Loading...
HomeMy WebLinkAboutContract 47259 (2)Developer and Project Information Cover Sheet: Developer Company Name: Hillwood Alliance Services, LLC Address, State, Zip Code: 13600 Heritage Parkway, Suite 200, Fort Worth, TX , 76177 Phone & Email: 817-224-6000, russell.laughlin@hillwood.com Authorized Signatory, Title: Russell Laughlin, Vice President, Properties Division Project Name and Brief Alliance Center North Phase 3 Description: Project Location: N. Beach St & Eagle Parkway Plat Case Number: FP-15-053 & Plat Name: N Beach Street & Eagel Parkway FP-15 -052 Mapsco: Council District: 7 City Project Number: 02657 CFA Number: 2015-105 To be completed by staff Received by: \/, ci I_ -%•CO City� oFr of Werth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 1 of 12 olo 1, DOE Number: 7519 Date: X St - OFFICIAL RECORD CITY SECRETARY Ft WORTh, TX STANDA THE STAT R OF S COMMUNITY F Cl 1ITIES AGREEMENT COUNTY OF TARRANT § City Secretary Contract No. /7d WHERE t S, Hillwood Alliance Services, LLC , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Alliance Center North Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, AS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 12 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub -contractors) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City -approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) , Sewer (A-1) ►Z4 , Paving (B) Storm Drain (B-1) E►_, Street Lights & Signs (C) E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s) pays the then -current City -established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 12 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will •be evidenced on the Certificate of Insurance (ACORD or other state - approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre -Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City -issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 12 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors, officers, agents or employees, whether or not such injuries. death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants. or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries. death or damages are caused. in whole or in part, by the alleged negligence of the City of Fort Worth, its officers. servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 12 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 6 of 12 the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 7 of 12 Cost Summary Sheet Project Name: Alliance Center North Phase 3' CFA No.: 2015-105 DOE No.: 7519 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre -construction meeting. An itemized estimate corresponding to each project -specific exhibit is required to support the following information. City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 12 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees): Construction Fees: C. Water/Sewer Inspection Fee (2%) D. Water/Sewer Material Testing Fee (2%) Sub -Total for Water Construction Fees E TPW Inspection Fee (4%) F. TPW Material Testing (2%) G. Street Light Inspsection Cost H. Signals Inspection Cost H. Street Signs Installation Cost Sub -Total for TPW Construction Fees Total Construction Fees: Financial Guarantee Options, choose one 'Bond = 100% Completion Agreement = 100% / Holds Plat (Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Paving/Storm Drain = 125% Letter of Credit = 125% w/2yr expiration period Developer's Cost 57,718.50 • 3,859.00 61,577.50 $ $ 1,408,217.10 163,191t00 31,390.00 $ $ $ 1,662,798.10 1,724,375.60 1,231.55 1,231.55 2,463.10 $ 65,256.32 $ 32,628.16 1,255.60 Me 99,140.09 $ 101,603.19 Amount 1,724,375.60 1,724,375.60 76,971.88 2,078,497.63 2,155,469.50 Choice !Mark one) x ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORT Jesus J. Chapa Assistant City Manager City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 9 of 12 Date: Recommended by: \ C i 1 p. Wendy Chi-Babulal, EMBA, P.E. OFFICIAL RECORD CITY SECRETARY Ft WORTH, TX `a j Development Engineering Manager Water Department Doug Wiersi , P.E. Direc Transportation & Public Works Department Approved as to Form & Legality: Douglas W. Black Assistant City Attorney M&C No. Date: City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 10 of 12 EYELOFER Hillwood Alliance Services, LLC e: L.' 1 Laughlin Title: Senior Vice President Division Date: (\3noerv,ber 3, 2015 ATTEST: (Only if required by Developer) Signature Name: Lori 6 0 u6i� n� ATTEST: Mary J. a , .: er City Secretary • OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 12 ATTACHMENT "1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02657 None City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 12 of 12 1 mai • NORTH NOT TO SCALE ALLIANCE CENTER NORTH PHASE 3 DATE:OCTOBER 2015 I' LAND soturt0N/ 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 hi ��uoeu wuaduw,miuuuu�wiWoiummr of aioP��luoiva m. i� au�wWwY�hh aw�d�. i uwm mu r��a�nun ��urd�muoauuu��,uuuoriu�an��w��waaia�uuWo�iiiu�r �m����o�d�aow rwuuu o�oamoue�my uin��m�r��.nui��m�uawauui�oa� i����� in ni i OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 ENGINEER: P E LOTO N LEGEND P ROPOSED WATER LINE EXIST WATER LINE P ROPOSED GATE VALVE P ROPOSED REDUCER N OTE: ALL PROPOSED WATER LINES ARE 8" U NLESS OTHERWISE NOTED 12"WL 10" WL EXHIBIT A - WATER TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO. 2009-143323 R.P.R.D.C.T. ALLLANC 2CENTER NORTH LOT 1, BLOCK I ALLIANCE CENTER NORTH Mill !Whin ma II !ill 10"WL AIL INVESTMENT, LP. PARCEL NO. RPRD.C.T3 ' i TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO.20094143323 R.P.R.D.C.T. CALVIN PETERSON & PETERSON FAMILY TRUST DOC NO.2008-94834,5 VOL. 384 PG. 257 R.P.R.D.C.T. r NORTH 300' MIS ALLIANCE CENTER NORTH PHASE 3 GRAPHIC SCALE DATE: OCTOBER, 2015 OWNER / DEVELOPER• HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 !i!�! PE LOTO N Pi LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 LEGEND TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO. 2009-143323 R.P.R.D.C.T. PROPOSED SEWER LINES -p - EXIST SEWER LINES ,.....ALLW CLNTEERR IKIRTR I ALLIANCE CEN OT ERNORTN EAGLE PARKWAY , EXHIBIT Al - WASTEWATER l 811 SS A&.INVESTMEN7, IP. DOC. N0. 1978-117441 PARCEL NO.3 RP.RD.C.T. EX 8 gf IF zt 1 q. 0) TRACT2 EAGLE INCOME PROPERTIES, LP DOC. N0. 2009-143323 RP.RD.C.T. CALVIN PETERSON & OC R 200 -945 4 ST PEpEf%R PG.2 �5....,. eti CC NORTH 300' ALLIANCE CENTER NORTH PHASE 1 GRAPHIC SCALE DATE: SEPTEMBER, 2013 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 (i!�! PE LOTO N 1111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 7h LEGEND PROPOSED CONCRETE PAVEMENT SIDEWALK BY DEVELOPER NO, PROPERTIES,LP TRACT 2 EAGLp CR RDCT3.3„ ALLIANCE OT C�NTERRORTH ...I LOTS BLOCK ALLIANCE CENTER NORTH 29' B-B / 110' ROW EAGLE PARKWAY 1 28' B-B / 130' ROW 28' B-B / 130' ROW ---►1 AIL INVESTMENT LP. DOC. NO.1998-117441 PARCEL NO. 3 RPRD.C.T. EXHIBIT B - PAVING TRACT 2 EAGLE INCOME PROPERTIES, LP DOC, NO. 2009-143323 R.P.RD.C.T. CALVIN PETERSON & PETERSON FAMILY TRUST DOC NO.2008-94834 5 VOL 384 PG.257 RP.R.D.C.T. i NORTH 300' Thai ALLIANCE CENTER NORTH PHASE 3 GRAPHIC SCALE DATE: OCTOBER, 2015 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 li!II PELOTON III I LAND SOLUTION! 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 LEGEND TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO. 2009-143323 R.P.R.D.C.T. PROPOSED STORM DRAIN INLET EXIST STORM DRAIN INLET PROPOSED STORM DRAIN MANHOLE PROPOSED STORM DRAIN HEADWALL 21" RCP ALLIANCE NTT R?MTH LOT L BLOCK I ALLIANCE CENTER NORTH 21" RCP 21"RCP _ LE PARKWAY i AIL INVESTMENT LP. DOC. NO. 199-Il 44l PARCEL N0.3 RPAD.C.T. i 21" RCP \ 21" RCP 36" RCP EXHIBIT B1-STORM DRAINAGE 21" RCP 66" RCP TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO.2009.143323 R.P.R.D.C.T. CALVIN PETERSON 8 Hi mi.!, DOCV NO. 2.008- 4S34 55T NORTH 300' ALLIANCE CENTER NORTH PHASE 3 , GRAPHIC SCALE DATE: OCTOBER, 2015 OWNER / DEVELOPER° HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 (i!�I P E LOTO N 1111 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 LEGEND PROPOSED STREET LIGHTS EXIST STREET LIGHTS TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO. 2009-143323 R.P.R,D.C.T. LOT2R RLOCKI ALLLANCE at/MR NORTH ALL1A iCE (CENTER NORTH I re- EAU PARKWAY &INVESTMENT, LP. DOC. NO.1998-117441 PARCEL H0.3 RPRD.CT, EXHIBIT C- STREET LIGHTS 1 101 TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. N0. 2009-143323 R.P.R.D.C.T. CALVIN PETERSON 8 PETERSON FAMILY TRUST DOC NO.2008-94834,5 VOL. RRD C.T 5711.,11, NORTH 300' ALLIANCE CENTER NORTH PHASE 3 GRAPHIC SCALE DATE: OCTOBER, 2015 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 1i�11 P E LOTO N rrLAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 LEGEND PROPOSED STREET NAME SIGNS A EXIST STREET NAME SIGNS EAGLEPARKWAY TRACT 2 EAGLE INCOME PROPERTIES, LP DOC. NO 2009-143323 .. .. R.P.R.D.C.T. ALLIkZE CENiEERR NORTH... I LOT 1, ALLIANCE COENTER NORTH I AIL DOC.PELNO.3 ,,,, i EXHIBIT CI - STREET NAME SIGNS I0 0 TRACT EAGLE INCOME PROPERTIES, LP DOC. N0. 2039-143323 R.P.R.D.C.T. CALVIN PETERSON 8 PETEFAMILYRSON TRUST 2008-943 VOL. 384 PG. 257 R.P.R.D.C.T. „..„..„,,.,., QV ye-J-1 NORTH 300' GRAPHIC SCALE ALLIANCE CENTER NORTH PHASE 3 DATE: OCTOBER, 2015 OWNER / DEVELOPER: HILLWOOD ALLIANCE SERVICES, L.P. 13600 HERITAGE PARKWAY, SUITE 200 FORT WORTH, TEXAS 76177 PHONE: (817) 224 - 6000 11111 PELOTON pl 1 LAND SOLUTIONS 5751 KROGER DRIVE SUITE 185 KELLER, TX 76244 PHONE: 817-562-3350 ;;; PELOTON mil LAND SOLUTIONS 5751 KROGER DR. S I E. 183 I KELLER, IX /6244 817.562.335O ITEM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 BID ITEM 3110.0101 Site Clearing 3123.0101 Unclassified Excavation by Plan 3124.0101 Embankment by Plan 3125.0101 SWPPP > 1 acre 3213.0105 10" Conc Pvmt 3211.0502 8" Lime Treatment 3211.0400 Hydrated Lime 3212.0503 6" Asphalt Base Type B 3211.0400 Hydrated Lime 3216.0101 6" Conc Curb and Gutter 9999.0001 Construct Concrete Header 3213.0301 4" Conc Sidewalk 9999.0002 Brick Pavers (Median) 3213.0503 Barrier Free Ramp, Type M-1 9999.0003 Install 'End of Road' Barricade 3305.0107 Manhole Adjustment, Minor 3305.0111 Valve Box Adjustment 2605.3031 4" CONDT PVC SCH 40 (T) 9999.0004 6" CONDT PVC SCH 40 (T) 3292.0400 Seeding, Hydromulch 9999.0005 Traffic Control 22 3217.0001 4" SLD Pvmt Marking HAS (W) 23 3217.0003 4" BRK Pvmt Marking HAS (W) 24 3217.0201 8" SLD Pvmt Marking HAS (W) 25 3217.0301 12" SLD Pvmt Marking HAE (W) 26 3217.0501 24" SLD Pvmt Marking HAE (W) 27 3217.2102 REFL Raised Marker TY I-C 28 13217.2104 REFL Raised Marker TY II-C-R 29 13217.1002 Lane Legend Arrow 30 13217.1006 Lane Legend Bike 31 19999.0006 Install Custom Sign Ground Mount - ACN 32 19999.0007 Install Custom Sign on Shared Pole - ACN CFA Quantity Take Off ALLINACE CENTER Water, Sanitary Sewer, Project Number: Prepared For: Date: File Name: UNIT LS CY CY LS SY SY TN SY TN LF LF SF SY EA LF EA EA LF LF SY LS LF LF LF LF LF EA EA EA 1 EA 1 EA 1 EA 1 SHEET NO. 7 NORTH - Phase 3 Paving, Drainage & Street Lighting Improvements HWA15013 Hillwood Alliance Services, L.P. October 15, 2015 1 8 10 CFA PROJECT QUANTITY MATRIX 13 14 15 18 2382 2844 58 99 3,766 1 220 220 2,686 19 3,177 3,791 78 4,004 1 230 230 2,518 20 4,765 5,687 116 161 2,087 229 3 183 1 1 132 132 1,679 1 21 2,780 3,317 68 40 62 3,478 2 3,693 1 1 22 3,375 4,028 82 43 52 3,313 3,189 23 3,375 4,028 82 2,510 79 3,400 51 1 1 3,021 ITEM TOTAL UNIT PRICE ITEM TOTAL COST 1 $5,500.00 3,390 $5.50 9,5191 $4.501 11 $15,500.001 Total Earthwork Improvements 19,854 23,696 484.71 2,553 40.83 2131 240 20,048 2291 31 2341 71 3 582 582 16,786 1 $45.00 $3.00 $165.00 $32.00 $165.00 $30.00 $20.00 $3.00 $72.00 $1,200.00 $25.00 $800.00 $300.00 $16.00 $20.00 $2.00 $5,500.00 Total Pav ng Improvements 4,204 2,553 1,436 731 153 64 204 91 111 131 11 $2.00 $2.00 $4.00 $6.00 $8.00 $4.00 $5.001 $300.001 $300.001 $1,400.001 $800.001 Total Pavement Markings & Signage Improvements $5,500.00 $18,645.00 $42,835.50 $15,500.00 $82,480.50 $893,430.00 $71,088.00 $79,977.15 $ 81,696.00 $6,736.95 $6,390.00 $4,800.00 $60,144.00 $16,488.00 $3,600.00 $5,850.00 $5,600.00 $900.00 $9,312.00 $11,640.00 $33,572.00 $5,500.00 $1,296,724.10 $8,408.00 M $5,106.001 $5,744.00 $4,386.00 $1,224.00 $256.00 $1,020.00 $2,700.00 $3,300.00 $18,200.001 $ 800.001 $51,144.00 33 3341.0201 21" RCP, Class III 34 3341.0305 33" RCP, Class III 35 3341.0309 36" RCP, Class III 36 3305.0112 Concrete Collar 37 3349.5001 10' Curb Inlet 38 3349.0001 4' Storm Junction Box 39 3305.0109 Trench Safety 40 2605.3011 2" CONDT PVC SCH 40 (T) 41 2605.3021 3" CONDT PVC SCH 40 (T) 42 3441.1502 Ground Box, Small, w/ Lid Apron 43 3441.3302 Rdwy Ilium Foundation TY 3,5,6, and 8 44 3441.3003 Rdwy Ilium Assmbly TY 18,18A,19, and D-40 45 3441.3201 LED Lighting Fixture 46 3311.0241 8" Water Pipe 47 3311.0341 10" Water Pipe 48 3311.0461 12" PVC Water Pipe 49 3311.0462 12" PVC Water Pipe, CSS Backfill 50 0241.1118 4"-12" Pressure Plug 51 3312.4108 12" x 10" Tapping Sleeve & Valve 52 3312.4114 16" x 12" Tapping Sleeve & Valve 53 13312.0117 Connection to Existing 4"-12" Water Main 54 13311.0001 Ductile Iron Water Fittings w/ Restraint 55 19999.0008 Concrete Blocking, Type B 56 13305.0109 Trench Safety 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 3331.4115 8" Sewer Pipe 3331.3302 8" 2-way Cleanout 3305.0109 Trench Safety 3301.0002 Post -CCTV Inspection 0241.1100 Remove Asphalt Pvmt 9999.0009 Remove Gravel Drive 0241.1300 Remove Cone Curb & Gutter 9999.0010 Remove Ex Median Island 9999.0011 Remove 'End of Road Barricade' 3217.4301 Remove 4" Pvmt Marking 3217.4303 Remove 8" Pvmt Marking 3217.4306 Remove 24" Pvmt Marking 3217.4402 Remove Lane Legend Arrow 3217.4404 Remove Lane Legend Only 9999.0012 Remove Alum Sign Ground Mount 0241.3017 Remove 30" Storm Line 0241.4203 Remove 6' Drop Inlet 0241.4401 Remove Headwall/SET 1 LF LF LF EA EA EA LF LF LF EA EA EA EA LF LF LF LF EA EA EA EA TN CY LF LF EA LF LF SY SY LF LS LF LF LF LF EA EA EA LF EA EA 70 123 305 20 2 5 1 2 1 41 0.68 1.081 0.98 1.571 325 1931 51 1 51 51 323 128 14 2,609 1,919 2 2 4 68 3 227 545 1 74 2,374 2,271 12 866 123 1,200 352 645 768 1 8 2 1,765 $48.00 $78.00 $90.00 $500.00 $2,200.00 $3,500.00 $1.00 Total Storm Drain Improvements 660 430 7 2 2 4 $12.00 $14.00 $750.00 $1,500.00 $3,000.00 $800.00 Total Street Light Improvements 70 $40.00! 123 $46.001 305 $52.00 20 $62.00 7 $800.00 1 $4,500.00 2 $5,500.00 4 $1,000.00 1.761 $3,500.00 2.551 $150.00 5181 $1.00 Total Water Improvements 51 1 51 51 $50.00 $850.00 $4.00 $5.00 Total Se ver Improvements 550 $6.00 866 $4.00 796 $10.00 1 $3,500.00 88 $5.00 6,183 $1.00 4,190 $1.25 12 $2.00 2 $100.00 2 $100.00 5 $200.00 68 $20.00 1 $1,000.00 4 $1,000.00 Total Misc Improvements $16,896.001 $50,310.00 $69,120.00 $500.00 $17,600.00 $7,000.00 $1,765.00 $163,191.00 $7,920.00 $6,020.00 $5,250.00 $3,000.00 $6,000.00 $3,200.00 $31,390.00 $2,800.00 $5,658.00 $15,860.00 $1,240.00 $5,600.00 $4,500.00 $11,000.00 $4,000.00 $6,160.00 $382.50 $518.00 $57,718.50 $2,550.00 $850.00 $204.00 $255.00 $3,859.00 $3,300.00 $3,464.00 $7,960.00 $3,500.00 $440.00 $6,183.00 $5,237.50 $24.00 $200.00 $200.00 $1,000.00 $1,360.00 $1,000.00 $4,000.00 $37,868.50 Total Improvements $1,724,375.60