Developer and Project Information Cover Sheet:
Developer Company Name: Weber Vista, LP
Address, State, Zip Code: 16000 Dallas Parkway, Suite 300, Dallas, TX , 75248
Phone & Email: 972-739-8400
Authorized Signatory, Title: John P. Weber, President
Project Name and Brief Presidio Tract G
Description:
Project Location: SWC North Freewa (IH 35W) & Presidio Vista Drive
Plat Case Number: FS-15-086 Plat Name: The Presidio
Mapsco: Council District: 7 City Project Number: 02677
CFA Number: 2015-097
To be completed by st
Received by:
Q� a
kECEIVED
Q
csi NOV 2320)5
r CITY OF FORT WORTH
CITY SECRETARY
0
NCtS v t Z_
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 1 of 11
.13
DOE Number: 7535
Date:
fie iee/S--
AFFICGAL RECORD
CITY SECRETARY
FT. WORTH, TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS
COUNTY OF TARRANT
City Secretary
Contract No. 47
Ase
WHEREAS, Weber Vista, LP, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Presidio Tract G ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 2 of 11
OFFICIAL, RECORD
CITY SECRETARY
Ft WORTH, TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City -approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein*
Water (A) ®, Sewer (A-1) ®, Paving (B) ®, Storm Drain (B-1) 0, Street Lights &
Signs (C) El
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in confonnnance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s) pays the then -current City -established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state -
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
v. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre -Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City -issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement
L The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub -contractors,
officers, agents or employees, whether or not such injuries. death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part. by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 7 of 11
Project Name:
Presidio Tract G
Cost Summary Sheet
CFA No.: 2015-097 DOE No.: 7535
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre -construction meeting.
An itemized estimate corresponding to each project -specific exhibit is required to support the
following information.
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
Developer's Cost
$ 121,472.00
$ 64,918.00
$ 186, 390.00
4,335.00
$ 750.00
TPW Construction Cost Total $ 5,085.00
Total Construction Cost (excluding the fees):
Construction Fees:
C. Water/Sewer Inspection Fee (2%)
D. Water/Sewer Material Testing Fee (2%)
Sub -Total for Water Construction Fees
$ 191,475.00
3,727.80
3,727.80
7,455.60
E TPW Inspection Fee (4%) $ 173.40
F. TPW Material Testing (2%) $ 86.70
G. Street Light Inspsection Cost $ 30.00
H. Signals Inspection Cost $
H. Street Signs Installation Cost
Sub -Total for TPW Construction Fees $ 290.10
Total Construction Fees:
$ 7,745.70
Choice
Financial Guarantee Options, choose one Amount (Mark one
Bond = 100% $ 191,475.00
Completion Agreement = 100% / Holds Plat $ 191,475.00
Cash Escrow Water/Sanitary Sewer= 125% $ 232,987.50
Cash Escrow Paving/Storm Drain = 125% $ 6,356.25
Letter of Credit = 125% w/2yr expiration period $ 239,343.75
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH
Jesus J. Chapa
Assistant City Manager
Date: /7"
Recommended by:
Wendy ChijBabulal, EMBA, P.E.
Development Engineering Manager
Water Department
Douglas . Wiersig, P.E.
Director
Transportation & Public Works Department
Approved as to Form & Legality:
Douglas W. Black
Assistant City Attorney
M&C No. wlk
Date:
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 9 of 11
DEVELOPER
Weber Vista, LP
Nam -.<John PWer
T e: President
Date:
to • V6 • / dr
ATTEST: (Only if required by Developer)
Signature
Name:
ATTEST:
Maly J.
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included
rs
El
►/
Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07 30 2015
Page 10 of 11
ATTACHMENT "1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02677
None
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 11
BLUE MOUND RD
BONDS RANCH
0
aN Nn1V030 010 N
ROAD
'ON ONnow 3nleY
GOLDEN TR
6 HER TRA(t= PARKWAY
z
si rE j
i ul
z
z
HARMON RD.
'gAILEY BOSWELL RD
7
T*.
LONGHORN RD.I
MCLEROY BLVD."
INDUSTIAL AVE.
��GHT
INTERSTATE
820
KELLER PARKWAY
E`BLVD. MAP
A 33EAT�00� V TY 1b AP CREEK PKWY
e/
NOT -TO -SCALE Z X
A
I=
cr�SHAagY GROVE RD
TARRANT PK
1 STAMES RD.
o --•+r
o N rr
J x
o HIGHTOWER DR. '1
1
m
r
O 0
m
WATAUGA ROAD
r
(VON 3NI1 10N103Nd
— 'MID CITIES BLS}/
/ �II/
DEVELOPER:
WEBER VISTA, LP
16000 DALLAS PARKWAY, SUITE 300
DALLAS, TEXAS 75248
PHONE: (972)739-8400
I
SEPTEMBER 30, 2015
VICINITY MAP
PRESIDIO - TRACT G
CITY PROJECT NO. 02677
LOTS 2R1-2R4, BLOCK D, THE PRESIDIO - FORT WORTH, TEXAS
10 CATES-CLARK
LIMW Quorum U,rcq Stole :W
U,Il,n. fear, 7524
()lace: 997_3N5 2272 I:ue: 472.91111627
I B14 1:3751
•
LOT 2R4
LEGEND
EXISTING PIPE
EXISTING FIRE HYDRANT
EXISTING GATE VALVE
PROPOSED PIPE
PROPOSED SERVICE
PROPOSED FIRE HYDRANT
PROPOSED GATE VALVE
1"m12o'
LOT 2R2
LOT 2R3
ANEW 12" W17ER LINE
LOT 2R1
INTERSTATE HIGHWAY.35
DEVELOPER:
WEBER VISTA, LP
16000 DALLAS PARKWAY, SUITE 300
DALLAS, TEXAS 75248
PHONE: (972)739-8400
SEPTEMBER 30, 2015
EXHIBIT "A" - WA'1'hR
PRESIDIO - TRACT G
CITY PROJECT' NO. 02677
LOTS 2R1-2R4, BLOCK D, THE PRESIDIO - FORT WORTH, TEXAS
r CATES-CLARK
1.00 (Nonlm Drn c. Smlc.
Dal 75'SI
OlfimnipE E3751
UNIT PRICE BID
Bidlist Item
No.
3305.0109
3311.0001
3311.0141
3311.0341
3311.0441
3311.0442
3311.0451
3311.0452
3312.0001
3312.0117
3312.2003
3312.2203
3312.3002
3312.3005
0241.1014
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Trench Safety
Ductile Iron Water Fittings w/ Restraint
6" Water Pipe
10" Water Pipe
12" Water Pipe
12" Water Pipe, CSS Backfill
112" DIP Water
112" DIP Water, CSS Backfill
Fire Hydrant
Connection to Existing 4"-12" Water Main
11" Water Service
12" Water Service
16" Gate Valve
112" Gate Valve
'Remove 10" Water Line
Specification
Section No.
Unit of
Measure
UNIT I: WATER IMPROVEMENTS
LF
TON
LF
LF
LF
LF
LF
LF 5
EA
EA
EA
EA
EA
00 42 43
DAP - BID PROPOSAL
Page 1 of 1
Bidder's Application
Bid
Quantity
1040
2.0
150
3
862
5
15
2
2
7
7
11
33 12 20 EA 1 8
02 41 14 LF 1 8
TOTAL UNIT I: WATER IMPROVEMENTS
33 05 10
33 11 11
33 11 10, 33 11 12
331110,331112
331110,331112
33 11 10, 33 11 12
33 11 10
33 11 10
33 12 40
33 12 25
33 12 10
33 12 10
33 12 20
Bidder's Proposal
Unit Price
1.00
4,721,50
28.00
44.00
39.00
63.00
67.00
102 00
3,615.00
485.501
1,600.001
2,250 001
1,310,001
2,700.001
6.001
Bid Value
1,040.00
9,443.00
4,200 00
132.00
33,618.00
315.00
1,005.00
510.00
7,230.00
971.00
11,200.00
15,750.00
14,410.00
21,600.00
48.00
$121,472 00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal_DAP xls
NEW 8' SANITARY
SEWER (OFF -SITE)
NEW 8" SANITARY SEWERI
\
\
NEW � MANHOLE
(TYR-5)
LOT 2R2
NEW 6'E SEWER
SERNC
`NEW 6' SEWER
SERVICE
NEW 6" SEWER
(NEW
LOT 2R4
LEGEND
• EXISTING MANHOLE
--- EXISTING PIPE
• PROPOSED MANHOLE
- - PROPOSED PIPE
'1 NEW 6" SEWER
SERVICE
LOT 2R3
LOT 2R2
INEW 8' SINITARY SEWER.
)NSERNCEEW 6' SEWERI
/ NE' SEWER
`C SERVWIC6E J
LOT 2R1
±HTt1AEEHIGHWAY 35
Y,
agZ
DEVELOPER:
WEBER VISTA, LP
16000 DALLAS PARKWAY, SUITE 300
DALLAS, TEXAS 75248
PHONE: (972)739-8400
i"=120'
SEPTEMBER 30, 2015
EXHIBIT "Al" - SANITARY SEWER
PRESIDIO - TRACT G
CITY PROJECT NO. 02677
LOTS 2R1-2R4, BLOCK D, THE PRESIDIO - FORT WORTH, TEXAS
�'/ CATES-CLARK 01°tt„'.
UNIT PRICE BID
Bidlist Item
No.
0330.0001
3305.0109
3301.0002
3301.0101
3331.3201
3331.4115
3331.4116
3339.1001
3339.1003
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Concrete Encase Sewer Pipe
Trench Safety
Post -CCTV Inspection
Manhole Vacuum Testing
6" Sewer Service
8" Sewer Pipe
8" Sewer Pipe, CSS Backfill
4' Manhole
4' Extra Depth Manhole
Specification
Section No.
Unit of
Measure
UNIT II: SANITARY SEWER IMPROVEMENTS
03 30 00
33 05 10
33 01 31
33 01 30
33 31 50
331110,333112,33
31 20
33 11 10, 33 31 12, 33
31 20
I 33 39 10, 33 39 20
I
33 39 10, 33 39 20
00 42 43
DAP - BID PROPOSAL
Page I of I
Bidder's Application
Bid
Quantity
CY 22
LF 908
LF 908
EA 6
EA 5
LF 808
LF I 100
EA 1 6
VF 1 30
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTSI
Bidder's Proposal
Unit Price
116.50
1.25
1.25
250.00
891.00
35.00
95.00
1,900.001
165.001
Bid Value
2,563.00
1,135.00
1,135.00
1,500.00
4,455.00
28,280.00
9,500.00
11,400.00
4,950.00
$64,918.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_B id Proposal_DAP.x!s
LOT 2R2
LOT 2R4
LOT 2R2
LOT 2R3
NEW DRIVE APPROACH I
(REMOVE EXIST SIDEWALK)
NEW S/DEWALKI
LOT 2R1
INTERSTATE HIGHWAX 35.
DEVELOPER:
WEBER VISTA, LP
16000 DALLAS PARKWAY, SUITE 300
DALLAS, TEXAS 75248
PHONE: (972)739-8400
1"=120'
SEPTEMBER 30, 2015
EXHIBIT "B" - PAVING
PRESIDIO - TRACT G
CITY PROJECT NO. 02677
LOTS 2R1-2R4, BLOCK D, THE PRESIDIO - FORT WORTH, TEXAS
1'/ CATES-CLARK
IA'Vxl Quorum Ihn, Swie 200
�ln��n.. Tcwn ]524
o(t( v]_ lvt_]2 fvcon.222) n
Il1PL F-i].51
UNIT PRICE BID
Bidlist Item
No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
0241.0100 Remove Sidewalk
0241.1300 Remove Conc Curb & Gutter
3125.0101 SWPPP >_1 acre
3213.0301 4" Conc Sidewalk
3213.0401 6" Concrete Driveway
Specification Unit of
Section No. Measure
UNIT III: PAVING IMPROVEMENTS
00 42 43
DAP- BID PROPOSAL
Page 1 of l
Bidder's Application
Bid
Quantity
02 41 13 SF 318
02 41 15 LF 72
31 2500 LS 1
32 13 20 SF 143
3213 20 SF 654
TOTAL UNIT III: PAVING IMPROVEMENTS
Bidder's Proposal
Unit Price
1.50
2 75
145.00
4.00
4.50
Bid Value
477.00
198.00
145.00
572.00
2,943.00
$4, 335.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal_DAP.xis
LOT 2R4
rti
LOT 2R2
LOT 2R3
RELOCATE EXISTING
UHT POLE
LOT 2R1
'INTERSTATE• HIGHWAY. 35
- o
rnI
1 "=120I
DEVELOPER:
WEBER VISTA, LP
16000 DALLAS PARKWAY, SUITE 300
DALLAS, TEXAS 75248
PHONE: (972)739-8400
SEPTEMBER 30, 2015
EXHIBIT "C" - STREET LIGHTS
PRESIDIO - TRACT G
CITY PROJECT NO. 02677
LOTS 2R1-2R4, BLOCK D, THE PRESIDIO - FORT WORTH, TEXAS
40 CATES-CLARK
IJHW Quorum Urnc. Smlc 2p1
U.,II 1'cvu>524
Oflia^ 0]2311 22]2 15I 9R-4+4
1'L 13]5I
UNIT PRICE BID
Bidlist Item
No.
3441.3502
3441.3302
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Relocate Street Light Pole
Rdwv Illum Foundation
Project Item Information
Description
Specification Unit of
Section No. Measure
UNIT IV: STREET LIGHTING IMPROVEMENTS
00 42 43
DAP - BID PROPOSAL
Pagel of I
Bidder's Application
Bid
Quantity
34 41 20 EA 1
34 41 20 EA 1
TOTAL UNIT IV: STREET LIGHTING IMPROVEMENTSI
Bidder's Proposal
Unit Price
250.00
500.00
Bid Value
1
250.001
500.001
$750.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version April 2, 2014
00 42 43_Bid Proposal_DAP.x!s