Loading...
HomeMy WebLinkAboutContract 47260 (2)Developer and Project Information Cover Sheet: Developer Company Name: 640 Taylor LP Address, State, Zip Code: 777 Taylor Street Ste P1, Fort Worth, TX , 76102 Phone & Email: 817-335-1179 Authorized Signatory, Title: Greg Bird, President of General Partner Project Name and Brief 640 Taylor Street Description: Project Location: 640 Taylor Street, Fort Worth, TX 76102 Plat Case Number: FS-15-030 Plat Name: Original Town Fort Worth Mapsco: 76D Council District: 9 City Project Number: 02672 CFA Number: 2015-093 DOE Number: 7530 To be completed by staff: Received by: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 1 of 11 Date: it alSe OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § COUNTY OF TARRANT § City Secretary Contract No. ij '724' o WHEREAS, 640 Taylor LP, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as 640 Taylor Street ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Proj ect. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 11 evelaper'�contraeto(s) OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein• Water (A) IXI, Sewer (A-1) , Paving (B) , Storm Drain (B-1) X, Street Lights & x Signs (C) E The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 3 of 11 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service fines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth. its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants. or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 5 of 11 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and stouu drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 11 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07 30 2015 Page 7 of 11 Project Name: 640 Taylor Cost Summary Sheet CFA No.: 2015-093 DOE No.: 7530 An hngineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 136,000.00 2. Sewer Construction $ 83,268 00 Water and Sewer Construction Total $ 219,268.00 B. TPW Construction 1. Street $ 132,833.00 2 Storm Drain $ 50,085.00 3. Street Lights Installed by Developer $ 25,000.00 4. Signals $ 95,000.00 TPW Construction Cost Total $ 302,918.00 Total Construction Cost (excluding the fees): $ 522,186.00 Construction Fees: C. Water/Sewer Inspection Fee (2%) $ 4,385.36 D. Water/Sewer Material Testing Fee (2%) $ 4,385.36 Sub -Total for Water Construction Fees $ 8,770.72 E. TPW Inspection Fee (4%) $ 7,316.72 F. TPW Material Testing (2%) $ 3,658.36 G. Street Light Inspsection Cost $ 1,000.00 H. Signals Inspection Cost $ 3,800.00 H. Street Signs Installation Cost $ - Sub -Total for TPW Construction Fees $ 15,775.08 Total Construction Fees: $ 24,545.80 Choice Financial Guarantee Options, choose one Amount (Mark one) Bond = 100% $ 522,186.00 'Completion Agreement = 100% / Holds Plat $ 522,186.00 'Cash Escrow Water/Sanitary Sewer= 125% $ 274,085.00 'Cash Escrow Paving/Storm Drain = 125% $ 378,647.50 'Letter of Credit = 125% w/2yr expiration period $ 652,732.50 City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Jesus J. Chapa Assistant City Manager Date: � /- ? 15- Recommended by: Wendy Chi-Ba ulal, EMBA, P.E. Development Engineering Manager Water Department Er,Dou Dire Tra • p . g, P.E. ion & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. Aire Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 11 DEVELOPER 640 Taylor LP By: Anthracite Investment Company, Inc. its General Partner Name: GreBird Title: President Date: /(/4t/15 ATTEST: (Only if required by Developer) Signature Name: irt FFICEJP\Th RECORD CITY SECRETARY r Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment M Attachment 1 - Changes to Standard Community Facilities Agreement (XI Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 11 ATTACH1VIENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02672 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 11 PLOTTED BY: Bruner, Katherine ON: Thursday, September 24, 2015 AT: 2:09 PM FILEPATH: Wtworth \file system Wroduction500 \001400\ B001467 \CorresPondence\003\City Submittals \CFA \ExhibitsWICINITY MAP.dwg 1 rri m 0 rn rn X n r- f`J*1 C7 w 44' NJW Z 0 UD cn 31VOS 01 ION I HARROLD 0 GREEN LEAF z ARTHU COMME4CIAL VIOLA AUSTIN SSA** lt4•4 44 444* 141 Sit* A4 464° 4 • 1 5 AT: 4:28 PM FILEPATH: \\ftworth\file system\Production500\001400\8001467\Correspondence\003\City Su PROPOSED 6" WATER LINE PROPOSED 8" WATER LINE PROPOSED 10" WATER LINE r DUNAWAy 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) 1 ( W. 5TH STREET (60' WIDE RIGHT-OF-WAY) 0 PROPOSED FIRE HYDRANT EXISTING 12" WATER LINE \ (D.I. 9456) EXISTING 12" WATER LINE --- (NO REF. AVAIL.) Ex 18" `N EXISTING BUILDING \\ —L-S CS IDt�== __ W. 6TH STREET (60' WIDE RIGHT-OF-WAY) PROPOSED L PROPOSED TEMPORARY SERVICES 8" WATER LIN= EXHIBIT A WATER PROPOSED 12" WATER LINE (ONLY IF RE—ROUTING REQUIRED FOR TO SD INLET CONFLICT) LEGEND EXISTING WATER LINE EXISTING FIRE HYDRANT EXISTING GATE VALVE EXISTING WATER METER PROPOSED WATER LINE PROPOSED FIRE HYDRANT PROPOSED GATE VALVE PROPOSED WATER METER PROPOSED PLUG PROPOSED REDUCER 0 60 120 JETTA OPERATING BUILDING SCALE: 1"= 60 ft. FA\Exhibits\WASTEW : \\ftworth\file system \Production500\001400\6001467\Correspondence\003\City Sub PLOTTED BY: Gaddis, Bobby ON: Tuesday, October 13, 2015 AT: 11:00 AM FILE PROPOSED 4' DIA SANITARY SEWER MANHOLE PROPOSED 6" WASTEWATER LINE LEGEND EX SS PROPOSED SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE EXISTING SANITARY SEWER LINE PROPOSED SANITARY SEWER MANHOLE DUNAWAj/ 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel:817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) 133111s HVWV1 I PROPOSED 4' DIA SANITARY SEWER MANHOLE PROPOSED 8" WASTEWATER LINE E(-1 0" SS i I\� L7�_�� o'== p PROPOSED BUILDING c IM EX0';5._---- W. 5TH STREET (60' WIDE RIGHT—OF—WAY) 9 EXISTING BUILDING IT 'W. 6TH STREET (60' WIDE RIGHT—OF-WAY) EXHIBIT Al WASTEWATER JETTA OPERATING BUILDING Ey 0 60 120 SCALE: 1"= 60 ft. PROPOSED BRICK _EAVFRS PROPOSED 7" 3,600 PSI CONCRETE PROPOSED ASPHALT TRENCH REPAIR PROPOSED ADA RAMP (TYP) PROPOSED ASPHALT PAVING m m r. (64, _ _ --111111 DUNAWAV 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) W. 5TH STREET (60' WIDE RIGHT-OF-WAY) (EXISTING ASPHALT PAVEMENT) PROPOSED BUILDING :N )_1 1 i _ •--NON. e r MOM =gra ------ EXISTING BU (LDING -•,+-dh • 'lam iRRtllil raw bri FAN Man r W. 6TH STREET (60' WIDE RIGHT-OF-WAY) piSTING ASPHALT PAVEMENT) EXHIBIT B PAVING i JETTA OPERATING BUILDING azzonl (AVM-30-1HJI2U 34IM ,09) 133H1S 1:1O1AVI LEGEND PROPERTY LINE RIGHT-OF-WAY PROPOSED CURB FULL DEPTH SAWCUT (TYP.) EXISTING STREET CENTERLINE PROPOSED ASPHALT PAVING PER CFW DETAIL 32 01 17-D520 PROPOSED ASPHALT TRENCH REPAIR PER CFW DETAIL 32 01 17-D520 PROPOSED 7" 3,600 PSI PORTLAND CEMENT CONCRETE W/ #3 BARS @ 18" O.C.E.W. ON 6" LIME STABILIZED SUBGRADE (36 LBS./SY) (558± SY) PROPOSED 4" 3,000 PSI PORTLAND CEMENT CONCRETE SIDEWALK W/ #3 BARS @ 18" O.C.E.W. ON COMPACTED SUBGRADE (434± SF) PROPOSED PAVERS (792± SY) SEE ARCH PLANS FOR DETAILS & SPECIFICATIONS PROPOSED LANDSCAPING 0 60 120 SCALE: 1"= 60 ft. LL ry z o DUNAWA oqi 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel:817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) 0 J a t_s." PROPOSED 18" STORM DRAIN W. 5TH STREET (60' WIDE RIGHT-OF-WAY) 11 r PROPOSED STORM DRAIN INLET PROPOSED BUILDING V EXISTING BUILDING W. 6TH STREET (60' WIDE RIGHT-OF-WAY) = I I I I 11 I I I I rn S0 0 m 71 0 m 1 O 73 m m 1\_ XISTING 24" STORM DRAIN EXISTING 18" STORM DRAIN PROPOSED STORM DRAIN INLET PROPOSED 18" STORM DRAIN 7I EXHIBIT B1 STORM DRAIN JETTA OPERATING BUILDING STORM DRAIN LEGEND PROPERTY BOUNDARY RIGHT-OF-WAY ADMIRERS EXISTING STORM DRAIN EXISTING CURB INLET EXISTING STORM DRAIN MANHOLE PROPOSED STORM DRAIN PROPOSED CURB INLET 0 60 120 SCALE: 1"= 60 ft. I, 11111 III I II I 111 1 I - r-!'' ' * El• P, 3* PROPOSED STREET LIGHT RELOCATION 7 ! ii- iYi II. i b 550 Bailey Avenue • Suite 400 • Fort Worth, Texas 76107 Tel: 817.335.1121 • Fax: 817.335.7437 (TX REG. F-1114) W. 5TH STREET (60WIDE RIGHT-OF-WAY) n ill iii 1 ..... . i. j‘" 7ki---r- \-- ,-4"-- i- - 4- --'(-1—i---k--=,--4' --,,,---4,-- I Y -Pr 9 9 0 . A -,'- ftl% 14' R. I PROIIPSED BUIL ING m > m H:s EXISTING BUILDING W. 6TH STREET (60' WIDE RIGHT-OF-WAY) EXHIBIT C STREET LIGHTS JETTA OPERATING BUILDING 0 z Xi 3 PROPOSED SIGNAL RELOCATION 0 60 120 SCALE: 1"= 60 ft. 4 = WATER, SEWER, PAVING, DRAINAGE, SIGNAL & STREET LIGHT IMPROVEMENTS TO SERVE 640 TAYLOR STREET CITY PROJECT NO. 02672, DOE 7530 CFA QUANTITY MATRIX ITEM NO. WATER BID ITEM 1 02.41.1012 Remove 6" Water Line 2 0241.1118 4"-12" Pressure Plug 3 0241.1302 Remove 6" Water Valve 4 0241.1510 Salvage Fire Hydrant 5 0241.1512 Salvage 1" Water Meter 6 0241.1514 Salvage 2" Water Meter 7 3305.0004 10" Waterline Lowering 8 3305.0005 12" Waterline Lowering 9 3305,0103 Exploratory Excavation of Existing Utilities 10 3305.0104 Ground Water Control 11 3305,0109 Trench Safety 12 3311.0001 Ductile Iron Water Fittings with Restraint 13 3311.0161 6" Water Pipe 14 3311.0241 8" Water Pipe 15 3311,0341 10" Water Pipe 16 3312.0001 Fire Hydrant 17 3312.28022 4" Water Meter and Vault 18 3312 3002 6" Gate Valve 19 3312.3003 8" Gate Valve 20 3312.3004 10" Gate Valve 21 3312.4117 18"x8"Tapping Sleeve and Valve 22 3312.4118 18"x10" Tapping Sleeve and Valve 23 3471.0001 Traffic Control 24 9999.0001 Remove Water Service SEWER 1 1 1 0241 2001 Sanitary Line Grouting 2 0241.2012 Remove 6" Sewer Line 3 0241.2012 6" Sewer Abandonment Plug 4 0241,5001 Abandon Manhole 5 3301.0101 Manhole Vacuum Testing 6 3305.0104 Ground Water Control 7 3305.0109 Trench Safety R 3305,0113 Trench Water Stops 10 3339.0003 Wastewater Access Chamber 11 3331.3201 6" Sewer Service 12 33313301 8" Sewer Service 13 3339.1005 4' Drop Manhole 14 3339.1003 4' Extra Depth Manhole 15 3303.0001 Bypass Pumping 16 3471.0001 Traffic Control 17 9999.0006 3,500 Gallon Grease Trap - Park Model GT-3500 IA 9999.0007 Grease Trap Sample Well - Park SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST UNIT C-008 C-009 ' C-012 C-016 C-017 ' C-021 C-024 C-029 C-031 C-036 C-037' L-001 L.F. 127 127 EA 4 4 EA 2 2 EA 1 1 EA 2 2 EA 1 1 EA 11 1 EA 1 1 EA 2 2 LS 1 1 LF 242 242 TON 1.6 1.6 LF 86 86 LF 41 41 LF 115 115 EA 1 1 EA 1 1 EA 2 2 EA 1 1 EA 3 3 EA 1 1 EA 1 1 MO 1 1 EA 3 3 1M1ATER TOTAL $136,000.00 Cr 1 1 LF 360 360 EA 3 3 EA 1 1 EA 1 1 2 LS 0.5 0.5 1 LF 51 28 79 EA 1 1 2 EA 1 1 EA 1 1 EA 1 1 EA 1 1 2 VF 11 11 22 LS 0.5 0.5 1.1 MO 1 1{ EA 1 1 EA 1 1 SEWER TOTAL $83,268.00 WATER, SEWER, PAVING, DRAINAGE, SIGNAL & STREET LIGHT IMPROVEMENTS TO SERVE 640 TAYLOR STREET CITY PROJECT NO. 02672, DOE 7530 CFA QUANTITY MATRIX ITEM NO. DRAINAGE BID ITEM 1 0241.3013 Remove 18" Storm Line 2 0241.40(11 Remove 10' Curb Inlet 3 3305.0104 Ground Water Control 4 3305.0109 Trench Safety 5 3341 0103 18" RCP, Class III 6 3349.8001 10' Type 2 Inlet 7 3471.0001 Traffic Control 8 9999.0012 SWPPP PAVING 1 0241.0100 Remove Sidewalk 0241.0300 Remove ADA Ramp 3 0241,0401 Remove Concrete Drive 4 0241.1100 Remove Asphalt Pavement 5 0246000 Remove Concrete Curb and Gutter 6 3110.0102 6"-I2" Tree Removal 7 3201.01222 5' Wide Asphalt Pavement Repair, Arterial 8 3201.0202 Asphalt Pavement Repair Beyond Defined Width, Art 9 3211.0501 6" Lime Treatment 10 3213.0502 Barrier Free Ramp, Type U-1 11 3213,0102 7" Concrete Pavement 12 3214.0100 Brick Pavement I 13 3216.0101 6" Concrete Curb and Gutter 14 3217.0501 24" SLD Pavement Marking HAE(W) 15 3217.1002 Lane Legend Arrow 16 3217.1004 Lane Legend Only 17 3217.1006 Lane Legend Bike I8 3217.4301 Remove 4" Pavement Marking 19 3217.4302 Remove 6" Pavement Marking 20 3217.4406 Reprove Lane Legend Bike 21 3293,0106 Plant 6" Tree 3471.0001 Traffic Control 23 9999.0008 Furnish/Install Righ Turn Only Sign (R3-7R) & Pole 24 9999.0009 Furnish/Install COFW Pay to Park Sign & Pole 25 9999.0010 Fumish/Install COFW Electronic Parking Meter 26 9999,0011 Furnish/Install One Way Traffic Sip (R6-2) & Pole 27 9999.0012 Funnsh/htstall Telco Vault 28 9999.0013 Furnish/Install A/V Vault STREET LIGHTING IMPROVEMENTS 1 2605.0101 Electrical Facilities 1 2 2605.21(11 Conduit Box 3 3441.3502 Relocate Street Light Pole 4 3471.0001 Traffic Control I SF EET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST UNIT C-008 C-009 C-012 C-016 C-017 C-021 C-024 C-029 C-031 C-036 C-037 L-001 LF EA LS LF LF EA MO LS SF EA SF SY LF EA LF SY SY EA SY SY LF LF EA EA EA LF LF EA EA MO EA EA EA EA EA EA LS EA EA MO 38 2 38 2 1 1 145 145 145 145 2 2 1 1 1 1 DRAI IAGE TOTAL 7940 7940 3 3 880 880 680 680 680 680 6 6 210 210 20 20 350 350 3 3 350 350 850 850 635 635 472 472 7 7 1 1 1 1 400 400 120 120 1 1 10 10 3 3 2 2 5 5 2 2 1 1 1 1 1 1 PAVING TOTAL 0,5 0.5 1 1] 1 1 1 1 $50,085.00 $132,833.00 STREET LIGHTING TOTAL $25,000.00 WATER, SEWER, PAVING, DRAINAGE, SIGNAL & STREET LIGHT IMPROVEMENTS TO SERVE 640 TAYLOR STREET CITY PROJECT NO. 02672, DOE 7530 CFA QUANTITY MATRIX ITEM NO. BID ITEM TRAFFIC SIGNAL IMPROVEMENTS 1 2605.3015 2" CONDT PVC SCH 80 (T) LF ^_ 2605.3016 2" CONDT PVC SCH 80 (B) LF 3 2605.3021 3" CONDT PVC SCH 40 (T) LF 4 2605.3022 3" CONDT PVC SCH 40 (B) LF 5 3441.10(14 3-Sect Signal Head Assembly EA 6 3441.1011 Ped Signal Head Assembly EA 7 3441.1225 Install Preemption Cable LF 8 3441.1310 4/C 14 AWG Multi -Conductor Cable LF 9 3441.1312 7/C 14 AWG Multi -Conductor Cable LF 10 3441.1313 8/C 14 AWG Multi -Conductor Cable LF 11 3441.1315 20/C 14 AWG Multi -Conductor Cable LF 12 3441.1320 6/C 14 AWG Multi -Conductor Cable LF 13 3441.1408 NO 6 Insulated Elec Coudr LF 14 3441.1409 NO 8 insulated Elec Condr LF 15 3441.1413 NO 6 Bare Elec Condr SLD LF 16 3441.1414 NO 8 Bare Elec Condr LF 17 3441.1502 Ground Box Type B. w/Apron EA 18 3441.1503 Ground Box Type D, w/Apron EA 19 3441.1611 Furnish/Install Type 41 Signal Pole EA 20 3441.1623 Furnish/Install Mast Arm 16'-36' EA 21 3441.1703 TY 3 Signal Foundation EA 22 3441.2001 Salvage Traffic Signal EA 23 3441.3301 Rdwy Ilium Fonmdanon, TY 1, 2 & 4 EA 24 3441.4001 Furnish/Install Alum Sign Mast Arm Mount EA 25 3471.0001 Traffic Control MO 9999.002 Furnish/Install ATAC 357i Controller/Cabinet, Pole Mounted LS 26 27 9999.0003 Furnish 2070 ATC Signal Controller LS 28 9999.0004 12 pair/19 AWG (interconnected) Cable LF 9999.0(105 Furnish/Install LED Luminaire ATB2-60BLED-TYP2-137W-NW or 29 Equal LS SF EET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST UNIT C-008 C-009 C-012 C-016 C-017 C-021 C-024 C-029 C-031 C-036 C-037 L-001 1360 1360 70 70 40 40 230 230 7 7 2 2 260 260 78 78 75 75 180 180 1280 1280 204 204 2480 2480 1665 1665 1240 1240 1935 1935 7 7 5 5 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 540 540 1 1 TRAFFIC TOTAL PROJECT TOTAL $95,000.00 $522,186.00