in which event City shall use the Hard Costs funds in its possession to pay the contractor(s) all funds due it/them. Any remaining undisbursed Hard Costs shall be returned to Lender within a reasonable time. 7. Completion by the Lender The Lender may, at its discretion, but shall not be obligated to, undertake to complete the Community Facilities if there is any default under any Loan Documents in lieu of requesting the Page 4 of 13 City to complete the Community Facilities. If the Lender elects to complete the Community Facilities, any Hard Costs it expends shall, dollar for dollar, reduce the Completion Amount. 8. Easements. In the event the City or the Lender undertakes the completion of the Community Facilities, the Developer (and to the extent necessary the Lender) grants to the City and the Lender open access to the Property and shall execute and deliver such temporary easements over and across the entirety of the Property for the purpose of access and use for the completion of the construction of the Community Facilities in accordance with this Agreement. To the extent requested by the City and the Lender written temporary construction easements in form acceptable to the City and the Lender shall be executed by the Developer and filed of record. Nothing in this paragraph shall reduce any rights of the Lender or obligations of the Developer under the Loan Documents. 9. Lender's Rights. Nothing in this Agreement shall affect any portion of the Lender's collateral for the Loan or limit or impair the Lender's ✓ ight to foreclose the same or deal with the collateral as it elects in accordance with the Loan Documents. 10. Satisfaction of the City Requirements. The City agrees that the assurances and covenants contained in this Agreement satisfy all requirements of the City with respect to payment and performance bonds or other requirements for security in connection with the development of the Property and the completion of the Community Facilities that are contained in the CFA or in any other agreement relating thereto, and the City hereby accepts the assurances and covenants contained herein in lieu thereof. To the e xtent the CFA irreconcilably conflicts with this Agreement, the provisions o f this Agreement shall control. 11. Termination. This Agreement shall terminate upon the earlier to occur of the following: (a) acceptance by the City of the Community Facilities; (b) mutual written agreement of all of the Parties; or (c) the ✓ eduction of the Completion Amount to zero. However, release of the plat P age 5 of 13 shall be governed by paragraph 12 hereof and termination pursuant to (b) or (c) of this paragraph 11 shall not require the City to release the plat. 12. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the Property until the Community Facilities are completed and accepted by the City and all Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and receipt of evidence from the Developer showing that all Hard Costs contractors have been paid, including but not necessarily limited to lien waivers and bills paid affidavits, the City shall within a reasonable time file the final plat for the Property in the Plat Records of the county where the Property is located. The purpose of the City retaining the final plat of the Property as provided herein is to guarantee the Developer's obligations under the CFA are completed. 13. Construction Contracts. Developer agrees to include in each Construction contract that it enters into for the completion of the Community Facilities the following: a. A statement that the City is not holding any security to guarantee any payment for work performed on the Community Facilities; b. A statement that the Property is private property and that same may be subject to mechanic's and materialman's liens; c. A requirement that each contractor contracting with the Developer release the City from any claim that is related to the Property; and d. A requirement that each contractor contracting with the Developer include in each subcontract the statements contained in a., b., and c. above. 14. Miscellaneous. A. Non -Assignment of Agreement This Agreement may not be assigned by any of the Parties without the prior written consent of all the other Parties. B. Notice. Any notice required or permitted to be delivered under this Agreement shall be deemed received on actual receipt by the appropriate party at the following addresses: Page 6 of 13 (i) and/or Notice to the City shall be addressed and delivered as follows: City of Fort Worth Planning and Development Department 1000 Throckmorton Street Fort Worth, Texas 76102 Attention: CFA Division David Schroeder, Development Manager Email: David.Schroeder@fortworthgov.org Confirmation Number: 817-392-2239 Attention: CFA Division Jana Knight, Administrative Assistant Email: Jana.Knight@fortworthgov.org Confirmation Number: 817-392-2025 With a copy thereof addressed and delivered as follows: Douglas W. Black Office of the City Attorney City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 Confirmation Number: 817-392-7607 (ii) Notice to the Developer shall be addressed and delivered as follows: FG ALEDO DEVELOPMENT, LLC, KIM GILL 3045 LACKLAND ROAD FORT WORTH, 76116, (817) 731-7737 (iii) Notice to the Lender shall be addressed and delivered as follows: SOUTHWEST BANK, ALEC BARRY] [ALEC BARRY, 817-298-5585 Page 7 of 13 2200 WEST 7Tx STREET FORT WORTH, TEXAS 76102 A party may change its address for notice upon prior written notice to the other parties pursuant to the terms hereof. C. Texas Law to Apply. This Agreement shall be construed under and in accordance with the laws of the State of Texas. D. Parties Bound This Agreement shall be binding upon and inure to the benefit of the Parties and their respective legal representatives, successors and assigns. E Leta1 Construction In case any one or more of the provisions contained in this Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provision of this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. F. Prior Atreements Superseded. This Agreement constitutes the sole and only agreement of the Parties with respect to the subject matter hereof and supersedes any prior understandings or written or oral agreements among the Parties concerning the subject matter hereof; provided, however, that this Agreement shall not supersede, amend or modify any of the Loan Documents or any portion thereof. G. Amendment. This Agreement may only be amended by a written instrument executed by all of the Parties to his Agreement. H. Headings. The headings that are used in this Agreement are used for reference and convenience purposes only and do not constitute substantive matters to be considered in construing the terms and provisions of this Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) Page 8 of 13 Executed IN QUADRUPLICATE by the Parties hereto: CITY OF FORT WORTH: Fcrn :=Cesta ' Assistant City Manager Date: R7 APPROVED AS TO FORM: Douglas W. Black Assistant City Attorney ATTEST: Mary J. City Secretary M&C: Date: Page 9 of 13 „c.c. ,t.p.itzteA Met 7 DEVELOPER: FG Aledo Development, LLC Name: `I� mberly Gill Title: President Date: LENDER: Southwest Bank Name: A (..5.7c. Title: Abfiegasr °Fru:1AL RECORP y lad gr{r+ • • KIMBERLY GILL, the "Guarantor" of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by KIMBERLY GILL.; By: Name: Title: TIMOTHY H. FLEET, the "Guarantor" of the Development Loan, is executing this Completion Agreement for the sole purpose of acknowledging that advances that are made by the Lender pursuant to this Completion Agreement shall be deemed to be advances that are made under the Loan that shall be subject to and covered by the Loan Documents and the Guaranty Agreement that was executed by TIMOTHY H. FLEET. By: Name: Title: 911412- tt/A VUzifE OFFICIAL RECORD CITY SECRETARY ::., ITIChriTiti TX Page 10 of 13 LIST OF EXHIBITS TO THE COMPLETION AGREEMENT EXHIBIT A - LEGAL DESCRIPTION EXHIBIT B - APPROVED BUDGET Page 11 of 13 EXHIBIT A Page 12 of 13 LEGAL DESCRIPTION: Being a tract of land out of the P. J. McClary Survey, Abstract No. 907, and situated in Parker County, Texas, and surveyed by Miller Surveying, Inc. of Hurst, Texas in October 2014, said tract being a portion of the same tract of land described in the deed to FG Aledo Development, LLC, recorded as Document No. 2014-10308 in the Deed Records of Parker County, Texas, and being a portion of the same tract of land described in the deed to FWFW Holdings, Inc., recorded as Document No. 2014-10303 in said Records and being more particularly described by metes and bounds as follows: Beginning at a 1/2 inch "MILLER 5665' capped steel rod set in the westerly boundary line of said FWFW tract, said rod being in the easterly right-of-way line of Farmer Road (FM Hwy. 3325) from which a TxDOT monument found for the northwest corner of said FWFW tract bears North 08 degrees 41 minutes 26 seconds West at 3669.52 feet; Thence North 88 degrees 56 minutes 35 seconds East a distance of 135.35 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 67 degrees 27 minutes 53 seconds East a distance of 70.16 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 79 degrees 58 minutes 11 seconds East a distance of 131.36 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 87 degrees 27 minutes 16 seconds East a distance of 335.09 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 23 degrees 06 minutes 18 seconds East a distance of 183.78 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 23 degrees 07 minutes 57 seconds East a distance of 50.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the right with a radius of 375.00 feet and whose chord bears South 63 degrees 16 minutes 26 seconds East at 47.01 feet; Thence easterly with said curve through a central angle of 07 degrees 11 minutes 13 seconds and an arc length of 47.04 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve; Thence South 59 degrees 40 minutes 50 seconds East a distance of 32.29 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 75 degrees 54 minutes 08 seconds East a distance of 14.29 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the right with a radius of 710.00 feet and whose chord bears North 35 degrees 21 minutes 45 seconds East at 86.04 feet; Thence northeasterly with said curve through a central angle of 06 degrees 56 minutes 51 seconds and an arc length of 86.09 feet to a 1/2 inch "MILLER 5665' capped steel rod set for the end of said curve; Thence South 51 degrees 09 minutes 50 seconds East a distance of 178.01 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 41 degrees 38 minutes 54 seconds East a distance of 61.08 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 48 degrees 42 minutes 17 seconds East a distance of 92.35 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 62 degrees 04 minutes 14 seconds East a distance of 78.83 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 64 degrees 39 minutes 14 seconds East a distance of 50.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 25 degrees 20 minutes 46 seconds East a distance of 54.17 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 64 degrees 39 minutes 14 seconds East a distance of 430.10 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 25 degrees 20 minutes 46 seconds East, passing at 73.33 feet a 1/2 inch "MILLER 5665" capped steel rod set in the easterly right-of-way line of Indigo Sky Way and continuing therewith a total distance of 133.33 feet to a 1/2 inch ' MILLER 5665" capped steel rod set; Thence South 64 degrees 39 minutes 14 seconds West, departing said right-of-way line, a distance of 115.00 feet to a 1/2 inch "MILLER 5665' capped steel rod set; Thence South 19 degrees 39 minutes 14 seconds West a distance of 14.14 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 64 degrees 39 minutes 14 seconds West a distance of 50.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 70 degrees 20 minutes 46 seconds West a distance of 14.14 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 64 degrees 39 minutes 14 seconds West passing at 115.00 feet a 1/2 inch "MILLER 5665" capped steel rod set for an inner corner of said FG tract and continuing with the southerly boundary line therewith a total distance of 305.09 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with a radius of 345.00 feet and whose chord bears South 49 degrees 39 minutes 52 seconds West at 178.46 feet; Thence southwesterly with said curve through a central angle of 29 degrees 58 minutes 44 seconds and an arc length of 180.52 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with a radius of 30.50 feet and whose chord bears South 23 degrees 00 minutes 03 seconds West at 12.34 feet; Thence southwesterly with said curve through a central angle of 23 degrees 20 minutes 53 seconds and an arc length of 12.43 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the right with a radius of 50.00 feet and whose chord bears South 77 degrees 38 minutes 51 seconds West at 91.58 feet; Thence westerly with said curve through a central angle of 132 degrees 38 minutes 29 seconds and an arc length of 115.75 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with a radius of 30.50 feet and whose chord bears North 47 degrees 51 minutes 22 seconds West at 12.50 feet; Thence northwesterly with said curve through a central angle of 23 degrees 38 minutes 56 seconds and an arc length of 12.59 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve; Thence North 59 degrees 40 minutes 50 seconds West a distance of 220.84 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 72 degrees 34 minutes 27 seconds West a distance of 13.45 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with a radius of 650.00 feet and whose chord bears South 11 degrees 48 minutes 20 seconds East at 767.67 feet; Thence southerly with said curve through a central angle of 72 degrees 23 minutes 13 seconds and an arc length of 821.20 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the right with a radius of 580.00 feet and whose chord bears South 42 degrees 49 minutes 23 seconds West at 104.65 feet; Thence southeasterly with said curve through a central angle of 10 degrees 21 minutes 07 seconds and an arc length of 104.79 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end of said curve, said rod being in the northerly right-of-way line of Morning Mist Trail; Thence South 52 degrees 21 minutes 10 seconds West with said northerly right-of-way line a distance of 60.00 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 09 degrees 49 minutes 58 seconds West continuing with said northerly right-of-way line a distance of 13.66 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 56 degrees 45 minutes 43 seconds West continuing with said northerly right-of-way line a distance of 225.49 feet to the beginning of a curve to the right with a radius of 570.00 feet and whose chord bears South 73 degrees 08 minutes 57 seconds West at 321.62 feet; Thence westerly, continuing with said northerly right-of-way line and with said curve through a central angle of 32 degrees 46 minutes 28 seconds and an arc length of 326.05 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the end said curve; Thence South 89 degrees 32 minutes 11 seconds West continuing with said northerly right-of-way line a distance of 61.96 feet to the beginning of a curve to the right with a radius of 500.00 feet and whose chord bears North 84 degrees 02 minutes 40 seconds West at 111.80 feet; Thence westerly, continuing with said northerly right-of-way line and with said curve through a central angle of 12 degrees 50 minutes 19 seconds and an arc length of 112.04 feet to a 1/2 inch "MILLER 5665" capped steel rod set for the beginning of a curve to the left with a radius of 300.00 feet and whose chord bears North 84 degrees 02 minutes 40 seconds West at 67.08 feet; Thence westerly, continuing with said northerly right-of-way line and with said curve through a central angle of 12 degrees 50 minutes 19 seconds and an arc length of 67.22 feet; Thence South 89 degrees 32 minutes 11 seconds West continuing with said northerly right-of-way line a distance of 241.25 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence North 45 degrees 45 minutes 37 seconds West continuing with said northerly right-of-way line a distance of 14.22 feet to a 1/2 inch "MILLER 5665" capped steel rod set; Thence South 88 degrees 56 minutes 50 seconds West continuing with said northerly right-of-way line a distance of 5.16 feet to a 1/2 inch "MILLER 5665" capped steel rod set in the easterly right-of-way line of said Farmer Road; Thence North 01 degrees 03 minutes 10 seconds West with said easterly right-of-way line a distance of 1466.70 feet to a TxDOT monument found; Thence North 04 degrees 25 minutes 07 seconds East continuing with said easterly right-of-way line a distance of 50.19 feet to a TxDOT monument found; Thence North 00 degrees 59 minutes 59 seconds West continuing with said easterly right-of-way line a distance of 100.04 feet to a TxDOT monument found; Thence North 06 degrees 43 minutes 22 seconds West continuing with said easterly right-of-way line a distance of 50.14 feet to the point of beginning and containing 24.509 acres of land, more or less; EXHIBIT B Page 13 of 13 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - SECTION 5, PHASE 1 UNIT PRICE BID Bidlist Item No. 1 13311.0161 2 3311.0261 3 3312.3002 4 3312.3003 5 3312.4109 6 3312.0112 7 3312.0001 8 3311,0001 9 3305.0109 10 3312,2003 Description Project Item information Specification Section No. Unit of Measure UNIT I: WATER IMPROVEMENTS 6" Water Pipe 8" Water Pipe 6" Gate Valve 8" Gate Valve 8" x 12" Tapping Sleeve & 8" Gate Valve Connect. to Existing 12" Water Main Fire Hydrant Ductile Iron Water Fittings Trench Safety 1" Water Service 33 11 12 331112 33 12 20 33 12 20 33 12 25 33 12 25 33 12 40 33 11 11 33 05 10 33 12 10 LF LF EA EA EA EA EA TON 1,F EA 004243 DAP - BID PROPOSAL. Page I oil 9/1/2U15 Bidder's Application Bid Quantity 90 4,520 9 15 2 2 9 3 4,610 72 TOTAL UNIT I: WATER IMPROVEMENT; 13idder's Proposal Unit Price $26,001 $29.001 $840,001 $950.0(1 $3,000.UG $700_00 $3,400.06 $5,400.00 $0.401 $780.0(11 Biel Value $2,340.001 $131,080.01 $7,560.0Ci $14,250.001 $6,000.00I $1.400.001 $30,600.0 $16,2OOA(i $1,844.Od $56,160.01, $267,434.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVI Form Version April 2, 2014 OPER AWARDED PROJECTS UJ 42 43 - CONTRACT BIDS DAP MORNINGSTAR SECTION 5 PH SE t - 2013 36E U9-01.15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGST tl2 - SECTION 5, PHASE 1 UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 Description Project Item Information Specification Section No. Unit of Measure 00 42 43 D:\P - BID PROPOSAI. Page 2 of7 911 i2015 Bidder's Application Bid Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 3331.41 15 8" Sewer Pipe 33 31.4116 8" Sewer Pipe, CSS 13ackfill 3339.1001 4' Manhole 3339.1003 4' Extra Depth Manhole 3331.3101 4" Sewer Service, Two-way cleanout 3301.0002 Post -CCTV Inspection 3339.0002 !Manhole Vacuum Testing 8 33 39.0001 Epoxy Manhole 1.incr 9 3305.0109 Trench Safety 10 3305.0113 Trench Water Stops 33 31 20 33 11 10 33 39 20 33 39 20 33 31 50 33 01 31 33 01 30 33 39 60 33 05 10 33 05 10 LP 1,1' EA VI' EA 1,r EA VI; LP EA 3,817 234 24 43 68 4,051 21 64 4,051 18 TOTAL UNIT II: SANITARY SEWER IMPROVEMENT$ Bidder's Proposal Unit Price $34.001 $50.001 $3,600.0(1 $150.001 $385.00 $2,80 $150.0 $25U.0 $0.40 $250, 00 13id Value $129,778.01 $11,700.0( $86,4UO.00 $6,450.001 $26,180.0(j $1 1,342.80 $3,150.001 $ 16.000.00 $1.620.40 $4,500,001 $297,121, 20 CITY OF FORT \muff STANDARD CONSTRUCTION SPECIPICA'CION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2, 2014 OU 42 43 - CONTRACT BIDS DAP MORNINOSTAI SECTION 5 PEIA I - 201336E- 09-01-I SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGS I'AR - SECTION 5, PHASE I UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 3305.0109 3341.0409 3341.0404 3341.0309 3341.0205 3349.7001 3349.0001 3349.0002 3349.5001 3349.5002 3349.5003 Description Trench Safety 48" RCP, Class I11 42" RCP, Class III 36" RCP, Class III 24" RCP. Class III 4' SQ. Yin! et 4' Storm Junction 13ox 5' Storm Junction Box 10' Curb Inlet 15' Curb Inlet 20' Curb Inlet Project ltcin Information Specification Section No. Unit of Measure UNIT III: DRAINAGE IMPROVEMENTS 33 05 10 33 41 10 3341 10 33 41 10 33 41 10 33 49 20 33 49 10 33 49 10 33 49 20 33 49 20 33 49 20 LF I,F LE LE LF EA EA EA EA EA EA 00 42 43 DAP - BID PROPOSAL. Page 3 or 7 9/1/2015 Bidder's Application Bid Quantity 1902 31 425 899 547 1 2 2 4 6 4 TOTAL UNIT HI: DRAINAGE IMPROVEMENT* 13iddet's Proposal Unit Price $0.50 S135.0 $115.00 $90,001 $60.001 $3,300.00 $4,000.00 $4,900.0( $3,200.001 $5,400.0C $6,100.00 Bid Value $951.0111 $4,185.0C1 $48,875.001 $80,910.0( $32,820.0( $3,300.01 $8,000.00 $9,800.0 $12.ROO.0(i $32,400.O14 $24.400.01,1 $258,441.00 CITY OF FORT WORT!! STANDARD CONSTJt1Cl'ION SPECIFICATION DOC Form Version April 2, 2014 1ENTS - DEVELOPER AWARDED PROJECTS 00 42 43 - CONTRACT BID DAIMORNINGS - SECTION 5 PHA 1- 2013 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGS C lR - SECTION 5, PHASE 1 UNIT PRICE BID 13idlisl Item No. 1 2 4 6 8 9 10 11 12 Description Project Item Inlormation UNIT IV 3213.0101 6" Cone Plant 321 1.0501 6" Lime Treatment 321 1.0400 I lydrate Lime 9999 0001 7,5" Cone Pvmt 321 1.0502 8" Lime Treatment 321 1.0400 Hydrate Lime 3213.0301 4" Concrete Sidewalk 3213.0504 Barrier Free Ramp - Type R-1 3441 4003 Furnish & Install Ground Mount Sign Post and Sign 3217.0501 24" Solid White Stop Bar Paint (W) 3217.2103 REEL Raised Marker TY 11 A -A )999.0002 Street barricade (street dead ends) Specification Section No. Unit of Measure PAVING IMPROVEMENTS 32 13 13 1 SY 32 11 29 SY 32 1 129 TN 32 13 13 SY 32 1 1 29 SY 32 11 29 TN 32 13 20 SE 32 13 20 EA 34 41 30 EA 32 17 23 LF 32 17 23 EA 31 36 00 LE 00 42 43 DAP• BID PROPOSAL Page 4 of 7 9/ 1 /2015 Bidder's Application Bid Quantity 8,085 8,611 129.16 9,095 9,686 193,82 8006 16 11 126 112 150 TOTAL UNIT IV: PAVING IMPROVEMENT Bidder's Proposal Unit Price S33.00 $3.00 $175.00 $38.00 $3.25 S175.00 $3.00 S I.000.00 $650.00 S 12,00 $5.00 $40.00 I3id Value $266,805.0( $25,831.581 $22,602.631 $345,610.(X $31,480.071 $33,918.561 $24,018.0d $16,000.0d $7,150.0()1 S 1,512.O01 $560.0tl S6,000.001 $781,487.84 CITY OF FORT WORTI1 STANDARD CONS'IRUC I JON SPECIFICATION DOCUMENTS - D Form Version April 2, 2014 ELOPER AWARDED PROJuC'TS 00 42 43 - CONTRACT BIDS DAP \MORNINOSTA SECTION 5 PHASE 1 -201336E-09•41-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM AIORNINGST 1R - SECTION 5, PHASE 1 UNIT PRICE BID Bidlist Item No. Description Project Item Information Specification Section No. linit of Measure ')0 42 43 DAI' - BID PROI'USAI. Page 5 nr 7 9/1/2015 Bidder's Application Bid Quantity UNIT V: STREET LIGHTING IMPROVEMENTS 1 3441.1502 Furnish/Install Ground I3ox, Type 13 9999.0000 Rdhuy lllum Assembly TY D-25-6, 70W - ATBO - LED TYPE 2 - 70 W - NW, Pole Type 8, Truss 3313 9999,0000 Rdwy Blum Assembly TY D-6, A'IB2 LED - Type 2 - 137W LED - NW 4 3441.3301 Furnish/Install Rdwy Ilium Foundation TY 3 5 3441.3001 Furnish/Install Rdwy Ilium Foundation TY 1 6 2605,301S 2 Inch Conduit PVC SCII 80 (T) 3441,3401 6-6-0 Triplex Alum Electric Conductor 2 3 34 41 10 34 41 20 34 41 20 34 41 20 34 41 20 26 05 33 34 41 10 EA EA EA EA EA LF CLF 9 14 8 14 8 1821 1821 TOTAL. UNIT V: STREET LIGHTING IMPROVEMENTS Bidder's Proposal Unit Price $400.00 $1, 800,00 $2,250 00 $856.00 $953.34 $8.00 $1.94 Bid Value $3,600.0 $25,200.0( $18,000.O(1 $11,984.00 $7,626.72 $14,568.Od $3,532.74 $84,511.46 CITY OF FORT NORTH STANDARD CONSTRUCrioN SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Pu�m VCAI011 April ? 2014 00 42 43 - CONTRACT BIDS DAP MORNINGSTAR - SECTION 5 PRASE 1 - 201336E- 09-UI-15 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGST i12 SECTION 5, I'IIASE 1 UNIT PRICE BID Bidlist Item No Project Item Information Description Specification Section No. Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS Contractor agrees to complete \VORK for F1NA1„4CCEP'1'ANCE withi CONTRACT commences to run as provided in the General Conditions. Unit of Measure 0042•3 DAP -111D PROPOSAL Page 7 of 7 9/1 /2015 Bidder's Application Bid Quantity Total Construction I3id END OF SEC"CION Bidder's Proposal Unit Price I3id Value $267,434.001 $297,121.201 $258,441.00 1 $781,487.84 $84,511.46 $1,688,995.501 calendar days after the dale when the C'ITy OF roRT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version April 2. '2014 GO 42 -13 - CONTRACT BIDS DAP PIORNINGST C - SECTION 5 PHASE 1 - 201330E- U9-0I-15